ML100550630

From kanterella
Jump to navigation Jump to search
Developmental Revision B - Technical Requirements Manual TR 3.9 - Refueling Operations
ML100550630
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 02/02/2010
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
Download: ML100550630 (5)


Text

Decay Time TR 3.9.1 TR 3.9 REFUELING OPERATIONS TR 3.9.1 Decay Time TR 3.9.1 The reactor shall be subcritical for > 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />.

APPLICABILITY: During movement of irradiated fuel in the reactor vessel.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Reactor subcritical for A.1 Suspend all operations Immediately

< 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />. involving movement of irradiated fuel in the reactor vessel.

TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.1.1 Verify the reactor has been subcritical for > 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> Prior to movement of by confirming the date and time of subcriticality. irradiated fuel in the reactor vessel Watts Bar - Unit 2 3.9-1 Technical Requirements (developmental) A

Communications TR 3.9.2 TR 3.9 REFUELING OPERATIONS TR 3.9.2 Communications TR 3.9.2 Direct communications shall be maintained between the control room and personnel at the refueling station.

APPLICABILITY: During CORE ALTERATIONS.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Direct communications A.1 Suspend all CORE Immediately between the control room ALTERATIONS.

and personnel at the refueling station cannot be maintained.

TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.2.1 Demonstrate that direct communications between the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> prior to the control room and personnel at the refueling station are start of CORE established. ALTERATIONS AND Each 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during CORE ALTERATIONS Watts Bar - Unit 2 3.9-2 Technical Requirements (developmental) A

Refueling Machine TR 3.9.3 TR 3.9 REFUELING OPERATIONS TR 3.9.3 Refueling Machine TR 3.9.3 The Refueling Machine and Auxiliary Hoist shall be used for movement of fuel assemblies or drive shafts and shall be OPERABLE as follows:

a. The Refueling Machine shall have a capacity of 3150 pounds, and two electrical overload cutoff limits of 2650 pounds and 2800 pounds, respectively.
b. The Auxiliary Hoist shall have a capacity of 1200 pounds and a load indicator shall be used to indicate the lifting of loads > 1190 pounds.

APPLICABILITY: During movement of fuel assemblies or drive shafts within the reactor pressure vessel.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Refueling Machine A.1 Suspend use of Refueling Immediately inoperable. Machine from operations involving the movement of fuel assemblies within the reactor pressure vessel.

B. Auxiliary Hoist inoperable. B.1 Suspend use of Auxiliary Immediately Hoist from operations involving the movement of drive shafts within the reactor pressure vessel.

Watts Bar - Unit 2 3.9-3 Technical Requirements (developmental) A

Refueling Machine TR 3.9.3 TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.3.1 For each required Refueling Machine, perform a load 18 months test of 3150 pounds and demonstrate an automatic electrical load cutoff before the crane load is

> 2650 pounds. Demonstrate a second automatic electrical load cutoff before the crane load is

> 2800 pounds.

TSR 3.9.3.2 For each required Auxiliary Hoist and associated load Within 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> indicator, perform a load test of 1200 pounds. prior to start of movement of drive shafts within the reactor pressure vessel Watts Bar - Unit 2 3.9-4 Technical Requirements (developmental) A

Crane Travel - Spent Fuel Storage Pool Building TR 3.9.4 TR 3.9 REFUELING OPERATIONS TR 3.9.4 Crane Travel - Spent Fuel Storage Pool Building TR 3.9.4 Loads > 2059 pounds shall be prohibited from travel over fuel assemblies in the spent fuel pool.

APPLICABILITY: With fuel assemblies in the spent fuel pool.


NOTE----------------------------------------------

TR 3.0.3 is not applicable.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Technical Requirement not A.1 Place the crane load in a Immediately met. safe condition.

TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.4.1 Demonstrate crane interlocks and physical stops Within 7 days prior to which prevent crane travel over fuel assemblies to be crane use OPERABLE.

AND At least once per 7 days thereafter during crane operation Watts Bar - Unit 2 3.9-5 Technical Requirements (developmental) A