ML101950493: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Attachment 6  OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Facility: River Bend First Exam Date:April 16, 2010 Written Exam Outline (2/19/2010) Comment Resolution 1 No comments None 2   3   4   5     Administrative JPM Outline (2/19/2010) Comment Resolution 1 Replace RO ADMIN for EP Replace RO Admin JPM A3 was replaced with a new JPM. 2 Replace SRO ADMIN A5 as it is an RO Will reword the JPM so that it is an SRO JPM This was done.
{{#Wiki_filter:DRAFT OUTLINE COMMENTS Facility: River Bend                               First Exam Date: April 16, 2010 Written Exam Outline (2/19/2010)
3 Make EP Determination following a scenario 4   5     Control Room / In-Plant System JPM Outline (2/19/2010) Comment Resolution 1 Replace JPM C2 as it is same as scenario 2. This was not replaced - the scenario was revised so it no longer has C2. 2 What is ARC? 3 What is safety significance of JPM C1? This is performed per an EOP attachment. 4   5     Simulator Scenario Outline Comments (2/19/2010) Comment Resolution 1 Scenario 1 -
Comment                                         Resolution 1   No comments                               None 2
Replace event 2 with a TS failure Event 2 has no safety significance. Will be replaced.
3 4
Attachment 6  OBDI 202 - IOLE Process This event was replaced.
5 Administrative JPM Outline (2/19/2010)
2 Scenario 2 -  Can LPRM be bypassed in simulator?
Comment                                         Resolution Replace RO ADMIN for EP                   Replace 1                                            RO Admin JPM A3 was replaced with a new JPM.
Remove 5 minutes from event 5.
Replace SRO ADMIN A5 as it is an RO       Will reword the JPM so that it is an SRO JPM 2
Does event 7 include BPV's?  If so, lower initial power to 70%. Will replace with a BOP TS event. Looking at inadvertent auto start of RCIC
This was done.
Make EP Determination following a 3
scenario 4
5 Control Room / In-Plant System JPM Outline (2/19/2010)
Comment                                         Resolution Replace JPM C2 as it is same as           This was not replaced - the scenario was 1
scenario 2.                              revised so it no longer has C2.
2   What is ARC?
3   What is safety significance of JPM C1?   This is performed per an EOP attachment.
4 5
Simulator Scenario Outline Comments (2/19/2010)
Comment                                         Resolution Scenario 1 -                             Event 2 has no safety significance. Will be 1
Replace event 2 with a TS failure        replaced.                                                       OBDI 202 - IOLE Process


Will remove the 5 minute delay so that it is  
This event was replaced.
 
Scenario 2 -                            Will replace with a BOP TS event. Looking at Can LPRM be bypassed in simulator?      inadvertent auto start of RCIC Remove 5 minutes from event 5.          Will remove the 5 minute delay so that it is 2  Does event 7 include BPVs? If so,      examiner initiated.
examiner initiated.
lower initial power to 70%.            Based on validation, events 3 and 4 were replaced. The 5 minute time delay was removed.
Based on validation, events 3 and 4 were replaced. The 5 minute time delay was removed. 3 Scenario 3 - What BOP actions for event 5? What is the operational impact of event 3? Looks like a spare 4 Scenario 4 -
Scenario 3 -                           Looks like a spare What BOP actions for event 5?
What are the BOP actions on event 4? Make sure it is ok to raise power Will add another BOP event. Event 6 was added to the scenario. 5}}
3 What is the operational impact of event 3?
Scenario 4 -                           Will add another BOP event.
What are the BOP actions on event 4?   Event 6 was added to the scenario.
Make sure it is ok to raise power 5                                                     OBDI 202 - IOLE Process}}

Latest revision as of 17:08, 13 November 2019

RB-2010-04-Draft Outline Comments
ML101950493
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/12/2010
From: Garchow S
Operations Branch IV
To:
Entergy Operations
References
50-458/10-04
Download: ML101950493 (2)


Text

DRAFT OUTLINE COMMENTS Facility: River Bend First Exam Date: April 16, 2010 Written Exam Outline (2/19/2010)

Comment Resolution 1 No comments None 2

3 4

5 Administrative JPM Outline (2/19/2010)

Comment Resolution Replace RO ADMIN for EP Replace 1 RO Admin JPM A3 was replaced with a new JPM.

Replace SRO ADMIN A5 as it is an RO Will reword the JPM so that it is an SRO JPM 2

This was done.

Make EP Determination following a 3

scenario 4

5 Control Room / In-Plant System JPM Outline (2/19/2010)

Comment Resolution Replace JPM C2 as it is same as This was not replaced - the scenario was 1

scenario 2. revised so it no longer has C2.

2 What is ARC?

3 What is safety significance of JPM C1? This is performed per an EOP attachment.

4 5

Simulator Scenario Outline Comments (2/19/2010)

Comment Resolution Scenario 1 - Event 2 has no safety significance. Will be 1

Replace event 2 with a TS failure replaced. OBDI 202 - IOLE Process

This event was replaced.

Scenario 2 - Will replace with a BOP TS event. Looking at Can LPRM be bypassed in simulator? inadvertent auto start of RCIC Remove 5 minutes from event 5. Will remove the 5 minute delay so that it is 2 Does event 7 include BPVs? If so, examiner initiated.

lower initial power to 70%. Based on validation, events 3 and 4 were replaced. The 5 minute time delay was removed.

Scenario 3 - Looks like a spare What BOP actions for event 5?

3 What is the operational impact of event 3?

Scenario 4 - Will add another BOP event.

4 What are the BOP actions on event 4? Event 6 was added to the scenario.

Make sure it is ok to raise power 5 OBDI 202 - IOLE Process