{{#Wiki_filter:1 WBN2Public Resource From: Crouch, William D [wdcrouch@tva.gov]
{{#Wiki_filter:WBN2Public Resource From:                   Crouch, William D [wdcrouch@tva.gov]
Sent: Thursday, July 22, 2010 7:24 AM To: Wiebe, Joel; Milano, Patrick; Arent, Gordon
Sent:                   Thursday, July 22, 2010 7:24 AM To:                     Wiebe, Joel; Milano, Patrick; Arent, Gordon


==Subject:==
==Subject:==
Bucket List 7/22/10 Attachments:
Bucket List 7/22/10 Attachments:           NRC PM Open Items List 7-22-10.docx For the 9 am phone call William D. (Bill) Crouch (423) 3652004 WBN (256) 7777676 Cell 1
NRC PM Open Items List 7-22-10.docx Forthe9amphonecallWilliam D. (Bill) Crouch(423)365 2004WBN(256)777 7676Cell Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 48   Mail Envelope Properties   (B75BE6D61CDE4A468D264343045CAC4F062D4B7C)
 
Hearing Identifier:     Watts_Bar_2_Operating_LA_Public Email Number:           48 Mail Envelope Properties       (B75BE6D61CDE4A468D264343045CAC4F062D4B7C)


==Subject:==
==Subject:==
Bucket List 7/22/10 Sent Date:   7/22/2010 7:24:19 AM Received Date: 7/22/2010 7:25:16 AM From:   Crouch, William D Created By:   wdcrouch@tva.gov Recipients:     "Wiebe, Joel" <Joel.Wiebe@nrc.gov>
Bucket List 7/22/10 Sent Date:               7/22/2010 7:24:19 AM Received Date:           7/22/2010 7:25:16 AM From:                   Crouch, William D Created By:             wdcrouch@tva.gov Recipients:
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
"Wiebe, Joel" <Joel.Wiebe@nrc.gov>
Tracking Status: None "Arent, Gordon" <garent@tva.gov> Tracking Status: None  
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Arent, Gordon" <garent@tva.gov>
Tracking Status: None Post Office:            TVANUCXVS2.main.tva.gov Files                            Size                  Date & Time MESSAGE                          108                  7/22/2010 7:25:16 AM NRC PM Open Items List 7-22-10.docx                44423 Options Priority:                        Standard Return Notification:            No Reply Requested:                No Sensitivity:                    Normal Expiration Date:
Recipients Received:


Post Office:  TVANUCXVS2.main.tva.gov Files    Size      Date & Time MESSAGE    108     7/22/2010 7:25:16 AM NRC PM Open Items List 7-22-10.docx    44423 
Page 1 of 10 NRC PM Open Items List 7/22/10 (423) 751-6338 ID 657601 No.               Description                    Status        Additional Comments Respond to Refurbishment meeting          C - 9/22 questions Respond to Replacement Items              C - 9/15 question Letter on MSIP                            C - 11/04 List of I&C systems and affected          C - 9/17 FSAR section List of open commitments                  C - 10/1 Resolve fifth DG licensing basis          C- 11/24      NPG Issue Rod FSAR A95      Krich EDCR Proc Appendix J                      C - 9/8 FSAR drawings                              C - 10/13 List of Project Milestones                C - 9/24 Public Meeting Part 70 License            C - 10/22     Application submitted 11/11 Decision on incorporating TSTF-493                        Follow BFN path (this will require you to develop a        C - 11/18 setpoint control program)
Other Unit 1 TSs that require revision for dual-unit operation (a list of any to C - 11/30 start with)
Provide info on your material purchases so that NRC can decide if vendor          C - 10/6 inspections are warranted.
Test sequence schedule for Eagle-21 Factory Acceptance Testing                C - 11/23 PRA/IPE/ submittal in Jan 2010            C - 2/9/10 Estimated schedule for cold and hot        C - 9/24 functional testing On-site emergency preparedness drill      C - 9/24 Current lists of items recommended in SECY 07-0096: e.g., betterments,          List Available adopt updated standards for Unit 2        Now where it would not significantly detract from design and operational consistency between Units 1 and 2, opportunities to resolve GSIs, exemptions/reliefs Evacuation time estimates and State/local EP Plans                      C - 12/3 Support Contracts                          C - 12/14


Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
Page 2 of 10 No.               Description                 Status       Additional Comments Security Plan update (cyber security) C - 11/23 FSAR Chapter 7 I&C                    C - 12/14   A-96 Commitment list for WRAG              C - 2/18/10 List ready Big FSAR drawings for 9.2.1, 9.2.2    C- 1/20 and 9.2.5 Refurbishment Electrical RAI          C - 2/5/10 Draft I&C RAI                          3/8/10      Complete RM-1000 Proprietary Documents          3/8/10      Ps will be in I&C and schedule for nonP                              RAI response Presevice Inspection/Refurbishment -               Regional Request example implementing procedures for    12/31/09    Complete.
Page 1 of 10     NRC PM Open Items List 7/22/10 (423) 751-6338 ID 657601 No. Description Status Additional Comments  Respond to Refurbishment meeting questions C - 9/22  Respond to Replacement Items question C - 9/15   Letter on MSIP C - 11/04 List of I&C systems and affected FSAR section C - 9/17  List of open commitments C - 10/1  Resolve fifth DG licensing basis C- 11/24 FSAR A95 NPG Issue Rod Krich  EDCR Proc Appendix J C - 9/8  FSAR drawings C - 10/13 List of Project Milestones C - 9/24  Public Meeting Part 70 License C - 10/22 Application submitted 11/11 Decision on incorporating TSTF-493 (this will require you to develop a setpoint control program)
audit Additional information related to GLs/             Region II request -
C - 11/18 Follow BFN path Other Unit 1 TSs that require revision for dual-unit operation (a list of any to start with)
Bulletins / TMI items                              Bulletins sent Environmental RAIs                    3/12/10 Step 1 Complete TS / TRM meeting ?                    3/30/10    Meeting Set Preservice Inspection Additional      3/12/10     Drawings and Information                            04/02/2010  preservice scope to 04/19/2010  be provided In-signoff
C - 11/30 Provide info on your material purchases so that NRC can decide if vendor inspections are warranted.
: 1. PSI Commitments - Revised PSI          Complete procedure and ASME Inspection Plan and Schedule (Chinn)
C - 10/6  Test sequence schedule for Eagle-21 Factory Acceptance Testing C - 11/23 PRA/IPE/ submittal in Jan 2010 C - 2/9/10 Estimated schedule for cold and hot functional testing C - 9/24  On-site emergency preparedness drill C - 9/24  Current lists of items recommended in SECY 07-0096: e.g., betterments, adopt updated standards for Unit 2 where it would not significantly detract from design and operational consistency between Units 1 and 2, opportunities to resolve GSIs, exemptions/reliefs List Available Now  Evacuation time estimates and State/local EP Plans C - 12/3  Support Contracts C - 12/14
: 2. Security Plan update                  05/28/10    RAI response 05/14/10A  submitted. Plan submitted.
: 3. List of TVA QA and Bechtel self-                   List of self assessments on implementation of      8/30/10    assessment licensing basis program, refurb                    compiled. Ready program, etc. (Metzler)                            for NRC review.
: 4. EAL procedure revisions (Walt Lee)    04/10/2010  RAIs received (Lyons)                                04/20/2010  In Review/Signoff 04/29/10   RAIs submitted 4/26 8/6/10      NRC questions: Are the EALs the same for U1 and U2?
Potential RAI on evacuation time estimate.
: 5. Antitrust Info - Gap analysis          3/12/10    Complete 04/02/2010 04/23/2010 04/29/10 5/13/10A


