Withdrawal of an Amendment Request
ML090890156
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/30/2009
From: Bhalchandra Vaidya
Plant Licensing Branch 1
To: Spence W
PPL Corp
Vaidya B, NRR/DORL/LP4, 415-3308
References
TAC MD8490, TAC MD8491
Download: ML090890156 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 March 30, 2009 Mr. William H. Spence Executive Vice President Chief Operating Officer/Chief Nuclear Officer PPL Corporation Two North Ninth Street, GENTW16 Allentown, PA 18101-1179

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NOS. MD8490 AND MD8491)

Dear Mr. Spence:

By letter dated March 28, 2008, you applied for an amendment to the Susquehanna Steam Electric Station, Units 1 And 2, Facility Operating License Nos. NPF-14 and NPF-22.

The proposed change would have modified PPL Susquehanna, LLC, Units 1 and 2 (PPL)

Technical Specifications (TSs) TS 3.6.4.1 "Secondary Containment," and TS 3.6.4.3 "Standby Gas Treatment System," as follows:

1) to add a new Required Action option for TS 3.6.4.1 Condition A, to allow additional time to restore secondary containment to OPERABLE when the inoperability is not caused by a loss of secondary containment integrity,
2) to add a new Actions note TS 3.6.4.1, to allow opening of secondary containment heating ventilation and air conditioning duct access doors and opening of a secondary containment equipment ingress/egress door (102 door) under administrative controls provided no movement of irradiated fuel assemblies in the secondary containment, CORE ALTERATIONS, or operations with a potential for draining the reactor vessel are in progress,
3) .to modify the existing note to Surveillance Requirement (SR) 3.6.4.1.3 and add a second note to this same SR, to expand upon the existing SR exception note by adding other types of door access openings that occur for entry and exit of people or equipment, and
4) the administrative change to remove a one-time allowance in TS 3.6.4.1 and TS 3.6.4.3 "Standby Gas Treatment System [SGTS]," that extended the allowable Completion Time for Secondary Containment inoperable and two SGTS subsystems inoperable in MODE 1, 2, or 3.

This allowance was previously incorporated into both Unit 1 and Unit 2 TSs to facilitate Reactor Recirculating Fan Damper Motor work.

Subsequently, by letter dated March 27,2009, you withdrew the amendment request.

W. H. Spence -2 The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely, Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388

Enclosure:

Notice of Withdrawal cc w/encl: Distribution via Listserv

7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION PPL SUSQUEHANNA, LLC DOCKET NOS. 50-387 AND 50-388 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has granted the request of PPL Susquehanna, LLC, (the licensee) to withdraw its March 28, 2008, application for proposed amendment to Facility Operating License Nos. NPF-14 and NPF-22 for the Susquehanna Steam Electric Station, Units 1 and 2, located in Luzerne County, Pennsylvania.

The proposed change would have modified PPL Susquehanna, LLC, Units 1 and 2 (PPL) Technical Specifications (TSs) TS 3.6.4.1 "Secondary Containment," and TS 3.6.4.3 "Standby Gas Treatment System," as follows:

1) to add a new Required Action option for TS 3.6.4.1 Condition A, to allow additional time to restore secondary containment to OPERABLE when the inoperability is not caused by a loss of secondary containment integrity,
2) to add a new Actions note TS 3.6.4.1, to allow opening of secondary containment heating ventilation and air conditioning duct access doors and opening of a secondary containment equipment ingress/egress door (102 door) under administrative controls provided no movement of irradiated fuel assemblies in the secondary containment, CORE ALTERATIONS, or operations with a potential for draining the reactor vessel (OPDRVs) are in progress,

-2

3) to modify the existing note to Surveillance Requirement (SR) 3.6.4.1.3 and add a second note to this same SR, to expand upon the existing SR exception note by adding other types of door access openings that occur for entry and exit of people or equipment, and
4) the administrative change to remove a one-time allowance in TS 3.6.4.1 and TS 3.6.4.3 "Standby Gas Treatment System [SGTS]," that extended the allowable Completion Time for Secondary Containment inoperable and two SGTS subsystems inoperable in MODE 1, 2, or 3.

This allowance was previously incorporated into both Unit 1 and Unit 2 TSs to facilitate Reactor Recirculating Fan Damper Motor work.

The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on [date] (XX FR XXXXX). However, by letter dated March 27, 2009, the licensee withdrew the proposed change.

For further details with respect to this action, see the application for amendment dated March 28, 2008, and the licensee's letter dated March 27, 2009, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRC's Public Document Room (PDR), located at One White Flint North, Public File Area 01 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr.resource@nrc.gov.

-3 Dated at Rockville, Maryland, this 30th day of March 2009.

FOR THE NUCLEAR REGULATORY COMMISSION Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

W. H. Spence - 2 The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely,

/raJ Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388

Enclosure:

Notice of Withdrawal cc w/encl: Distribution via Listserv DISTRIBUTION PUBLIC PDI-1 RF RidsNrrDorlLPL 1-1 RidsOGCRp RidsNrrDorlDpr RidsNrrPMBVaidya (hard copy) RidsNrrLA SLittie (hard copy)

RidsAcrsAcnw&mMailCenter RidsRg1MailCenter ADAMS Accession No.: ML090890156 *concurrence via e-mail dated 3/30109 OFFICE LPLI-1/PM LPLI-1/LA LPLI-1/BC LPLI-1/PM NAME BVaidya SLittie (*) MKowal (~IBoska for) BVaidya DATE 3/30109 3/30109 3/30109 3/30109 OFFICIAL RECORD COpy