ML101950493: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 04/12/2010
| issue date = 04/12/2010
| title = RB-2010-04-Draft Outline Comments
| title = RB-2010-04-Draft Outline Comments
| author name = Garchow S M
| author name = Garchow S
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Attachment 6  OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Facility: River Bend First Exam Date:April 16, 2010 Written Exam Outline (2/19/2010) Comment Resolution 1 No comments None 2   3   4   5     Administrative JPM Outline (2/19/2010) Comment Resolution 1 Replace RO ADMIN for EP Replace RO Admin JPM A3 was replaced with a new JPM. 2 Replace SRO ADMIN A5 as it is an RO Will reword the JPM so that it is an SRO JPM This was done.
{{#Wiki_filter:DRAFT OUTLINE COMMENTS Facility: River Bend                               First Exam Date: April 16, 2010 Written Exam Outline (2/19/2010)
3 Make EP Determination following a scenario 4   5     Control Room / In-Plant System JPM Outline (2/19/2010) Comment Resolution 1 Replace JPM C2 as it is same as scenario 2. This was not replaced - the scenario was revised so it no longer has C2. 2 What is ARC? 3 What is safety significance of JPM C1? This is performed per an EOP attachment. 4   5     Simulator Scenario Outline Comments (2/19/2010) Comment Resolution 1 Scenario 1 -
Comment                                         Resolution 1   No comments                               None 2
Replace event 2 with a TS failure Event 2 has no safety significance. Will be replaced.
3 4
Attachment 6  OBDI 202 - IOLE Process This event was replaced.
5 Administrative JPM Outline (2/19/2010)
2 Scenario 2 -  Can LPRM be bypassed in simulator?
Comment                                         Resolution Replace RO ADMIN for EP                   Replace 1                                            RO Admin JPM A3 was replaced with a new JPM.
Remove 5 minutes from event 5.
Replace SRO ADMIN A5 as it is an RO       Will reword the JPM so that it is an SRO JPM 2
Does event 7 include BPV's?  If so, lower initial power to 70%. Will replace with a BOP TS event. Looking at inadvertent auto start of RCIC
This was done.
Make EP Determination following a 3
scenario 4
5 Control Room / In-Plant System JPM Outline (2/19/2010)
Comment                                         Resolution Replace JPM C2 as it is same as           This was not replaced - the scenario was 1
scenario 2.                              revised so it no longer has C2.
2   What is ARC?
3   What is safety significance of JPM C1?   This is performed per an EOP attachment.
4 5
Simulator Scenario Outline Comments (2/19/2010)
Comment                                         Resolution Scenario 1 -                             Event 2 has no safety significance. Will be 1
Replace event 2 with a TS failure        replaced.                                                       OBDI 202 - IOLE Process


Will remove the 5 minute delay so that it is  
This event was replaced.
 
Scenario 2 -                            Will replace with a BOP TS event. Looking at Can LPRM be bypassed in simulator?      inadvertent auto start of RCIC Remove 5 minutes from event 5.          Will remove the 5 minute delay so that it is 2  Does event 7 include BPVs? If so,      examiner initiated.
examiner initiated.
lower initial power to 70%.            Based on validation, events 3 and 4 were replaced. The 5 minute time delay was removed.
Based on validation, events 3 and 4 were replaced. The 5 minute time delay was removed. 3 Scenario 3 - What BOP actions for event 5? What is the operational impact of event 3? Looks like a spare 4 Scenario 4 -
Scenario 3 -                           Looks like a spare What BOP actions for event 5?
What are the BOP actions on event 4? Make sure it is ok to raise power Will add another BOP event. Event 6 was added to the scenario. 5}}
3 What is the operational impact of event 3?
Scenario 4 -                           Will add another BOP event.
What are the BOP actions on event 4?   Event 6 was added to the scenario.
Make sure it is ok to raise power 5                                                     OBDI 202 - IOLE Process}}

Latest revision as of 17:08, 13 November 2019

RB-2010-04-Draft Outline Comments
ML101950493
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/12/2010
From: Garchow S
Operations Branch IV
To:
Entergy Operations
References
50-458/10-04
Download: ML101950493 (2)


Text

DRAFT OUTLINE COMMENTS Facility: River Bend First Exam Date: April 16, 2010 Written Exam Outline (2/19/2010)

Comment Resolution 1 No comments None 2

3 4

5 Administrative JPM Outline (2/19/2010)

Comment Resolution Replace RO ADMIN for EP Replace 1 RO Admin JPM A3 was replaced with a new JPM.

Replace SRO ADMIN A5 as it is an RO Will reword the JPM so that it is an SRO JPM 2

This was done.

Make EP Determination following a 3

scenario 4

5 Control Room / In-Plant System JPM Outline (2/19/2010)

Comment Resolution Replace JPM C2 as it is same as This was not replaced - the scenario was 1

scenario 2. revised so it no longer has C2.

2 What is ARC?

3 What is safety significance of JPM C1? This is performed per an EOP attachment.

4 5

Simulator Scenario Outline Comments (2/19/2010)

Comment Resolution Scenario 1 - Event 2 has no safety significance. Will be 1

Replace event 2 with a TS failure replaced. OBDI 202 - IOLE Process

This event was replaced.

Scenario 2 - Will replace with a BOP TS event. Looking at Can LPRM be bypassed in simulator? inadvertent auto start of RCIC Remove 5 minutes from event 5. Will remove the 5 minute delay so that it is 2 Does event 7 include BPVs? If so, examiner initiated.

lower initial power to 70%. Based on validation, events 3 and 4 were replaced. The 5 minute time delay was removed.

Scenario 3 - Looks like a spare What BOP actions for event 5?

3 What is the operational impact of event 3?

Scenario 4 - Will add another BOP event.

4 What are the BOP actions on event 4? Event 6 was added to the scenario.

Make sure it is ok to raise power 5 OBDI 202 - IOLE Process