| {{#Wiki_filter:1 WBN2Public Resource From: Elton, Thomas L [tlelton@tva.gov] | | {{#Wiki_filter:WBN2Public Resource From: Elton, Thomas L [tlelton@tva.gov] |
| Sent: Wednesday, June 02, 2010 11:51 AM To: Wiebe, Joel | | Sent: Wednesday, June 02, 2010 11:51 AM To: Wiebe, Joel |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Please Clarify Bucket List Item Attachments: | | Please Clarify Bucket List Item Attachments: image001.gif |
| image001.gif Joel, I work for Bill Crouch and he has assigned one of the NRC PM Open Items List items to me. | | : Joel, I work for Bill Crouch and he has assigned one of the NRC PM Open Items List items to me. |
| | | It simply says Control Room Lighting RAI. |
| It simply says "Control Room Lighting RAI." | | Earlier today, I was compiling a list of RAIs for which we owe yall a response. In doing so, I reviewed a group provided by e-mail from Lamb dated 05/27. The last RAI in this group was as follows: |
| Earlier today, I was compiling a list of RAIs for which we owe y'all a response. In doing so, I reviewed a group provided by e-mail from Lamb dated 05/27. The last RA I in this group was as follows: | | Section 9.5.3 - Lighting System |
| | | : 1. Provide a summary discussion of the typical luminance ranges for normal and emergency lighting in all areas/rooms of the plant to ensure that the functional capability of the lighting system design provides illumination level in accordance with the IESNA Lighting Handbook for Central Stations or NUREG 700. Discuss the technical basis if the design illumination levels are not in conformance with the guidelines of IESNA Lighting Handbook for Central Stations and NUREG 700. |
| "Section 9.5.3 - Lighting System
| | Section 9.5.3 of the WBN Unit 2 FSAR does not describe the illumination levels for the work areas or type of tasks in the Main Control Room (MCR), safety-related panels in the MCR and remote shutdown consoles. Provide a description of the illumination levels for normal lighting in these areas. Discuss the technical basis if the design illumination levels do not conform to the 1 |
| : 1. Provide a summary discussion of the typical luminance ranges for normal and emergency lighting in all areas/rooms of the plant to ensure that the functional capabilit y of the lighting system design provides illumination level in accordance with the IESNA Lighting Handbook for Central Stations or NUREG 700. Discuss the technical basis if the design illumination levels are not in conformance with the guidelines of IESNA Lighting Handbook for Central Stations and NUREG 700. | |
| Section 9.5.3 of the WBN Unit 2 FSAR does not describe the illumination levels for the work ar eas or type of tasks in the Main Control Room (MCR), safety-related panels in the MCR and remote shutdown consoles. Provide a description of the illumination levels for normal lighting in these areas. | |
| Discuss the technical basis if the design illumination levels do not conform to the 2guidelines of IESNA Lighting Handbook for Central Stations or NUREG 700. | |
| Discuss if the emergency lighting in the MCR, safety-related
| |
| | |
| panels in the MCR and remo te shutdown consoles provides illumination levels in these ar eas equal to grea ter than those recommended by the IESNA Li ghting Handbook for Central Stations or NUREG 700 for at least 8 hours."
| |
| | |
| Please confirm that this is the RAI that the subject of the PM Open Item mentioned above.
