Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARML0631303722006-11-0101 November 2006 License Amendment Request - Changes to the Local Power Range Monitor (LPRM) Calibration Frequency Project stage: Other GNRO-2006/00064, Supplement to Amendment Request Changes to the Local Power Range Monitor (LPRM) Calibration Frequency2006-11-22022 November 2006 Supplement to Amendment Request Changes to the Local Power Range Monitor (LPRM) Calibration Frequency Project stage: Supplement ML0634201442006-12-13013 December 2006 Letter to Areva Np Inc. Request for Withholding Information from Public Disclosure for GGNS Project stage: Withholding Request Acceptance GNRO-2007/00018, Supplement to Amendment Request, Changes to the Local Power Range Monitor (LPRM) Calibration Frequency2007-04-0404 April 2007 Supplement to Amendment Request, Changes to the Local Power Range Monitor (LPRM) Calibration Frequency Project stage: Supplement GNRO-2007/00031, Supplement 2 to Amendment Request, Changes to the Local Power Range Monitor (LPRM) Calibration Frequency2007-05-0707 May 2007 Supplement 2 to Amendment Request, Changes to the Local Power Range Monitor (LPRM) Calibration Frequency Project stage: Supplement GNRO-2007/00056, Supplement 3 to Amendment Request: Changes to the LPRM Calibration Frequency2007-08-16016 August 2007 Supplement 3 to Amendment Request: Changes to the LPRM Calibration Frequency Project stage: Supplement GNRO-2006/00058, Revision to Supplement 3 of Amendment Request, Changes to the Local Power Range Monitor Calibration Frequency2007-09-21021 September 2007 Revision to Supplement 3 of Amendment Request, Changes to the Local Power Range Monitor Calibration Frequency Project stage: Supplement ML0723404552007-09-26026 September 2007 Areva Np, Inc. Request for Withholding Information from Public Disclosure Local Power Range Monitor Calibration Frequency Project stage: Withholding Request Acceptance ML0731902502007-10-24024 October 2007 License Amendment 177, Changes to TS SR 3.3.1.1.7, the Local Power Range Monitor Calibration Frequency Project stage: Approval ML0724900082007-10-24024 October 2007 Technical Specifications, Issuance of Amendment No. 177 Changes to Technical Specifications Surveillance Requirement 3.3.1.1.7, the Local Power Range Monitor Calibration Frequency Project stage: Approval ML0731902012007-11-28028 November 2007 Inadvertent Release of Proprietary Information, Contained in 10/24/2007 Amendment No. 177 Changes to TS SR 3.3.1.1.7, the Local Power Range Monitor Calibration Frequency (Tac No. MD3469) Project stage: Other 2007-11-28
[Table View] |
|
---|
Category:Letter
MONTHYEARML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23348A3712023-12-14014 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information ML23340A2222023-12-13013 December 2023 Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23270B1892023-09-27027 September 2023 Evacuation Time Estimate Study ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23240A3952023-08-28028 August 2023 Reply to a Notice of Violation; EA-23-019 IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) ML23226A1002023-08-18018 August 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000416/20234042023-08-0707 August 2023 Material Control and Accounting Program Inspection Report 05000416/2023404 IR 05000416/20230912023-07-28028 July 2023 Final Significance Determination of a Green Finding and Notice of Violation; NRC Inspection Report 05000416/2023091 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23166B0712023-06-15015 June 2023 Reply to Notice of Violation EA-22-104 and EA-22-115 ML23166B0662023-06-15015 June 2023 Response to NRC Integrated Inspection Report 05000416/2023001 ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23122A1632023-05-18018 May 2023 NRC Inspection Report 05000416/2023090 and Preliminary White Finding IR 05000416/20234022023-05-17017 May 2023 Security Baseline Inspection Report 05000416/2023402 ML23110A8002023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000416/20230012023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23117A0422023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23110A0552023-04-20020 April 2023 Annual Radiological Environmental Operating Report (AREOR) ML23103A1022023-04-13013 April 2023 Annual Report of Individual Monitoring - NRC Form 5 for 2022 Per 10 CFR 20.2206 ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23079A2772023-03-21021 March 2023 U.S. Nuclear Regulatory Commission Presentation at the May 1, 2023, Port Gibson City Council Meeting ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc IR 05000416/20230112023-03-0808 March 2023 Design Basis Assurance Inspection Report 05000416/2023011 2024-01-31
[Table view] Category:Proprietary Information Review
MONTHYEARML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML21195A0392021-09-0202 September 2021 Request for Withholding Proprietary Information from Public Disclosure for X-Energy, LLC Regulatory Engagement Plan Update for the XE-100 Reactor ML20317A1752020-11-19019 November 2020 Request for Withholding Information from Public Disclosure ML16112A2952016-04-27027 April 2016 Request for Withholding Information from Public Disclosure ML15141A1852015-07-15015 July 2015 Request for Withholding Information from Public Disclosure ML14262A3722014-11-12012 November 2014 Request for Withholding from Public Disclosure - 8/20/14 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC Related to Attachment 1 to GNRO-2014/00052 Dated 9/10/14 ML14262A3972014-11-12012 November 2014 Request for Withholding from Public Disclosure - 7/22/14 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC Related to Enclosure 1 to GNRO-2014/00051 Dated 8/14/14 ML14111A0582014-10-23023 October 2014 Request for Withholding from Public Disclosure - 3/4/14 Affidavit Executed by P. Yandow, GE-Hitachi Nuclear Energy Americas LLC Related to Enclosure to GNRO-2014/00024 Responses to Request for Additional Information ML14265A4222014-10-23023 October 2014 Request for Withholding from Public Disclosure - 6/25/14 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC Related to Attachment 3 to GNRO-2014/00045 Dated 8/26/14 ML14265A3842014-10-23023 October 2014 Request for Withholding from Public Disclosure - 6/19/14 Affidavit Executed by P. Yandow, GE-Hitachi Nuclear Energy Americas LLC Related to Attachment 1 to GNRO-2014/00045 Dated 8/26/14 ML14265A3702014-10-23023 October 2014 Request for Withholding from Public Disclosure - 7/1/14 Affidavit Executed by P. Yandow, GE-Hitachi Nuclear Energy Americas LLC Related to Attachment 1 to GNRO-2014/00064 Dated 9/4/14 ML14101A0872014-05-0808 May 2014 Request for Withholding from Public Disclosure - 9/10/2013 Affidavit Executed by P. Yandow, GE-Hitachi Nuclear Energy Americas LLC Related to Nedc - 33612P, Revision 0 ML14101A0432014-05-0808 May 2014 Request for Withholding from Public Disclosure - 12/19/2013 Affidavit Executed by L. Dolan, GE-Hitachi Nuclear Energy Americas LLC Related to Responses to Request for Supplemental Information ML13197A1922013-11-25025 November 2013 Request for Withholding Information from Public Disclosure, 6/26/13 Affidavit Executed by L. Trosman, GNF-A, for Attachment 1 to GNRO-2013/00050 Dated 7/2/2013 ML13219A3472013-09-0505 September 2013 Request for Withholding Information from Public Disclosure - 7/5/12, 8/19/12, 9/1/12, and 9/17/12 Letters Regarding Summary Report After Achieving EPU Power Level for the Replacement Steam Dryer ML13219A3792013-09-0505 September 2013 Request for Withholding Information from Public Disclosure - 12/6/12 and 8/1/13 Letters Regarding Summary Report After Achieving EPU Power Level for the Replacement Steam Dryer ML13219A3762013-09-0505 September 2013 Request for Withholding Information from Public Disclosure - 8/7/12 Letter and Affidavit Regarding Summary Report After Achieving EPU Power Level for the Replacement Steam Dryer ML12312A2372013-01-0202 January 2013 Request for Withholding Information from Public Disclosure, 10/3/12 Affidavit Executed by E. Schrull, GE-Hitachi Nuclear Energy Americas LLC, for NEDC-33671P, Revision 1 Dated October 2012 ML12312A2382013-01-0202 January 2013 Request for Withholding Information from Public Disclosure, 9/28/12 Affidavit Executed by L. Trosman, GNF-A, for Attachment 1 to GNRO-2012/00120 Dated 10/1/12 ML1213506762012-05-16016 May 2012 Request for Withholding Information from Public Disclosure, 5/3/2012 Affidavit Executed by Edward G. Schrull, GEH, for Attachment 1 to GNRO-2012/00046 ML1211100202012-05-11011 May 2012 Request for Withholding Information from Public Disclosure, 4/18/2012 Affidavit Executed by Edward G. Schrull, GEH, for Attachment 1 to GNRO-2012/00026 ML12110A4382012-05-11011 May 2012 Request for Withholding Information from Public Disclosure, 4/5/2012 Affidavit Executed by Edward G. Schrull, GEH, for Attachment 1 to GNRO-2012/00023 ML1208700392012-04-0202 April 2012 Request for Withholding Information from Public Disclosure, 3/21/2012 Affidavit Executed by Edward G. Schrull, GEH, for Attachment 1 to GNRO-2012/00018 ML1207206272012-03-20020 March 2012 Request for Withholding Information from Public Disclosure, 1/12/2012 Affidavit Executed by Lukas Trosman, Gnf, for Attachment 1 to GNRO-2012/00005 ML1207206502012-03-20020 March 2012 Request for Withholding Information from Public Disclosure, 