ML091260093: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 12/22/2008
| issue date = 12/22/2008
| title = Documentation of December 12, 2008, Telephone Conference Organizational Changes
| title = Documentation of December 12, 2008, Telephone Conference Organizational Changes
| author name = SansCrainte C V
| author name = Sanscrainte C
| author affiliation = Dairyland Power Cooperative
| author affiliation = Dairyland Power Cooperative
| addressee name = Banovac K L
| addressee name = Banovac K
| addressee affiliation = NRC/FSME/DWMEP/DURLD
| addressee affiliation = NRC/FSME/DWMEP/DURLD
| docket = 05000409
| docket = 05000409
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CHARLES V. SANS CRAINTE, P.E.Vice President, Generation DAIRYLAND POWER COO P E RAT IV E-December 22, 2008 In reply, please refer to LAC-14054 DOCKET NO. 50-409 U.S. Nuclear Regulatory Commission Attn: Kristina Banovac, FSME Mail Stop T-8F5 Washington, DC 20555.
{{#Wiki_filter:CHARLES V. SANS CRAINTE, P.E.
Vice President, Generation DAIRYLAND POWER COO     P E RAT IV         E
        -December 22, 2008 In reply, please refer to LAC-14054 DOCKET NO. 50-409 U.S. Nuclear Regulatory Commission Attn: Kristina Banovac, FSME Mail Stop T-8F5 Washington, DC 20555.


==Dear Ms. Banovac:==
==Dear Ms. Banovac:==


==SUBJECT:==
==SUBJECT:==
Dairyland Power Cooperative (DPC)La Crosse Boiling Water Reactor (LACBWR)Possession-Only License No. DPR-45 Documentation of Telephone Conference This letter documents our telephone conversation of December 12, 2008, in which we discussed the organizational changes that have been implemented at the La Crosse BoilingjWater Reactor.The changes in responsibilities and reporting relationships have been implemented to streamline and strengthen the organization in preparation for the Dry Cask Storage Project, as well as to fill the position of Plant Manager due to the impending retirement of the current Plant Manager, Roger Christians.
Dairyland Power Cooperative (DPC)
The changes that have been implemented include the following: " Richard Cota has assumed the title and responsibilities of Operations Supervisor.
La Crosse Boiling Water Reactor (LACBWR)
* Dan Tesar has been assigned as a Technical Support Engineer and will serve as an assistant to the Project Manager for the DCS Project, including performing project related training." A foreman in each of the craft areas has been designated.
Possession-Only License No. DPR-45 Documentation of Telephone Conference This letter documents our telephone conversation of December 12, 2008, in which we discussed the organizational changes that have been implemented at the La Crosse BoilingjWater Reactor.
These foremen will direct the activities of their individual groups.* The Security Captain, Martin Moe, will assume more of the day-to-day duties of security administration, such as procedure and plan changes, training and other duties. The few remaining duties regarding security and oversight will be assigned to the Plant Manager." The Health and Safety Supervisor, Larry Nelson, will add the duties of Maintenance Supervisor to his job description, but will administer the maintenance tasks through the recently appointed foremen.* Mike Brasel will succeed Mr. Christians as Plant Manager and will maintain oversight of the DCS Project as well.A Touchstone Energy Cooperative 4, 3200 East Ave. S.
The changes in responsibilities and reporting relationships have been implemented to streamline and strengthen the organization in preparation for the Dry Cask Storage Project, as well as to fill the position of Plant Manager due to the impending retirement of the current Plant Manager, Roger Christians.
The changes that have been implemented include the following:
            " Richard Cota has assumed the title and responsibilities of Operations Supervisor.
* Dan Tesar has been assigned as a Technical Support Engineer and will serve as an assistant to the Project Manager for the DCS Project, including performing project related training.
            " A foreman in each of the craft areas has been designated. These foremen will direct the activities of their individual groups.
* The Security Captain, Martin Moe, will assume more of the day-to-day duties of security administration, such as procedure and plan changes, training and other duties. The few remaining duties regarding security and oversight will be assigned to the Plant Manager.
            " The Health and Safety Supervisor, Larry Nelson, will add the duties of Maintenance Supervisor to his job description, but will administer the maintenance tasks through the recently appointed foremen.
* Mike Brasel will succeed Mr. Christians as Plant Manager and will maintain oversight of the DCS Project as well.
A Touchstone Energy Cooperative 4, 3200 East Ave. S.
* PO Box 81 7
* PO Box 81 7
* La Crosse, WI 54602-0817 o 608-787-1233  
* La Crosse, WI 54602-0817 o 608-787-1233 - 608-787-1462 fax
-608-787-1462 fax
* www.dairynet.com
* www.dairynet.com These changes have been made to improve the work processes at LACBWR and will better facilitate the completion of the Dry Cask Storage Project.If you have any questions about these changes, please call Mike Brasel of my staff at 608-689-2331, or me at 608-788-2331.
 
Sincerely, DAIRYLAND POWER COOPERATIVE Charles V. Sans Crainte Vice President Generation CVS: REC: two cc: William Snell Senior Health Physicist U.S. NRC, Region III}}
These changes have been made to improve the work processes at LACBWR and will better facilitate the completion of the Dry Cask Storage Project.
If you have any questions about these changes, please call Mike Brasel of my staff at 608-689-2331, or me at 608-788-2331.
Sincerely, DAIRYLAND POWER COOPERATIVE Charles V. Sans Crainte Vice President Generation CVS: REC: two cc:     William Snell Senior Health Physicist U.S. NRC, Region III}}

Latest revision as of 07:18, 14 November 2019

Documentation of December 12, 2008, Telephone Conference Organizational Changes
ML091260093
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 12/22/2008
From: Sanscrainte C
Dairyland Power Cooperative
To: Kristina Banovac
NRC/FSME/DWMEP/DURLD
BANOVAC, K (415-5114)
References
LAC-14054
Download: ML091260093 (2)


Text

CHARLES V. SANS CRAINTE, P.E.

Vice President, Generation DAIRYLAND POWER COO P E RAT IV E

-December 22, 2008 In reply, please refer to LAC-14054 DOCKET NO. 50-409 U.S. Nuclear Regulatory Commission Attn: Kristina Banovac, FSME Mail Stop T-8F5 Washington, DC 20555.

Dear Ms. Banovac:

SUBJECT:

Dairyland Power Cooperative (DPC)

La Crosse Boiling Water Reactor (LACBWR)

Possession-Only License No. DPR-45 Documentation of Telephone Conference This letter documents our telephone conversation of December 12, 2008, in which we discussed the organizational changes that have been implemented at the La Crosse BoilingjWater Reactor.

The changes in responsibilities and reporting relationships have been implemented to streamline and strengthen the organization in preparation for the Dry Cask Storage Project, as well as to fill the position of Plant Manager due to the impending retirement of the current Plant Manager, Roger Christians.

The changes that have been implemented include the following:

" Richard Cota has assumed the title and responsibilities of Operations Supervisor.

  • Dan Tesar has been assigned as a Technical Support Engineer and will serve as an assistant to the Project Manager for the DCS Project, including performing project related training.

" A foreman in each of the craft areas has been designated. These foremen will direct the activities of their individual groups.

  • The Security Captain, Martin Moe, will assume more of the day-to-day duties of security administration, such as procedure and plan changes, training and other duties. The few remaining duties regarding security and oversight will be assigned to the Plant Manager.

" The Health and Safety Supervisor, Larry Nelson, will add the duties of Maintenance Supervisor to his job description, but will administer the maintenance tasks through the recently appointed foremen.

  • Mike Brasel will succeed Mr. Christians as Plant Manager and will maintain oversight of the DCS Project as well.

A Touchstone Energy Cooperative 4, 3200 East Ave. S.

  • PO Box 81 7
  • La Crosse, WI 54602-0817 o 608-787-1233 - 608-787-1462 fax
  • www.dairynet.com

These changes have been made to improve the work processes at LACBWR and will better facilitate the completion of the Dry Cask Storage Project.

If you have any questions about these changes, please call Mike Brasel of my staff at 608-689-2331, or me at 608-788-2331.

Sincerely, DAIRYLAND POWER COOPERATIVE Charles V. Sans Crainte Vice President Generation CVS: REC: two cc: William Snell Senior Health Physicist U.S. NRC, Region III