| |
|
| |
|
| | guidelines of IESNA Lighting Handbook for Central Stations or NUREG 700. |
| | Discuss if the emergency lighting in the MCR, safety-related panels in the MCR and remote shutdown consoles provides illumination levels in these areas equal to greater than those recommended by the IESNA Lighting Handbook for Central Stations or NUREG 700 for at least 8 hours. |
| | Please confirm that this is the RAI that the subject of the PM Open Item mentioned above. |
| If this is not the one, please provide me with more information. | | If this is not the one, please provide me with more information. |
| Thanks, Thomas Lee (Tommy) Elton Watts Bar Unit 2 Licensing 423-365-7751 | | : Thanks, Thomas Lee (Tommy) Elton Watts Bar Unit 2 Licensing 423-365-7751 2 |
|
| |
|
| Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 29 Mail Envelope Properties (14495210B2808F499555F3B6E04436570A6085BE) | | Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 29 Mail Envelope Properties (14495210B2808F499555F3B6E04436570A6085BE) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Please Clarify Bucket List Item Sent Date: 6/2/2010 11:51:05 AM Received Date: 6/2/2010 11:55:01 AM From: Elton, Thomas L Created By: tlelton@tva.gov Recipients: "Wiebe, Joel" <Joel.Wiebe@nrc.gov> | | Please Clarify Bucket List Item Sent Date: 6/2/2010 11:51:05 AM Received Date: 6/2/2010 11:55:01 AM From: Elton, Thomas L Created By: tlelton@tva.gov Recipients: |
| Tracking Status: None | | "Wiebe, Joel" <Joel.Wiebe@nrc.gov> |
| | Tracking Status: None Post Office: TVANUCXVS1.main.tva.gov Files Size Date & Time MESSAGE 1937 6/2/2010 11:55:01 AM image001.gif 927 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| | Recipients Received: |
|
| |
|
| Post Office: TVANUCXVS1.main.tva.gov Files Size Date & Time MESSAGE 1937 6/2/2010 11:55:01 AM image001.gif 927 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
| | Page 1 of 1 file://c:\EMailCapture\Watts_Bar_2_Operating_LA_Public\29\attch1.gif 6/10/2010}} |
| Pa ge 1of 1 6/10/2010file://c:\EMailCa p ture\Watts
| |
| _Bar_2_O p eratin g_LA_Public\29\attch1.
| |
| g if}}
| |
|
---|
Category:E-Mail
MONTHYEARML24309A0552024-11-0101 November 2024 NRR E-mail Capture - Request for Additional Information - TVA LAR to Revised Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 Re TS Table 3.3.2-1, Function 5 ML24304A3752024-10-29029 October 2024 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) to Revise Watts Bar Updated Final Safety Analysis Report (UFSAR) for Hydrologic Analysis ML24274A2762024-09-24024 September 2024 Email from K.Green to S.Hughes, Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, Hydrologic LAR to Revise the UFSAR ML24260A0322024-09-10010 September 2024 NRR E-mail Capture - Request for Additional Information Regarding the Watts Bar Unit 2 Steam Generator Tube Inspection Report for U2R5 ML24215A3152024-07-24024 July 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-276-A, Revision 2 TS 3.8.1, AC Sources ML24177A1412024-06-11011 June 2024 NRR E-mail Capture - Audit Plan Related to Review of the Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, LAR to Revise Technical Specification Table 3.3.2-1 Function 5 ML24157A3152024-06-0303 June 2024 2024 Sequoyah Commercial Grade Dedication Inspection Information Request ML24155A1372024-05-29029 May 2024 Email from K. Green to S. Hughes Request for Additional Information Related to License Amendment Request to Revise Residual Heat Removal Flow Rate ML24156A0062024-05-22022 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Recapture Low-Power Testing Time ML24130A0132024-05-0707 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.7.11 for MCR Chiller Completion Time ML24123A0882024-05-0202 May 2024 NRR E-mail Capture - Correction Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24122B4872024-04-30030 April 2024 NRR E-mail Capture - Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24082A0662024-04-17017 April 2024 Email to Stuart Rymer on Exemption Decision for Watts Bar ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24082A0682024-04-10010 April 2024 Email to Stuart Rymer Re_ Availability of EA-FONSI for Watts Bar ML24100A8392024-04-0909 April 2024 Response from State of Tn Regarding Review of Environmental Assessment for Watts Bar Exemption Request ML24100A8402024-04-0808 April 2024 Email to State of Tn Requesting Review of Environmental Assessment for Watts Bar Exemption Request ML24071A0982024-03-0707 March 2024 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate ML24058A0962024-02-26026 February 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant License Amendment Request to Revise UFSAR for Hydrologic Analysis ML24047A2792024-02-15015 February 2024 RAI Related to the Exemption Request for 10 CFR 37.11 ML24045A0312024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML24033A0562024-02-0101 February 2024 NRR E-mail Capture - Correction Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-427-A, Revision 2 Regarding Degraded Barriers ML24036A0132024-01-23023 January 2024 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar Nuclear Plants, License Amendment Request to Revise TS Table 3.3.2-1, Function 5, Turbine Trip and Feedwater Isolation ML24022A2592024-01-22022 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator ML24016A0762024-01-16016 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications ML23347A0642023-12-13013 December 2023 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 ML23334A0932023-11-28028 November 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23254A2872023-09-11011 September 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23191A8672023-07-10010 July 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23150A2472023-05-25025 May 2023 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23116A1492023-04-21021 April 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23075A0032023-03-13013 March 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1, 2, and 3, License Amendment Request to Revise TS 3.7.11, Required Actions A.1 and E.1 Footnotes Re Date for the Modification ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22356A2982022-12-22022 December 2022 Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report ML22353A0812022-12-15015 December 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 2024-09-24
[Table view] |
Text
WBN2Public Resource From: Elton, Thomas L [tlelton@tva.gov]
Sent: Wednesday, June 02, 2010 11:51 AM To: Wiebe, Joel
Subject:
Please Clarify Bucket List Item Attachments: image001.gif
- Joel, I work for Bill Crouch and he has assigned one of the NRC PM Open Items List items to me.
It simply says Control Room Lighting RAI.
Earlier today, I was compiling a list of RAIs for which we owe yall a response. In doing so, I reviewed a group provided by e-mail from Lamb dated 05/27. The last RAI in this group was as follows:
Section 9.5.3 - Lighting System
- 1. Provide a summary discussion of the typical luminance ranges for normal and emergency lighting in all areas/rooms of the plant to ensure that the functional capability of the lighting system design provides illumination level in accordance with the IESNA Lighting Handbook for Central Stations or NUREG 700. Discuss the technical basis if the design illumination levels are not in conformance with the guidelines of IESNA Lighting Handbook for Central Stations and NUREG 700.
Section 9.5.3 of the WBN Unit 2 FSAR does not describe the illumination levels for the work areas or type of tasks in the Main Control Room (MCR), safety-related panels in the MCR and remote shutdown consoles. Provide a description of the illumination levels for normal lighting in these areas. Discuss the technical basis if the design illumination levels do not conform to the 1
guidelines of IESNA Lighting Handbook for Central Stations or NUREG 700.
Discuss if the emergency lighting in the MCR, safety-related panels in the MCR and remote shutdown consoles provides illumination levels in these areas equal to greater than those recommended by the IESNA Lighting Handbook for Central Stations or NUREG 700 for at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
Please confirm that this is the RAI that the subject of the PM Open Item mentioned above.
If this is not the one, please provide me with more information.
- Thanks, Thomas Lee (Tommy) Elton Watts Bar Unit 2 Licensing 423-365-7751 2
Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 29 Mail Envelope Properties (14495210B2808F499555F3B6E04436570A6085BE)
Subject:
Please Clarify Bucket List Item Sent Date: 6/2/2010 11:51:05 AM Received Date: 6/2/2010 11:55:01 AM From: Elton, Thomas L Created By: tlelton@tva.gov Recipients:
"Wiebe, Joel" <Joel.Wiebe@nrc.gov>
Tracking Status: None Post Office: TVANUCXVS1.main.tva.gov Files Size Date & Time MESSAGE 1937 6/2/2010 11:55:01 AM image001.gif 927 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
Page 1 of 1 file://c:\EMailCapture\Watts_Bar_2_Operating_LA_Public\29\attch1.gif 6/10/2010