|
---|
Category:E-Mail
MONTHYEARML24029A2732024-01-29029 January 2024 NRC Consultation with Commonwealth of Pennsylvania Re Proposed NSHC for Susquehanna License Amendment Request ML23352A2542023-12-18018 December 2023 NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, License Amendment Request to Revise Technical Specifications (TS) to Adopt TSTF-568 ML23345A0542023-12-0808 December 2023 Email - NRC LIC-109 Acceptance Review Results for Susquehanna License Amendment Request to Revise Technical Specifications to Adopt TSTF-563 ML23334A1502023-11-30030 November 2023 NRC Request for Additional Information Re. Susquehanna Relief Request RR-02 ML23334A1682023-11-30030 November 2023 NRC Request for Additional Information Re. Susquehanna Relief Request RR-01 ML23242A2832023-08-30030 August 2023 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, Proposed Alternatives RR01 and RR02 (EPIDs L-2023-LLR-0043 and -0044) ML23230A0712023-08-18018 August 2023 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, Proposed Alternative for Valve 251130 ML23188A0802023-07-0707 July 2023 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, License Amendment Request to Revise Control Rod Technical Specifications ML23171A4312023-06-20020 June 2023 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, Proposed Alternative 5RR-02 ML23103A4702023-04-12012 April 2023 NRR E-mail Capture - Susquehanna Unit 2 - Verbal Authorization of Relief Request 4RR-10 ML23094A1242023-03-31031 March 2023 EN 56387 Update - Paragon Energy Solutions Final Notification of Defect of Automatic Transfer Switch ML23075A0492023-03-16016 March 2023 NRR E-mail Capture - Notification to the State of Pennsylvania Re. Susquehanna Steam Electric Station, Units 1 and 2 - Indirect License Transfer and Draft Conforming Amendments ML23073A1202023-03-14014 March 2023 NRR E-mail Capture - Evacuation Time Estimate Review ML23013A2082023-01-13013 January 2023 Request for Additional Information ML23012A0012023-01-11011 January 2023 NRC Notification to the State of Pennsylvania Re. Emergency Amendment Control Rod Technical Specifications ML22293A0882022-10-20020 October 2022 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna License Transfer ML22257A1942022-09-14014 September 2022 NRR E-mail Capture - NRC Notification to the State of Pennsylvania Re. Susquehanna Steam Electric Station, Units 1 and 2 Amendment - Relocating Staff Qualification Requirements ML22213A2612022-08-0101 August 2022 NRR E-mail Capture - NRC Notification to the State of Pennsylvania Re. Susquehanna Steam Electric Station, Units 1 and 2 Amendment - Instrumentation and Control Technical Specifications ML22179A2902022-06-28028 June 2022 NRR E-mail Capture - NRC Notification to the State of Pennsylvania Re. Susquehanna Steam Electric Station, Units 1 and 2 Amendment - TSTF-505, Risk Informed Completion Times ML22146A0742022-05-25025 May 2022 NRR E-mail Capture - NRC Request for Additional Information - Susquehanna License Amendment Request ML22123A1112022-05-0303 May 2022 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, License Amendment Request to Relocate Staff Qualifications ML22111A3132022-04-21021 April 2022 NRR E-mail Capture - NRC Request for Additional Information - Susquehanna License Amendment Request ML22084A0222022-03-25025 March 2022 NRR E-mail Capture - Susquehanna Atrium-11 LAR Audit Report ML22038A1062022-02-0404 February 2022 NRR E-mail Capture - Susquehanna Steam Electric Station, Units 1 and 2 - Acceptance of Requested Licensing Action Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR ML22005A0712021-12-21021 December 2021 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna 1 & 2 ECCS TS LAR ML21190A1702021-06-11011 June 2021 NRR E-mail Capture - NRC Notification to the State of Pennsylvania Regarding a Susquehanna Steam Electric Station, Unit 2 Amendment - Unit 1 Transformer Replacement ML21124A2022021-05-0404 May 2021 NRR E-mail Capture - Acceptance Review for Susquehanna TSTF-505 ML20343A3702020-12-0808 December 2020 NRR E-mail Capture - Acceptance Review of Susquehanna RR 4RR-02 ML20343A3712020-12-0808 December 2020 NRR E-mail Capture - Corrected - Acceptance Review of Susquehanna RR 4RR-02 ML20335A5732020-11-30030 November 2020 NRR E-mail Capture - Susquehanna -Acceptance Review Replacement