Page 2 of 10     No. Description Status Additional Comments Security Plan update (cyber security)
Page 3 of 10 No.               Description                 Status       Additional Comments
C - 11/23 FSAR Chapter 7 I&C C - 12/14 A-96  Commitment list for WRAG C - 2/18/10 List ready Big FSAR drawings for 9.2.1, 9.2.2 and 9.2.5 C- 1/20   Refurbishment Electrical RAI C - 2/5/10 Draft I&C RAI 3/8/10 Complete RM-1000 Proprietary Documents and schedule for nonP 3/8/10 Ps will be in I&C RAI response Presevice Inspection/Refurbishment - example implementing procedures for audit  12/31/09 Regional Request Complete.
: 6. Step 1 - Submit Cyber Security       Step 1 -    Update Cyber Plan/Controls and Implementation    7/23/10      Security Plan IAW Schedule. State will be ready for                 NEI 08-09 Rev 6 inspection by April 2011.            Step 2 - TBD per NRC letter dated 5/24/10.
Additional information related to GLs/ Bulletins / TMI items Region II request - Bulletins sent Environmental RAIs 3/12/10 Step 1 Complete   TS / TRM meeting ?
Step 2 - Conduct Cyber Security Self              NRC Inspection Assessment (Pointer)                              early 2011 Need TVA letter to state ready for inspection in April 2011
3/30/10 Meeting Set Preservice Inspection Additional Information 3/12/10 04/02/2010 04/19/2010 Drawings and preservice scope to be provided In-signoff 1. PSI Commitments - Revised PSI procedure and ASME Inspection Plan and Schedule (Chinn) Complete  2. Security Plan update 05/28/10 05/14/10A RAI response submitted. Plan submitted. 3. List of TVA QA and Bechtel self-assessments on implementation of licensing basis program, refurb
: 7. NUREG-0847 Appendix update          01/31/2010   Letter to update the (Pointer)                            04/30/2010  TVA appendices 5/26/10     from NUREG-0847 7/23/10     including the USIs.
: 8. IDVP Rationale for system selection 4/22/10     System selected 5/12/10A    CCS and RHR.
Scheduled for week of 9/28/10.
Wally Justice to lead. NRC Question: Who did the IDVP for U1?
: 9. SBO assumptions                      W/ A98      FSAR A75 sent, needs additional clarification to ensure assumptions and coping strategy remain unchanged.-
Need to Docket result. Define where in FSAR the info is located. Info provided. See item 71.
: 10. Environmental RAIs                   Step 2 due  Complete 4/30/10 05/12/10A
: 11. Regulatory Framework Update          3/18/10     Complete 4/29 4/9/10 4/30/2010
: 12. IPEEE submittal                      3/31/10     In Review/Signoff 04/19/2010   Comment 04/30/10    incorporation in progress Complete - Fed Exd out
: 13. FSAR RAIs (Elton)                   7/30/10
: 14. FSAR RAIs 11, 12, 14                              Closed to Item 13


program, etc. (Metzler) 8/30/10 List of self assessment
Page 4 of 10 No.                Description                  Status          Additional Comments
: 15. FSAR RAIs 3.8-1 thru 3.8-5                            Closed to Item 13
: 16. FSAR RAIs 3.5.1 & 3.5.3, 3.10                          Closed to Item 13
: 17. FSAR RAIs 3.2.2                                        Closed to Item 13
: 18. FSAR RAIs 2.3                                          Closed to Item 13
: 19. FSAR RAIs 9.4.4 & 9.4.8                                Closed to Item 13
: 20. FSAR RAIs 9.3.2, 9.2.6                                Closed to Item 13
: 21. FSAR RAIs 11.3 & 11.4                                  Closed to Item 13
: 22. Amendment 98                            4/15/10        Complete 4/23/10 4/30/10 5/7/10A
: 23. Hydrology Section 2.4                  w/A98          Complete
: 24. Buried Piping/Cable White Paper        6/3/10A        Complete (Lyons)
: 25. ACRS Meeting Preparations              Complete      Develop Agenda SR Refurb (Valves, Pumps, Motors) -
totals, refurb, replace Fire Protection Program Buried Piping & Cables, other technical issues (Crouch)
: 26. Refurbishment Mtg - Overall Program:    Complete      Purpose of meeting Region/NRR/TVA (Crouch/Charlton)                      accomplished by NRR review of Refurb program document and Region inspection of program
: 27. SAMA RAIs (Metzler)                     Step 1 -      2-Step Approach 3/31/10        Step 1 - Address 5/14/10        Initial RAIs 5/28/10 Step 1 Step 2 - Provide 7/23/10 Step 1 segue to new PRA 8/15/10 Step 2 and impact on SAMA
: 28. Indemnity Letter                        04/02/2010    Complete 04/23/2010 04/29/10
: 29. 3/12/2010 submittal rejected by        5/11/10A      Complete ADAMs due to duplicate and missing pages
* duplicate documents for Rosemount 3051 Vendor document dated March of 2008,
* Duplicate documents dated November 2009 with missing pages 3-1 through 3-6


