Attachment 6 OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Facility: River Bend First Exam Date:

April 16, 2010 Written Exam Outline (2/19/2010)

Comment Resolution 1 No comments None 2

3 4

5 Administrative JPM Outline (2/19/2010)

Comment Resolution 1

Replace RO ADMIN for EP Replace RO Admin JPM A3 was replaced with a new JPM.

2 Replace SRO ADMIN A5 as it is an RO Will reword the JPM so that it is an SRO JPM This was done.

3 Make EP Determination following a scenario 4

5 Control Room / In-Plant System JPM Outline (2/19/2010)

Comment Resolution 1 Replace JPM C2 as it is same as scenario 2.

This was not replaced - the scenario was revised so it no longer has C2.

2 What is ARC?

3 What is safety significance of JPM C1?

This is performed per an EOP attachment.

4 5

Simulator Scenario Outline Comments (2/19/2010)

Comment Resolution 1 Scenario 1 -

Replace event 2 with a TS failure Event 2 has no safety significance. Will be replaced.

OBDI 202 - IOLE Process This event was replaced.

2 Scenario 2 -

Can LPRM be bypassed in simulator?

Remove 5 minutes from event 5.

Does event 7 include BPVs? If so, lower initial power to 70%.

Will replace with a BOP TS event. Looking at inadvertent auto start of RCIC Will remove the 5 minute delay so that it is examiner initiated.

Based on validation, events 3 and 4 were replaced. The 5 minute time delay was removed.

3 Scenario 3 -

What BOP actions for event 5?

What is the operational impact of event 3?

Looks like a spare 4

Scenario 4 -

What are the BOP actions on event 4?

Make sure it is ok to raise power Will add another BOP event.

Event 6 was added to the scenario.

5