MONTHYEARWBL-22-026, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual2022-05-11011 May 2022 Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual ML20273A0432020-09-29029 September 2020 Plants Unit 1 and 2 - Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual2019-03-19019 March 2019 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual ML17306A8022017-11-0202 November 2017 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-15-177, Submittal of Replacement Pages for Developmental and Final Revision J of the Technical Specification & Technical Specification Bases, and Developmental and Final Revision E of Technical Requirements Manual & Technical Manual.2015-09-0404 September 2015 Submittal of Replacement Pages for Developmental and Final Revision J of the Technical Specification & Technical Specification Bases, and Developmental and Final Revision E of Technical Requirements Manual & Technical Manual. NL-15-177, Watts Bar, Unit 2, Submittal of Replacement Pages for Developmental and Final Revision J of the Technical Specification & Technical Specification Bases, and Developmental and Final Revision E of Technical Requirements Manual & Technical Ma2015-09-0404 September 2015 Watts Bar, Unit 2, Submittal of Replacement Pages for Developmental and Final Revision J of the Technical Specification & Technical Specification Bases, and Developmental and Final Revision E of Technical Requirements Manual & Technical Man CNL-14-197, Two-Unit Offsite Dose Calculation Manual, Revision 02014-11-21021 November 2014 Two-Unit Offsite Dose Calculation Manual, Revision 0 ML14325A8052014-11-21021 November 2014 Two-Unit Offsite Dose Calculation Manual, Revision 0 ML14307A9812014-11-0303 November 2014 Periodic Submission for Changes Made to Technical Specification Bases and Technical Requirement Manual ML14170A0422014-06-16016 June 2014 Attachment 3 - TRM Developmental Revision D Changes (Mark-Up) for WBN Unit 2 ML14170A0442014-06-16016 June 2014 Attachment 5 - WBN Unit 2 TS and Tsb Through Developmental Revision I, and Trm and Trmb Through Developmental Revision D ML14170A0432014-06-16016 June 2014 Attachment 4 - TRM Bases Developmental Revision D Changes (Mark-Up) for WBN Unit 2 ML13091A0372013-03-26026 March 2013 Submittal of Pre-op Test Instructions for Condenser Vacuum and Flood Mode Boration ML12311A1512012-10-31031 October 2012 Draft Two-Unit Offsite Dose Calculation Manual (ODCM) ML11325A3222011-11-16016 November 2011 Changes Made to the Technical Requirements Manual ML11257A0512011-07-31031 July 2011 Attachment 11, WCAP-17458-NP, Revision 0, Wincise Signal Processing System Cabinet Operation & Maintenance Manual, and Attachment 12, Application for Withholding Proprietary Information from Public Disclosure ML1011210872010-04-20020 April 2010 Changes Made to the Technical Requirements Manual ML1005506372010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual Bases B 3.1 - Reactivity Control Systems ML1005506502010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual Bases B 3.9 - Refueling Operations ML1005506492010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual Bases B 3.8 - Electrical Power Systems ML1005506442010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual Bases B 3.7 - Plant Systems ML1005506412010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual Bases B 3.6 - Containment Systems ML1005506402010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual Bases B 3.4 - Reactor Coolant System ML1005506392010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual Bases B 3.3- Instrumentation ML1005506362010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual Bases B 3.0 - Technical Requirement (TR) and Technical Surveillance Requirement (Tsr) Applicability ML1005506342010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual 5.0 - Administrative Controls ML1005506302010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual TR 3.9 - Refueling Operations ML1005506292010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual TR 3.8 - Electrical Power Systems ML1005506262010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual TR 3.7 - Plant Systems ML1005506242010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual TR 3.6 - Containment Systems ML1005506232010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual TR 3.4 - Reactor Coolant System (RCS) ML1005506212010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual TR 3.3 - Instrumentation ML1005506202010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual TR 3.1 - Reactivity Control Systems ML1005506162010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual 3.0 - Technical Requirement (TR) Applicability ML1005506122010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual 1.0 - Use and Application ML1005506082010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual - Table of Contents ML11126A1812010-01-26026 January 2010 Offsite Dose Calculation Manual, Effluent and Waste Disposal Annual Report - 2010, Attachment 3 ML12124A2172010-01-26026 January 2010 Attachment 3, Offsite Dose Calculation Manual Revision 23 (No Revisions in 2011) ML0712300842006-08-18018 August 2006 2006 Effluent and Waste Disposal Annual Report, Attachment 3.0 Offsite Dose Calculation Manual, Rev 18 ML0526402732005-09-16016 September 2005 Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual ML0612202592005-08-19019 August 2005 2005 Watts Bar Nuclear Plant Effluent and Waste Disposal Annual Report, Attachment 3 to Enclosure 1 Offsite Dose Calculation Manual ML0512506262004-10-19019 October 2004 Attachment 3.0, Watts Bar, Offsite Dose Calculation Manual, Revision 13 2022-05-11
[Table view] |
Text
Decay Time TR 3.9.1 TR 3.9 REFUELING OPERATIONS TR 3.9.1 Decay Time TR 3.9.1 The reactor shall be subcritical for > 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />.
APPLICABILITY: During movement of irradiated fuel in the reactor vessel.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Reactor subcritical for A.1 Suspend all operations Immediately
< 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />. involving movement of irradiated fuel in the reactor vessel.
TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.1.1 Verify the reactor has been subcritical for > 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> Prior to movement of by confirming the date and time of subcriticality. irradiated fuel in the reactor vessel Watts Bar - Unit 2 3.9-1 Technical Requirements (developmental) A
Communications TR 3.9.2 TR 3.9 REFUELING OPERATIONS TR 3.9.2 Communications TR 3.9.2 Direct communications shall be maintained between the control room and personnel at the refueling station.
APPLICABILITY: During CORE ALTERATIONS.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Direct communications A.1 Suspend all CORE Immediately between the control room ALTERATIONS.
and personnel at the refueling station cannot be maintained.
TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.2.1 Demonstrate that direct communications between the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> prior to the control room and personnel at the refueling station are start of CORE established. ALTERATIONS AND Each 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during CORE ALTERATIONS Watts Bar - Unit 2 3.9-2 Technical Requirements (developmental) A
Refueling Machine TR 3.9.3 TR 3.9 REFUELING OPERATIONS TR 3.9.3 Refueling Machine TR 3.9.3 The Refueling Machine and Auxiliary Hoist shall be used for movement of fuel assemblies or drive shafts and shall be OPERABLE as follows:
- a. The Refueling Machine shall have a capacity of 3150 pounds, and two electrical overload cutoff limits of 2650 pounds and 2800 pounds, respectively.
- b. The Auxiliary Hoist shall have a capacity of 1200 pounds and a load indicator shall be used to indicate the lifting of loads > 1190 pounds.
APPLICABILITY: During movement of fuel assemblies or drive shafts within the reactor pressure vessel.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Refueling Machine A.1 Suspend use of Refueling Immediately inoperable. Machine from operations involving the movement of fuel assemblies within the reactor pressure vessel.
B. Auxiliary Hoist inoperable. B.1 Suspend use of Auxiliary Immediately Hoist from operations involving the movement of drive shafts within the reactor pressure vessel.
Watts Bar - Unit 2 3.9-3 Technical Requirements (developmental) A
Refueling Machine TR 3.9.3 TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.3.1 For each required Refueling Machine, perform a load 18 months test of 3150 pounds and demonstrate an automatic electrical load cutoff before the crane load is
> 2650 pounds. Demonstrate a second automatic electrical load cutoff before the crane load is
> 2800 pounds.
TSR 3.9.3.2 For each required Auxiliary Hoist and associated load Within 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> indicator, perform a load test of 1200 pounds. prior to start of movement of drive shafts within the reactor pressure vessel Watts Bar - Unit 2 3.9-4 Technical Requirements (developmental) A
Crane Travel - Spent Fuel Storage Pool Building TR 3.9.4 TR 3.9 REFUELING OPERATIONS TR 3.9.4 Crane Travel - Spent Fuel Storage Pool Building TR 3.9.4 Loads > 2059 pounds shall be prohibited from travel over fuel assemblies in the spent fuel pool.
APPLICABILITY: With fuel assemblies in the spent fuel pool.
NOTE----------------------------------------------
TR 3.0.3 is not applicable.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Technical Requirement not A.1 Place the crane load in a Immediately met. safe condition.
TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.4.1 Demonstrate crane interlocks and physical stops Within 7 days prior to which prevent crane travel over fuel assemblies to be crane use OPERABLE.
AND At least once per 7 days thereafter during crane operation Watts Bar - Unit 2 3.9-5 Technical Requirements (developmental) A