Line 9: Line 9:
| docket = 05000324, 05000325
| docket = 05000324, 05000325
| license number = DPR-062, DPR-071
| license number = DPR-062, DPR-071
| contact person = Bailey S N , NRR/ADRO/DORL, 415-1321
| contact person = Bailey S , NRR/ADRO/DORL, 415-1321
| case reference number = TAC MD3305, TAC MD3306
| case reference number = TAC MD3305, TAC MD3306
| package number = ML072600464
| package number = ML072600464
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required;(4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source, and special nuclear materials without restriction to chemical of physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70 to posses, but not separate, such byproduct and special nuclear materials as may be produced by the operation of Brunswick Steam Electric Plant, Unit Nos. 1 and 2, and H. B. Robinson Steam Electric Plant, Unit No. 2 (6) Carolina Power & Light Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility and as approved in the Safety Evaluation Report dated November 22, 1977, as supplemented April 1979, June 11, 1980, December 30, 1986, December 6, 1989, July 28, 1993, and February 10, 1994 respectively, subject to the following provision:
{{#Wiki_filter:as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)     Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source, and special nuclear materials without restriction to chemical of physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (5)     Pursuant to the Act and 10 CFR Parts 30 and 70 to posses, but not separate, such byproduct and special nuclear materials as may be produced by the operation of Brunswick Steam Electric Plant, Unit Nos. 1 and 2, and H. B. Robinson Steam Electric Plant, Unit No. 2 (6)     Carolina Power & Light Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility and as approved in the Safety Evaluation Report dated November 22, 1977, as supplemented April 1979, June 11, 1980, December 30, 1986, December 6, 1989, July 28, 1993, and February 10, 1994 respectively, subject to the following provision:
The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 2923 megawatts (thermal).
The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 270, are hereby incorporated in the license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
Renewed License No. DPR-62 Amendment No. 270 Diesel Fuel Oil 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel Oil LCO 3.8.3 APPLICABILITY:
(1)     Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 2923 megawatts (thermal).
The stored diesel fuel oil shall be within limits for each required diesel generator (DG).When associated DG is required to be OPERABLE.ACTIONS---------------------------------------------------------
(2)     Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 270, are hereby incorporated in the license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications.
NOTES.1. Separate Condition entry is allowed for each DG.2. On a one-time basis, the main fuel oil storage tank may be made inoperable and drained, to support cleaning, inspection, and associated repair activities, for 14 days without entering Conditions A or B. If not restored within 14 days, Condition D must be entered.Fuel oil level in the day fuel oil storage tank(s) shall be confirmed to be > 22,650 gal per required DG prior to removing the main fuel oil storage tank from service and once per [[estimated NRC review hours::12 hours]] thereafter.
Renewed License No. DPR-62 Amendment No. 270
This Note expires upon completion of these activities, but no later than December 31, 2008.CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required DGs A.1 Restore required day fuel [[estimated NRC review hours::48 hours]] with fuel oil level in the oil storage tank level to associated day fuel oil within limit.storage tank(s) < 22,650 gal per required DG and>__ 17,000 gal per required DG.AND Fuel oil level in the main fuel oil storage tank _ 20,850 gal per required DG.(continued)
Brunswick Unit 2 3.8-20 Amendment No. 270 I (2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 242, are hereby incorporated in the license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications.
For Surveillance Requirements (SRs) that are new in Amendment 203 to Renewed Facility Operating License DPR-71, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 203. For SRs that existed prior to Amendment 203, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 203.(a) Effective June 30, 1982, the surveillance requirements listed below need not be completed until July 15, 1982. Upon accomplishment of the surveillances, the provisions of Technical Specification


