ML100550608: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML100550608
| number = ML100550608
| issue date = 02/02/2010
| issue date = 02/02/2010
| title = Watts Bar Nuclear Plant, Unit 2, Developmental Revision B - Technical Requirements Manual - Table of Contents
| title = Developmental Revision B - Technical Requirements Manual - Table of Contents
| author name =  
| author name =  
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
Line 17: Line 17:
{{#Wiki_filter:WATTS BAR - UNIT 2 TECHNICAL REQUIREMENTS MANUAL TABLE OF CONTENTS
{{#Wiki_filter:WATTS BAR - UNIT 2 TECHNICAL REQUIREMENTS MANUAL TABLE OF CONTENTS


TABLE OF CONTENTS TECHNICAL REQUIREMENTS Watts Bar - Unit 2 i (continued)
TABLE OF CONTENTS TECHNICAL REQUIREMENTS TABLE OF CONTENTS . i LIST OF TABLES  vi LIST OF FIGURES . vii LIST OF MISCELLANEOUS REPORTS AND PROGRAMS .. vii LIST OF ACRONYMS  viii LIST OF EFFECTIVE PAGES .. x 1.0       USE AND APPLICATION .. 1.1-1 1.1             Definitions  1.1-1 1.2             Logical Connectors .............. 1.2-1 1.3             Completion Times .. 1.3-1 1.4             Frequency  1.4-1 TR 3.0     APPLICABILITY ......... 3.0-1 TR 3.1     REACTIVITY CONTROL SYSTEMS ... 3.1-1 TR 3.1.1         Boration Systems Flow Paths, Shutdown ................ 3.1-1 TR 3.1.2         Boration Systems Flow Paths, Operating .................... 3.1-3 TR 3.1.3       Charging Pump, Shutdown .. 3.1-5 TR 3.1.4       Charging Pumps, Operating . 3.1-6 TR 3.1.5       Borated Water Sources, Shutdown . 3.1-8 TR 3.1.6       Borated Water Sources, Operating . 3.1-10 TR 3.1.7         Position Indication System, Shutdown  3.1-16 TR 3.3     INSTRUMENTATION . 3.3-1 TR 3.3.1       Reactor Trip System (RTS) Instrumentation . 3.3-1 TR 3.3.2         Engineered Safety Feature Actuation System (ESFAS) Instrumentation  3.3-4 TR 3.3.3       Power Distribution Monitoring System (PDMS) . 3.3-11 TR 3.3.4       Seismic Instrumentation  3.3-14 TR 3.3.5       Turbine Overspeed Protection . 3.3-18 TR 3.3.6       Loose-Part Detection System .. 3.3-21 TR 3.3.7       RESERVED FOR FUTURE ADDITION . 3.3-22 TR 3.3.8         Hydrogen Monitor .. 3.3.23 Watts Bar - Unit 2                              i                                (continued)
Technical Requirements (developmental)
Technical Requirements (developmental)                                                                            B
B TABLE OF CONTENTS --------------------------. i LIST OF TABLES  ----------------------------- vi LIST OF FIGURES ----------------------------. vii LIST OF MISCELLANEOUS REPORTS AND PROGRAMS ----------.. vii LIST OF ACRONYMS  --------------------------- viii LIST OF EFFECTIVE PAGES -----------------------.. x 1.0 USE AND APPLICATION --------------------.. 1.1-1 1.1 Definitions  ------------------------- 1.1-1 1.2 Logical Connectors -----------------.............. 1.2-1 1.3 Completion Times ---------------------.. 1.3-1 1.4 Frequency  ------------------------- 1.4-1 TR 3.0 APPLICABILITY ----------------------......... 3.0-1 TR 3.1 REACTIVITY CONTROL SYSTEMS ---------------... 3.1-1 TR 3.1.1 Boration Systems Flow Paths, Shutdown -------................ 3.1-1 TR 3.1.2 Boration Systems Flow Paths, Operating ------.................... 3.1-3 TR 3.1.3 Charging Pump, Shutdown -----------------.. 3.1-5 TR 3.1.4 Charging Pumps, Operating -----------------. 3.1-6 TR 3.1.5 Borated Water Sources, Shutdown --------------. 3.1-8 TR 3.1.6 Borated Water Sources, Operating --------------. 3.1-10 TR 3.1.7 Position Indication System, Shutdown  ------------- 3.1-16 TR 3.3 INSTRUMENTATION ----------------------. 3.3-1 TR 3.3.1 Reactor Trip System (RTS) Instrumentation ----------. 3.3-1 TR 3.3.2 Engineered Safety Feature Actuation System (ESFAS) Instrumentation  -----------------3.3-4 TR 3.3.3 Power Distribution Monitoring System (PDMS) ---------.
3.3-11 TR 3.3.4 Seismic Instrumentation  ------------------- 3.3-14 TR 3.3.5 Turbine Overspeed Protection ----------------. 3.3-18 TR 3.3.6 Loose-Part Detection System ----------------.. 3.3-21 TR 3.3.7 RESERVED FOR FUTURE ADDITION ------------.
3.3-22 TR 3.3.8 Hydrogen Monitor ---------------------..
3.3.23


TABLE OF CONTENTS (continued)
TABLE OF CONTENTS (continued)
TECHNICAL REQUIREMENTS Watts Bar - Unit 2 ii (continued)
TECHNICAL REQUIREMENTS TR 3.4     REACTOR COOLANT SYSTEM (RCS) .. 3.4-1 TR 3.4.1       Safety Valves, Shutdown .. 3.4-1 TR 3.4.2       Pressurizer Temperature Limits .. 3.4-3 TR 3.4.3       RCS Vents .. 3.4-5 TR 3.4.4       Chemistry  3.4-7 TR 3.4.5       Piping System Structural Integrity ... 3.4-10 TR 3.6     CONTAINMENT SYSTEMS .. 3.6-1 TR 3.6.1       Ice Bed Temperature Monitoring System ...... 3.6-1 TR 3.6.2       Inlet Door Position Monitoring System  3.6-4 TR 3.6.3       Lower Compartment Cooling (LCC) System . 3.6-6 TR 3.7     PLANT SYSTEMS ......... 3.7-1 TR 3.7.1         Steam Generator Pressure / Temperature Limitations. 3.7-1 TR 3.7.2       Flood Protection Plan  3.7-3 TR 3.7.3       Snubbers . 3.7-5 TR 3.7.4       Sealed Source Contamination . 3.7-16 TR 3.7.5       Area Temperature Monitoring ..... 3.7-19 TR 3.8     ELECTRICAL POWER SYSTEMS ......... 3.8-1 TR 3.8.1       Isolation Devices  3.8-1 TR 3.8.2         Containment Penetration Conductor Overcurrent Protection Devices ........................... 3.8-4 TR 3.8.3         Motor-Operated Valves Thermal Overload Bypass Devices ...... 3.8-8 TR 3.8.4         Submerged Component Circuit Protection .............. 3.8-14 TR 3.9     REFUELING OPERATIONS . 3.9-1 TR 3.9.1       Decay Time . 3.9-1 TR 3.9.2       Communications . 3.9-2 TR 3.9.3       Refueling Machine ..... 3.9-3 TR 3.9.4         Crane Travel - Spent Fuel Storage Pool Building  3.9-5 Watts Bar - Unit 2                              ii                            (continued)
Technical Requirements (developmental)
Technical Requirements (developmental)                                                                        A
A TR 3.4 REACTOR COOLANT SYSTEM (RCS) --------------.. 3.4-1 TR 3.4.1 Safety Valves, Shutdown ------------------.. 3.4-1 TR 3.4.2 Pressurizer Temperature Limits ---------------.. 3.4-3 TR 3.4.3 RCS Vents ------------------------.. 3.4-5 TR 3.4.4 Chemistry  ------------------------- 3.4-7 TR 3.4.5 Piping System Structural Integrity --------------... 3.4-10 TR 3.6 CONTAINMENT SYSTEMS -------------------.. 3.6-1 TR 3.6.1 Ice Bed Temperature Monitoring System ----------...... 3.6-1 TR 3.6.2 Inlet Door Position Monitoring System  ------------- 3.6-4 TR 3.6.3 Lower Compartment Cooling (LCC) System ----------. 3.6-6 TR 3.7 PLANT SYSTEMS ---------------------......... 3.7-1 TR 3.7.1 Steam Generator Pressure / Temperature Limitations------. 3.7-1 TR 3.7.2 Flood Protection Plan  -------------------- 3.7-3 TR 3.7.3 Snubbers -------------------------. 3.7-5 TR 3.7.4 Sealed Source Contamination ----------------. 3.7-16 TR 3.7.5 Area Temperature Monitoring ---------------..... 3.7-19 TR 3.8 ELECTRICAL POWER SYSTEMS --------------......... 3.8-1 TR 3.8.1 Isolation Devices  ---------------------- 3.8-1 TR 3.8.2 Containment Penetration Conductor Overcurrent Protection Devices ------------........................... 3.8-4 TR 3.8.3 Motor-Operated Valves Thermal Overload Bypass Devices --...... 3.8-8 TR 3.8.4 Submerged Component Circuit Protection --..-----............ 3.8-14 TR 3.9 REFUELING OPERATIONS -------------------. 3.9-1 TR 3.9.1 Decay Time ------------------------. 3.9-1 TR 3.9.2 Communications --------.-------------- 3.9-2 TR 3.9.3 Refueling Machine --------..------------... 3.9-3 TR 3.9.4 Crane Travel - Spent Fuel Storage Pool Building  -------- 3.9-5


