ML073180313: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 20: | Line 20: | ||
=Text= | =Text= | ||
{{#Wiki_filter:(2) TvcbalS ievricntlon | {{#Wiki_filter:(2) TvcbalS ievricntlon | ||
*ne Tecuilcal Sofcfatons Contraied | *ne Tecuilcal Sofcfatons Contraied inAppendix A,as revised bogh AnendMetNo 238 which 8m attched hereto, are hereby oipomted iNto te rkewd operatng cerns. Duke Power Company LLC sha opeate the ad*y In acemdance with the Tachical Specilications. | ||
(3) LWdte F-Ima Iae AmalyIsvW 9 Rmnei The Updated Fialr Safety Anauls* Report mupplemntr submitted postia to 10CFR 4.21(d) as mlv d on Decemer 16, 200= deabes c=eb future activities to be completed before the pedod of extended opeato Duke shaD coplete # | (3) LWdte F-Ima Iae AmalyIsvW 9 Rmnei The Updated Fialr Safety Anauls*Report mupplemntr submitted postia to 10CFR 4.21(d) as mlv d on Decemer 16, 200= deabes c=eb future activities to be completed before the pedod of extended opeato Duke shaD coplete #IemeectIvIles no later ihan December 6, 2024. and am noty fte NRC In witing when milied by NRC kiq* o*'ao of these ecNttes IIscompmete and mrm be The Updated Fnal Saiety Analysi Report supplement as revised an December 16, 20M2, descrbed above, doa be icuded h the ned adeduled update the ho Updated Finl Safety Analyfs Report rquked by 10 CFR Wo71(eX4)N followng issuance ofthis renewed operating license. utlhat update Is cmplte. Duke my'make cargesto teo programs deamted in such supplement without prkor Conmislon approval. pronded OWt Duke evAtates each such change pmuunt to Owe attef set forth In10 CFRR.9.aW o*thrwWe coanAes vdth the requirements in that secton.. | ||
pronded OWt Duke evAtates each such change pmuunt to Owe attef set forth | (4) | ||
Duke shad | Duke Powe C~ompany LLC shall =Mop with Dhe antilnat conditios delmeneted in Appendx C to tIhs renewed operati icense. | ||
The Updated Fnal Safety Analyes Reort supplement as revised on December 16,202 descrbed above. shall be hidde | (5) P9AI..1,SER, (Scir SSER#2,SSER#3 8SER94, Duke Pomwr Comany LLC shal hnplernent and maintahInhieffect d provison fthe approved fire pxotectton Program as described intlh Updated Rme Safety Analyisb Report, as amendd, ortieftfadliyad as approved InDiSER V=ouh Sup1eniri 1%,subject b 0 tiefolwin pwvlorom The.,Inhee may make ges to the approved Ire profedIn aded program withou Prior approval Of glu Commissionnly f ttve d ngesvOM*fat adversely effec the alit to achieve and maintaln safe shuAdM= In Ie* | ||
* | event of a fire. | ||
rn*, d to | -The pamrenttical notatin fOllowingthe fttl of fti renewed operat"n license condkx denotes the secton of the Safety Evaluation Report and/mo Is supperment wherein flhe venewmd lonse condition Is discussd. | ||
" The licensee miay make dwanes to the approved fire protection program wihout prfr approval of tfe CmTls only 9 11ose dnges would ndt adversely affect the abiy to achieve end safe dwzown | Rtenewved License No. NPF%35 Am ndment No. 238 | ||
Renewed L | |||
(2) TedbV SAMM2ciitlord dctA The Technicalt~k.Srw'tiatins | |||
SURVEILLANCE FREQUENCY SR 3.5.2.5 Verify each ECCS automatic valve in the flow path that is 18 months not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.SR 3.5.2.6 Verify each ECCS pump starts automatically on an actual 18 months or simulated actuation signal.SR 3.5.2.7 Verify, for each ECCS throttle valve listed below, each 18 months position stop is in the correct position.Centrifugal Charging Safety Injection Pump Injection Throttle Pump Throttle Valve Number Valve Number N114 N1164 N116 NI166 NI18 N1168 N120 N1170 SR 3.5.2.8 Verify, by visual inspection, that the ECCs containment 18 months sump strainer assembly is not restricted by debris and shows no evidence of structural distress or abnormal corrosion. | ,AImldfft contafred 234A.: VMt. are fIn A-ppedix . as revisd fthugh Sat ed herglo, rWhereby cxoraled knt this renewed operatig icens. Duke Pmwe Comrn LLC shal operale the fadtLy In accrdance with the Tedcnal Sped-icalns* | ||
