|
|
(2 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML090910453 | | | number = ML090910453 |
| | issue date = 04/02/2009 | | | issue date = 04/02/2009 |
| | title = Susquehanna, Units 1 and 2, MD8490 & MD8491, Correction Letter Withdrawal of Amendment Request TAC Nos. MD8490 and MD8491) | | | title = MD8490 & MD8491, Correction Letter Withdrawal of Amendment Request TAC Nos. MD8490 and MD8491) |
| | author name = Vaidya B K | | | author name = Vaidya B |
| | author affiliation = NRC/NRR/DORL/LPLI-1 | | | author affiliation = NRC/NRR/DORL/LPLI-1 |
| | addressee name = Spence W H | | | addressee name = Spence W |
| | addressee affiliation = PPL Corp | | | addressee affiliation = PPL Corp |
| | docket = 05000387, 05000388 | | | docket = 05000387, 05000388 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITEDNUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 Apd 1 2, 2009 Mr. William H. | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Apd 1 2, 2009 Mr. William H. Spence Executive Vice President Chief Operating Officer/Chief Nuclear Officer PPL Corporation Two North Ninth Street, GENTW16 Allentown, PA 18101-1179 |
| Spence Executive Vice President Chief Operating Officer/Chief Nuclear Officer PPL Corporation Two North Ninth Street, GENTW16 Allentown, PA 18101-1179 SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND CORRECTION LETTER RE: WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NOS. | |
| MD8490 AND MD8491)
| |
|
| |
|
| ==Dear Mr. By letter dated March 28,== | | ==SUBJECT:== |
| 2008, you applied for an amendment to the Susquehanna Electric Station, Units 1 and 2, Facility Operating License Nos.
| | SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 CORRECTION LETTER RE: WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NOS. MD8490 AND MD8491) |
| NPF-14 and Subsequently, by letter dated March 27, 2009, you withdrew the amendment request. March 30, 2009 (Agencywide Documents Access and Management System Accession No. ML090890156), the Nuclear Regulatory Commission (NRC) issued the regarding withdrawal of the amendment request and the "Notice of Withdrawal of Application Amendment to Facility Operating License with the Office of the Federal Register for as the Prior to the publication of the Notice of Withdrawal in the Federal Register, the NRC staff an inadvertent error in the notice of withdrawal, that omitted the information regarding details (May 6, 2008 (73 FR 25044)) regarding the original Federal Register Notice Consideration of Issuance Of Amendment. Please note that the correct notice will be in the Federal Register.
| |
| The enclosure to this letter provides the corrected page 2 of the of Please contact me at (301 )-415-3308, if you have any Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and Corrected Page 2 of the Notice of cc w/encl:
| |
| Distribution via
| |
| -23) to modify the existing note to Surveillance Requirement (SR) 3.6.4.1.3 and add a second note to this same SR, to expand upon the existing SR exception note by adding other types of door access openings that occur for entry and exit of people or equipment, and 4) the administrative change to remove a one-time allowance in TS 3.6.4.1 and TS 3.6.4.3 "Standby Gas Treatment System [SGTS]," that extended the allowable Completion Time for Secondary Containment inoperable and two SGTS subsystems inoperable in MODE 1, 2, or 3.
| |
| This allowance was previously incorporated into both Unit 1 and Unit 2 TSs to facilitate Reactor Recirculating Fan Damper Motor work. The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on May 6,2008 (73 FR 25044). However, by letter dated March 27, 2009, the licensee withdrew the proposed change. For further details with respect to this action, see the application for amendment dated March 28, 2008, and the licensee's letter dated March 27, 2009, which withdrew the application for license amendment.
| |
| Documents may be examined, and/or copied for a fee, at the NRC's Public Document Room (PDR), located at One White Flint North, Public File Area 01 F21, 11555 Rockville Pike (first floor), Rockville, Maryland.
| |
| Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr.resource@nrc.gov.
| |
| March 2, 2009 Mr. William H.
| |
| Spence Executive Vice President Chief Operating Officer/Chief Nuclear Officer PPL Corporation Two North Ninth Street, GENTW16 Allentown, PA 18101-1179 SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND CORRECTION LETTER RE: WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NOS.
