|
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:September 26, 2007Mr. William R. BrianSite Vice President Grand Gulf Nuclear Station Entergy Operations, Inc. | | {{#Wiki_filter:September 26, 2007 Mr. William R. Brian Site Vice President Grand Gulf Nuclear Station Entergy Operations, Inc. |
| P.O. Box 756 Port Gibson, MS 39150 | | P.O. Box 756 Port Gibson, MS 39150 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| GRAND GULF NUCLEAR STATION, UNIT 1 - REQUEST FOR WITHHOLDINGINFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MD3469) | | GRAND GULF NUCLEAR STATION, UNIT 1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MD3469) |
|
| |
|
| ==Dear Mr. Brian:== | | ==Dear Mr. Brian:== |
|
| |
|
| By letter dated August 16, 2007, Mr. Arthur D. Barfield, Director, Nuclear Safety Assurance,Grand Gulf Nuclear Station, Unit 1 (GGNS), submitted an affidavit, executed by Mr. Jerald S. | | By letter dated August 16, 2007, Mr. Arthur D. Barfield, Director, Nuclear Safety Assurance, Grand Gulf Nuclear Station, Unit 1 (GGNS), submitted an affidavit, executed by Mr. Jerald S. |
| Holm, Manager, Product Licensing, for AREVA NP Inc., dated August 13, 2007, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390:[Attachment 1 to] Entergy letter number GNRO-2007/00056, titled Supplement 3to Amendment Request: Changes to the LPRM [Local Power Range Monitor] | | Holm, Manager, Product Licensing, for AREVA NP Inc., dated August 13, 2007, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390: |
| Calibration Frequency, Grand Gulf Nuclear Station, Unit 1, Docket No. 50-416, License No. NPF-29, dated August 16, 2007.The August 13, 2007, affidavit by Jerald S. Holm stated that the submitted information shouldbe considered exempt from mandatory public disclosure for the following reason:6.(d)The information reveals certain distinguishing aspects of a process,methodology, or component, the exclusive use of which provides a competitive advantage for AREVA NP in product optimization or marketability.By letter dated September 21, 2007, you submitted the revised affidavit executed byMr. Jerald S. Holm, Manager, Product Licensing, for AREVA NP Inc., dated September 18, 2007, affirming that the requested information contained in August 16, 2007, letter be considered exempt from mandatory public disclosure for the following additional reason:6.(e)The information is vital to a competitive advantage held by AREVA, NP,would be helpful to competitors to AREVA, NP, and would likely cause substantial harm to the competitive position of AREVA, NP.We have reviewed your application and the material in accordance with the requirements of10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. | | [Attachment 1 to] Entergy letter number GNRO-2007/00056, titled Supplement 3 to Amendment Request: Changes to the LPRM [Local Power Range Monitor] |
| W. R. Brian-2-Therefore, the submitted information marked as proprietary will be withheld from publicdisclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. A nonproprietary copy of the document was provided for placement in the Nuclear RegulatoryCommission's (NRC's) Public Document Room and for addition to the Agencywide Document Access and Management System Public Electronic Reading Room.Withholding from public inspection shall not affect the right, if any, of persons properly anddirectly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.If the basis for withholding this information from public inspection should change in the futuresuch that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.If you have any questions regarding this matter, I may be reached at 301-415-3308.Sincerely,/RA/Bhalchandra Vaidya, Project ManagerPlant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-416 cc: See next page
| | Calibration Frequency, Grand Gulf Nuclear Station, Unit 1, Docket No. 50-416, License No. NPF-29, dated August 16, 2007. |
| | The August 13, 2007, affidavit by Jerald S. Holm stated that the submitted information should be considered exempt from mandatory public disclosure for the following reason: |