Catawba Units 1 and 2 3.5.2-3 Amendment Nos. 238 & 234}} | (3) lixlte inl aft Aals~is Reor "rsUpdted Final Safety Analysis Report supplemet uiMded PMRa to 10 CFR 64.21(d)a as revised an December 16, 2002M. desibes-ceraiin futre adlttes to be co=pleted before the period of extended operation. Duke shad onpIets themsecyiltes no lter Sum Febrwy 24,2025, wnd su *IYO tie NRC Inwriting when knplimernton of these a8vdles Iscomplete and can be vedred by NRC Inspecoon. | ||
The Updated Fnal Safety Analyes Reort supplement as revised on December 16,202 descrbed above. shall be hidde Inthe neid Scheduled update to the Upd4 td Fbn Safety Arnalyisf Repoxt equrd by 10 CFR 60.71(eX4), following Issuance of tds renewed operating Bceme. Urt fat updae Iscomplete, Duke may make changes to the programs describd Insuch sulemWent wMh prior Commission approval, provided-Wt Duke evaulates ewdi such change pursuant b the crtera set forth In10 CFR M 50.59Ad otherlwse compiles with tae requirements Intht W ciol. | |||
(4) ,,drmt QMW Duke Power Conan LLC shD comply wih fte aist a n ionms dellnested | |||
*InAppendlx C to fts rnewed opemtng licese. | |||
(6) E Prote. eMgm (Section M..1, GER, SSER M SE #31 SSER #4, Due Power Compy WLLC shalk riplement and maintabn In effed al pr*s*km of Me approved ir prot n program as decrbed inthe Updated inl Sety Anabi15 Report.. as-amended, for tje faclty andas appnwved InVie SER through SuplementS. rn*, d to fthfollowkf lp;riskn: | |||
.. " | |||
The licensee miay make dwanes to the approved fire protection program wihout prfr approval of tfe CmTls only 9 11ose dnges would ndt adversely affect the abiy to achieve end rnal*h safe dwzown Inthe event are r-. | |||
-The parenthetkl notakion 1follwet the tt of lIfs renewed operaftng ICnse cwidlon denotes the secton of #* Safety Evaluation Repot, andlor Its suppleffierfsweretn.this renewed license ncdmtl Is discussed. | |||
Renewed L nMnNo. PF.623 Armedmenit o. 234 | |||
ECCS - Operating 3.5.2 SURVEILLANCE REQUIREMENTS (continued) | |||
SURVEILLANCE FREQUENCY SR 3.5.2.5 Verify each ECCS automatic valve in the flow path that is 18 months not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal. | |||
SR 3.5.2.6 Verify each ECCS pump starts automatically on an actual 18 months or simulated actuation signal. | |||
SR 3.5.2.7 Verify, for each ECCS throttle valve listed below, each 18 months position stop is in the correct position. | |||
Centrifugal Charging Safety Injection Pump Injection Throttle Pump Throttle Valve Number Valve Number N114 N1164 N116 NI166 NI18 N1168 N120 N1170 SR 3.5.2.8 Verify, by visual inspection, that the ECCs containment 18 months sump strainer assembly is not restricted by debris and shows no evidence of structural distress or abnormal corrosion. | |||
Catawba Units 1 and 2 3.5.2-3 Amendment Nos. 238 & 234}} |
Revision as of 00:41, 23 November 2019
ML073180313 | |
Person / Time | |
---|---|
Site: | Catawba |
Issue date: | 11/08/2007 |
From: | NRC/NRR/ADRO/DORL/LPLII-1 |
To: | |
Stang J, NRR/DORL, 415-1345 | |
Shared Package | |
ML073020581 | List: |
References | |
TAC MD5163, TAC MD5164 | |
Download: ML073180313 (3) | |
Text
(2) TvcbalS ievricntlon
- ne Tecuilcal Sofcfatons Contraied inAppendix A,as revised bogh AnendMetNo 238 which 8m attched hereto, are hereby oipomted iNto te rkewd operatng cerns. Duke Power Company LLC sha opeate the ad*y In acemdance with the Tachical Specilications.
(3) LWdte F-Ima Iae AmalyIsvW 9 Rmnei The Updated Fialr Safety Anauls*Report mupplemntr submitted postia to 10CFR 4.21(d) as mlv d on Decemer 16, 200= deabes c=eb future activities to be completed before the pedod of extended opeato Duke shaD coplete #IemeectIvIles no later ihan December 6, 2024. and am noty fte NRC In witing when milied by NRC kiq* o*'ao of these ecNttes IIscompmete and mrm be The Updated Fnal Saiety Analysi Report supplement as revised an December 16, 20M2, descrbed above, doa be icuded h the ned adeduled update the ho Updated Finl Safety Analyfs Report rquked by 10 CFR Wo71(eX4)N followng issuance ofthis renewed operating license. utlhat update Is cmplte. Duke my'make cargesto teo programs deamted in such supplement without prkor Conmislon approval. pronded OWt Duke evAtates each such change pmuunt to Owe attef set forth In10 CFRR.9.aW o*thrwWe coanAes vdth the requirements in that secton..