| |
| MD8490 AND MD8491) | |
|
| |
|
| ==Dear Mr. By letter dated March 28,== | | ==Dear Mr. Spence:== |
| 2008, you applied for an amendment to the Susquehanna Electric Station, Units 1 and 2, Facility Operating License Nos. NPF-14 and Subsequently, by letter dated March 27, 2009, you withdrew the amendment request. March 30, 2009 (Agencywide Documents Access and Management System Accession No. ML090890156), the Nuclear Regulatory Commission (NRC) issued the regarding withdrawal of the amendment request and the "Notice of Withdrawal of Application Amendment to Facility Operating License with the Office of the Federal Register for as the Prior to the publication of the Notice of Withdrawal in the Federal Register, the NRC staff an inadvertent error in the notice of withdrawal, that omitted the information regarding details (May 6, 2008 (73 FR 25044)) regarding the original Federal Register Notice Consideration of Issuance Of Amendment. Please note that the correct notice will be in the Federal Register. | | |
| The enclosure to this letter provides the corrected page 2 of the of Please contact me at (301 | | By letter dated March 28, 2008, you applied for an amendment to the Susquehanna Steam Electric Station, Units 1 and 2, Facility Operating License Nos. NPF-14 and NPF-22. |
| )-415-3308, if you have any Sincerely, IRA! Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388 | | Subsequently, by letter dated March 27, 2009, you withdrew the amendment request. On March 30, 2009 (Agencywide Documents Access and Management System (ADAMS) |
| | Accession No. ML090890156), the Nuclear Regulatory Commission (NRC) issued the letter regarding withdrawal of the amendment request and the "Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication" as the enclosure. |
| | Prior to the publication of the Notice of Withdrawal in the Federal Register, the NRC staff noticed an inadvertent error in the notice of withdrawal, that omitted the information regarding specific details (May 6, 2008 (73 FR 25044)) regarding the original Federal Register Notice of Consideration of Issuance Of Amendment. Please note that the correct notice will be published in the Federal Register. The enclosure to this letter provides the corrected page 2 of the Notice of Withdrawal. |
| | Please contact me at (301 )-415-3308, if you have any questions. |
| | Sincerel~: .L~ |
| | ~~wo |
| | ~ |
| | Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| Corrected Page 2 of the Notice of Withdrawal cc w/encl: Distribution via Listserv DISTRIBUTION PUBLIC PDI-1 RF RidsNrrDorlLPL 1-1 RidsOGCRp RidsNrrDorlDpr RidsNrrPMBVaidya (hard copy) RidsNrrLA SUttle (hard copy) | | |
| RidsAcrsAcnw&mMailCenter RidsRg1MailCenter ADAMS Accession No*.. ML090910453 OFFICE LPLI-1/PM LPLI-1/LA LPLI-1/BC LPLI-1/PM NAME BVaidya SUttle MKowal BVaidya DATE 4/02/09 4/02/09 4/02/09 4/02/09 OFFICIAL RECORD COPY}}
| | Corrected Page 2 of the Notice of Withdrawal cc w/encl: Distribution via Listserv |
| | |
| | -2 |
| | : 3) to modify the existing note to Surveillance Requirement (SR) 3.6.4.1.3 and add a second note to this same SR, to expand upon the existing SR exception note by adding other types of door access openings that occur for entry and exit of people or equipment, and |
| | : 4) the administrative change to remove a one-time allowance in TS 3.6.4.1 and TS 3.6.4.3 "Standby Gas Treatment System [SGTS]," that extended the allowable Completion Time for Secondary Containment inoperable and two SGTS subsystems inoperable in MODE 1, 2, or 3. |
| | This allowance was previously incorporated into both Unit 1 and Unit 2 TSs to facilitate Reactor Recirculating Fan Damper Motor work. |
| | The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on May 6,2008 (73 FR 25044). However, by letter dated March 27, 2009, the licensee withdrew the proposed change. |
| | For further details with respect to this action, see the application for amendment dated March 28, 2008, and the licensee's letter dated March 27, 2009, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRC's Public Document Room (PDR), located at One White Flint North, Public File Area 01 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr.resource@nrc.gov. |
| | |
| | *.. ML090910453 OFFICE LPLI-1/PM LPLI-1/LA LPLI-1/BC LPLI-1/PM NAME BVaidya SUttle MKowal BVaidya DATE 4/02/09 4/02/09 4/02/09 4/02/09}} |
Letter Sequence Withdrawal |
---|
|
|
|
|
---|
Category:Letter
MONTHYEARIR 05000387/20245012024-11-13013 November 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000387/2024501 and 05000388/2024501 IR 05000387/20240102024-11-13013 November 2024 Biennial Problem Identification and Resolution Inspection Report 05000387/2024010 and 05000388/2024010 IR 05000387/20240032024-11-12012 November 2024 Integrated Inspection Report 05000387/2024003 and 05000388/2024003 PLA-8135, Specification 5.5.12, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type Leak Rate Testing Frequencies and Permanently Extend the Drywell Bypass Leakage Test Frequency - PLA-81352024-11-0101 November 2024 Specification 5.5.12, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type Leak Rate Testing Frequencies and Permanently Extend the Drywell Bypass Leakage Test Frequency - PLA-8135 ML24289A1252024-10-22022 October 2024 – Authorized Alternative to Requirements of the ASME OM Code PLA-8145, Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-81452024-10-21021 October 2024 Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-8145 ML24291A1562024-10-16016 October 2024 Missed Annual Inventory Required by 40 CFR 266, Subpart in PLE 0026645 PLA-8148, Registration for the Use of Spent Fuel Storage Casks 311, 308, and 3102024-10-15015 October 2024 Registration for the Use of Spent Fuel Storage Casks 311, 308, and 310 PLA-8141, Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-81412024-09-18018 September 2024 Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-8141 PLA-8142, Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-81422024-09-18018 September 2024 Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-8142 ML24260A2312024-09-17017 