compiled. Ready for NRC review. 4. EAL procedure revisions (Walt Lee) (Lyons) 0 4/10/2010 04/20/2010 04/29/10 8/6/10 RAIs received In Review/Signoff RAIs submitted 4/26 NRC questions: Are the EALs the same for U1 and U2?
Page 5 of 10 No.               Description                  Status        Additional Comments
Potential RAI on evacuation time estimate. 5. Antitrust Info - Gap analysis 3/12/10 04/02/2010 04/23/2010 04/29/10 5/13/10A Complete Page 3 of 10    No. Description Status Additional Comments 6. Step 1 - Submit Cyber Security Plan/Controls and Implementation Schedule. State will be ready for inspection by April 2011.
* Duplicate CAM documents,
* EDCR 523343-A missing pages 1, 11,12,13,14,15,16 & 17 of 17- need to resubmit with correct documentation
* RM-100 Vendor test report missing page 6 of Appendix F Need to confirm duplicates are not required Provide missing sheets to Joel
: 30. 12/14/2009 Cultural resources submittal  4/26/10     Complete rejected by ADAMS                        Complete
* Missing pages 3, 5, & 7 and      4/23/10 now is lost.
* We need to resubmit with correct documentation again.
: 31. TVA - what is the schedule for the Fire  Complete    Will provide another Protection Plan submittal accounting for 7/16/10A    briefing on Fire WBN 2 within the plan? What changes                  Protection in an have occurred to the Unit 1 plan since              upcoming bi-weekly last submitted to NRC?                               meeting (Knuettel/Woodfin)
: 32. Part 70 and 50 License Telecon          05/05/2010A Telecon Held regarding EP and Security with NMSS
: 33. Pre-1995 Program Review Status for      04/30/2010 Closed - Duplicate Generic Letters and TMI items                        of Item 11
: 34. Electrical RAIs (Includes Control Room  05/27/2010A Complete Lighting?)
: 35. IPE/PRA RAIs on Peer Review              Complete    Include information (Metzler)                                            regarding the status of the F&Os Additional questions during 5/13/10 telecon
: 36. Internal Setpoint Methodology            5/12/10A   Complete
: 37. Information for upcoming NRC visit to    4/23/10    Complete Westinghouse for Eagle 21 FAT
* Updated GANT Chart - not required
* Points of Contact
* Testing to be Performed
* Location & Hotels
: 38. Find & Forward: Radiation Records        Closed      Addressed by RAI