(4)
Duke Powe C~ompany LLC shall =Mop with Dhe antilnat conditios delmeneted in Appendx C to tIhs renewed operati icense.
(5) P9AI..1,SER, (Scir SSER#2,SSER#3 8SER94, Duke Pomwr Comany LLC shal hnplernent and maintahInhieffect d provison fthe approved fire pxotectton Program as described intlh Updated Rme Safety Analyisb Report, as amendd, ortieftfadliyad as approved InDiSER V=ouh Sup1eniri 1%,subject b 0 tiefolwin pwvlorom The.,Inhee may make ges to the approved Ire profedIn aded program withou Prior approval Of glu Commissionnly f ttve d ngesvOM*fat adversely effec the alit to achieve and maintaln safe shuAdM= In Ie*
event of a fire.
-The pamrenttical notatin fOllowingthe fttl of fti renewed operat"n license condkx denotes the secton of the Safety Evaluation Report and/mo Is supperment wherein flhe venewmd lonse condition Is discussd.
Rtenewved License No. NPF%35 Am ndment No. 238
(2) TedbV SAMM2ciitlord dctA The Technicalt~k.Srw'tiatins
,AImldfft contafred 234A.: VMt. are fIn A-ppedix . as revisd fthugh Sat ed herglo, rWhereby cxoraled knt this renewed operatig icens. Duke Pmwe Comrn LLC shal operale the fadtLy In accrdance with the Tedcnal Sped-icalns*
(3) lixlte inl aft Aals~is Reor "rsUpdted Final Safety Analysis Report supplemet uiMded PMRa to 10 CFR 64.21(d)a as revised an December 16, 2002M. desibes-ceraiin futre adlttes to be co=pleted before the period of extended operation. Duke shad onpIets themsecyiltes no lter Sum Febrwy 24,2025, wnd su *IYO tie NRC Inwriting when knplimernton of these a8vdles Iscomplete and can be vedred by NRC Inspecoon.
The Updated Fnal Safety Analyes Reort supplement as revised on December 16,202 descrbed above. shall be hidde Inthe neid Scheduled update to the Upd4 td Fbn Safety Arnalyisf Repoxt equrd by 10 CFR 60.71(eX4), following Issuance of tds renewed operating Bceme. Urt fat updae Iscomplete, Duke may make changes to the programs describd Insuch sulemWent wMh prior Commission approval, provided-Wt Duke evaulates ewdi such change pursuant b the crtera set forth In10 CFR M 50.59Ad otherlwse compiles with tae requirements Intht W ciol.
(4) ,,drmt QMW Duke Power Conan LLC shD comply wih fte aist a n ionms dellnested
- InAppendlx C to fts rnewed opemtng licese.
(6) E Prote. eMgm (Section M..1, GER, SSER M SE #31 SSER #4, Due Power Compy WLLC shalk riplement and maintabn In effed al pr*s*km of Me approved ir prot n program as decrbed inthe Updated inl Sety Anabi15 Report.. as-amended, for tje faclty andas appnwved InVie SER through SuplementS. rn*, d to fthfollowkf lp;riskn:
.. "
The licensee miay make dwanes to the approved fire protection program wihout prfr approval of tfe CmTls only 9 11ose dnges would ndt adversely affect the abiy to achieve end rnal*h safe dwzown Inthe event are r-.
-The parenthetkl notakion 1follwet the tt of lIfs renewed operaftng ICnse cwidlon denotes the secton of #* Safety Evaluation Repot, andlor Its suppleffierfsweretn.this renewed license ncdmtl Is discussed.
Renewed L nMnNo. PF.623 Armedmenit o. 234
ECCS - Operating 3.5.2 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.5.2.5 Verify each ECCS automatic valve in the flow path that is 18 months not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
SR 3.5.2.6 Verify each ECCS pump starts automatically on an actual 18 months or simulated actuation signal.
SR 3.5.2.7 Verify, for each ECCS throttle valve listed below, each 18 months position stop is in the correct position.
Centrifugal Charging Safety Injection Pump Injection Throttle Pump Throttle Valve Number Valve Number N114 N1164 N116 NI166 NI18 N1168 N120 N1170 SR 3.5.2.8 Verify, by visual inspection, that the ECCs containment 18 months sump strainer assembly is not restricted by debris and shows no evidence of structural distress or abnormal corrosion.
Catawba Units 1 and 2 3.5.2-3 Amendment Nos. 238 & 234