ML073511856: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 12/17/2007
| issue date = 12/17/2007
| title = Retake Exam - March 31 - Corporate Letter
| title = Retake Exam - March 31 - Corporate Letter
| author name = Lantz R E
| author name = Lantz R
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Brian W R
| addressee name = Brian W
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000416
| docket = 05000416
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:December 17, 2007  
{{#Wiki_filter:UNITED STATES NU CLE AR RE GU LATOR Y C O M M I S S I O N R EGI ON I V 611 R YAN PLAZA D R IV E, SU ITE 400 AR LI N GTON , TEXAS 76011-4005 December 17, 2007 William R. Brian, Vice President of Operations Grand Gulf Nuclear Station Entergy Operations, Inc.
 
P.O. Box 756 Port Gibson, MS 39150
William R. Brian, Vice President   of Operations Grand Gulf Nuclear Station Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150  


==SUBJECT:==
==SUBJECT:==
GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC RETAKE OPERATOR LICENSING EXAMINATION 05000416/2008301
GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC RETAKE OPERATOR LICENSING EXAMINATION 05000416/2008301


==Dear Mr. Brian:==
==Dear Mr. Brian:==


In a telephone conversation on December 4, 2007, between Mr. Steve Reeves, Senior Operations Instructor, and Mr. Mark Haire, Chief Examiner, arrangements were made for the administration of licensing examinations at Grand Gulf Nuclear Station on March 31, 2008.  
In a telephone conversation on December 4, 2007, between Mr. Steve Reeves, Senior Operations Instructor, and Mr. Mark Haire, Chief Examiner, arrangements were made for the administration of licensing examinations at Grand Gulf Nuclear Station on March 31, 2008.
 
As agreed during the telephone conversation, your staff will prepare the examination based on the guidelines in Revision 9 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, and the use of Revision 2 of NUREG-1123, Knowledge and Abilities Catalog for Nuclear Power Plant Operators. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
As agreed during the telephone conversation, your staff will prepare the exami nation based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," and the use of Revision 2 of NUREG-1123, "Knowl edge and Abilities Catalog for Nuclear Power Plant Operators.The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.  
To meet the above schedule, it will be necessary for your staff to furnish the examination outline by January 16, 2008. The written examination and supporting reference materials identified in to ES-201 will be due by February 15, 2008. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline and examination before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.
 
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
To meet the above schedule, it will be necessary for your staff to furnish the examinati on outline by January 16, 2008. The written examination and supporting reference materials identified in   to ES-201 will be due by February 15, 2008. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline and examination before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examination is being administered.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.  


Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examination is being administered.  
Entergy Operations, Inc.                        To permit timely NRC review and evaluation, your staff should submit preliminary senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Reeves has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Mark Haire at 817-860-8117, or myself at 817-860-8159.
Sincerely,
                                                /RA/
Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety Docket: 50-416 License: NPF-29


UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV611 RYAN PLAZA DRIVE, SUITE 400ARLINGTON, TEXAS 76011-4005 Entergy Operations, Inc.
Entergy Operations, Inc.              DISTRIBUTION:
To permit timely NRC review and evaluation, your staff should submit preliminary senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.  
Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Senior Vice President and COO Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Vice President, Operations Support Entergy Services, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Chief Energy & Transportation Branch Environmental Compliance and Enforcement Division Mississippi Department of Environmental Quality P.O. Box 10385 Jackson, MS 39289-0385 President Claiborne County Board of Supervisors P.O. Box 339 Port Gibson, MS 39150 General Manager, Plant Operations Grand Gulf Nuclear Station Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150 Senior Manager Nuclear Safety & Licensing Entergy Services, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Manager, Licensing Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150


This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.  
Entergy Operations, Inc.            Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, LA 70804-9005 Office of the Governor State of Mississippi Jackson, MS 39205 Attorney General Assistant Attorney General State of Mississippi P.O. Box 22947 Jackson, MS 39225-2947 State Health Officer State Board of Health P.O. Box 139 Jackson, MS 39205 Director Nuclear Safety & Licensing Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213-8298 Director, Nuclear Safety Assurance Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150 Richard Penrod, Senior Environmental Scientist, State Liaison Officer Office of Environmental Services Northwestern State University Russsell Hall, Room 201 Natchitoches, LA 71497 Lisa R. Hammond, Chief Technological Hazards Branch National Preparedness Division FEMA Region VI 800 N. Loop 288 Denton, TX 76209