TABLE OF CONTENTS (continued)
TABLE OF CONTENTS (continued)
TECHNICAL REQUIREMENTS Watts Bar - Unit 2 iii Technical Requirements (developmental)
TECHNICAL REQUIREMENTS 5.0       ADMINISTRATIVE CONTROLS .......... 5.0-1 5.1             Technical Requirements Control Program . 5.0-1 Watts Bar - Unit 2                          iii Technical Requirements (developmental)                                                          A
A 5.0 ADMINISTRATIVE CONTROLS ---------------.......... 5.0-1 5.1 Technical Requirements Control Program -----------. 5.0-1


TABLE OF CONTENTS (continued)
TABLE OF CONTENTS (continued)
TECHNICAL REQUIREMENTS BASES Watts Bar - Unit 2 iv (continued)
TECHNICAL REQUIREMENTS BASES B 3.0     TECHNICAL REQUIREMENT (TR) AND TECHNICAL SURVEILLANCE REQUIREMENT (TSR) APPLICABILITY .............. B 3.0-1 B 3.1     REACTIVITY CONTROL SYSTEMS .. B 3.1-1 B 3.1.1         Boration Systems Flow Paths, Shutdown ................... B 3.1-1 B 3.1.2         Boration Systems Flow Paths, Operating ................... B 3.1-5 B 3.1.3         Charging Pump, Shutdown ...... B 3.1-9 B 3.1.4         Charging Pumps, Operating .... B 3.1-12 B 3.1.5         Borated Water Sources, Shutdown .... B 3.1-15 B 3.1.6         Borated Water Sources, Operating .... B 3.1-19 B 3.1.7         Position Indication System, Shutdown .......... B 3.1-24 B 3.3     INSTRUMENTATION . B 3.3-1 B 3.3.1         Reactor Trip System (RTS) Instrumentation . B 3.3-1 B 3.3.2         Engineered Safety Features Actuation System (ESFAS) Instrumentation  B 3.3-4 B 3.3.3         Power Distribution Monitoring System (PDMS)  B 3.3-7 B 3.3.4         Seismic Instrumentation  B 3.3-12 B 3.3.5         Turbine Overspeed Protection . B 3.3-17 B 3.3.6         Loose-Part Detection System .. B 3.3-22 B 3.3.7         RESERVED FOR FUTURE ADDITION . B 3.3-25 B 3.3.8         Hydrogen Monitor .. B 3.3-26 B 3.4     REACTOR COOLANT SYSTEM (RCS) .. B 3.4-1 B 3.4.1         Safety Valves, Shutdown .. B 3.4-1 B 3.4.2         Pressurizer Temperature Limits .. B 3.4-4 B 3.4.3         RCS Vents .. B 3.4-7 B 3.4.4         Chemistry  B 3.4-10 B 3.4.5         Piping System Structural Integrity ... B 3.4-13 Watts Bar - Unit 2                              iv                                (continued)
Technical Requirements (developmental)
Technical Requirements (developmental)                                                                            B
B B 3.0 TECHNICAL REQUIREMENT (TR) AND TECHNICAL SURVEILLANCE REQUIREMENT (TSR) APPLICABILITY .............. B 3.0-1 B 3.1 REACTIVITY CONTROL SYSTEMS ---------------.. B 3.1-1 B 3.1.1 Boration Systems Flow Paths, Shutdown ------................... B 3.1-1 B 3.1.2 Boration Systems Flow Paths, Operating ------................... B 3.1-5 B 3.1.3 Charging Pump, Shutdown ----------..------.... B 3.1-9 B 3.1.4 Charging Pumps, Operating ---------..-------.. B 3.1-12 B 3.1.5 Borated Water Sources, Shutdown -----..--------.. B 3.1-15 B 3.1.6 Borated Water Sources, Operating ----..---------.. B 3.1-19 B 3.1.7 Position Indication System, Shutdown ----------.......... B 3.1-24 B 3.3 INSTRUMENTATION ----------------------. B 3.3-1 B 3.3.1 Reactor Trip System (RTS) Instrumentation ----------. B 3.3-1 B 3.3.2 Engineered Safety Features Actuation System (ESFAS) Instrumentation  -----------------B 3.3-4 B 3.3.3 Power Distribution Monitoring System (PDMS)  ---------
B 3.3-7 B 3.3.4 Seismic Instrumentation  ------------------- B 3.3-12 B 3.3.5 Turbine Overspeed Protection ----------------. B 3.3-17 B 3.3.6 Loose-Part Detection System ----------------.. B 3.3-22 B 3.3.7 RESERVED FOR FUTURE ADDITION ------------.
B 3.3-25 B 3.3.8 Hydrogen Monitor ---------------------..
B 3.3-26 B 3.4 REACTOR COOLANT SYSTEM (RCS) --------------.. B 3.4-1 B 3.4.1 Safety Valves, Shutdown ------------------.. B 3.4-1 B 3.4.2 Pressurizer Temperature Limits ---------------.. B 3.4-4 B 3.4.3 RCS Vents ------------------------.. B 3.4-7 B 3.4.4 Chemistry  ------------------------- B 3.4-10 B 3.4.5 Piping System Structural Integrity --------------... B 3.4-13