Step 2 - Conduct Cyber Security Self Assessment (Pointer)
Page 6 of 10 No.                Description                Status          Additional Comments Data Collection and Analysis date                      on SNM License January 4, 1994.
Step 1 - 7/23/10 Step 2 - TBD Update Cyber Security Plan IAW NEI 08-09 Rev 6 per NRC letter dated 5/24/10.
: 39. GL 2004-02 submittal of post Unit 1    Step 1 7/30/10 Step 1 Report w/o RAIs (Chinn)                                          test data Step 2 9/15/10 Step 2 Include test data
: 40. Discrepancy between A95 and A97 for    With A98      Complete Rev bars in Section 5.5.2.1; A97 P 5.5-9 no Rev bars, A95 P5.5-14 no Rev bars
: 41. Section 5.5.2.4 last paragraph address  W/ A98        Complete Tech Spec requirement words
: 42. Provide categorization table for A92    Step 1 6/2/10A Step 1 - Disks thru A97 (Stockton)                                    provided on 6/8/10 Step 2 - TBD Step 2 - Need to add a column that identifies change by Amendment Number
: 43. Issue PER and extent of condition for  Complete      PER 233219 FSAR errors (Metzler/Stockton)
: 44. Plan for combining Unit 1 and Unit 2                  Closed to Item 52 FSARs post U2 Licensing
: 45. Plan for NRC review of Fire Protection  5/11/10 mtg    Duplicate of 31 Report
: 46. Issue letter to change TVA WBN          Complete      I Licensing personnel and distribution lists for NRR and Region (Crouch)
: 47. Add Station Blackout section to FSAR    W/ A98        Closed - See Item 71
: 48. Provide FMEA for 125 VDC system        Complete      Presentation made (Pointer)                                              in bi-weekly meeting
: 49. NRC review of vendor procurement        Complete      Audit Scheduled for documents (Charlton)                                  July
: 50. Schedule for Maintenance Rule          Closed        Addressed by Reg Implementation                                        Framework Letter
: 51. ACRS Meeting Preparations              August 2010    Review Slides for SR Refurb (Valves, Pumps, Motors) -                    October Meeting totals, refurb, replace Fire Protection Program Buried Piping & Cables, other technical issues (Pointer)
: 52. Discuss status of the U1/U2 Integration 8/20/10       When does U1 Team. Who is responsible for plant                    PORC assume from now until U2 Licensing? (Pointer)                control of U2? Will discuss at August


NRC Inspection
Page 7 of 10 No.                Description                    Status      Additional Comments mtg at WBN
: 53. Develop Plan for early Tech Spec          Need      Describe how the verification (Elton/Stockton)            Schedule  Tech Spec template was developed
: 54. Discuss dual unit operator licenses      Discuss at Mtg held on 7/20 (Metzler)                                next WRAG  between U1 and meeting    Region.
: 55. Provide plan for providing a single                  Closed - Discussed Emergency Plan for Unit 1 & 2 to NRC                 on 5/17. Will minimize Unit 1 revisions.
: 56. March 2009 Emergency Plan response                  Information showed additional staffing in Rev 88 but            provided to Joel not in Rev 89. Address why it changed.              Wiebe on 5/11/10.
Amendment 98 did not replace the template. This was explained in a letter dated 3/11/10.
: 57. Provide Appendix R discussion of RCP      5/20/10A  Unit 2 will have the
    #1 Seals need for cooling.                          same seals as Unit 1 therefore post fire cooling is required.
: 58. For info in the FSAR that is as-        7/6/10A    Provided discussion designed/not confirmed yet such as                  regarding how issue stress, is the info Unit 2 as designed or            is tracked via UVAs.
Unit 1 as constructed? (Knuettel)                    NRC stated no need for submittal at this time.
: 59. Eagle 21 FAT Issues                      12/3/10    Need Submittal
: 1. Provide NRC with difference form from WBN Design change package EDCR 52319 Unit Diff Form provided
: 2. Provide NRC a statement of the new power supplies have been installed by TVA in WBN 1 -
that how the equipment was installed via equivalency evaluation from Westinghouse.
WO 08-813412-000
: 3. Provide NRC with Rack 5 issue cause determination and corrective actions needed for resolution


early 2011  Need TVA letter to state ready for inspection in April 2011 7. NUREG-0847 Appendix update (Pointer) 01/31/2010 04/30/2010 5/26/10 7/23/10 Letter to update the TVA appendices
Page 8 of 10 No.                 Description                  Status          Additional Comments
 