of Unit 1 Transformers ML20283A7722020-10-0909 October 2020 Submittal of Pennsylvania Letter Requesting Exemption from Biennial Exercise Requirements for Pennsylvania Nuclear Power Plants in Calendar Year 2020 ML20261H4272020-09-17017 September 2020 NRR E-mail Capture - Corrected Acceptance Review for Susquehanna - Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20261H4212020-09-16016 September 2020 NRR E-mail Capture - Corrected Acceptance Review for Susquehanna - Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20195B1282020-07-13013 July 2020 NRR E-mail Capture - Acceptance Review for Susquehanna- Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (EPID L-2020-Lla-0139) ML20178A6502020-06-26026 June 2020 Acceptance Review for Susquehanna - Revise Technical Specification 3.8.1 to Create a New Condition for an Inoperable Manual Synchronization Circuit ML20028F6352020-01-28028 January 2020 NRR E-mail Capture - Acceptance Review of LAR to Revise the Dose Consequence Analysis for a Loss of Coolant Accident ML19319A0092019-11-14014 November 2019 NRR E-mail Capture - Draft RAI for SSES Units 1 and 2 LAR to Replace ESW Piping ML19319B1922019-11-14014 November 2019 NRR E-mail Capture - RAI for Susquehanna, 1 and 2 License Amendment Request - Replace the Emergency Service Water System and Residual Heat Removal Service Water System ML19234A0342019-08-19019 August 2019 Acceptance Review: Susquehanna Units 1 and 2 License Amendment Request for Advanced Framatome Methodologies for Atrium 11 ML19234A1222019-08-19019 August 2019 Acceptance Review: Susquehanna Units 1 and 2 License Amendment Request for TSTF-535 ML19128A0232019-05-0707 May 2019 Request for Additional Information: Susquehanna Steam Electric Station, Units 1 and 2 License Amendment Request for ESW Piping Replacement ML19107A0092019-04-16016 April 2019 License Amendment Request for TSTF-439 ML19039A0892019-02-0808 February 2019 Acceptance of Requested Licensing Action License Amendment Request to Revise Emergency Service Water Piping Technical Specifications During Replacement ML19003A4752019-01-0303 January 2019 Acceptance Review Susquehanna Units 1 and 2 License Amendment Request for TSTF-501 ML18347A3282018-12-12012 December 2018 E-Mail from M. Krick/Sses SSES ISFSI (Conversation Held on December 12, 2018) ML18122A2412018-05-0202 May 2018 NRR E-mail Capture - Accepted for Review - Sequoyah 1 and 2, Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report (SQN-TS-17-04) ML18108A3022018-04-18018 April 2018 NRR E-mail Capture - Accepted for Review - Sequoyah License Amendment Request to Adopt 10CFR50.69 Risk-informed SSC Categorization ML17290A0242017-10-16016 October 2017 NRR E-mail Capture - Acceptance Review: Susquehanna Units 1 and 2 License Amendment Request for TSTF-542 ML17081A3802017-03-21021 March 2017 E-mail - Multi-Licensee License Amendment Request Example ML16211A3562016-07-29029 July 2016 Acceptance of Requested Licensing Action Request for Order Approving Indirect Transfer of Control 2024-01-29
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23334A1502023-11-30030 November 2023 NRC Request for Additional Information Re. Susquehanna Relief Request RR-02 ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information ML23013A2082023-01-13013 January 2023 Request for Additional Information ML22146A1022022-05-26026 May 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000387/2022404 and 05000388/2022404 ML22146A0742022-05-25025 May 2022 NRR E-mail Capture - NRC Request for Additional Information - Susquehanna License Amendment Request ML22111A3132022-04-21021 April 2022 NRR E-mail Capture - NRC Request for Additional Information - Susquehanna License Amendment Request ML22041A1562022-02-10010 February 2022 Information Request for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000387/2022013 and 05000388/2022013 ML21316A1242021-11-18018 November 2021 Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Emergency Core Cooling Technical Specifications ML20056E4392020-02-21021 February 2020 Ti 2515/194 Inspection Documentation Request ML20010D2012020-01-0909 January 2020 Request for Additional Information Related to Request to Allow Application of Framatome Analysis Methodologies Necessary to Support a Planned Transition to Atrium 11 Fuel Under Maximum ML19319B1922019-11-14014 