TABLE OF CONTENTS (continued)
TABLE OF CONTENTS (continued)
TECHNICAL REQUIREMENTS BASES Watts Bar - Unit 2 v Technical Requirements (developmental)
TECHNICAL REQUIREMENTS BASES B 3.6     CONTAINMENT SYSTEMS .. B 3.6-1 B 3.6.1         Ice Bed Temperature Monitoring System ......... B 3.6-1 B 3.6.2         Inlet Door Position Monitoring System  B 3.6-6 B 3.6.3         Lower Compartment Cooling (LCC) System . B 3.6-10 B 3.7     PLANT SYSTEMS ............. B 3.7-1 B 3.7.1         Steam Generator Pressure / Temperature Limitations. B 3.7-1 B 3.7.2         Flood Protection Plan  B 3.7-4 B 3.7.3         Snubbers . B 3.7-8 B 3.7.4         Sealed Source Contamination . B 3.7-15 B 3.7.5         Area Temperature Monitoring .. B 3.7-19 B 3.8     ELECTRICAL POWER SYSTEMS .. B 3.8-1 B 3.8.1         Isolation Devices  B 3.8-1 B 3.8.2         Containment Penetration Conductor Overcurrent Protection Devices ........................... B 3.8-7 B 3.8.3         Motor Operated Valves Thermal Overload Bypass Devices .. B 3.8-13 B 3.8.4         Submerged Component Circuit Protection .............. B 3.8-16 B 3.9     REFUELING OPERATIONS . B 3.9-1 B 3.9.1         Decay Time . B 3.9-1 B 3.9.2         Communications ........ B 3.9-3 B 3.9.3         Refueling Machine ..... B 3.9-5 B 3.9.4         Crane Travel - Spent Fuel Storage Pool Building  B 3.9-8 Watts Bar - Unit 2                               v Technical Requirements (developmental)                                                                         A
A B 3.6 CONTAINMENT SYSTEMS -------------------.. B 3.6-1 B 3.6.1 Ice Bed Temperature Monitoring System ---------......... B 3.6-1 B 3.6.2 Inlet Door Position Monitoring System  ------------- B 3.6-6 B 3.6.3 Lower Compartment Cooling (LCC) System ----------. B 3.6-10 B 3.7 PLANT SYSTEMS --------------------............. B 3.7-1 B 3.7.1 Steam Generator Pressure / Temperature Limitations------. B 3.7-1 B 3.7.2 Flood Protection Plan  -------------------- B 3.7-4 B 3.7.3 Snubbers -------------------------. B 3.7-8 B 3.7.4 Sealed Source Contamination ----------------. B 3.7-15 B 3.7.5 Area Temperature Monitoring ----------------.. B 3.7-19 B 3.8 ELECTRICAL POWER SYSTEMS ----------------.. B 3.8-1 B 3.8.1 Isolation Devices  ---------------------- B 3.8-1 B 3.8.2 Containment Penetration Conductor Overcurrent Protection Devices ------------........................... B 3.8-7 B 3.8.3 Motor Operated Valves Thermal Overload Bypass Devices ---.. B 3.8-13 B 3.8.4 Submerged Component Circuit Protection --..-----............ B 3.8-16 B 3.9 REFUELING OPERATIONS -------------------. B 3.9-1 B 3.9.1 Decay Time ------------------------. B 3.9-1 B 3.9.2 Communications --------.------------....... B 3.9-3 B 3.9.3 Refueling Machine --------..------------... B 3.9-5 B 3.9.4 Crane Travel - Spent Fuel Storage Pool Building  -------- B 3.9-8 Watts Bar - Unit 2 vi Technical Requirements (developmental)
B LIST OF TABLES


TABLE NO. TITLE PAGE 1.1-1 MODES ---------------------------.1.1-6 3.3.1-1 Reactor Trip System Instrumentation Response Times -----.......3.3-2 3.3.2-1 Engineered Safety Features Actuation System Response Times  --..3.3-5  
LIST OF TABLES TABLE NO.                                       TITLE                                     PAGE 1.1-1         MODES . 1.1-6 3.3.1-1       Reactor Trip System Instrumentation Response Times ....... 3.3-2 3.3.2-1       Engineered Safety Features Actuation System Response Times .. 3.3-5 3.3.3-1        Power Distribution Monitoring (PDMS) Instrumentation 3.3-13 3.3.4-1        Seismic Monitoring Instrumentation  3.3-17 3.7.3-1        Snubber Visual Inspection Acceptance Criteria . 3.7-8 3.7.3-2        Snubber Visual Inspection Surveillance Frequency .. 3.7-9 3.7.3-3        Snubber Transient Event Inspection  3.7-11 3.7.3-4        Snubber Functional Testing Plan .............................. 3.7-12 3.7.3-5        Snubber Functional Testing Acceptance Criteria .. 3.7-14 3.7.5-1        Area Temperature Monitoring ....... 3.7-22 3.8.3-1        Motor-Operated Valves Thermal Overload Devices Which Are Bypassed Under Accident Conditions  3.8-9 3.8.4-1        Submerged Components With Automatic De-energization Under Accident Conditions ....... 3.8-16 Watts Bar - Unit 2                            vi Technical Requirements (developmental)                                                                              B


3.3.3-1 Power Distribution Monitoring (PDMS) Instrumentation  -------
LIST OF FIGURES FIGURE NO.                                      TITLE                                                    PAGE 3.1.6A        Boric Acid Tank Limits Based on RWST Boron Concentration Level 1 RWST Concentration .................................................. 3.1-13 3.1.6B        Boric Acid Tank Limits Based on RWST Boron Concentration Level 2 RWST Concentration .................................................. 3.1-14 3.1.6C        Boric Acid Tank Limits Based on RWST Boron Concentration Level 3 RWST Concentration .................................................. 3.1-15 3.7.3-1        Sample Plan B for Snubber Functional Test .. 3.7-15 LIST OF MISCELLANEOUS REPORTS AND PROGRAMS Core Operating Limits Report Watts Bar - Unit 2                          vii Technical Requirements (developmental)                                                                                            B
3.3-13 3.3.4-1 Seismic Monitoring Instrumentation  ---------------3.3-17 3.7.3-1  Snubber Visual Inspection Acceptance Criteria  ----------.3.7-8 3.7.3-2  Snubber Visual Inspection Surveillance Frequency  --------..3.7-9 3.7.3-3  Snubber Transient Event Inspection  ---------------3.7-11 3.7.3-4  Snubber Functional Testing Plan  --------..............................3.7-12 3.7.3-Snubber Functional Testing Acceptance Criteria  ---------..3.7-14


3.7.5-1 Area Temperature Monitoring  ----------------.......
LIST OF ACRONYMS (Page 1 of 2)
3.7-22 3.8.3-1  Motor-Operated Valves Thermal Overload Devices Which Are Bypassed Under Accident Conditions  --------3.8-9 3.8.4-1  Submerged Components With Automatic De-energization Under Accident Conditions  --------.......3.8-16
ACRONYM                                              TITLE ABGTS                Auxiliary Building Gas Treatment System ACRP                  Auxiliary Control Room Panel AFD                  Axial Flux Difference AFW                  Auxiliary Feedwater System ARFS                  Air Return Fan System ARO                  All Rods Out ARV                  Atmospheric Relief Valve ASME                  American Society of Mechanical Engineers BOC                  Beginning of Cycle CCS                  Component Cooling Water System CFR                  Code of Federal Regulations COLR                  Core Operating Limits Report CREVS                Control Room Emergency Ventilation System CSS                  Containment Spray System CST                  Condensate Storage Tank DNB                  Departure from Nucleate Boiling ECCS                  Emergency Core Cooling System EFPD                  Effective Full-Power Days EGTS                  Emergency Gas Treatment System EOC                  End of Cycle ERCW                  Essential Raw Cooling Water ESF                  Engineered Safety Feature ESFAS                Engineered Safety Features Actuation System HEPA                  High Efficiency Particulate Air HVAC                  Heating, Ventilating, and Air-Conditioning LCC                  Lower Compartment Cooler LCO                  Limiting Condition For Operation MFIV                  Main Feedwater Isolation Valve MFRV                  Main Feedwater Regulation Valve Watts Bar - Unit 2                          viii                (continued)
Technical Requirements (developmental)                                                            A


Watts Bar - Unit 2 vii Technical Requirements (developmental)
LIST OF ACRONYMS (Page 2 of 2)
B LIST OF FIGURES
ACRONYM              TITLE MSIV                  Main Steam Line Isolation Valve MSSV                  Main Steam Safety Valve MTC                  Moderator Temperature Coefficient NMS                  Neutron Monitoring System ODCM                  Offsite Dose Calculation Manual PCP                  Process Control Program PDMS                  Power Distribution Monitoring System PIV                  Pressure Isolation Valve PORV                  Power-Operated Relief Valve PTLR                  Pressure and Temperature Limits Report QPTR                  Quadrant Power Tilt Ratio RAOC                  Relaxed Axial Offset Control RCCA                  Rod Cluster Control Assembly RCP                  Reactor Coolant Pump RCS                  Reactor Coolant System RHR                  Residual Heat Removal RTP                  Rated Thermal Power RTS                  Reactor Trip System RWST                  Refueling Water Storage Tank SG                    Steam Generator SI                    Safety Injection SL                    Safety Limit SR                    Surveillance Requirement TSR                  Technical Surveillance Requirement UHS                  Ultimate Heat Sink (continued)
Watts Bar - Unit 2                           ix Technical Requirements (developmental)                                                       B