| | : 6. (d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA NP in product optimization or marketability. |
| | By letter dated September 21, 2007, you submitted the revised affidavit executed by Mr. Jerald S. Holm, Manager, Product Licensing, for AREVA NP Inc., dated September 18, 2007, affirming that the requested information contained in August 16, 2007, letter be considered exempt from mandatory public disclosure for the following additional reason: |
| | : 6. (e) The information is vital to a competitive advantage held by AREVA, NP, would be helpful to competitors to AREVA, NP, and would likely cause substantial harm to the competitive position of AREVA, NP. |
| | We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. |
|
| |
|
| ML072340455*See previous concurrenceOFFICENRR/LPL4/PMNRR/LPL4/LANRR/SRXB/BCNRR/EICB/BCNRR/LPL4/BCNAMEBVaidyaJBurkhardtGCranston*WKemper*THiltz DATE9/25/079/25/079/4/079/5/079/26/07 September 2007Grand Gulf Nuclear Station cc:Senior Vice PresidentEntergy Nuclear OperationsP.O. Box 31995Jackson, MS 39286-1995Senior Vice President and COOEntergy Operations, Inc. P.O. Box 31995 Jackson, MS 39286-1995Vice President, Operations Support Entergy Services, Inc. P.O. Box 31995Jackson, MS 39286-1995General Manager, Plant OperationsEntergy Operations, Inc. P.O. Box 756 Port Gibson, MS 39150Director, Nuclear Safety & LicensingEntergy Services, Inc.440 Hamilton AvenueWhite Plains, NY 10601Director, Nuclear Safety AssuranceEntergy Operations, Inc.P.O. Box 756Port Gibson, MS 39150Senior ManagerNuclear Safety & LicensingEntergy Services, Inc.P.O. Box 31995Jackson, MS 39286-1995Manager, LicensingEntergy Operations, Inc. P.O. Box 756 Port Gibson, MS 39150State Health Officer State Health BoardP.O. Box 1700Jackson, MS 39215Attorney GeneralAsst. Attorney General State of MississippiP.O. Box 22947 Jackson, MS 39225-2947Office of the Governor State of Mississippi Jackson, MS 39201Attorney GeneralDepartment of Justice State of Louisiana P.O. Box 94005 Baton Rouge, LA 70804-9005PresidentClaiborne County Board of SupervisorsP.O. Box 339 Port Gibson, MS 39150Richard Penrod, Senior Environmental Scientist/State Liaison OfficerOffice of Environmental ServicesNorthwestern State University Russell Hall, Room 201Natchitoches, LA 71497Chief, Energy and Transportation BranchEnvironmental Compliance and Enforcement DivisionMississippi Department of Environmental QualityP.O. Box 10385Jackson, MS 39289-0385Regional Administrator, Region IVU.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 399 Port Gibson, MS 39150Mr. Jerald S. HolmAREVA NP Inc.Product Licensing and Regulatory Affairs,OF163315 Old Forest RoadP.O. Box 10935Lynchburg, VA 24501}} | | W. R. Brian Therefore, the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. |
| | A nonproprietary copy of the document was provided for placement in the Nuclear Regulatory Commissions (NRCs) Public Document Room and for addition to the Agencywide Document Access and Management System Public Electronic Reading Room. |
| | Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. |
| | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. |
| | If you have any questions regarding this matter, I may be reached at 301-415-3308. |
| | Sincerely, |
| | /RA/ |
| | Bhalchandra Vaidya, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 cc: See next page |
| | |
| | ML072340455 *See previous concurrence OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/SRXB/BC NRR/EICB/BC NRR/LPL4/BC NAME BVaidya JBurkhardt GCranston* WKemper* THiltz DATE 9/25/07 9/25/07 9/4/07 9/5/07 9/26/07 |
| | |
| | Grand Gulf Nuclear Station cc: |