The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
Entergy Operations, Inc.      Conrad S. Burnside, Chief Technological Hazards Branch National Preparedness Division DHS/FEMA 3003 Chamblee Tucker Road Atlanta, GA 30341


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC' s Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
Entergy Operations, Inc.                     Electronic distribution by RIV:
Thank you for your cooperation in this matter. Mr. Reeves has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mark Haire at 817-860-8117, or myself at 817-860-8159.
Regional Administrator (EEC)
 
Sincerely, 
 
/RA/
Ryan E. Lantz, Chief Operations Branch      Division of Reactor Safety
 
Docket:  50-416 License:  NPF-29
 
Entergy Operations, Inc.
DISTRIBUTION: Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995
 
Senior Vice President and COO Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995
 
Vice President, Operations Support Entergy Services, Inc.
P.O. Box 31995 Jackson, MS 39286-1995
 
Chief Energy & Transportation Branch Environmental Compliance and Enforcement Division Mississippi Department of Environmental Quality P.O. Box 10385 Jackson, MS  39289-0385
 
President Claiborne County Board of Supervisors P.O. Box 339 Port Gibson, MS  39150
 
General Manager, Plant Operations Grand Gulf Nuclear Station Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS  39150
 
Senior Manager Nuclear Safety & Licensing Entergy Services, Inc.
P.O. Box 31995 Jackson, MS 39286-1995
 
Manager, Licensing Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150 Entergy Operations, Inc.
Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, LA  70804-9005 
 
Office of the Governor State of Mississippi Jackson, MS  39205
 
Attorney General Assistant Attorney General State of Mississippi P.O. Box 22947 Jackson, MS  39225-2947
 
State Health Officer State Board of Health P.O. Box 139 Jackson, MS  39205 
 
Director Nuclear Safety & Licensing Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS  39213-8298
 
Director, Nuclear Safety Assurance Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS  39150
 
Richard Penrod, Senior Environmental Scientist, State Liaison Officer Office of Environmental Services Northwestern State University Russsell Hall, Room 201 Natchitoches, LA  71497
 
Lisa R. Hammond, Chief Technological Hazards Branch National Preparedness Division FEMA Region VI 800 N. Loop 288 Denton, TX  76209
 
Entergy Operations, Inc.
Conrad S. Burnside, Chief Technological Hazards Branch National Preparedness Division DHS/FEMA 3003 Chamblee Tucker Road Atlanta,  GA  30341
 
Entergy Operations, Inc.
Electronic distribution by RIV: Regional Administrator (EEC)
DRP Director (ATH)
DRP Director (ATH)
DRS Director (DDC)
DRS Director (DDC)
Line 103: Line 62:
Senior Project Engineer, DRP/C (WCW)
Senior Project Engineer, DRP/C (WCW)
Team Leader, DRP/TSS (CJP)
Team Leader, DRP/TSS (CJP)
RITS Coordinator (MSH3)  
RITS Coordinator (MSH3)
 
SUNSI Review Completed: ___Y___ADAMS: Yes                 No   Initials: _msh_____
SUNSI Review Completed: ___Y___ADAMS:   Yes  No      Initials: _msh_____     Publicly Available         Non-Publicly Available        Sensitive  Non-Sensitive  
Publicly Available       Non-Publicly Available   Sensitive         Non-Sensitive S:\DRS\REPORTS\GG2008301LTR-MSH2.doc SOE:OB               C:OB MSHaire/lmb           RELantz
 
/RA/                 /RA/
S:\DRS\REPORTS\GG2008301LTR-MSH2.doc SOE:OB C:OB   MSHaire/lmb RELantz   /RA/ /RA/   12/6/07 12/17/07   OFFICIAL RECORD COPY T=Telephone           E=E-mail       F=Fax}}
12/6/07               12/17/07 OFFICIAL RECORD COPY T=Telephone                 E=E-mail   F=Fax}}

Latest revision as of 00:52, 23 November 2019

Retake Exam - March 31 - Corporate Letter
ML073511856
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/17/2007
From: Ryan Lantz
Operations Branch IV
To: Brian W
Entergy Operations
References
OLE 2008301
Download: ML073511856 (6)


Text

UNITED STATES NU CLE AR RE GU LATOR Y C O M M I S S I O N R EGI ON I V 611 R YAN PLAZA D R IV E, SU ITE 400 AR LI N GTON , TEXAS 76011-4005 December 17, 2007 William R. Brian, Vice President of Operations Grand Gulf Nuclear Station Entergy Operations, Inc.