FIGURE NO. TITLE  PAGE 3.1.6A  Boric Acid Tank Limits Based on RWST Boron Concentration Level 1 RWST Concentration  --..................................................
TECHNICAL REQUIREMENTS - LIST OF EFFECTIVE PAGES PAGE          AMENDMENT                      PAGE        AMENDMENT NUMBER            NUMBER                      NUMBER          NUMBER i                      B                        1.3-1              A ii                    A                        1.3-2              A iii                    A                        1.3-3              A iv                    B                        1.3-4              A v                      A                        1.3-5              A vi                    B                        1.3-6              A vii                    B                        1.3-7              A viii                  A                        1.3-8              A ix                    B                        1.3-9              A x                      B                        1.3-10            A xi                    B                        1.3-11            A xii                    B                        1.4-1              A xiii                  B                        1.4-2              A xiv                    B                        1.4-3              A xv                    B                        1.4-4              A xvi                    A                        3.0-1              A 1.1-1                  A                        3.0-2              A 1.1-2                  A                        3.0-3             A 1.1-3                  A                        3.0-4              A 1.1-4                  B                        3.1-1              A 1.1-5                  A                        3.1-2              A 1.1-6                  A                        3.1-3             A 1.2-1                  A                        3.1-4              A 1.2-2                  A                        3.1-5              A 1.2-3                  A                        3.1-6              A Watts Bar - Unit 2                    x                            (continued)
3.1-13 3.1.6B  Boric Acid Tank Limits Based on RWST Boron Concentration Level 2 RWST Concentration  --..................................................
Technical Requirements (developmental)                                                            B
3.1-14 3.1.6C  Boric Acid Tank Limits Based on RWST Boron Concentration Level 3 RWST Concentration  --..................................................
3.1-15 3.7.3-1 Sample Plan B for Snubber Functional Test  -----------..3.7-15


LIST OF MISCELLANEOUS REPORTS AND PROGRAMS Core Operating Limits Report
TECHNICAL REQUIREMENTS - LIST OF EFFECTIVE PAGES PAGE            AMENDMENT                      PAGE        AMENDMENT NUMBER            NUMBER                      NUMBER          NUMBER 3.1-7                  A                        3.3-18            A 3.1-8                  A                        3.3-19            A 3.1-9                  A                        3.3-20            A 3.1-10                A                        3.3-21            B 3.1-11                A                        3.3-22            B 3.1-12                B                        3.3-23            B 3.1-13                B                        3.3-24            B 3.1-14                B                        3.4-1              A 3.1-15                B                        3.4-2              A 3.1-16                A                        3.4-3              A 3.3-1                  A                        3.4-4              A 3.3-2                  A                        3.4-5              A 3.3-3                  A                        3.4-6              A 3.3-4                  A                        3.4-7              A 3.3-5                  A                        3.4-8              A 3.3-6                  A                        3.4-9              A 3.3-7                  A                        3.4-10            A 3.3-8                  A                        3.4-11            A 3.3-9                  A                        3.4-12            A 3.3-10                B                        3.6-1              A 3.3-11                B                        3.6-2              A 3.3-12                B                        3.6-3              A 3.3-13                B                        3.6-4              A 3.3-14                A                        3.6-5              A 3.3-15                A                        3.6-6              A 3.3-16                A                        3.7-1              A 3.3-17                A                        3.7-2              A Watts Bar - Unit 2                    xi                          (continued)
Technical Requirements (developmental)                                                            B


Watts Bar - Unit 2 viii (continued)
TECHNICAL REQUIREMENTS - LIST OF EFFECTIVE PAGES PAGE            AMENDMENT                      PAGE        AMENDMENT NUMBER            NUMBER                      NUMBER          NUMBER 3.7-3                  B                        3.8-6              A 3.7-4                  B                        3.8-7              A 3.7-5                  A                        3.8-8              A 3.7-6                  A                        3.8-9              B 3.7-7                  B                        3.8-10            B 3.7-8                  A                        3.8-11            B 3.7-9                  A                        3.8-12            B 3.7-10                A                        3.8-13            B 3.7-11                A                        3.8-14            B 3.7-12                A                        3.8-15            B 3.7-13                A                        3.8-16            B 3.7-14                A                        3.8-17            B 3.7-15                A                        3.8-18            B 3.7-16                A                        3.8-19            B 3.7-17                A                        3.9-1              A 3.7-18                A                        3.9-2             A 3.7-19                A                        3.9-3              A 3.7-20                A                        3.9-4              A 3.7-21                A                        3.9-5              A 3.7-22                B                        5.0-1              A 3.7-23                B 3.8-1                 A 3.8-2                 B 3.8-3                  A 3.8-4                  A 3.8-5                  A Watts Bar - Unit 2                   xii Technical Requirements (developmental)                                                         B
Technical Requirements (developmental)
A LIST OF ACRONYMS (Page 1 of 2)
ACRONYM  TITLE ABGTS  Auxiliary Building Gas Treatment System ACRP  Auxiliary Control Room Panel AFD  Axial Flux Difference AFW  Auxiliary Feedwater System ARFS  Air Return Fan System ARO  All Rods Out ARV  Atmospheric Relief Valve ASME  American Society of Mechanical Engineers BOC  Beginning of Cycle CCS  Component Cooling Water System CFR  Code of Federal Regulations COLR  Core Operating Limits Report CREVS  Control Room Emergency Ventilation System CSS  Containment Spray System CST  Condensate Storage Tank DNB  Departure from Nucleate Boiling ECCS  Emergency Core Cooling System EFPD  Effective Full-Power Days EGTS  Emergency Gas Treatment System EOC  End of Cycle ERCW  Essential Raw Cooling Water ESF  Engineered Safety Feature ESFAS  Engineered Safety Features Actuation System HEPA  High Efficiency Particulate Air HVAC  Heating, Ventilating, and Air-Conditioning LCC  Lower Compartment Cooler LCO  Limiting Condition For Operation MFIV  Main Feedwater Isolation Valve MFRV  Main Feedwater Regulation Valve (continued)Watts Bar - Unit 2 ix Technical Requirements (developmental)
B LIST OF ACRONYMS (Page 2 of 2)
ACRONYM  TITLE MSIV  Main Steam Line Isolation Valve MSSV  Main Steam Safety Valve MTC  Moderator Temperature Coefficient NMS  Neutron Monitoring System ODCM  Offsite Dose Calculation Manual PCP  Process Control Program PDMS  Power Distribution Monitoring System PIV  Pressure Isolation Valve PORV  Power-Operated Relief Valve PTLR  Pressure and Temperature Limits Report QPTR  Quadrant Power Tilt Ratio RAOC  Relaxed Axial Offset Control RCCA  Rod Cluster Control Assembly RCP  Reactor Coolant Pump RCS  Reactor Coolant System RHR  Residual Heat Removal RTP  Rated Thermal Power RTS  Reactor Trip System RWST  Refueling Water Storage Tank SG  Steam Generator SI  Safety Injection SL  Safety Limit SR  Surveillance Requirement TSR  Technical Surveillance Requirement UHS  Ultimate Heat Sink