====4.0.2 shall====
Diesel Fuel Oil 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3      Diesel Fuel Oil LCO 3.8.3                      The stored diesel fuel oil shall be within limits for each required diesel generator (DG).
apply.Specification 4.3.3.1, Table 4.3.3-1, Items 5.a and 5.b (b) Effective July 1, 1982, through July 8, 1982, Action statement "a" of Technical Specification 3.8.1.1 shall read as follows: ACTION: a. With either one offsite circuit or one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.A. sources by performing Surveillance Requirements 4.8.1.1.1 .a and 4.8.1.1.2.a.4 within two hours and at least once per [[estimated NRC review hours::12 hours]] thereafter; restore at least two offsite circuits and four diesel generators to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next [[estimated NRC review hours::12 hours]] and in COLD SHUTDOWN within the following [[estimated NRC review hours::24 hours]].(3) Deleted by Amendment No. 206.D. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
APPLICABILITY:                When associated DG is required to be OPERABLE.
The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Physical Security Plan, Revision 2," and "Safeguards Contingency Plan, Revision 2," submitted by letter dated May 17, 2006, and "Guard Training and Qualification Plan, Revision 0," submitted by letter dated September 30, 2004.Renewed License No. DPR- 71 Amendment No. 242 Diesel Fuel Oil 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel Oil LCO 3.8.3 APPLICABILITY:
ACTIONS
The stored diesel fuel oil shall be within limits for each required diesel generator (DG).When associated DG is required to be OPERABLE.ACTIONS NOTES-1 .Separate Condition entry is allowed for each DG.2. On a one-time basis, the main fuel oil storage tank may be made inoperable and drained, to support cleaning, inspection, and associated repair activities, for 14 days without entering Conditions A or B. If not restored within 14 days, Condition D must be entered.Fuel oil level in the day fuel oil storage tank(s) shall be confirmed to be > 22,650 gal per required DG prior to removing the main fuel oil storage tank from service and once per [[estimated NRC review hours::12 hours]] thereafter.
--------------------------------------------------------- NOTES.
This Note expires upon completion of these activities, but no later than December 31, 2008.CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required DGs A.1 Restore required day fuel [[estimated NRC review hours::48 hours]] with fuel oil level in the oil storage tank level to associated day fuel oil within limit.storage tank(s) < 22,650 gal per required DG and>_ 17,000 gal per required DG.AND Fuel oil level in the main fuel oil storage tank _ 20,850 gal per required DG.(continued)
: 1.      Separate Condition entry is allowed for each DG.
Brunswick Unit 1 3.8-20 Amendment No. 242 I}}
: 2.      On a one-time basis, the main fuel oil storage tank may be made inoperable and drained, to support cleaning, inspection, and associated repair activities, for 14 days without entering Conditions A or B. If not restored within 14 days, Condition D must be entered.
Fuel oil level in the day fuel oil storage tank(s) shall be confirmed to be > 22,650 gal per required DG prior to removing the main fuel oil storage tank from service and once per [[estimated NRC review hours::12 hours]] thereafter. This Note expires upon completion of these activities, but no later than December 31, 2008.
CONDITION                              REQUIRED ACTION                COMPLETION TIME A. One or more required DGs A.1                      Restore required day fuel    [[estimated NRC review hours::48 hours]] with fuel oil level in the                        oil storage tank level to associated day fuel oil                            within limit.
storage tank(s) < 22,650 gal per required DG and
        >__17,000 gal per required DG.
AND Fuel oil level in the main fuel oil storage tank &#x17d;_20,850 gal per required DG.
(continued)
Brunswick Unit 2                                          3.8-20                        Amendment No. 270    I
 
(2)    Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 242, are hereby incorporated in the license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications.
For Surveillance Requirements (SRs) that are new in Amendment 203 to Renewed Facility Operating License DPR-71, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 203. For SRs that existed prior to Amendment 203, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 203.
(a)    Effective June 30, 1982, the surveillance requirements listed below need not be completed until July 15, 1982. Upon accomplishment of the surveillances, the provisions of Technical Specification 4.0.2 shall apply.
Specification 4.3.3.1, Table 4.3.3-1, Items 5.a and 5.b (b)     Effective July 1, 1982, through July 8, 1982, Action statement "a" of Technical Specification 3.8.1.1 shall read as follows:
ACTION:
: a. With either one offsite circuit or one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.A. sources by performing Surveillance Requirements 4.8.1.1.1 .a and 4.8.1.1.2.a.4 within two hours and at least once per [[estimated NRC review hours::12 hours]] thereafter; restore at least two offsite circuits and four diesel generators to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next [[estimated NRC review hours::12 hours]] and in COLD SHUTDOWN within the following [[estimated NRC review hours::24 hours]].
(3)     Deleted by Amendment No. 206.
D. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Physical Security Plan, Revision 2," and "Safeguards Contingency Plan, Revision 2," submitted by letter dated May 17, 2006, and "Guard Training and Qualification Plan, Revision 0,"
submitted by letter dated September 30, 2004.
Renewed License No. DPR- 71 Amendment No. 242
 
Diesel Fuel Oil 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3   Diesel Fuel Oil LCO 3.8.3               The stored diesel fuel oil shall be within limits for each required diesel generator (DG).
APPLICABILITY:          When associated DG is required to be OPERABLE.
ACTIONS NOTES-
: 1. Separate Condition entry is allowed for each DG.
: 2. On a one-time basis, the main fuel oil storage tank may be made inoperable and drained, to support cleaning, inspection, and associated repair activities, for 14 days without entering Conditions A or B. If not restored within 14 days, Condition D must be entered.
Fuel oil level in the day fuel oil storage tank(s) shall be confirmed to be > 22,650 gal per required DG prior to removing the main fuel oil storage tank from service and once per [[estimated NRC review hours::12 hours]] thereafter. This Note expires upon completion of these activities, but no later than December 31, 2008.
CONDITION                         REQUIRED ACTION                   COMPLETION TIME A. One or more required DGs A.1               Restore required day fuel     [[estimated NRC review hours::48 hours]] with fuel oil level in the                 oil storage tank level to associated day fuel oil                     within limit.
storage tank(s) < 22,650 gal per required DG and
      >_17,000 gal per required DG.
AND Fuel oil level in the main fuel oil storage tank &#x17d;_20,850 gal per required DG.
(continued)
Brunswick Unit 1                                 3.8-20                           Amendment No. 242     I}}