2/19/2012 Affidavit Executed by Edward G. Schrull, GEH, for Attachment 1 to GNRO-2012/00011 ML1207205372012-03-20020 March 2012 Request for Withholding Information from Public Disclosure, 11/25/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00105 ML1207206412012-03-20020 March 2012 Request for Withholding Information from Public Disclosure, 8/1/2011 Affidavit Executed by Andrew A. Lingenfelter, Gnf, for Attachment 3 to GNRO-2011/00064 ML1207205882012-03-20020 March 2012 Request for Withholding Information from Public Disclosure, 2/15/2012 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2012/00009 ML1207205692012-03-20020 March 2012 Request for Withholding Information from Public Disclosure, 2/5/2012 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2012/00006 ML1207205462012-03-20020 March 2012 Request for Withholding Information from Public Disclosure, 11/26/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00107 ML1204407072012-02-29029 February 2012 Request for Withholding Information from Public Disclosure, 1/30/2012 Affidavit Executed by E. Schrull, GEH, for 1/30/2012 Meeting Slide Presentation Steam Dryer Review ML1204406232012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 6/23/2011 Affidavit Executed by E. Schrull, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00045 ML1204406602012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 11/29/2011 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00110 ML1204406532012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 11/3/2011 Affidavit Executed by E. Schrull, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00091 ML1204406462012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 10/20/2011 Affidavit Executed by E. Schrull, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00090 ML1204406382012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 9/22/2011 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00066 ML1204406272012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 7/21/2011 Affidavit Executed by E. Schrull, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00057 ML1204406162012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 5/25/2011 Affidavit Executed by E. Schrull, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00042 ML1204406022012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 5/19/2011 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00039 ML1131804272011-11-22022 November 2011 Request for Withholding Information from Public Disclosure, 9/22/2011 Affidavit Executed by James F. Harrison, GEH, for Attachment 1 to GNRO-2011/00082 ML1131804612011-11-22022 November 2011 Request for Withholding Information from Public Disclosure, 7/6/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00053 ML1131804412011-11-22022 November 2011 Request for Withholding Information from Public Disclosure, 8/29/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00075 ML1131804212011-11-22022 November 2011 Request for Withholding Information from Public Disclosure, 7/28/2011 Affidavit Executed by E. Schrull, GEH, for Enclosure 1 to Attachment 1 to GNRO-2011/00055 ML1131804102011-11-22022 November 2011 Request for Withholding Information from Public Disclosure, 10/10/11 Affidavit Executed by E. Schrull, GEH; Attachment 1 to GNRO-2011/00088, Response to Action Items from 9/18-19/11 Steam Dryer Audit ML1113905962011-06-0202 June 2011 Request for Withholding Information from Public Disclosure, 4/28/2011 Affidavit Executed by E. Schrull, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00032 ML1113905252011-05-31031 May 2011 Request for Withholding Information from Public Disclosure, 4/21/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00025 ML1110401252011-04-27027 April 2011 Request for Withholding Information from Public Disclosure, 2/20/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00013 ML1110401002011-04-27027 April 2011 Request for Withholding Information from Public Disclosure, 3/28/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00018 ML1110401072011-04-27027 April 2011 Request for Withholding Information from Public Disclosure, 2/17/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00012 2023-09-27
[Table view] |
Text
September 26, 2007 Mr. William R. Brian Site Vice President Grand Gulf Nuclear Station Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150
SUBJECT:
GRAND GULF NUCLEAR STATION, UNIT 1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MD3469)
Dear Mr. Brian:
By letter dated August 16, 2007, Mr. Arthur D. Barfield, Director, Nuclear Safety Assurance, Grand Gulf Nuclear Station, Unit 1 (GGNS), submitted an affidavit, executed by Mr. Jerald S.