TECHNICAL REQUIREMENTS - LIST OF EFFECTIVE PAGES PAGE NUMBER AMENDMENT NUMBER PAGE NUMBER AMENDMENT NUMBER Watts Bar - Unit 2 x (continued)
TECHNICAL REQUIREMENTS BASES - LIST OF EFFECTIVE PAGES PAGE             AMENDMENT                  PAGE        AMENDMENT NUMBER             NUMBER                   NUMBER         NUMBER B 3.0-1               A                     B 3.1-14            A B 3.0-2                A                     B 3.1-15            A B 3.0-3               A                     B 3.1-16            A B 3.0-4                A                     B 3.1-17            A B 3.0-5                A                     B 3.1-18            B B 3.0-6               A                     B 3.1-19            A B 3.0-7                A                     B 3.1-20            A B 3.0-8                A                     B 3.1-21            A B 3.0-9               A                     B 3.1-22            B B 3.0-10              A                     B 3.1-23           B B 3.0-11              A                    B 3.1-24            A B 3.0-12              A                     B 3.1-25            A B 3.0-13              A                     B 3.1-26            A B 3.0-14              A                     B 3.3-1             A B 3.1-1                A                     B 3.3-2             A B 3.1-2                A                     B 3.3-3             A B 3.1-3                A                     B 3.3-4             A B 3.1-4               B                    B 3.3-5             A B 3.1-5                A                     B 3.3-6             A B 3.1-6                A                     B 3.3-7             B B 3.1-7                A                     B 3.3-8             B B 3.1-8                B                    B 3.3-9             B B 3.1-9                A                     B 3.3-10           B B 3.1-10              A                     B 3.3-11           B B 3.1-11              A                     B 3.3-12           A B 3.1-12              A                     B 3.3-13           A B 3.1-13              A                     B 3.3-14           A Watts Bar - Unit 2                 xiii                          (continued)
Technical Requirements (developmental)
Technical Requirements (developmental)                                                            B
B i  B 1.3-1  A ii  A  1.3-2  A iii  A  1.3-3  A iv  B 1.3-4  A v  A  1.3-5  A vi  B  1.3-6  A vii  B  1.3-7  A viii  A 1.3-8  A ix  B 1.3-9  A x  B  1.3-10  A xi  B 1.3-11  A xii  B  1.4-1  A xiii  B  1.4-A xiv  B 1.4-3 A xv  B 1.4-4  A xvi  A  3.0-1  A 1.1-A 3.0-A 1.1-2  A  3.0-3  A 1.1-A 3.0-A 1.1-4  B 3.1-1  A 1.1-5  A  3.1-2  A 1.1-6 A 3.1-A 1.2-1  A  3.1-A 1.2-2  A  3.1-A 1.2-3  A  3.1-A TECHNICAL REQUIREMENTS  -  LIST OF EFFECTIVE PAGES PAGE NUMBER  AMENDMENT NUMBER  PAGE NUMBER  AMENDMENT NUMBER  Watts Bar - Unit 2 xi (continued)
Technical Requirements (developmental)
B 3.1-A 3.3-18  A 3.1-8  A  3.3-19  A 3.1-9 A  3.3-20  A 3.1-10  A 3.3-21  B 3.1-11  A 3.3-22  B 3.1-12  B 3.3-23 B 3.1-13  B 3.3-24  B 3.1-14  B 3.4-A 3.1-15  B 3.4-A 3.1-16  A 3.4-A 3.3-1 A 3.4-A 3.3-2 A 3.4-A 3.3-3 A 3.4-A 3.3-4 A 3.4-7  A 3.3-5 A 3.4-A 3.3-6 A 3.4-A 3.3-7 3.4-10  A 3.3-8 3.4-11  A 3.3-9 3.4-12  A 3.3-10 B 3.6-A 3.3-11 B 3.6-A 3.3-12 B 3.6-A 3.3-13 B 3.6-A 3.3-14 A 3.6-5  A 3.3-15  A 3.6-6  A 3.3-16  A 3.7-1  A 3.3-17  A 3.7-2  A TECHNICAL REQUIREMENTS  -  LIST OF EFFECTIVE PAGES PAGE NUMBER  AMENDMENT NUMBER  PAGE NUMBER  AMENDMENT NUMBER  Watts Bar - Unit 2 xii


Technical Requirements (developmental)
TECHNICAL REQUIREMENTS BASES - LIST OF EFFECTIVE PAGES PAGE             AMENDMENT                   PAGE         AMENDMENT NUMBER             NUMBER                   NUMBER         NUMBER B 3.3-15               A                     B 3.4-14           B B 3.3-16               A                     B 3.4-15           A B 3.3-17               A                     B 3.6-1             A B 3.3-18               A                     B 3.6-2             A B 3.3-19               A                     B 3.6-3             A B 3.3-20               A                     B 3.6-4             A B 3.3-21               A                     B 3.6-5             A B 3.3-22               B                     B 3.6-6             A B 3.3-23               B                     B 3.6-7             A B 3.3-24               B                     B 3.6-8             A B 3.3-25               B                     B 3.6-9             A B 3.3-26               B                     B 3.6-10           B B 3.3-27               B                     B 3.6-11           A B 3.3-28               B                     B 3.6-12           B B 3.3-29               B                     B 3.7-1             B B 3.4-1               A                     B 3.7-2             A B 3.4-2               A                     B 3.7-3             B B 3.4-3               A                     B 3.7-4             A B 3.4-4               A                     B 3.7-5             B B 3.4-5               A                     B 3.7-6             B B 3.4-6               A                     B 3.7-7             B B 3.4-7               A                     B 3.7-8             A B 3.4-8               A                     B 3.7-9             A B 3.4-9               B                     B 3.7-10           A B 3.4-10               A                     B 3.7-11           B B 3.4-11               A                     B 3.7-12           A B 3.4-12               A                     B 3.7-13           A B 3.4-13               A                     B 3.7-14           A Watts Bar - Unit 2                 xiv                          (continued)
B 3.7-3  B  3.8-6  A 3.7-4  B  3.8-7  A 3.7-5  A  3.8-8  A 3.7-6  A  3.8-9  B 3.7-7  B  3.8-10  B 3.7-8  A  3.8-11  B 3.7-9  A  3.8-12  B 3.7-10  A 3.8-13  B 3.7-11  A 3.8-14  B 3.7-12  A 3.8-15  B 3.7-13  A 3.8-16  B 3.7-14  A 3.8-17  B 3.7-15  A 3.8-18  B 3.7-16  A 3.8-19  B 3.7-17  A 3.9-1  A 3.7-18  A 3.9-2  A 3.7-19  A 3.9-3  A 3.7-20  A 3.9-4  A 3.7-21  A 3.9-5  A 3.7-22  B 5.0-1  A 3.7-23  B 3.8-1  A    3.8-2  B    3.8-3  A    3.8-4  A    3.8-5  A TECHNICAL REQUIREMENTS BASES - LIST OF EFFECTIVE PAGES PAGE NUMBER  AMENDMENT NUMBER  PAGE NUMBER  AMENDMENT NUMBER Watts Bar - Unit 2 xiii (continued)
Technical Requirements (developmental)                                                            B
Technical Requirements (developmental)
B B 3.0-1  A B 3.1-14  A B 3.0-2  A B 3.1-15  A B 3.0-3  A B 3.1-16  A B 3.0-4  A B 3.1-17  A B 3.0-5  A B 3.1-18  B B 3.0-6  A B 3.1-19  A B 3.0-7  A B 3.1-20  A B 3.0-8  A B 3.1-21  A B 3.0-9  A B 3.1-22  B B 3.0-10  A B 3.1-23  B B 3.0-11  A B 3.1-24  A B 3.0-12  A B 3.1-25  A B 3.0-13  A B 3.1-26  A B 3.0-14  A B 3.3-1  A B 3.1-1  A B 3.3-2  A B 3.1-2  A B 3.3-3  A B 3.1-3  A B 3.3-4  A B 3.1-4  B B 3.3-5  A B 3.1-5  A B 3.3-6  A B 3.1-6  A B 3.3-7  B B 3.1-7  A B 3.3-8  B B 3.1-8  B B 3.3-9  B B 3.1-9  A B 3.3-10  B B 3.1-10  A B 3.3-11  B B 3.1-11  A B 3.3-12  A B 3.1-12  A B 3.3-13  A B 3.1-13  A B 3.3-14  A TECHNICAL REQUIREMENTS BASES  -  LIST OF EFFECTIVE PAGES PAGE NUMBER  AMENDMENT NUMBER PAGE NUMBER AMENDMENT NUMBER Watts Bar - Unit 2 xiv (continued)
Technical Requirements (developmental)
B B 3.3-15 A B 3.4-14 B B 3.3-16 A B 3.4-15 A B 3.3-17 A B 3.6-1 A B 3.3-18 A B 3.6-2 A B 3.3-19 A B 3.6-3 A B 3.3-20 A B 3.6-4 A B 3.3-21 A B 3.6-5 A B 3.3-22 B B 3.6-6 A B 3.3-23 B B 3.6-7 A B 3.3-24 B B 3.6-8 A B 3.3-25 B B 3.6-9 A B 3.3-26 B B 3.6-10 B B 3.3-27 B B 3.6-11 A B 3.3-28 B B 3.6-12 B B 3.3-29 B B 3.7-1 B B 3.4-1 A B 3.7-2 A B 3.4-2 A B 3.7-3 B B 3.4-3 A B 3.7-4 A B 3.4-4 A B 3.7-5 B B 3.4-5 A B 3.7-6 B B 3.4-6 A B 3.7-7 B B 3.4-7 A B 3.7-8 A B 3.4-8 A B 3.7-9 A B 3.4-9 B B 3.7-10 A B 3.4-10 A B 3.7-11 B B 3.4-11 A B 3.7-12 A B 3.4-12 A B 3.7-13 A B 3.4-13 A B 3.7-14 A TECHNICAL REQUIREMENTS BASES  -  LIST OF EFFECTIVE PAGES PAGE NUMBER  AMENDMENT NUMBER  PAGE NUMBER  AMENDMENT NUMBER  Watts Bar - Unit 2 xv