: 4. Was a PER written and an Extent of Condition performed?
from NUREG-0847 including the USIs. 8. IDVP Rationale for system selection 4/22/10 5/12/10A System selected CCS and RHR. Scheduled for week of 9/28/10.
Westinghouse PER initiated.
Wally Justice to lead. NRC Question: Who did the IDVP for U1? 9. SBO assumptions W/ A98 FSAR A75 sent, needs additional clarification to ensure assumptions and coping strategy remain unchanged.-
Cause analysis and extent of condition in process (Lyons)
Need to Docket result. Define where in FSAR the info is located. Info provided. See item
: 60. Biweekly meeting on Shared Systems      5/25/10A       Complete - See Item 68 for follow up meeting
: 71. 10. Environmental RAIs Step 2 due 4/30/10 05/12/10A Complete 11. Regulatory Framework Update 3/18/10 4/9/10 4/30/2010 Complete 4/29 12. IPEEE submittal 3/31/10 04/19/2010 04/30/10 In R eview/Signoff Comment incorporation in progress Complete - Fed Ex'd out 13. FSAR RAIs  (Elton) 7/30/10  14. FSAR RAIs 11, 12, 14 Closed to Item 13 Page 4 of 10    No. Description Status Additional Comments 15. FSAR RAIs 3.8-1 thru 3.8-5 Closed to Item 13 16. FSAR RAIs 3.5.1 & 3.5.3, 3.10 Closed to Item 13 17. FSAR RAIs 3.2.2 Closed to Item 13 18. FSAR RAIs 2.3 Closed to Item 13 19. FSAR RAIs 9.4.4 & 9.4.8 Closed to Item 13 20. FSAR RAIs 9.3.2, 9.2.6 Closed to Item 13 21. FSAR RAIs 11.3 & 11.4 Closed to Item 13 22. Amendment 98 4/15/10 4/23/10 4/30/10 5/7/10A Complete 23. Hydrology Section 2.4 w/A98 Complete 24. Buried Piping/Cable White Paper (Lyons) 6/3/10A Complete  25. ACRS Meeting Preparations SR Refurb (Valves, Pumps, Motors) - totals, refurb, replace Fire Protection Program Buried Piping & Cables, other technical issues (Crouch) Complete Develop Agenda 26. Refurbishment Mtg - Overall Program: Region/NRR/TVA (Crouch/Charlton) Complete Purpose of meeting accomplished by NRR review of Refurb program document and Region inspection of program 27. SAMA RAIs (Metzler) Step 1 -
: 61. Rx Systems RAI                          Closed to Item Confirmed 13             contained in the list FSAR 15.2.14 Inadvertent SI @ Power                    for Item 13
3/31/10 5/14/10 5/28/10 Step 1 7/23/10 Step 1
    - RIS on subject not addressed FSAR 5.2.2 and 5.5.13 - Does not address Overpressure Protection relief capacity at power (Elton)
 
: 62. A97 Sect 5.5.1.2 - Verify if TVA will  Closed        Addressed in NRC do a periodic ISI inspection of the RCP                EMCB RAI flywheel versus taking credit for the vibration monitoring system (Pointer)
8/15/10 Step 2 2-Step Approach Step 1 - Address
: 63. Provide discussion of missing QA        8/5/10         IEB 79-14 records Records Was a PER written? What was                    were found. The the cause? What is the regulatory                      HAUUP records (in impact? What happened from 1985 to                     punch card format) 1995 on Unit 1 pipe supports that makes                have also been located. In process Unit 1 different than Unit 2? Why was of procuring new the same process not applied to Unit 2?                machine to read What went wrong? How did we lose the                  cards to verify all records? Address 10CFR50 Appendix                      records present.
 
B Control of Records. Does the CAP and/or Implementation Plan need to be changed? (Stephenson)
Initial RAIs
: 64. Confirm acceptability of shifting EP   7/29/10 -     No NRC objections.
 
drill from May 2011 to July 2011 to    Discuss status Need FEMA and support other state drills. (Crouch)                   state of TN concurrence Meeting with state on 7/16/10
Step 2 - Provide segue to new PRA
: 65. Three issues identified regarding      Closed environmental items:                    7/6/10A
 
