Attachment 6 OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Facility:

WT First Exam Date:

10/05/2009 Written Exam Outline (30JUL09)

Comment Resolution 1

Read ES-401, D.2.a regarding Tier 3 questions. They need to focus on generic plant-wide knowledge, not system specific knowledge (like Tier 2).

OK 2 Minimize use of reference materials (handouts).

OK 3

For Modified questions, include original bank question with DRAFT exam submittal.

OK Administrative JPM Outline (30JUL09)

Comment Resolution 1 For Modified JPMs, include original bank JPM with DRAFT exam submittal.

OK 2 Include IR values on ES 301-1 forms DONE 3 A9 - ensure EAL is different than Nov 2006 NRC exam OK Control Room / In-Plant System JPM Outline (30JUL09)

Comment Resolution 1 Are any sim JPMs designed to run concurrently?

YES - 2 pairs 2 What NRC exam was S3 used on to classify as a P?

2006 3

Verify all Alternate Path JPMs have procedural guidance for operator actions.

OK 4 S3 - is the identified critical time in a regulation or commitment document?

YES

OBDI 202 - IOLE Process Simulator Scenario Outline Comments (30JUL09)

Comment Resolution 1 ES 301-5 doesnt match draft schedule FIXED 2 Draft schedule doesnt include A9 FIXED 3

Ensure Ops Rep reviews / concurs with all TS action statements. D-2s should distinguish between MUST HAVE and OPTIONAL TS calls.

OK 4

Ensure Ops Rep reviews / concurs with all Critical Tasks and their acceptance criteria.

OK 5 Scenario 1, Event 1 - what is action for BOP when BD-103B fails to close?

NONE - CRS ENTERS TS's 6

S2 - how will the rain be communicated to the crew during the scenario? (if we need to shorten the scenario, this Normal evolution can be deleted)

CUE FROM BOOTH OPERATOR 7 S3, E1 - in the narrative - what does will go late this shift mean?

REVISED 8

S3 - may want to swap events 4 and 5:

if crew doesnt diagnose steam bypass valve failure and trips the reactor we wont get Event 5.

DONE