November 2019 NRR E-mail Capture - RAI for Susquehanna, 1 and 2 License Amendment Request - Replace the Emergency Service Water System and Residual Heat Removal Service Water System ML19319A0092019-11-14014 November 2019 NRR E-mail Capture - Draft RAI for SSES Units 1 and 2 LAR to Replace ESW Piping ML19128A0232019-05-0707 May 2019 Request for Additional Information: Susquehanna Steam Electric Station, Units 1 and 2 License Amendment Request for ESW Piping Replacement ML18352B1832018-12-13013 December 2018 Enclosurequest for Additional Information (Letter to K. Cimorelli Request for Additional Information Regarding Susquehanna Nuclear, Llc'S Decommissioning Funding Plan Update for Susquehanna Steam Electric Station Independent Spent Fuel Stor ML17180A2002017-07-0707 July 2017 Request for Additional Information Regarding License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage and Frequency Limits ML17059D2142017-03-0606 March 2017 Susquehanna Steam Electric Station - Supplemental Information Needed for Acceptance of Requested Licensing Action Re: License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage Frequency Limits ML16251A0652016-09-0909 September 2016 Susquehanna Steam Electric Station, Unit 2 - RAI Regarding Temporary Change of Unit 2, Technical Specifications 3.7.1 & 3.8.7 to Allow Replacement of Unit 1, 480 Volt Engineered Safeguard System Load Center Transformers(CAC No. MF7298) ML16245A2052016-09-0101 September 2016 Draft Request for Additional Information Replacement of Load Center Transformers ML16243A0952016-08-30030 August 2016 Draft Request for Additional Information Application for Approval of Indirect Transfer of Control of Licenses ML16060A2302016-03-24024 March 2016 Acceptance of Requested Licensing Action License Amendment Request for Temporary Change of Unit 2 Technical Specifications 3.71 and 3.87 to Allow Replacement of Unit 1 480V Ess Load Center Transformers ML15316A5632015-11-13013 November 2015 Request for Additional Information Regarding Proposed Relief Requests for the Third 10-Year Inservice Inspection Interval(Cac Nos. MF6302 Through MF6307) ML15292A1782015-10-15015 October 2015 TSTF-425 LAR Draft 3rd RAIs ML15230A0802015-08-26026 August 2015 Request for Additional Information Regarding License Amendment Request to Adopt NEI 99-01, Revision 6, EAL Scheme Change ML15209A9742015-08-24024 August 2015 Request for Additional Information License Amendment Request to Adopt Technical Specifications Task Force Traveler (TSTF)-425 ML15229A2002015-08-17017 August 2015 E-mail from J. Whited to J. Jennings SSES Draft TSTF-425 RAIs ML15229A2092015-08-17017 August 2015 SSES Draft Request for Additional Information Licensee Request to Adopt TSTF-425 ML15230A0462015-08-17017 August 2015 Draft RAIs SSES EAL Scheme Change LAR in Accordance with NEI 99-01 Rev 6 ML15183A3502015-07-0202 July 2015 SSES Relief Requests 3RR-19, 3RR-20, and 3RR-21 Draft Identified Information Insufficiencies (TAC Nos. MF6302 Through MF6307) ML15103A3962015-05-22022 May 2015 Request for Additional Information License Amendment Request to Adopt Technical Specifications Task Force Traveler (TSTF)-425 (TAC Nos. MF5151 and MF5152) ML15128A5162015-05-0808 May 2015 SSES Draft Request for Additional Information LAR for Implementation of TSTF-425 ML15128A5092015-05-0808 May 2015 E-mail from J. Whited to D. Filchner SSES Draft Request for Additional Information LAR for Implementation of TSTF-425 ML15008A4702015-01-30030 January 2015 Request for Additional Information Request to Revise Technical Specification 3.4.10, RCS Pressure and Temperature (P/T) Limits. ML15016A2742015-01-16016 January 2015 Draft RAIs License Amendment Request for Change to TS 3.4.10 P/T Limits (TAC Nos. MF4597 and MF45980) ML15016A2722015-01-16016 January 2015 E-mail from J. Whited to D. Filchner Draft RAIs License Amendment Request for Change to TS 3.4.10 P/T Limits (TAC Nos. MF4597 and MF45980) ML14343A9842015-01-0808 January 2015 Request for Additional Information Relief Request 4RR-01 ML14345A2412014-12-16016 December 2014 Request for Additional Information Request for Order Approving Indirect Transfer of Control and Conforming License Amendments ML14346A1022014-12-12012 December 2014 Draft License Transfer Revised 2nd RAIs ML14346A4022014-12-12012 December 2014 Draft