| | Senior Vice President Office of the Governor Entergy Nuclear Operations State of Mississippi P.O. Box 31995 Jackson, MS 39201 Jackson, MS 39286-1995 Attorney General Senior Vice President and COO Department of Justice Entergy Operations, Inc. State of Louisiana P.O. Box 31995 P.O. Box 94005 Jackson, MS 39286-1995 Baton Rouge, LA 70804-9005 Vice President, Operations Support President Entergy Services, Inc. Claiborne County P.O. Box 31995 Board of Supervisors Jackson, MS 39286-1995 P.O. Box 339 Port Gibson, MS 39150 General Manager, Plant Operations Entergy Operations, Inc. Richard Penrod, Senior Environmental P.O. Box 756 Scientist/State Liaison Officer Port Gibson, MS 39150 Office of Environmental Services Northwestern State University Director, Nuclear Safety & Licensing Russell Hall, Room 201 Entergy Services, Inc. Natchitoches, LA 71497 440 Hamilton Avenue White Plains, NY 10601 Chief, Energy and Transportation Branch Environmental Compliance and Director, Nuclear Safety Assurance Enforcement Division Entergy Operations, Inc. Mississippi Department of Environmental P.O. Box 756 Quality Port Gibson, MS 39150 P.O. Box 10385 Jackson, MS 39289-0385 Senior Manager Nuclear Safety & Licensing Regional Administrator, Region IV Entergy Services, Inc. U.S. Nuclear Regulatory Commission P.O. Box 31995 611 Ryan Plaza Drive, Suite 400 Jackson, MS 39286-1995 Arlington, TX 76011-8064 Manager, Licensing Senior Resident Inspector Entergy Operations, Inc. U.S. Nuclear Regulatory Commission P.O. Box 756 P.O. Box 399 Port Gibson, MS 39150 Port Gibson, MS 39150 State Health Officer Mr. Jerald S. Holm State Health Board AREVA NP Inc. |
| | P.O. Box 1700 Product Licensing and Regulatory Affairs, Jackson, MS 39215 OF16 3315 Old Forest Road Attorney General P.O. Box 10935 Asst. Attorney General Lynchburg, VA 24501 State of Mississippi P.O. Box 22947 Jackson, MS 39225-2947 September 2007}} |
Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARML0631303722006-11-0101 November 2006 License Amendment Request - Changes to the Local Power Range Monitor (LPRM) Calibration Frequency Project stage: Other GNRO-2006/00064, Supplement to Amendment Request Changes to the Local Power Range Monitor (LPRM) Calibration Frequency2006-11-22022 November 2006 Supplement to Amendment Request Changes to the Local Power Range Monitor (LPRM) Calibration Frequency Project stage: Supplement ML0634201442006-12-13013 December 2006 Letter to Areva Np Inc. Request for Withholding Information from Public Disclosure for GGNS Project stage: Withholding Request Acceptance GNRO-2007/00018, Supplement to Amendment Request, Changes to the Local Power Range Monitor (LPRM) Calibration Frequency2007-04-0404 April 2007 Supplement to Amendment Request, Changes to the Local Power Range Monitor (LPRM) Calibration Frequency Project stage: Supplement GNRO-2007/00031, Supplement 2 to Amendment Request, Changes to the Local Power Range Monitor (LPRM) Calibration Frequency2007-05-0707 May 2007 Supplement 2 to Amendment Request, Changes to the Local Power Range Monitor (LPRM) Calibration Frequency Project stage: Supplement GNRO-2007/00056, Supplement 3 to Amendment Request: Changes to the LPRM Calibration Frequency2007-08-16016 August 2007 Supplement 3 to Amendment Request: Changes to the LPRM Calibration Frequency Project stage: Supplement GNRO-2006/00058, Revision to Supplement 3 of Amendment Request, Changes to the Local Power Range Monitor Calibration Frequency2007-09-21021 September 2007 Revision to Supplement 3 of Amendment Request, Changes to the Local Power Range Monitor Calibration Frequency Project stage: Supplement ML0723404552007-09-26026 September 2007 Areva Np, Inc. Request for Withholding Information from Public Disclosure Local Power Range Monitor Calibration Frequency Project stage: Withholding Request Acceptance ML0731902502007-10-24024 October 2007 License Amendment 177, Changes to TS SR 3.3.1.1.7, the Local Power Range Monitor Calibration Frequency Project stage: Approval ML0724900082007-10-24024 October 2007 Technical Specifications, Issuance of Amendment No. 177 Changes to Technical Specifications Surveillance Requirement 3.3.1.1.7, the Local Power Range Monitor Calibration Frequency Project stage: Approval ML0731902012007-11-28028 November 2007 Inadvertent Release of Proprietary Information, Contained in 10/24/2007 Amendment No. 177 Changes to TS SR 3.3.1.1.7, the Local Power Range Monitor Calibration Frequency (Tac No. MD3469) Project stage: Other 2007-11-28
[Table View] |
|
---|
Category:Letter
MONTHYEARML24289A0312024-11-0808 November 2024 – Issuance of Amendments Related to the Removal of License Condition 2.F as Part of the Consolidated Line-Item Improvement Process (CLIIP) IR 05000416/20240032024-11-0606 November 2024 Integrated Inspection Report 05000416/2024003 IR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 ML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 ML24254A3602024-09-10010 September 2024 Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 05000416/LER-2024-003, Feedwater Inlet Check Valve Incorrectly Determined Operable2024-08-26026 August 2024 Feedwater Inlet Check Valve Incorrectly Determined Operable ML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24191A2432024-07-0909 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operations IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 ML24156A1762024-06-24024 June 2024 Regulatory Audit Summary in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 and 10 CFR 50.69 (Epids L-2023-LLA-0081 and L-2023-LLA-0080) ML24165A1512024-06-13013 June 2024 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-Informe ML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 05000416/LER-2024-002, Automatic Actuation of Reactor Protection System2024-05-28028 May 2024 Automatic Actuation of Reactor Protection System ML24130A0912024-05-0909 May 2024 Request for Information Letter License Renewal Phase 2 Inspection ML24128A1512024-05-0909 May 2024 Project Manager Assignment ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 ML24122C6112024-05-0101 May 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML24113A0972024-04-22022 April 2024 Annual Report of Individual Monitoring - NRC Form 5 for 2023 Per 1 0 CFR 20.2206 ML24113A0952024-04-22022 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24107B0402024-04-16016 April 2024 Notification by Entergy Operations, Inc., of Proposed Economic Performance Incentive and Reliance on Post-Event Improvements in Plant Procedures And/Or Methods of Operation in FERC ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24100A0692024-04-0909 April 2024 Report of Changes or Errors to 10 CFR 50.46 Analysis ML24094A0992024-04-0303 April 2024 (GGNS) Core Operating Limits Report (COLR) Cycle 25, Revision O ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams 05000416/LER-2024-001, High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close2024-03-27027 March 2024 High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close IR 05000416/20220042024-03-19019 March 2024 – Amended Integrated Inspection Report 05000416/2022004 and Exercise of Enforcement Discretion ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 ML24058A3512024-02-28028 February 2024 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 05000416/LER-2023-002, Reactor Scram Due to Generator Stator Fault to Ground2024-02-13013 February 2024 Reactor Scram Due to Generator Stator Fault to Ground ML24043A1892024-02-12012 February 2024 Spent Fuel Storage Radioactive Effluent Release Report for 2023 ML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 2024-09-09
[Table view] Category:Proprietary Information Review
MONTHYEARML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23269A1242023-09-27027 September 2023 – Request for Withholding Information from Public Disclosure ML21195A0392021-09-0202 September 2021 Request for Withholding Proprietary Information from Public Disclosure for X-Energy, LLC Regulatory Engagement Plan Update for the XE-100 Reactor ML20317A1752020-11-19019 November 2020 Request for Withholding Information from Public Disclosure ML16112A2952016-04-27027 April 2016 Request for Withholding Information from Public Disclosure ML15141A1852015-07-15015 July 2015 Request for Withholding Information from Public Disclosure ML14262A3972014-11-12012 November 2014 Request for Withholding from Public Disclosure - 7/22/14 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC Related to Enclosure 1 to GNRO-2014/00051 Dated 8/14/14 ML14262A3722014-11-12012 November 2014 Request for Withholding from Public Disclosure - 8/20/14 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC Related to