RB-2010-04-Draft Outline Comments
ML101950493
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/12/2010
From: Garchow S
Operations Branch IV
To:
Entergy Operations
References
50-458/10-04
Download: ML101950493 (2)


Text

DRAFT OUTLINE COMMENTS Facility: River Bend First Exam Date: April 16, 2010 Written Exam Outline (2/19/2010)

Comment Resolution 1 No comments None 2

3 4

5 Administrative JPM Outline (2/19/2010)

Comment Resolution Replace RO ADMIN for EP Replace 1 RO Admin JPM A3 was replaced with a new JPM.

Replace SRO ADMIN A5 as it is an RO Will reword the JPM so that it is an SRO JPM 2

This was done.

Make EP Determination following a 3

scenario 4

5 Control Room / In-Plant System JPM Outline (2/19/2010)

Comment Resolution Replace JPM C2 as it is same as This was not replaced - the scenario was 1

scenario 2. revised so it no longer has C2.

2 What is ARC?

3 What is safety significance of JPM C1? This is performed per an EOP attachment.

4 5

Simulator Scenario Outline Comments (2/19/2010)

Comment Resolution Scenario 1 - Event 2 has no safety significance. Will be 1

Replace event 2 with a TS failure replaced. OBDI 202 - IOLE Process

This event was replaced.

Scenario 2 - Will replace with a BOP TS event. Looking at Can LPRM be bypassed in simulator? inadvertent auto start of RCIC Remove 5 minutes from event 5. Will remove the 5 minute delay so that it is 2 Does event 7 include BPVs? If so, examiner initiated.

lower initial power to 70%. Based on validation, events 3 and 4 were replaced. The 5 minute time delay was removed.

Scenario 3 - Looks like a spare What BOP actions for event 5?

3 What is the operational impact of event 3?

Scenario 4 - Will add another BOP event.

4 What are the BOP actions on event 4? Event 6 was added to the scenario.

Make sure it is ok to raise power 5 OBDI 202 - IOLE Process