RAIs Relief Request 4RR-01 ML14346A4012014-12-12012 December 2014 E-mail from J. Whited to D. Filchner Susquehanna Steam Electric Station Draft RAIs Relief Request 4RR-01 ML14346A1002014-12-12012 December 2014 E-mail from J. Whited to R. Sgarro Susquehanna Steam Electric Station Draft License Transfer Revised 2nd RAIs ML14342A8082014-12-0808 December 2014 E-mail from J. Whited to R. Sgarro (PPL) SSES Units 1 and 2 Draft RAIs Application for Approval of Indirect Transfer of Control of Licenses ML14342A8132014-12-0808 December 2014 SSES Units 1 and 2 Draft RAIs Application for Approval of Indirect Transfer of Control of Licenses ML14233A2772014-08-27027 August 2014 Request for Additional Information License Amendment Request to Change the Low Pressure Safety Limit ML14233A3392014-08-21021 August 2014 Draft RAIs for Susquehanna Steam Electric Station Units 1 and 2 License Amendment Request for Changes to the Low Pressure Safety Limits ML13298A7582014-03-0707 March 2014 Request for Additional Information Regarding Request for Changes to Technical Specification Surveillance Requirements to Increase Diesel Generator Minimum Steady State Voltage (TAC ME9607 and ME960) ML13298A7812014-03-0707 March 2014 Request for Additional Information Regarding Request for Changes to Technical Specification Surveillance Requirement 3.8.1.19 to Increase Diesel Generator Minimum Steady State Frequency (TACs ME9609. ML14013A1502014-01-31031 January 2014 Request for Additional Information Regarding Relief Requests for the Fourth 10-Year Inservice Testing Interval ML14024A4752014-01-24024 January 2014 Draft 4th IST RRs 1RR05 RAIs ML13338A4422013-12-19019 December 2013 Request for Additional Information Regarding Relief Requests for the Fourth Ten-Year Inservice Inspection Interval ML13312A9142013-12-18018 December 2013 Request for Additional Information Regarding Request for Changes to Technical Specification Surveillance Requirements 3.5.1.12 2023-11-30
[Table view] |
Text
From: Bhalchandra Vaidya Sent: Friday, January 23, 2009 1:47 PM To: 'Coddington, Cornelius T' Cc: Mark Kowal; Nageswara Karipineni; Aleem Boatright
Subject:
MD8490 & MD8491- RAI from SCVB & AADB-LAR Re: changes to TS 3.6.4.1 and TS 3.6.4.3 Attachments: MD8490 & MD8491- RAIs from SCVB & AADB.doc
Subject:
License Amendment Request, PLA-6328.
Re: Changes to TS 3.6.4.1 and TS 3.6.4.3 Subsequent to the Tele-Conference between the NRC staff and PPL Susquehanna (PPL) on December 18, 2008, and the review of the additional draft information you sent via your e-mail to me on January 15, 2009, the NRC staff from SCVB and AADB has determined that additional information, as described in the "The Request for Additional Information (RAI)" in the attachment, is needed to complete the review of the subject License Amendment Request.
This request is in addition to the Draft RAI from ITSB, that is being sent you via separate e-mail and the RAI from APLA sent to you on December 17, 2008, (This RAI was discussed in the tele-Conf between the NRC staff and PPL on December 22, 2008).
Please contact me, if you any questions and require clarifications from the NRC Staff. Also, let me know ASAP when you will respond to all the RAI sets mentioned above.
Also, please note that in view of the complexity of the Amendment Request and the extent of the staff review involved, the NRC Staff does not believe that the requested completion date of March 28, 2009, could be met.
Bhalchandra K. Vaidya Licensing Project Manager U. S. NRC, NRR/DORL 301-415-3308 (Office) 301-415-1222 (Fax)
Bhalchandra.Vaidya@nrc.gov E-mail Properties Mail Envelope Properties (1D658D167B82F54585A33C1A31821B6827C1292838)
Subject:
MD8490 & MD8491- RAI from SCVB & AADB-LAR Re: changes to TS 3.6.4.1 and TS 3.6.4.3 Sent Date: 01/23/2009 2:11:00 PM Received Date: 01/23/2009 1:47:00 PM From: Bhalchandra Vaidya Created By: Bhalchandra.Vaidya@nrc.gov Recipients:
ctcoddington@pplweb.com ('Coddington, Cornelius T')
Tracking Status: None Mark.Kowal@nrc.gov (Mark Kowal)
Tracking Status: None Nageswara.Karipineni@nrc.gov (Nageswara Karipineni)
Tracking Status: None Aleem.Boatright@nrc.gov (Aleem Boatright)
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 47947 01/23/2009 MD8490 & MD8491- RAIs from SCVB & AADB.doc 38930 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: