ML100290023: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML100290023 | | number = ML100290023 | ||
| issue date = 01/26/2010 | | issue date = 01/26/2010 | ||
| title = | | title = Correction of Errata for Technical Specifications Change 07-05 - Upgrade of Emergency Core Cooling System Requirements | ||
| author name = Krich R | | author name = Krich R | ||
| author affiliation = Tennessee Valley Authority | | author affiliation = Tennessee Valley Authority | ||
| addressee name = | | addressee name = | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402-2801 January 26, 2010 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 | {{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402-2801 January 26, 2010 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 | ||
==Subject:== | ==Subject:== | ||
Correction of Errata for Technical Specifications Change 07 | Correction of Errata for Technical Specifications Change 07 Upgrade of Emergency Core Cooling System Requirements (TAC No. MEl115 and MEl116) | ||
==Reference:== | ==Reference:== | ||
Letter from TVA to NRC dated April 21, 2009, "Sequoyah Nuclear Plant (SQN) - Units 1 and 2 - Technical Specification (TS) Change No. 07-05, Emergency Core Cooling System (ECCS)" | |||
By letter dated April 21, 2009 (Reference), Tennessee Valley Authority (TVA) submitted a license amendment application to NRC to revise the Sequoyah Nuclear Plant (SQN) Units 1 and 2 Technical Specifications (TSs) to upgrade the emergency core cooling system TS. | |||
The enclosure provides a correction of errata that was inadvertently included in the application as described below. | |||
The Index Page for Unit 2 did not include mark-ups showing a revision to the TS Bases page numbering. The enclosure provides the corrected marked-up page. TVA has determined that the additional information provided by this letter does not affect the no significant hazards considerations associated with the proposed TS changes. The proposed TS changes still qualify for a categorical exclusion from environmental review pursuant to the provisions of 10 CFR 51.22(c)(9). | |||
Printed on recycled paper | |||
U.S. Nuclear Regulatory Commission Page 2 January 26, 2010 There are no new regulatory commitments in this letter. If you have any questions about this change, please contact Beth A. Wetzel at (423) 843-7170. | |||
I declare under the penalty of perjury that the foregoing is true and correct. | |||
Executed on this 26th day of January, 2009. | |||
Respectfully, / | |||
R. M. Krich Vice President Nuclear Licensing | |||
==Enclosure:== | ==Enclosure:== | ||
Marked-up Index page for TS Change 07-05 cc (Enclosure): | |||
Regional Administrator - NRC Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant Director, Division of Radiological Health - State of Tennessee | |||
ENCLOSURE SUPPLEMENTAL INFORMATION CONCERNING TECHNICAL SPECIFICATION CHANGE 07 UPGRADE OF EMERGENCY CORE COOLING SYSTEM REQUIREMENTS MARKED-UP PAGE E-1 | |||
INDEX BASES SECTION PAGE 3/4.4.6 REACTOR COOLANT SYSTEM LEAKAGE ...................................................................... B 3/4 4-4 3/4.4 .7 C HE MIS T RY (D eleted) ..................................................................................................... B 3/4 4-4 r 3/4 .4 .8 S P E C IFIC A C T IVITY ......................................................................................................... B 3/4 4-5 3/4.4.9 RCS PRESSURE AND TEMPERATURE (P/T) LIMITS .................................................... B 3/4 4-7 3/4.4.10 STRUCTURAL INTEG RITY (Deleted) ............................................................................. B 3/4 4-14 3/4.4.11 REACTOR COOLANT SYSTEM HEAD VENTS (Deleted) .............................................. B 3/4 4-14 3/4.4.12 LOW TEMPERATURE OVERPRESSURE PROTECTION (LTOP) SYSTEM ................ B 3/4 4-15 3/4.5 EMERGENCY CORE COOLING SYSTEMS ECCS-Operating 3/4.5.1 ACCUMULATORS ........................................................ 3/45-3/4..2 amdd- -3 GGSS-118--YsT .......(Dletd) .................B 3/4 5-X' 2 3/4. . BO RON INJECTIO N SYSTE M ........................................................................................ B 3/4 5-Z 15 3/4.5.5 REF GWATER STORAGE TANK ....................................................................... B3/4 5-15 3/4 .5.6 S EA L INJECT IO N ."16 | |||
........... _..................................................................................... B 3/4 5-W 3/4.6 CONTAINMENT SYSTEMS 3/4 5 3 ECCS - Shutdown....... B 3/4 512 3/4.6.1 PR IMA RY C O NTA INMEN T ................................................................................................... B 3/4 6-1 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS .......................................................... B 3/4 6-3 3/4.6.3 CONTAINM ENT ISOLATION VALVES .............................................................................. B 3/4 6-3 3/4.6.4 CO MBUSTIBLE GAS CO NTRO L ...................................................................................... B 3/4 6-4 3/4 .6 .5 IC E C O ND E NS E R .............................................................................................................. B 3/4 6-4 3/4.6.6 VA C UUM R ELIEF VA LV ES ............................................................................................... B 3/4 6-6 3/4.7 PLANT SYSTEMS 3/4 .7 .1 T UR B INE C Y C LE ............................................................................................................... B 3/4 7-1 3/4.7.2 STEAM GENERATOR PRESSURE/TEMPERATURE LIMITATION (Deleted) ................. B 3/4 7-3 3/4.7.3 COMPONENT COOLING WATER SYSTEM ................................................................... B 3/4 7-3a December 28, 2005 SEQUOYAH - UNIT 2 XIII Amendment No. 147, 188, 250, 284, 295 E-2}} | |||
B 3/4 4-4 3/4.4 .7 C | |||
B 3/4 4-4 r 3/4 .4 .8 S P E C IFIC A C T | |||
B 3/4 4-5 3/4.4.9 RCS PRESSURE AND TEMPERATURE (P/T) LIMITS .................................................... | |||
B 3/4 4-7 3/4.4.10 STRUCTURAL INTEG RITY (Deleted) | |||
............................................................................. | |||
B 3/4 4-14 3/4.4.11 REACTOR COOLANT SYSTEM HEAD VENTS (Deleted) | |||
.............................................. | |||
B 3/4 4-14 3/4.4.12 LOW TEMPERATURE OVERPRESSURE PROTECTION (LTOP) SYSTEM ................ | |||
B 3/4 4-15 3/4.5 EMERGENCY CORE COOLING SYSTEMS ECCS-Operating 3/4.5.1 ACCUMULATORS | |||
........................................................ | |||
3/45-3/4..2 amdd- -3 GGSS-118--YsT | |||
....... (Dletd) ................. | |||
B 3/4 5-X' 2 3/4. .BO | |||
B 3/4 5-Z 15 3/4.5.5 REF GWATER STORAGE TANK ....................................................................... | |||
B3/4 5-15 3/4 .5.6 S EA L | |||
_..................................................................................... | |||
B 3/4 5-W | |||
B 3/4 512 3/4.6.1 PR | |||
B 3/4 6-1 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS .......................................................... | |||
B 3/4 6-3 3/4.6.3 CONTAINM ENT ISOLATION VALVES .............................................................................. | |||
B 3/4 6-3 3/4.6.4 CO | |||
B 3/4 6-4 3/4 .6 .5 IC E C O | |||
B 3/4 6-4 3/4.6.6 VA C | |||
B 3/4 6-6 3/4.7 PLANT SYSTEMS 3/4 .7 .1 T | |||
B 3/4 7-1 3/4.7.2 STEAM GENERATOR PRESSURE/TEMPERATURE LIMITATION (Deleted) | |||
................. | |||
B 3/4 7-3 3/4.7.3 COMPONENT COOLING WATER SYSTEM ................................................................... | |||
B 3/4 7-3a December 28, 2005 SEQUOYAH -UNIT 2 XIII Amendment No. 147, 188, 250, 284, 295 E-2}} |
Latest revision as of 22:17, 13 November 2019
ML100290023 | |
Person / Time | |
---|---|
Site: | Sequoyah |
Issue date: | 01/26/2010 |
From: | Krich R Tennessee Valley Authority |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
TAC ME1115, TAC ME1116 | |
Download: ML100290023 (4) | |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402-2801 January 26, 2010 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328
Subject:
Correction of Errata for Technical Specifications Change 07 Upgrade of Emergency Core Cooling System Requirements (TAC No. MEl115 and MEl116)
Reference:
Letter from TVA to NRC dated April 21, 2009, "Sequoyah Nuclear Plant (SQN) - Units 1 and 2 - Technical Specification (TS) Change No. 07-05, Emergency Core Cooling System (ECCS)"
By letter dated April 21, 2009 (Reference), Tennessee Valley Authority (TVA) submitted a license amendment application to NRC to revise the Sequoyah Nuclear Plant (SQN) Units 1 and 2 Technical Specifications (TSs) to upgrade the emergency core cooling system TS.
The enclosure provides a correction of errata that was inadvertently included in the application as described below.
The Index Page for Unit 2 did not include mark-ups showing a revision to the TS Bases page numbering. The enclosure provides the corrected marked-up page. TVA has determined that the additional information provided by this letter does not affect the no significant hazards considerations associated with the proposed TS changes. The proposed TS changes still qualify for a categorical exclusion from environmental review pursuant to the provisions of 10 CFR 51.22(c)(9).
Printed on recycled paper
U.S. Nuclear Regulatory Commission Page 2 January 26, 2010 There are no new regulatory commitments in this letter. If you have any questions about this change, please contact Beth A. Wetzel at (423) 843-7170.
I declare under the penalty of perjury that the foregoing is true and correct.
Executed on this 26th day of January, 2009.
Respectfully, /
R. M. Krich Vice President Nuclear Licensing
Enclosure:
Marked-up Index page for TS Change 07-05 cc (Enclosure):
Regional Administrator - NRC Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant Director, Division of Radiological Health - State of Tennessee
ENCLOSURE SUPPLEMENTAL INFORMATION CONCERNING TECHNICAL SPECIFICATION CHANGE 07 UPGRADE OF EMERGENCY CORE COOLING SYSTEM REQUIREMENTS MARKED-UP PAGE E-1
INDEX BASES SECTION PAGE 3/4.4.6 REACTOR COOLANT SYSTEM LEAKAGE ...................................................................... B 3/4 4-4 3/4.4 .7 C HE MIS T RY (D eleted) ..................................................................................................... B 3/4 4-4 r 3/4 .4 .8 S P E C IFIC A C T IVITY ......................................................................................................... B 3/4 4-5 3/4.4.9 RCS PRESSURE AND TEMPERATURE (P/T) LIMITS .................................................... B 3/4 4-7 3/4.4.10 STRUCTURAL INTEG RITY (Deleted) ............................................................................. B 3/4 4-14 3/4.4.11 REACTOR COOLANT SYSTEM HEAD VENTS (Deleted) .............................................. B 3/4 4-14 3/4.4.12 LOW TEMPERATURE OVERPRESSURE PROTECTION (LTOP) SYSTEM ................ B 3/4 4-15 3/4.5 EMERGENCY CORE COOLING SYSTEMS ECCS-Operating 3/4.5.1 ACCUMULATORS ........................................................ 3/45-3/4..2 amdd- -3 GGSS-118--YsT .......(Dletd) .................B 3/4 5-X' 2 3/4. . BO RON INJECTIO N SYSTE M ........................................................................................ B 3/4 5-Z 15 3/4.5.5 REF GWATER STORAGE TANK ....................................................................... B3/4 5-15 3/4 .5.6 S EA L INJECT IO N ."16
........... _..................................................................................... B 3/4 5-W 3/4.6 CONTAINMENT SYSTEMS 3/4 5 3 ECCS - Shutdown....... B 3/4 512 3/4.6.1 PR IMA RY C O NTA INMEN T ................................................................................................... B 3/4 6-1 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS .......................................................... B 3/4 6-3 3/4.6.3 CONTAINM ENT ISOLATION VALVES .............................................................................. B 3/4 6-3 3/4.6.4 CO MBUSTIBLE GAS CO NTRO L ...................................................................................... B 3/4 6-4 3/4 .6 .5 IC E C O ND E NS E R .............................................................................................................. B 3/4 6-4 3/4.6.6 VA C UUM R ELIEF VA LV ES ............................................................................................... B 3/4 6-6 3/4.7 PLANT SYSTEMS 3/4 .7 .1 T UR B INE C Y C LE ............................................................................................................... B 3/4 7-1 3/4.7.2 STEAM GENERATOR PRESSURE/TEMPERATURE LIMITATION (Deleted) ................. B 3/4 7-3 3/4.7.3 COMPONENT COOLING WATER SYSTEM ................................................................... B 3/4 7-3a December 28, 2005 SEQUOYAH - UNIT 2 XIII Amendment No. 147, 188, 250, 284, 295 E-2