Attachment 1 to GNRO-2014/00052 Dated 9/10/14 ML14111A0582014-10-23023 October 2014 Request for Withholding from Public Disclosure - 3/4/14 Affidavit Executed by P. Yandow, GE-Hitachi Nuclear Energy Americas LLC Related to Enclosure to GNRO-2014/00024 Responses to Request for Additional Information ML14265A4222014-10-23023 October 2014 Request for Withholding from Public Disclosure - 6/25/14 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC Related to Attachment 3 to GNRO-2014/00045 Dated 8/26/14 ML14265A3842014-10-23023 October 2014 Request for Withholding from Public Disclosure - 6/19/14 Affidavit Executed by P. Yandow, GE-Hitachi Nuclear Energy Americas LLC Related to Attachment 1 to GNRO-2014/00045 Dated 8/26/14 ML14265A3702014-10-23023 October 2014 Request for Withholding from Public Disclosure - 7/1/14 Affidavit Executed by P. Yandow, GE-Hitachi Nuclear Energy Americas LLC Related to Attachment 1 to GNRO-2014/00064 Dated 9/4/14 ML14101A0872014-05-0808 May 2014 Request for Withholding from Public Disclosure - 9/10/2013 Affidavit Executed by P. Yandow, GE-Hitachi Nuclear Energy Americas LLC Related to Nedc - 33612P, Revision 0 ML14101A0432014-05-0808 May 2014 Request for Withholding from Public Disclosure - 12/19/2013 Affidavit Executed by L. Dolan, GE-Hitachi Nuclear Energy Americas LLC Related to Responses to Request for Supplemental Information ML13197A1922013-11-25025 November 2013 Request for Withholding Information from Public Disclosure, 6/26/13 Affidavit Executed by L. Trosman, GNF-A, for Attachment 1 to GNRO-2013/00050 Dated 7/2/2013 ML13219A3792013-09-0505 September 2013 Request for Withholding Information from Public Disclosure - 12/6/12 and 8/1/13 Letters Regarding Summary Report After Achieving EPU Power Level for the Replacement Steam Dryer ML13219A3762013-09-0505 September 2013 Request for Withholding Information from Public Disclosure - 8/7/12 Letter and Affidavit Regarding Summary Report After Achieving EPU Power Level for the Replacement Steam Dryer ML13219A3472013-09-0505 September 2013 Request for Withholding Information from Public Disclosure - 7/5/12, 8/19/12, 9/1/12, and 9/17/12 Letters Regarding Summary Report After Achieving EPU Power Level for the Replacement Steam Dryer ML12312A2372013-01-0202 January 2013 Request for Withholding Information from Public Disclosure, 10/3/12 Affidavit Executed by E. Schrull, GE-Hitachi Nuclear Energy Americas LLC, for NEDC-33671P, Revision 1 Dated October 2012 ML12312A2382013-01-0202 January 2013 Request for Withholding Information from Public Disclosure, 9/28/12 Affidavit Executed by L. Trosman, GNF-A, for Attachment 1 to GNRO-2012/00120 Dated 10/1/12 ML1213506762012-05-16016 May 2012 Request for Withholding Information from Public Disclosure, 5/3/2012 Affidavit Executed by Edward G. Schrull, GEH, for Attachment 1 to GNRO-2012/00046 ML1211100202012-05-11011 May 2012 Request for Withholding Information from Public Disclosure, 4/18/2012 Affidavit Executed by Edward G. Schrull, GEH, for Attachment 1 to GNRO-2012/00026 ML12110A4382012-05-11011 May 2012 Request for Withholding Information from Public Disclosure, 4/5/2012 Affidavit Executed by Edward G. Schrull, GEH, for Attachment 1 to GNRO-2012/00023 ML1208700392012-04-0202 April 2012 Request for Withholding Information from Public Disclosure, 3/21/2012 Affidavit Executed by Edward G. Schrull, GEH, for Attachment 1 to GNRO-2012/00018 ML1207206412012-03-20020 March 2012 Request for Withholding Information from Public Disclosure, 8/1/2011 Affidavit Executed by Andrew A. Lingenfelter, Gnf, for Attachment 3 to GNRO-2011/00064 ML1207205372012-03-20020 March 2012 Request for Withholding Information from Public Disclosure, 11/25/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00105 ML1207206502012-03-20020 March 2012 Request for Withholding Information from Public Disclosure, 2/19/2012 Affidavit Executed by Edward G. Schrull, GEH, for Attachment 1 to GNRO-2012/00011 ML1207206272012-03-20020 March 2012 Request for Withholding Information from Public Disclosure, 1/12/2012 Affidavit Executed by Lukas Trosman, Gnf, for Attachment 