Technical Requirements (developmental)
TECHNICAL REQUIREMENTS BASES - LIST OF EFFECTIVE PAGES PAGE            AMENDMENT                  PAGE        AMENDMENT NUMBER            NUMBER                    NUMBER          NUMBER B 3.7-15               B                     B 3.8-19           B B 3.7-16               A                     B 3.9-1             A B 3.7-17               A                     B 3.9-2             A B 3.7-18               A                     B 3.9-3             A B 3.7-19               A                     B 3.9-4             A B 3.7-20               A                     B 3.9-5             A B 3.7-21               A                     B 3.9-6             A B 3.7-22               A                     B 3.9-7             A B 3.8-1               A                     B 3.9-8             A B 3.8-2               B                     B 3.9-9             A B 3.8-3               A B 3.8-4               A B 3.8-5               A B 3.8-6               B B 3.8-7               A B 3.8-8               A B 3.8-9               A B 3.8-10               A B 3.8-11               A B 3.8-12               A B 3.8-13               A B 3.8-14               B B 3.8-15               A B 3.8-16               A B 3.8-17               B B 3.8-18               B Watts Bar - Unit 2                  xv Technical Requirements (developmental)                                                      B
B B 3.7-15 B B 3.8-19 B B 3.7-16 A B 3.9-1 A B 3.7-17 A B 3.9-2 A B 3.7-18 A B 3.9-3 A B 3.7-19 A B 3.9-4 A B 3.7-20 A B 3.9-5 A B 3.7-21 A B 3.9-6 A B 3.7-22 A B 3.9-7 A B 3.8-1 A B 3.9-8 A B 3.8-2 B B 3.9-9 A B 3.8-3 A B 3.8-4 A B 3.8-5 A B 3.8-6 B B 3.8-7 A B 3.8-8 A B 3.8-9 A B 3.8-10 A B 3.8-11 A B 3.8-12 A B 3.8-13 A B 3.8-14 B B 3.8-15 A B 3.8-16 A B 3.8-17 B B 3.8-18 B  


Watts Bar - Unit 2 xvi Technical Requirements (developmental)
TECHNICAL REQUIREMENTS MANUAL / TRM BASES - REVISION LISTING (This listing is an administrative tool maintained by WBN Licensing. It may be updated without formally revising the Technical Requirements Manual / TRM Bases Tables of Contents.)
A TECHNICAL REQUIREMENTS MANUAL / TRM BASES - REVISION LISTING (This listing is an administrative tool maintained by WBN Licensing. It may be updated without formally revising the Technical Requirements Manual / TRM Bases Tables of Contents.)
Revisions                     Issued                                       Subject Watts Bar - Unit 2                                      xvi Technical Requirements (developmental)                                                                                      A}}
Revisions Issued Subject}}

Latest revision as of 22:34, 13 November 2019

Developmental Revision B - Technical Requirements Manual - Table of Contents
ML100550608
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 02/02/2010
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
Download: ML100550608 (17)


Text

WATTS BAR - UNIT 2 TECHNICAL REQUIREMENTS MANUAL TABLE OF CONTENTS

TABLE OF CONTENTS TECHNICAL REQUIREMENTS TABLE OF CONTENTS . i LIST OF TABLES vi LIST OF FIGURES . vii LIST OF MISCELLANEOUS REPORTS AND PROGRAMS .. vii LIST OF ACRONYMS viii LIST OF EFFECTIVE PAGES .. x 1.0 USE AND APPLICATION .. 1.1-1 1.1 Definitions 1.1-1 1.2 Logical Connectors .............. 1.2-1 1.3 Completion Times .. 1.3-1 1.4 Frequency 1.4-1 TR 3.0 APPLICABILITY ......... 3.0-1 TR 3.1 REACTIVITY CONTROL SYSTEMS ... 3.1-1 TR 3.1.1 Boration Systems Flow Paths, Shutdown ................ 3.1-1 TR 3.1.2 Boration Systems Flow Paths, Operating .................... 3.1-3 TR 3.1.3 Charging Pump, Shutdown .. 3.1-5 TR 3.1.4 Charging Pumps, Operating . 3.1-6 TR 3.1.5 Borated Water Sources, Shutdown . 3.1-8 TR 3.1.6 Borated Water Sources, Operating . 3.1-10 TR 3.1.7 Position Indication System, Shutdown 3.1-16 TR 3.3 INSTRUMENTATION . 3.3-1 TR 3.3.1 Reactor Trip System (RTS) Instrumentation . 3.3-1 TR 3.3.2 Engineered Safety Feature Actuation System (ESFAS) Instrumentation 3.3-4 TR 3.3.3 Power Distribution Monitoring System (PDMS) . 3.3-11 TR 3.3.4 Seismic Instrumentation 3.3-14 TR 3.3.5 Turbine Overspeed Protection . 3.3-18 TR 3.3.6 Loose-Part Detection System .. 3.3-21 TR 3.3.7 RESERVED FOR FUTURE ADDITION . 3.3-22 TR 3.3.8 Hydrogen Monitor .. 3.3.23 Watts Bar - Unit 2 i (continued)

Technical Requirements (developmental) B

TABLE OF CONTENTS (continued)

TECHNICAL REQUIREMENTS TR 3.4 REACTOR COOLANT SYSTEM (RCS) .. 3.4-1 TR 3.4.1 Safety Valves, Shutdown .. 3.4-1 TR 3.4.2 Pressurizer Temperature Limits .. 3.4-3 TR 3.4.3 RCS Vents .. 3.4-5 TR 3.4.4 Chemistry 3.4-7 TR 3.4.5 Piping System Structural Integrity ... 3.4-10 TR 3.6 CONTAINMENT SYSTEMS .. 3.6-1 TR 3.6.1 Ice Bed Temperature Monitoring System ...... 3.6-1 TR 3.6.2 Inlet Door Position Monitoring System 3.6-4 TR 3.6.3 Lower Compartment Cooling (LCC) System . 3.6-6 TR 3.7 PLANT SYSTEMS ......... 3.7-1 TR 3.7.1 Steam Generator Pressure / Temperature Limitations. 3.7-1 TR 3.7.2 Flood Protection Plan 3.7-3 TR 3.7.3 Snubbers . 3.7-5 TR 3.7.4 Sealed Source Contamination . 3.7-16 TR 3.7.5 Area Temperature Monitoring ..... 3.7-19 TR 3.8 ELECTRICAL POWER SYSTEMS ......... 3.8-1 TR 3.8.1 Isolation Devices 3.8-1 TR 3.8.2 Containment Penetration Conductor Overcurrent Protection Devices ........................... 3.8-4 TR 3.8.3 Motor-Operated Valves Thermal Overload Bypass Devices ...... 3.8-8 TR 3.8.4 Submerged Component Circuit Protection .............. 3.8-14 TR 3.9 REFUELING OPERATIONS . 3.9-1 TR 3.9.1 Decay Time . 3.9-1 TR 3.9.2 Communications . 3.9-2 TR 3.9.3 Refueling Machine ..... 3.9-3 TR 3.9.4 Crane Travel - Spent Fuel Storage Pool Building 3.9-5 Watts Bar - Unit 2 ii (continued)

Technical Requirements (developmental) A

TABLE OF CONTENTS (continued)