P.O. Box 756 Port Gibson, MS 39150

SUBJECT:

GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC RETAKE OPERATOR LICENSING EXAMINATION 05000416/2008301

Dear Mr. Brian:

In a telephone conversation on December 4, 2007, between Mr. Steve Reeves, Senior Operations Instructor, and Mr. Mark Haire, Chief Examiner, arrangements were made for the administration of licensing examinations at Grand Gulf Nuclear Station on March 31, 2008.

As agreed during the telephone conversation, your staff will prepare the examination based on the guidelines in Revision 9 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, and the use of Revision 2 of NUREG-1123, Knowledge and Abilities Catalog for Nuclear Power Plant Operators. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outline by January 16, 2008. The written examination and supporting reference materials identified in to ES-201 will be due by February 15, 2008. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline and examination before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examination is being administered.

Entergy Operations, Inc. To permit timely NRC review and evaluation, your staff should submit preliminary senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Reeves has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Mark Haire at 817-860-8117, or myself at 817-860-8159.

Sincerely,

/RA/

Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety Docket: 50-416 License: NPF-29

Entergy Operations, Inc. DISTRIBUTION:

Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Senior Vice President and COO Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Vice President, Operations Support Entergy Services, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Chief Energy & Transportation Branch Environmental Compliance and Enforcement Division Mississippi Department of Environmental Quality P.O. Box 10385 Jackson, MS 39289-0385 President Claiborne County Board of Supervisors P.O. Box 339 Port Gibson, MS 39150 General Manager, Plant Operations Grand Gulf Nuclear Station Entergy Operations, Inc.

P.O. Box 756 Port Gibson, MS 39150 Senior Manager Nuclear Safety & Licensing Entergy Services, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Manager, Licensing Entergy Operations, Inc.

P.O. Box 756 Port Gibson, MS 39150

Entergy Operations, Inc. Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, LA 70804-9005 Office of the Governor State of Mississippi Jackson, MS 39205 Attorney General Assistant Attorney General State of Mississippi P.O. Box 22947 Jackson, MS 39225-2947 State Health Officer State Board of Health P.O. Box 139 Jackson, MS 39205 Director Nuclear Safety & Licensing Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213-8298 Director, Nuclear Safety Assurance Entergy Operations, Inc.

P.O. Box 756 Port Gibson, MS 39150 Richard Penrod, Senior Environmental Scientist, State Liaison Officer Office of Environmental Services Northwestern State University Russsell Hall, Room 201 Natchitoches, LA 71497 Lisa R. Hammond, Chief Technological Hazards Branch National Preparedness Division FEMA Region VI 800 N. Loop 288 Denton, TX 76209

Entergy Operations, Inc. Conrad S. Burnside, Chief Technological Hazards Branch National Preparedness Division DHS/FEMA 3003 Chamblee Tucker Road Atlanta, GA 30341

Entergy Operations, Inc. Electronic distribution by RIV:

Regional Administrator (EEC)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJC1)

Senior Resident Inspector (AJB6)

Branch Chief, DRP/C (MCH2)

Senior Project Engineer, DRP/C (WCW)

Team Leader, DRP/TSS (CJP)

RITS Coordinator (MSH3)

SUNSI Review Completed: ___Y___ADAMS: Yes No Initials: _msh_____

Publicly Available Non-Publicly Available Sensitive Non-Sensitive S:\DRS\REPORTS\GG2008301LTR-MSH2.doc SOE:OB C:OB MSHaire/lmb RELantz

/RA/ /RA/

12/6/07 12/17/07 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax