ML101270491

From kanterella
Jump to navigation Jump to search
WT-2009-10-Draft Outline Comments
ML101270491
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/05/2009
From: Brian Larson
Operations Branch IV
To:
References
50-382/09-301, WT-2009-10-DRAFT
Download: ML101270491 (2)


Text

DRAFT OUTLINE COMMENTS Facility: WT First Exam Date: 10/05/2009 Written Exam Outline (30JUL09)

Comment Resolution Read ES-401, D.2.a regarding Tier 3 OK questions. They need to focus on 1

generic plant-wide knowledge, not system specific knowledge (like Tier 2).

Minimize use of reference materials OK 2

(handouts).

For Modified questions, include original OK 3 bank question with DRAFT exam submittal.

Administrative JPM Outline (30JUL09)

Comment Resolution For Modified JPMs, include original bank OK 1

JPM with DRAFT exam submittal.

2 Include IR values on ES 301-1 forms DONE A9 - ensure EAL is different than Nov OK 3

2006 NRC exam Control Room / In-Plant System JPM Outline (30JUL09)

Comment Resolution Are any sim JPMs designed to run YES - 2 pairs 1

concurrently?

What NRC exam was S3 used on to 2006 2

classify as a P?

Verify all Alternate Path JPMs have OK 3 procedural guidance for operator actions.

S3 - is the identified critical time in a YES 4

regulation or commitment document? OBDI 202 - IOLE Process

Simulator Scenario Outline Comments (30JUL09)

Comment Resolution 1 ES 301-5 doesnt match draft schedule FIXED 2 Draft schedule doesnt include A9 FIXED Ensure Ops Rep reviews / concurs with OK all TS action statements. D-2s should 3

distinguish between MUST HAVE and OPTIONAL TS calls.

Ensure Ops Rep reviews / concurs with OK 4 all Critical Tasks and their acceptance criteria.

Scenario 1, Event 1 - what is action for NONE - CRS ENTERS TS's 5

BOP when BD-103B fails to close?

S2 - how will the rain be communicated CUE FROM BOOTH OPERATOR to the crew during the scenario? (if we 6

need to shorten the scenario, this Normal evolution can be deleted)

S3, E1 - in the narrative - what does REVISED 7

will go late this shift mean?

S3 - may want to swap events 4 and 5: DONE if crew doesnt diagnose steam bypass 8

valve failure and trips the reactor we wont get Event 5. OBDI 202 - IOLE Process