ML101610702: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 WBN2Public Resource From: Elton, Thomas L [tlelton@tva.gov]
{{#Wiki_filter:WBN2Public Resource From:             Elton, Thomas L [tlelton@tva.gov]
Sent: Wednesday, June 02, 2010 11:51 AM To: Wiebe, Joel
Sent:             Wednesday, June 02, 2010 11:51 AM To:               Wiebe, Joel


==Subject:==
==Subject:==
Please Clarify Bucket List Item Attachments:
Please Clarify Bucket List Item Attachments:       image001.gif
image001.gif Joel, I work for Bill Crouch and he has assigned one of the NRC PM Open Items List items to me.  
: Joel, I work for Bill Crouch and he has assigned one of the NRC PM Open Items List items to me.
 
It simply says Control Room Lighting RAI.
It simply says "Control Room Lighting RAI."
Earlier today, I was compiling a list of RAIs for which we owe yall a response. In doing so, I reviewed a group provided by e-mail from Lamb dated 05/27. The last RAI in this group was as follows:
Earlier today, I was compiling a list of RAIs for which we owe y'all a response. In doing so, I reviewed a group provided by e-mail from Lamb dated 05/27. The last RA I in this group was as follows:  
Section 9.5.3 - Lighting System
 
: 1. Provide a summary discussion of the typical luminance ranges for normal and emergency lighting in all areas/rooms of the plant to ensure that the functional capability of the lighting system design provides illumination level in accordance with the IESNA Lighting Handbook for Central Stations or NUREG 700. Discuss the technical basis if the design illumination levels are not in conformance with the guidelines of IESNA Lighting Handbook for Central Stations and NUREG 700.
"Section 9.5.3 - Lighting System
Section 9.5.3 of the WBN Unit 2 FSAR does not describe the illumination levels for the work areas or type of tasks in the Main Control Room (MCR), safety-related panels in the MCR and remote shutdown consoles. Provide a description of the illumination levels for normal lighting in these areas. Discuss the technical basis if the design illumination levels do not conform to the 1
: 1. Provide a summary discussion of the typical luminance ranges for normal and emergency lighting in all areas/rooms of the plant to ensure that the functional capabilit y of the lighting system design provides illumination level in accordance with the IESNA Lighting Handbook for Central Stations or NUREG 700. Discuss the technical basis if the design illumination levels are not in conformance with the guidelines of IESNA Lighting Handbook for Central Stations and NUREG 700.
Section 9.5.3 of the WBN Unit 2 FSAR does not describe the illumination levels for the work ar eas or type of tasks in the Main Control Room (MCR), safety-related panels in the MCR and remote shutdown consoles. Provide a description of the illumination levels for normal lighting in these areas.
Discuss the technical basis if the design illumination levels do not conform to the 2guidelines of IESNA Lighting Handbook for Central Stations or NUREG 700.
Discuss if the emergency lighting in the MCR, safety-related
 
panels in the MCR and remo te shutdown consoles provides illumination levels in these ar eas equal to grea ter than those recommended by the IESNA Li ghting Handbook for Central Stations or NUREG 700 for at least 8 hours."
 
Please confirm that this is the RAI that the subject of the PM Open Item mentioned above.


guidelines of IESNA Lighting Handbook for Central Stations or NUREG 700.
Discuss if the emergency lighting in the MCR, safety-related panels in the MCR and remote shutdown consoles provides illumination levels in these areas equal to greater than those recommended by the IESNA Lighting Handbook for Central Stations or NUREG 700 for at least 8 hours.
Please confirm that this is the RAI that the subject of the PM Open Item mentioned above.
If this is not the one, please provide me with more information.
If this is not the one, please provide me with more information.
Thanks, Thomas Lee (Tommy) Elton Watts Bar Unit 2 Licensing 423-365-7751
: Thanks, Thomas Lee (Tommy) Elton Watts Bar Unit 2 Licensing 423-365-7751 2


Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 29   Mail Envelope Properties   (14495210B2808F499555F3B6E04436570A6085BE)
Hearing Identifier:   Watts_Bar_2_Operating_LA_Public Email Number:         29 Mail Envelope Properties     (14495210B2808F499555F3B6E04436570A6085BE)