September 2024 Senior Reactor and Reactor Operator Initial License Examinations 05000387/LER-2024-002, B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor2024-09-16016 September 2024 B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24233A2192024-09-0303 September 2024 – Authorized Alternative to Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR 05000387/20240052024-08-29029 August 2024 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2024005 and 05000388/2024005) 05000387/LER-2023-004-01, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-08-26026 August 2024 Manual Reactor Scram Due to Degraded Main Condenser Vacuum 05000387/LER-2024-001-01, Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear2024-08-21021 August 2024 Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear IR 05000387/20240022024-08-12012 August 2024 Integrated Inspection Report 05000387/2024002 and 05000388/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) ML24197A0982024-07-15015 July 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000387/2024010 and 05000388/2024010 ML24127A2262024-05-29029 May 2024 Issuance of Amendment Nos. 288 and 272 Adoption of TSTF-563 PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) 05000387/LER-2024-001, Main Steam Isolation Valve Leakage2024-05-23023 May 2024 Main Steam Isolation Valve Leakage IR 05000387/20240012024-05-13013 May 2024 Integrated Inspection Report 05000387/2024001 and 05000388/2024001 IR 05000387/20244042024-05-0707 May 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000387/2024404 and 05000388/2024404 PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure ML24082A1372024-04-22022 April 2024 Issuance of Amendment Nos. 287 and 271 Adoption of TSTF-568, Revision 2 and Associated Technical Specification Changes PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) PLA-8098, Annual Financial Report (PLA-8098)2024-04-0101 April 2024 Annual Financial Report (PLA-8098) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance ML24067A2512024-03-19019 March 2024 Authorized Alternative to Requirements of the ASME Code ML24044A2532024-03-14014 March 2024 Associated Independent Spent Fuel Storage Installation – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0077 (Security Notifications, Reports, and Recordkeeping & Suspicious Activity Reporting)) IR 05000387/20240112024-02-29029 February 2024 Commercial Grade Dedication Inspection Report 05000387/2024011 and 05000388/2024011 IR 05000387/20230062024-02-28028 February 2024 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2023006 and 05000388/2023006) ML24039A1882024-02-27027 February 2024 Issuance of Amendment Nos. 286 and 270 Changes to Technical Specifications for Control Rods ML24037A3072024-02-22022 February 2024 Summary of Regulatory Audit in Support of Relief Request 5RR-02 PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) IR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 05000387/LER-2023-004, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-01-0909 January 2024 Manual Reactor Scram Due to Degraded Main Condenser Vacuum 2024-09-06
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Apd 1 2, 2009 Mr. William H. Spence Executive Vice President Chief Operating Officer/Chief Nuclear Officer PPL Corporation Two North Ninth Street, GENTW16 Allentown, PA 18101-1179
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 CORRECTION LETTER RE: WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NOS. MD8490 AND MD8491)
Dear Mr. Spence:
By letter dated March 28, 2008, you applied for an amendment to the Susquehanna Steam Electric Station, Units 1 and 2, Facility Operating License Nos. NPF-14 and NPF-22.
Subsequently, by letter dated March 27, 2009, you withdrew the amendment request. On March 30, 2009 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML090890156), the Nuclear Regulatory Commission (NRC) issued the letter regarding withdrawal of the amendment request and the "Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication" as the enclosure.
Prior to the publication of the Notice of Withdrawal in the Federal Register, the NRC staff noticed an inadvertent error in the notice of withdrawal, that omitted the information regarding specific details (May 6, 2008 (73 FR 25044)) regarding the original Federal Register Notice of Consideration of Issuance Of Amendment. Please note that the correct notice will be published in the Federal Register. The enclosure to this letter provides the corrected page 2 of the Notice of Withdrawal.
Please contact me at (301 )-415-3308, if you have any questions.
Sincerel~: .L~
~~wo
~
Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388
Enclosure:
Corrected Page 2 of the Notice of Withdrawal cc w/encl: Distribution via Listserv
-2
- 3) to modify the existing note to Surveillance Requirement (SR) 3.6.4.1.3 and add a second note to this same SR, to expand upon the existing SR exception note by adding other types of door access openings that occur for entry and exit of people or equipment, and
- 4) the administrative change to remove a one-time allowance in TS 3.6.4.1 and TS 3.6.4.3 "Standby Gas Treatment System [SGTS]," that extended the allowable Completion Time for Secondary Containment inoperable and two SGTS subsystems inoperable in MODE 1, 2, or 3.
This allowance was previously incorporated into both Unit 1 and Unit 2 TSs to facilitate Reactor Recirculating Fan Damper Motor work.
The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on May 6,2008 (73 FR 25044). However, by letter dated March 27, 2009, the licensee withdrew the proposed change.
For further details with respect to this action, see the application for amendment dated March 28, 2008, and the licensee's letter dated March 27, 2009, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRC's Public Document Room (PDR), located at One White Flint North, Public File Area 01 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr.resource@nrc.gov.
- .. ML090910453 OFFICE LPLI-1/PM LPLI-1/LA LPLI-1/BC LPLI-1/PM NAME BVaidya SUttle MKowal BVaidya DATE 4/02/09 4/02/09 4/02/09 4/02/09