1 to GNRO-2012/00005 ML1207205882012-03-20020 March 2012 Request for Withholding Information from Public Disclosure, 2/15/2012 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2012/00009 ML1207205692012-03-20020 March 2012 Request for Withholding Information from Public Disclosure, 2/5/2012 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2012/00006 ML1207205462012-03-20020 March 2012 Request for Withholding Information from Public Disclosure, 11/26/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00107 ML1204407072012-02-29029 February 2012 Request for Withholding Information from Public Disclosure, 1/30/2012 Affidavit Executed by E. Schrull, GEH, for 1/30/2012 Meeting Slide Presentation Steam Dryer Review ML1204406162012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 5/25/2011 Affidavit Executed by E. Schrull, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00042 ML1204406602012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 11/29/2011 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00110 ML1204406532012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 11/3/2011 Affidavit Executed by E. Schrull, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00091 ML1204406462012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 10/20/2011 Affidavit Executed by E. Schrull, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00090 ML1204406382012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 9/22/2011 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00066 ML1204406272012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 7/21/2011 Affidavit Executed by E. Schrull, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00057 ML1204406232012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 6/23/2011 Affidavit Executed by E. Schrull, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00045 ML1204406022012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 5/19/2011 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00039 ML1131804102011-11-22022 November 2011 Request for Withholding Information from Public Disclosure, 10/10/11 Affidavit Executed by E. Schrull, GEH; Attachment 1 to GNRO-2011/00088, Response to Action Items from 9/18-19/11 Steam Dryer Audit ML1131804612011-11-22022 November 2011 Request for Withholding Information from Public Disclosure, 7/6/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00053 ML1131804412011-11-22022 November 2011 Request for Withholding Information from Public Disclosure, 8/29/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00075 ML1131804272011-11-22022 November 2011 Request for Withholding Information from Public Disclosure, 9/22/2011 Affidavit Executed by James F. Harrison, GEH, for Attachment 1 to GNRO-2011/00082 ML1131804212011-11-22022 November 2011 Request for Withholding Information from Public Disclosure, 7/28/2011 Affidavit Executed by E. Schrull, GEH, for Enclosure 1 to Attachment 1 to GNRO-2011/00055 ML1113905962011-06-0202 June 2011 Request for Withholding Information from Public Disclosure, 4/28/2011 Affidavit Executed by E. Schrull, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00032 ML1113905252011-05-31031 May 2011 Request for Withholding Information from Public Disclosure, 4/21/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00025 ML1110401072011-04-27027 April 2011 Request for Withholding Information from Public Disclosure, 2/17/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00012 ML1110401252011-04-27027 April 2011 Request for Withholding Information from Public Disclosure, 2/20/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00013 2024-09-17
[Table view] |
Text
September 26, 2007 Mr. William R. Brian Site Vice President Grand Gulf Nuclear Station Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150
SUBJECT:
GRAND GULF NUCLEAR STATION, UNIT 1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MD3469)
Dear Mr. Brian:
By letter dated August 16, 2007, Mr. Arthur D. Barfield, Director, Nuclear Safety Assurance, Grand Gulf Nuclear Station, Unit 1 (GGNS), submitted an affidavit, executed by Mr. Jerald S.