TECHNICAL REQUIREMENTS 5.0 ADMINISTRATIVE CONTROLS .......... 5.0-1 5.1 Technical Requirements Control Program . 5.0-1 Watts Bar - Unit 2 iii Technical Requirements (developmental) A

TABLE OF CONTENTS (continued)

TECHNICAL REQUIREMENTS BASES B 3.0 TECHNICAL REQUIREMENT (TR) AND TECHNICAL SURVEILLANCE REQUIREMENT (TSR) APPLICABILITY .............. B 3.0-1 B 3.1 REACTIVITY CONTROL SYSTEMS .. B 3.1-1 B 3.1.1 Boration Systems Flow Paths, Shutdown ................... B 3.1-1 B 3.1.2 Boration Systems Flow Paths, Operating ................... B 3.1-5 B 3.1.3 Charging Pump, Shutdown ...... B 3.1-9 B 3.1.4 Charging Pumps, Operating .... B 3.1-12 B 3.1.5 Borated Water Sources, Shutdown .... B 3.1-15 B 3.1.6 Borated Water Sources, Operating .... B 3.1-19 B 3.1.7 Position Indication System, Shutdown .......... B 3.1-24 B 3.3 INSTRUMENTATION . B 3.3-1 B 3.3.1 Reactor Trip System (RTS) Instrumentation . B 3.3-1 B 3.3.2 Engineered Safety Features Actuation System (ESFAS) Instrumentation B 3.3-4 B 3.3.3 Power Distribution Monitoring System (PDMS) B 3.3-7 B 3.3.4 Seismic Instrumentation B 3.3-12 B 3.3.5 Turbine Overspeed Protection . B 3.3-17 B 3.3.6 Loose-Part Detection System .. B 3.3-22 B 3.3.7 RESERVED FOR FUTURE ADDITION . B 3.3-25 B 3.3.8 Hydrogen Monitor .. B 3.3-26 B 3.4 REACTOR COOLANT SYSTEM (RCS) .. B 3.4-1 B 3.4.1 Safety Valves, Shutdown .. B 3.4-1 B 3.4.2 Pressurizer Temperature Limits .. B 3.4-4 B 3.4.3 RCS Vents .. B 3.4-7 B 3.4.4 Chemistry B 3.4-10 B 3.4.5 Piping System Structural Integrity ... B 3.4-13 Watts Bar - Unit 2 iv (continued)

Technical Requirements (developmental) B

TABLE OF CONTENTS (continued)

TECHNICAL REQUIREMENTS BASES B 3.6 CONTAINMENT SYSTEMS .. B 3.6-1 B 3.6.1 Ice Bed Temperature Monitoring System ......... B 3.6-1 B 3.6.2 Inlet Door Position Monitoring System B 3.6-6 B 3.6.3 Lower Compartment Cooling (LCC) System . B 3.6-10 B 3.7 PLANT SYSTEMS ............. B 3.7-1 B 3.7.1 Steam Generator Pressure / Temperature Limitations. B 3.7-1 B 3.7.2 Flood Protection Plan B 3.7-4 B 3.7.3 Snubbers . B 3.7-8 B 3.7.4 Sealed Source Contamination . B 3.7-15 B 3.7.5 Area Temperature Monitoring .. B 3.7-19 B 3.8 ELECTRICAL POWER SYSTEMS .. B 3.8-1 B 3.8.1 Isolation Devices B 3.8-1 B 3.8.2 Containment Penetration Conductor Overcurrent Protection Devices ........................... B 3.8-7 B 3.8.3 Motor Operated Valves Thermal Overload Bypass Devices .. B 3.8-13 B 3.8.4 Submerged Component Circuit Protection .............. B 3.8-16 B 3.9 REFUELING OPERATIONS . B 3.9-1 B 3.9.1 Decay Time . B 3.9-1 B 3.9.2 Communications ........ B 3.9-3 B 3.9.3 Refueling Machine ..... B 3.9-5 B 3.9.4 Crane Travel - Spent Fuel Storage Pool Building B 3.9-8 Watts Bar - Unit 2 v Technical Requirements (developmental) A

LIST OF TABLES TABLE NO. TITLE PAGE 1.1-1 MODES . 1.1-6 3.3.1-1 Reactor Trip System Instrumentation Response Times ....... 3.3-2 3.3.2-1 Engineered Safety Features Actuation System Response Times .. 3.3-5 3.3.3-1 Power Distribution Monitoring (PDMS) Instrumentation 3.3-13 3.3.4-1 Seismic Monitoring Instrumentation 3.3-17 3.7.3-1 Snubber Visual Inspection Acceptance Criteria . 3.7-8 3.7.3-2 Snubber Visual Inspection Surveillance Frequency .. 3.7-9 3.7.3-3 Snubber Transient Event Inspection 3.7-11 3.7.3-4 Snubber Functional Testing Plan .............................. 3.7-12 3.7.3-5 Snubber Functional Testing Acceptance Criteria .. 3.7-14 3.7.5-1 Area Temperature Monitoring ....... 3.7-22 3.8.3-1 Motor-Operated Valves Thermal Overload Devices Which Are Bypassed Under Accident Conditions 3.8-9 3.8.4-1 Submerged Components With Automatic De-energization Under Accident Conditions ....... 3.8-16 Watts Bar - Unit 2 vi Technical Requirements (developmental) B

LIST OF FIGURES FIGURE NO. TITLE PAGE 3.1.6A Boric Acid Tank Limits Based on RWST Boron Concentration Level 1 RWST Concentration .................................................. 3.1-13 3.1.6B Boric Acid Tank Limits Based on RWST Boron Concentration Level 2 RWST Concentration .................................................. 3.1-14 3.1.6C Boric Acid Tank Limits Based on RWST Boron Concentration Level 3 RWST Concentration .................................................. 3.1-15 3.7.3-1 Sample Plan B for Snubber Functional Test .. 3.7-15 LIST OF MISCELLANEOUS REPORTS AND PROGRAMS Core Operating Limits Report Watts Bar - Unit 2 vii Technical Requirements (developmental) B

LIST OF ACRONYMS (Page 1 of 2)

ACRONYM TITLE ABGTS Auxiliary Building Gas Treatment System ACRP Auxiliary Control Room Panel AFD Axial Flux Difference AFW Auxiliary Feedwater System ARFS Air Return Fan System ARO All Rods Out ARV Atmospheric Relief Valve ASME American Society of Mechanical Engineers BOC Beginning of Cycle CCS Component Cooling Water System CFR Code of Federal Regulations COLR Core Operating Limits Report CREVS Control Room Emergency Ventilation System CSS Containment Spray System CST Condensate Storage Tank DNB Departure from Nucleate Boiling ECCS Emergency Core Cooling System EFPD Effective Full-Power Days EGTS Emergency Gas Treatment System EOC End of Cycle ERCW Essential Raw Cooling Water ESF Engineered Safety Feature ESFAS Engineered Safety Features Actuation System HEPA High Efficiency Particulate Air HVAC Heating, Ventilating, and Air-Conditioning LCC Lower Compartment Cooler LCO Limiting Condition For Operation MFIV Main Feedwater Isolation Valve MFRV Main Feedwater Regulation Valve Watts Bar - Unit 2 viii (continued)

Technical Requirements (developmental) A

LIST OF ACRONYMS (Page 2 of 2)

ACRONYM TITLE MSIV Main Steam Line Isolation Valve MSSV Main Steam Safety Valve MTC Moderator Temperature Coefficient NMS Neutron Monitoring System ODCM Offsite Dose Calculation Manual PCP Process Control Program PDMS Power Distribution Monitoring System PIV Pressure Isolation Valve PORV Power-Operated Relief Valve PTLR Pressure and Temperature Limits Report QPTR Quadrant Power Tilt Ratio RAOC Relaxed Axial Offset Control RCCA Rod Cluster Control Assembly RCP Reactor Coolant Pump RCS Reactor Coolant System RHR Residual Heat Removal RTP Rated Thermal Power RTS Reactor Trip System RWST Refueling Water Storage Tank SG Steam Generator SI Safety Injection SL Safety Limit SR Surveillance Requirement TSR Technical Surveillance Requirement UHS Ultimate Heat Sink (continued)