Holm, Manager, Product Licensing, for AREVA NP Inc., dated August 13, 2007, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390:
[Attachment 1 to] Entergy letter number GNRO-2007/00056, titled Supplement 3 to Amendment Request: Changes to the LPRM [Local Power Range Monitor]
Calibration Frequency, Grand Gulf Nuclear Station, Unit 1, Docket No. 50-416, License No. NPF-29, dated August 16, 2007.
The August 13, 2007, affidavit by Jerald S. Holm stated that the submitted information should be considered exempt from mandatory public disclosure for the following reason:
- 6. (d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA NP in product optimization or marketability.
By letter dated September 21, 2007, you submitted the revised affidavit executed by Mr. Jerald S. Holm, Manager, Product Licensing, for AREVA NP Inc., dated September 18, 2007, affirming that the requested information contained in August 16, 2007, letter be considered exempt from mandatory public disclosure for the following additional reason:
- 6. (e) The information is vital to a competitive advantage held by AREVA, NP, would be helpful to competitors to AREVA, NP, and would likely cause substantial harm to the competitive position of AREVA, NP.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
W. R. Brian Therefore, the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
A nonproprietary copy of the document was provided for placement in the Nuclear Regulatory Commissions (NRCs) Public Document Room and for addition to the Agencywide Document Access and Management System Public Electronic Reading Room.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-3308.
Sincerely,
/RA/
Bhalchandra Vaidya, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 cc: See next page
ML072340455 *See previous concurrence OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/SRXB/BC NRR/EICB/BC NRR/LPL4/BC NAME BVaidya JBurkhardt GCranston* WKemper* THiltz DATE 9/25/07 9/25/07 9/4/07 9/5/07 9/26/07 Grand Gulf Nuclear Station cc:
Senior Vice President Office of the Governor Entergy Nuclear Operations State of Mississippi P.O. Box 31995 Jackson, MS 39201 Jackson, MS 39286-1995 Attorney General Senior Vice President and COO Department of Justice Entergy Operations, Inc. State of Louisiana P.O. Box 31995 P.O. Box 94005 Jackson, MS 39286-1995 Baton Rouge, LA 70804-9005 Vice President, Operations Support President Entergy Services, Inc. Claiborne County P.O. Box 31995 Board of Supervisors Jackson, MS 39286-1995 P.O. Box 339 Port Gibson, MS 39150 General Manager, Plant Operations Entergy Operations, Inc. Richard Penrod, Senior Environmental P.O. Box 756 Scientist/State Liaison Officer Port Gibson, MS 39150 Office of Environmental Services Northwestern State University Director, Nuclear Safety & Licensing Russell Hall, Room 201 Entergy Services, Inc. Natchitoches, LA 71497 440 Hamilton Avenue White Plains, NY 10601 Chief, Energy and Transportation Branch Environmental Compliance and Director, Nuclear Safety Assurance Enforcement Division Entergy Operations, Inc. Mississippi Department of Environmental P.O. Box 756 Quality Port Gibson, MS 39150 P.O. Box 10385 Jackson, MS 39289-0385 Senior Manager Nuclear Safety & Licensing Regional Administrator, Region IV Entergy Services, Inc. U.S. Nuclear Regulatory Commission P.O. Box 31995 611 Ryan Plaza Drive, Suite 400 Jackson, MS 39286-1995 Arlington, TX 76011-8064 Manager, Licensing Senior Resident Inspector Entergy Operations, Inc. U.S. Nuclear Regulatory Commission P.O. Box 756 P.O. Box 399 Port Gibson, MS 39150 Port Gibson, MS 39150 State Health Officer Mr. Jerald S. Holm State Health Board AREVA NP Inc.
P.O. Box 1700 Product Licensing and Regulatory Affairs, Jackson, MS 39215 OF16 3315 Old Forest Road Attorney General P.O. Box 10935 Asst. Attorney General Lynchburg, VA 24501 State of Mississippi P.O. Box 22947 Jackson, MS 39225-2947 September 2007