Latest revision as of 03:17, 23 November 2019

Tech Spec Pages for Amendments 242 and 270 Related to Main Fuel Oil Storage Tank
ML072710141
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/27/2007
From:
NRC/NRR/ADRO/DORL/LPLII-2
To:
Bailey S , NRR/ADRO/DORL, 415-1321
Shared Package
ML072600464 List:
References
TAC MD3305, TAC MD3306
Download: ML072710141 (4)


Text

as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source, and special nuclear materials without restriction to chemical of physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70 to posses, but not separate, such byproduct and special nuclear materials as may be produced by the operation of Brunswick Steam Electric Plant, Unit Nos. 1 and 2, and H. B. Robinson Steam Electric Plant, Unit No. 2 (6) Carolina Power & Light Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility and as approved in the Safety Evaluation Report dated November 22, 1977, as supplemented April 1979, June 11, 1980, December 30, 1986, December 6, 1989, July 28, 1993, and February 10, 1994 respectively, subject to the following provision:

The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 2923 megawatts (thermal).

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 270, are hereby incorporated in the license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications.

Renewed License No. DPR-62 Amendment No. 270

Diesel Fuel Oil 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel Oil LCO 3.8.3 The stored diesel fuel oil shall be within limits for each required diesel generator (DG).

APPLICABILITY: When associated DG is required to be OPERABLE.

ACTIONS


NOTES.

1. Separate Condition entry is allowed for each DG.
2. On a one-time basis, the main fuel oil storage tank may be made inoperable and drained, to support cleaning, inspection, and associated repair activities, for 14 days without entering Conditions A or B. If not restored within 14 days, Condition D must be entered.

Fuel oil level in the day fuel oil storage tank(s) shall be confirmed to be > 22,650 gal per required DG prior to removing the main fuel oil storage tank from service and once per 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> thereafter. This Note expires upon completion of these activities, but no later than December 31, 2008.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required DGs A.1 Restore required day fuel 48 hours2 days <br />0.286 weeks <br />0.0658 months <br /> with fuel oil level in the oil storage tank level to associated day fuel oil within limit.

storage tank(s) < 22,650 gal per required DG and

>__17,000 gal per required DG.

AND Fuel oil level in the main fuel oil storage tank Ž_20,850 gal per required DG.

(continued)

Brunswick Unit 2 3.8-20 Amendment No. 270 I

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 242, are hereby incorporated in the license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications.

For Surveillance Requirements (SRs) that are new in Amendment 203 to Renewed Facility Operating License DPR-71, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 203. For SRs that existed prior to Amendment 203, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 203.

(a) Effective June 30, 1982, the surveillance requirements listed below need not be completed until July 15, 1982. Upon accomplishment of the surveillances, the provisions of Technical Specification 4.0.2 shall apply.

Specification 4.3.3.1, Table 4.3.3-1, Items 5.a and 5.b (b) Effective July 1, 1982, through July 8, 1982, Action statement "a" of Technical Specification 3.8.1.1 shall read as follows:

ACTION:

a. With either one offsite circuit or one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.A. sources by performing Surveillance Requirements 4.8.1.1.1 .a and 4.8.1.1.2.a.4 within two hours and at least once per 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> thereafter; restore at least two offsite circuits and four diesel generators to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> and in COLD SHUTDOWN within the following 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />.

(3) Deleted by Amendment No. 206.

D. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Physical Security Plan, Revision 2," and "Safeguards Contingency Plan, Revision 2," submitted by letter dated May 17, 2006, and "Guard Training and Qualification Plan, Revision 0,"

submitted by letter dated September 30, 2004.

Renewed License No. DPR- 71 Amendment No. 242

Diesel Fuel Oil 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel Oil LCO 3.8.3 The stored diesel fuel oil shall be within limits for each required diesel generator (DG).

APPLICABILITY: When associated DG is required to be OPERABLE.

ACTIONS NOTES-

1. Separate Condition entry is allowed for each DG.
2. On a one-time basis, the main fuel oil storage tank may be made inoperable and drained, to support cleaning, inspection, and associated repair activities, for 14 days without entering Conditions A or B. If not restored within 14 days, Condition D must be entered.

Fuel oil level in the day fuel oil storage tank(s) shall be confirmed to be > 22,650 gal per required DG prior to removing the main fuel oil storage tank from service and once per 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> thereafter. This Note expires upon completion of these activities, but no later than December 31, 2008.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required DGs A.1 Restore required day fuel 48 hours2 days <br />0.286 weeks <br />0.0658 months <br /> with fuel oil level in the oil storage tank level to associated day fuel oil within limit.

storage tank(s) < 22,650 gal per required DG and

>_17,000 gal per required DG.

AND Fuel oil level in the main fuel oil storage tank Ž_20,850 gal per required DG.

(continued)

Brunswick Unit 1 3.8-20 Amendment No. 242 I