==Subject:==
==Subject:==
Please Clarify Bucket List Item Sent Date:   6/2/2010 11:51:05 AM Received Date: 6/2/2010 11:55:01 AM From:   Elton, Thomas L Created By:   tlelton@tva.gov Recipients:     "Wiebe, Joel" <Joel.Wiebe@nrc.gov>
Please Clarify Bucket List Item Sent Date:             6/2/2010 11:51:05 AM Received Date:         6/2/2010 11:55:01 AM From:                 Elton, Thomas L Created By:           tlelton@tva.gov Recipients:
Tracking Status: None  
"Wiebe, Joel" <Joel.Wiebe@nrc.gov>
Tracking Status: None Post Office:          TVANUCXVS1.main.tva.gov Files                          Size                  Date & Time MESSAGE                        1937                  6/2/2010 11:55:01 AM image001.gif                    927 Options Priority:                      Standard Return Notification:            No Reply Requested:                No Sensitivity:                    Normal Expiration Date:
Recipients Received:


Post Office:  TVANUCXVS1.main.tva.gov Files    Size      Date & Time MESSAGE    1937      6/2/2010 11:55:01 AM image001.gif    927 Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
Page 1 of 1 file://c:\EMailCapture\Watts_Bar_2_Operating_LA_Public\29\attch1.gif  6/10/2010}}
Pa ge 1of 1 6/10/2010file://c:\EMailCa p ture\Watts
_Bar_2_O p eratin g_LA_Public\29\attch1.
g if}}

Revision as of 17:12, 13 November 2019

2010/06/02 Watts Bar 2 OL - Please Clarify Bucket List Item
ML101610702
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 06/02/2010
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML101610702 (4)


Text

WBN2Public Resource From: Elton, Thomas L [tlelton@tva.gov]

Sent: Wednesday, June 02, 2010 11:51 AM To: Wiebe, Joel

Subject:

Please Clarify Bucket List Item Attachments: image001.gif

Joel, I work for Bill Crouch and he has assigned one of the NRC PM Open Items List items to me.

It simply says Control Room Lighting RAI.

Earlier today, I was compiling a list of RAIs for which we owe yall a response. In doing so, I reviewed a group provided by e-mail from Lamb dated 05/27. The last RAI in this group was as follows:

Section 9.5.3 - Lighting System

1. Provide a summary discussion of the typical luminance ranges for normal and emergency lighting in all areas/rooms of the plant to ensure that the functional capability of the lighting system design provides illumination level in accordance with the IESNA Lighting Handbook for Central Stations or NUREG 700. Discuss the technical basis if the design illumination levels are not in conformance with the guidelines of IESNA Lighting Handbook for Central Stations and NUREG 700.

Section 9.5.3 of the WBN Unit 2 FSAR does not describe the illumination levels for the work areas or type of tasks in the Main Control Room (MCR), safety-related panels in the MCR and remote shutdown consoles. Provide a description of the illumination levels for normal lighting in these areas. Discuss the technical basis if the design illumination levels do not conform to the 1

guidelines of IESNA Lighting Handbook for Central Stations or NUREG 700.

Discuss if the emergency lighting in the MCR, safety-related panels in the MCR and remote shutdown consoles provides illumination levels in these areas equal to greater than those recommended by the IESNA Lighting Handbook for Central Stations or NUREG 700 for at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

Please confirm that this is the RAI that the subject of the PM Open Item mentioned above.

If this is not the one, please provide me with more information.

Thanks, Thomas Lee (Tommy) Elton Watts Bar Unit 2 Licensing 423-365-7751 2

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 29 Mail Envelope Properties (14495210B2808F499555F3B6E04436570A6085BE)

Subject:

Please Clarify Bucket List Item Sent Date: 6/2/2010 11:51:05 AM Received Date: 6/2/2010 11:55:01 AM From: Elton, Thomas L Created By: tlelton@tva.gov Recipients:

"Wiebe, Joel" <Joel.Wiebe@nrc.gov>

Tracking Status: None Post Office: TVANUCXVS1.main.tva.gov Files Size Date & Time MESSAGE 1937 6/2/2010 11:55:01 AM image001.gif 927 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Page 1 of 1 file://c:\EMailCapture\Watts_Bar_2_Operating_LA_Public\29\attch1.gif 6/10/2010