Watts Bar - Unit 2 ix Technical Requirements (developmental) B

TECHNICAL REQUIREMENTS - LIST OF EFFECTIVE PAGES PAGE AMENDMENT PAGE AMENDMENT NUMBER NUMBER NUMBER NUMBER i B 1.3-1 A ii A 1.3-2 A iii A 1.3-3 A iv B 1.3-4 A v A 1.3-5 A vi B 1.3-6 A vii B 1.3-7 A viii A 1.3-8 A ix B 1.3-9 A x B 1.3-10 A xi B 1.3-11 A xii B 1.4-1 A xiii B 1.4-2 A xiv B 1.4-3 A xv B 1.4-4 A xvi A 3.0-1 A 1.1-1 A 3.0-2 A 1.1-2 A 3.0-3 A 1.1-3 A 3.0-4 A 1.1-4 B 3.1-1 A 1.1-5 A 3.1-2 A 1.1-6 A 3.1-3 A 1.2-1 A 3.1-4 A 1.2-2 A 3.1-5 A 1.2-3 A 3.1-6 A Watts Bar - Unit 2 x (continued)

Technical Requirements (developmental) B

TECHNICAL REQUIREMENTS - LIST OF EFFECTIVE PAGES PAGE AMENDMENT PAGE AMENDMENT NUMBER NUMBER NUMBER NUMBER 3.1-7 A 3.3-18 A 3.1-8 A 3.3-19 A 3.1-9 A 3.3-20 A 3.1-10 A 3.3-21 B 3.1-11 A 3.3-22 B 3.1-12 B 3.3-23 B 3.1-13 B 3.3-24 B 3.1-14 B 3.4-1 A 3.1-15 B 3.4-2 A 3.1-16 A 3.4-3 A 3.3-1 A 3.4-4 A 3.3-2 A 3.4-5 A 3.3-3 A 3.4-6 A 3.3-4 A 3.4-7 A 3.3-5 A 3.4-8 A 3.3-6 A 3.4-9 A 3.3-7 A 3.4-10 A 3.3-8 A 3.4-11 A 3.3-9 A 3.4-12 A 3.3-10 B 3.6-1 A 3.3-11 B 3.6-2 A 3.3-12 B 3.6-3 A 3.3-13 B 3.6-4 A 3.3-14 A 3.6-5 A 3.3-15 A 3.6-6 A 3.3-16 A 3.7-1 A 3.3-17 A 3.7-2 A Watts Bar - Unit 2 xi (continued)

Technical Requirements (developmental) B

TECHNICAL REQUIREMENTS - LIST OF EFFECTIVE PAGES PAGE AMENDMENT PAGE AMENDMENT NUMBER NUMBER NUMBER NUMBER 3.7-3 B 3.8-6 A 3.7-4 B 3.8-7 A 3.7-5 A 3.8-8 A 3.7-6 A 3.8-9 B 3.7-7 B 3.8-10 B 3.7-8 A 3.8-11 B 3.7-9 A 3.8-12 B 3.7-10 A 3.8-13 B 3.7-11 A 3.8-14 B 3.7-12 A 3.8-15 B 3.7-13 A 3.8-16 B 3.7-14 A 3.8-17 B 3.7-15 A 3.8-18 B 3.7-16 A 3.8-19 B 3.7-17 A 3.9-1 A 3.7-18 A 3.9-2 A 3.7-19 A 3.9-3 A 3.7-20 A 3.9-4 A 3.7-21 A 3.9-5 A 3.7-22 B 5.0-1 A 3.7-23 B 3.8-1 A 3.8-2 B 3.8-3 A 3.8-4 A 3.8-5 A Watts Bar - Unit 2 xii Technical Requirements (developmental) B

TECHNICAL REQUIREMENTS BASES - LIST OF EFFECTIVE PAGES PAGE AMENDMENT PAGE AMENDMENT NUMBER NUMBER NUMBER NUMBER B 3.0-1 A B 3.1-14 A B 3.0-2 A B 3.1-15 A B 3.0-3 A B 3.1-16 A B 3.0-4 A B 3.1-17 A B 3.0-5 A B 3.1-18 B B 3.0-6 A B 3.1-19 A B 3.0-7 A B 3.1-20 A B 3.0-8 A B 3.1-21 A B 3.0-9 A B 3.1-22 B B 3.0-10 A B 3.1-23 B B 3.0-11 A B 3.1-24 A B 3.0-12 A B 3.1-25 A B 3.0-13 A B 3.1-26 A B 3.0-14 A B 3.3-1 A B 3.1-1 A B 3.3-2 A B 3.1-2 A B 3.3-3 A B 3.1-3 A B 3.3-4 A B 3.1-4 B B 3.3-5 A B 3.1-5 A B 3.3-6 A B 3.1-6 A B 3.3-7 B B 3.1-7 A B 3.3-8 B B 3.1-8 B B 3.3-9 B B 3.1-9 A B 3.3-10 B B 3.1-10 A B 3.3-11 B B 3.1-11 A B 3.3-12 A B 3.1-12 A B 3.3-13 A B 3.1-13 A B 3.3-14 A Watts Bar - Unit 2 xiii (continued)

Technical Requirements (developmental) B

TECHNICAL REQUIREMENTS BASES - LIST OF EFFECTIVE PAGES PAGE AMENDMENT PAGE AMENDMENT NUMBER NUMBER NUMBER NUMBER B 3.3-15 A B 3.4-14 B B 3.3-16 A B 3.4-15 A B 3.3-17 A B 3.6-1 A B 3.3-18 A B 3.6-2 A B 3.3-19 A B 3.6-3 A B 3.3-20 A B 3.6-4 A B 3.3-21 A B 3.6-5 A B 3.3-22 B B 3.6-6 A B 3.3-23 B B 3.6-7 A B 3.3-24 B B 3.6-8 A B 3.3-25 B B 3.6-9 A B 3.3-26 B B 3.6-10 B B 3.3-27 B B 3.6-11 A B 3.3-28 B B 3.6-12 B B 3.3-29 B B 3.7-1 B B 3.4-1 A B 3.7-2 A B 3.4-2 A B 3.7-3 B B 3.4-3 A B 3.7-4 A B 3.4-4 A B 3.7-5 B B 3.4-5 A B 3.7-6 B B 3.4-6 A B 3.7-7 B B 3.4-7 A B 3.7-8 A B 3.4-8 A B 3.7-9 A B 3.4-9 B B 3.7-10 A B 3.4-10 A B 3.7-11 B B 3.4-11 A B 3.7-12 A B 3.4-12 A B 3.7-13 A B 3.4-13 A B 3.7-14 A Watts Bar - Unit 2 xiv (continued)

Technical Requirements (developmental) B

TECHNICAL REQUIREMENTS BASES - LIST OF EFFECTIVE PAGES PAGE AMENDMENT PAGE AMENDMENT NUMBER NUMBER NUMBER NUMBER B 3.7-15 B B 3.8-19 B B 3.7-16 A B 3.9-1 A B 3.7-17 A B 3.9-2 A B 3.7-18 A B 3.9-3 A B 3.7-19 A B 3.9-4 A B 3.7-20 A B 3.9-5 A B 3.7-21 A B 3.9-6 A B 3.7-22 A B 3.9-7 A B 3.8-1 A B 3.9-8 A B 3.8-2 B B 3.9-9 A B 3.8-3 A B 3.8-4 A B 3.8-5 A B 3.8-6 B B 3.8-7 A B 3.8-8 A B 3.8-9 A B 3.8-10 A B 3.8-11 A B 3.8-12 A B 3.8-13 A B 3.8-14 B B 3.8-15 A B 3.8-16 A B 3.8-17 B B 3.8-18 B Watts Bar - Unit 2 xv Technical Requirements (developmental) B

TECHNICAL REQUIREMENTS MANUAL / TRM BASES - REVISION LISTING (This listing is an administrative tool maintained by WBN Licensing. It may be updated without formally revising the Technical Requirements Manual / TRM Bases Tables of Contents.)

Revisions Issued Subject Watts Bar - Unit 2 xvi Technical Requirements (developmental) A