{{#Wiki_filter:Attachment 6 OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Facility:
{{#Wiki_filter:DRAFT OUTLINE COMMENTS Facility:       WT                                     First Exam Date:       10/05/2009 Written Exam Outline (30JUL09)
WT First Exam Date:
Comment                                       Resolution Read ES-401, D.2.a regarding Tier 3           OK questions. They need to focus on 1
10/05/2009 Written Exam Outline (30JUL09)
generic plant-wide knowledge, not system specific knowledge (like Tier 2).
Comment Resolution 1 Read ES-401, D.2.a regarding Tier 3 questions. They need to focus on generic plant-wide knowledge, not system specific knowledge (like Tier 2).
Minimize use of reference materials           OK 2
OK 2 Minimize use of reference materials (handouts).
(handouts).
OK 3 For Modified questions, include original  
For Modified questions, include original     OK 3  bank question with DRAFT exam submittal.
 
Administrative JPM Outline (30JUL09)
bank question with DRAFT exam submittal.
Comment                                       Resolution For Modified JPMs, include original bank OK 1
OK      Administrative JPM Outline (30JUL09)
JPM with DRAFT exam submittal.
Comment Resolution 1 For Modified JPMs, include original bank JPM with DRAFT exam submittal.
2   Include IR values on ES 301-1 forms           DONE A9 - ensure EAL is different than Nov         OK 3
OK 2 Include IR values on ES 301-1 forms DONE 3 A9 - ensure EAL is different than Nov 2006 NRC exam OK Control Room / In-Plant System JPM Outline (30JUL09)
2006 NRC exam Control Room / In-Plant System JPM Outline (30JUL09)
Comment Resolution 1 Are any sim JPMs designed to run  
Comment                                       Resolution Are any sim JPMs designed to run             YES - 2 pairs 1
 
concurrently?
concurrently?
YES - 2 pairs 2 What NRC exam was S3 used on to classify as a "P?"
What NRC exam was S3 used on to               2006 2
2006 3 Verify all Alternate Path JPMs have procedural guidance for operator  
classify as a P?
 
Verify all Alternate Path JPMs have           OK 3  procedural guidance for operator actions.
actions. OK 4 S3 - is the identified critical time in a regulation or commitment document?
S3 - is the identified critical time in a     YES 4
YES 
regulation or commitment document?                                                         OBDI 202 - IOLE Process
 
Attachment 6 OBDI 202 - IOLE Process Simulator Scenario Outline Comments (30JUL09)
Comment Resolution 1 ES 301-5 doesn't match draft schedule  FIXED 2 Draft schedule doesn't include A9 FIXED 3 Ensure Ops Rep reviews / concurs with all TS action statements. D-2's should distinguish between MUST HAVE and OPTIONAL TS calls.
OK 4 Ensure Ops Rep reviews / concurs with all Critical Tasks and their acceptance


criteria.
Simulator Scenario Outline Comments (30JUL09)
OK 5 Scenario 1, Event 1 - what is action for BOP when BD-103B fails to close? NONE - CRS ENTERS TS's 6 S2 - how will the rain be communicated to the crew during the scenario? (if we need to shorten the scenario, this Normal evolution can be deleted) CUE FROM BOOTH OPERATOR 7 S3, E1 - in the narrative - what does "will go late this shift" mean? REVISED 8 S3 - may want to swap events 4 and 5:
Comment                                  Resolution 1  ES 301-5 doesnt match draft schedule      FIXED 2  Draft schedule doesnt include A9          FIXED Ensure Ops Rep reviews / concurs with      OK all TS action statements. D-2s should 3
if crew doesn't diagnose steam bypass valve failure and trips the reactor we won't get Event 5. DONE}}
distinguish between MUST HAVE and OPTIONAL TS calls.
Ensure Ops Rep reviews / concurs with      OK 4  all Critical Tasks and their acceptance criteria.
Scenario 1, Event 1 - what is action for   NONE - CRS ENTERS TS's 5
BOP when BD-103B fails to close?
S2 - how will the rain be communicated     CUE FROM BOOTH OPERATOR to the crew during the scenario? (if we 6
need to shorten the scenario, this Normal evolution can be deleted)
S3, E1 - in the narrative - what does       REVISED 7
will go late this shift mean?
S3 - may want to swap events 4 and 5:       DONE if crew doesnt diagnose steam bypass 8
valve failure and trips the reactor we wont get Event 5.                                                   OBDI 202 - IOLE Process}}

Latest revision as of 19:33, 13 November 2019

WT-2009-10-Draft Outline Comments
ML101270491
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/05/2009
From: Brian Larson
Operations Branch IV
To:
References
50-382/09-301, WT-2009-10-DRAFT
Download: ML101270491 (2)


Text

DRAFT OUTLINE COMMENTS Facility: WT First Exam Date: 10/05/2009 Written Exam Outline (30JUL09)

Comment Resolution Read ES-401, D.2.a regarding Tier 3 OK questions. They need to focus on 1

generic plant-wide knowledge, not system specific knowledge (like Tier 2).

Minimize use of reference materials OK 2

(handouts).

For Modified questions, include original OK 3 bank question with DRAFT exam submittal.

Administrative JPM Outline (30JUL09)

Comment Resolution For Modified JPMs, include original bank OK 1

JPM with DRAFT exam submittal.

2 Include IR values on ES 301-1 forms DONE A9 - ensure EAL is different than Nov OK 3

2006 NRC exam Control Room / In-Plant System JPM Outline (30JUL09)

Comment Resolution Are any sim JPMs designed to run YES - 2 pairs 1

concurrently?

What NRC exam was S3 used on to 2006 2

classify as a P?

Verify all Alternate Path JPMs have OK 3 procedural guidance for operator actions.

S3 - is the identified critical time in a YES 4

regulation or commitment document? OBDI 202 - IOLE Process

Simulator Scenario Outline Comments (30JUL09)

Comment Resolution 1 ES 301-5 doesnt match draft schedule FIXED 2 Draft schedule doesnt include A9 FIXED Ensure Ops Rep reviews / concurs with OK all TS action statements. D-2s should 3

distinguish between MUST HAVE and OPTIONAL TS calls.

Ensure Ops Rep reviews / concurs with OK 4 all Critical Tasks and their acceptance criteria.

Scenario 1, Event 1 - what is action for NONE - CRS ENTERS TS's 5

BOP when BD-103B fails to close?

S2 - how will the rain be communicated CUE FROM BOOTH OPERATOR to the crew during the scenario? (if we 6

need to shorten the scenario, this Normal evolution can be deleted)

S3, E1 - in the narrative - what does REVISED 7

will go late this shift mean?

S3 - may want to swap events 4 and 5: DONE if crew doesnt diagnose steam bypass 8

valve failure and trips the reactor we wont get Event 5. OBDI 202 - IOLE Process