Holm, Manager, Product Licensing, for AREVA NP Inc., dated August 13, 2007, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390:
[Attachment 1 to] Entergy letter number GNRO-2007/00056, titled Supplement 3 to Amendment Request: Changes to the LPRM [Local Power Range Monitor]
Calibration Frequency, Grand Gulf Nuclear Station, Unit 1, Docket No. 50-416, License No. NPF-29, dated August 16, 2007.
The August 13, 2007, affidavit by Jerald S. Holm stated that the submitted information should be considered exempt from mandatory public disclosure for the following reason:
- 6. (d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA NP in product optimization or marketability.
By letter dated September 21, 2007, you submitted the revised affidavit executed by Mr. Jerald S. Holm, Manager, Product Licensing, for AREVA NP Inc., dated September 18, 2007, affirming that the requested information contained in August 16, 2007, letter be considered exempt from mandatory public disclosure for the following additional reason:
- 6. (e) The information is vital to a competitive advantage held by AREVA, NP, would be helpful to competitors to AREVA, NP, and would likely cause substantial harm to the competitive position of AREVA, NP.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
W. R. Brian Therefore, the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
A nonproprietary copy of the document was provided for placement in the Nuclear Regulatory Commissions (NRCs) Public Document Room and for addition to the Agencywide Document Access and Management System Public Electronic Reading Room.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-3308.
Sincerely,
/RA/
Bhalchandra Vaidya, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 cc: See next page
ML072340455 *See previous concurrence OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/SRXB/BC NRR/EICB/BC NRR/LPL4/BC NAME BVaidya JBurkhardt GCranston* WKemper* THiltz DATE 9/25/07 9/25/07 9/4/07 9/5/07 9/26/07
Grand Gulf Nuclear Station cc:
Senior Vice President Office of the Governor Entergy Nuclear Operations State of Mississippi P.O. Box 31995 Jackson, MS 39201 Jackson, MS 39286-1995 Attorney General Senior Vice President and COO Department of Justice Entergy Operations, Inc. State of Louisiana P.O. Box 31995 P.O. Box 94005 Jackson, MS 39286-1995 Baton Rouge, LA 70804-9005 Vice President, Operations Support President Entergy Services, Inc. Claiborne County P.O. Box 31995 Board of Supervisors Jackson, MS 39286-1995 P.O. Box 339 Port Gibson, MS 39150 General Manager, Plant Operations Entergy Operations, Inc. Richard Penrod, Senior Environmental P.O. Box 756 Scientist/State Liaison Officer Port Gibson, MS 39150 Office of Environmental Services Northwestern State University Director, Nuclear Safety & Licensing Russell Hall, Room 201 Entergy Services, Inc. Natchitoches, LA 71497 440 Hamilton Avenue White Plains, NY 10601 Chief, Energy and Transportation Branch Environmental Compliance and Director, Nuclear Safety Assurance Enforcement Division Entergy Operations, Inc. Mississippi Department of Environmental P.O. Box 756 Quality Port Gibson, MS 39150 P.O. Box 10385 Jackson, MS 39289-0385 Senior Manager Nuclear Safety & Licensing Regional Administrator, Region IV Entergy Services, Inc. U.S. Nuclear Regulatory Commission P.O. Box 31995 611 Ryan Plaza Drive, Suite 400 Jackson, MS 39286-1995 Arlington, TX 76011-8064 Manager, Licensing Senior Resident Inspector Entergy Operations, Inc. U.S. Nuclear Regulatory Commission P.O. Box 756 P.O. Box 399 Port Gibson, MS 39150 Port Gibson, MS 39150 State Health Officer Mr. Jerald S. Holm State Health Board AREVA NP Inc.
P.O. Box 1700 Product Licensing and Regulatory Affairs, Jackson, MS 39215 OF16 3315 Old Forest Road Attorney General P.O. Box 10935 Asst. Attorney General Lynchburg, VA 24501 State of Mississippi P.O. Box 22947 Jackson, MS 39225-2947 September 2007