: 1. Three reports (Baxter)
and impact on SAMA 28. Indemnity Letter 04/02/2010 04/23/2010 04/29/10 Complete 29. 3/12/2010 submittal rejected by ADAMs due to duplicate and missing pages  duplicate documents for Rosemount 3051 Vendor document dated March of 2008,  Duplicate documents dated November 2009 with missing pages 3-1 through 3-6 5/11/10A Complete Page 5 of 10    No. Description Status Additional Comments  Duplicate CAM documents,  EDCR 523343-A missing pages 1, 11,12,13,14,15,16 & 17 of 17- need to resubmit with correct documentation  RM-100 Vendor test report missing page 6 of Appendix F Need to confirm duplicates are not required Provide missing sheets to Joel 30. 12/14/2009 Cultural resources submittal rejected by ADAMS    Missing pages 3, 5, & 7 and now is lost. We need to resubmit with correct documentation again.
: 2. Water samples different
4/26/10 Complete 4/23/10 Complete 31. TVA - what is the schedule for the Fire Protection Plan submittal accounting for WBN 2 within the plan?  What changes have occurred to the Unit 1 plan since last submitted to NRC? (Knuettel/Woodfin)
: 3. Addressing three reactor events
Complete 7/16/10A Will provide another briefing on Fire Protection in an upcoming bi-weekly meeting 32. Part 70 and 50 License Telecon regarding EP and Security with NMSS 05/05/2010A Telecon Held 33. Pre-1995 Program Review Status for Generic Letters and TMI items 04/30/2010 Closed - Duplicate of Item 11 34. Electrical RAIs (Includes Control Room Lighting?)
05/27/2010A Complete 35. IPE/PRA RAIs on Peer Review (Metzler) Complete Include information regarding the status of the F&Os  Additional questions during 5/13/10 telecon 36. Internal Setpoint Methodology 5/12/10A Complete 37. Information for upcoming NRC visit to Westinghouse for Eagle 21 FAT  Updated GANT Chart - not required  Points of Contact Testing to be Performed Location & Hotels 4/23/10 Complete 38. Find & Forward: Radiation Records Closed Addressed by RAI Page 6 of 10    No. Description Status Additional Comments Data Collection and Analysis date January 4, 1994. on SNM License 39. GL 2004-02 submittal of post Unit 1 RAIs (Chinn)
Step 1 7/30/10 Step 2 9/15/10 Step 1 Report w/o test data


Step 2 Include test
Page 9 of 10 No.                Description                  Status          Additional Comments (locked rotor, RCP shaft break,
              ???)
Look at ML101370186 for NRC telecom minutes for 5/15/10.
(Lyons)
: 66. Control Room Lighting RAI (Elton)        Closed to Item 13.
: 67. Instrumentation RAI List (Knuettel)      Ongoing        Next Submittal planned for 7/23/10
: 68. Shared Systems Meeting (Crouch)          7/20/10
: 69. Emergency Preparedness RAI (Lyons)      Complete
: 70. Part 70 and 50 License RAI regarding    7/30/10        Corporate providing EP and Security from NMSS (Lyons)                      response
: 71. NRC reviewing the Station Blackout      Complete      NRC stated that Design Criteria to determine if it                      answering the provides the info they are requesting.                  FSAR RAI (Stockton)                                              questions will provide the required info.
: 72. Questions on A98 rev bars- Sections      Closed        Discussed with 8.3.1.1, 9.4, 11.2.6, 11.3, 15.2                        NRC (Stockton)
: 73. Appendix R changes from Rev 0 to        Closed to Item current (Boyd/Woodfin)                  31
: 74. Technical Specifications Change WBN-    8/15/10 TS-10 Control Rod Assemblies (Elton)
: 75. Provide letter regarding Conformal      Complete Coatings on Eagle 21 boards.
: 76. Provide commitment letter on B.5.b      Closed        7/01/10A assumptions and backup power to H2 igniters being the same as Unit 1 -
(i.e.,procedural guidance)
: 77. Answer RAI related to Spent Fuel Pool    Closed to Item Heat Loads specific to Unit 2 only.      13
: 78. X-750 Bolt Material Issue (Elton)        Closed        Submittal issued 6/29/10A
: 79. Control Rod Tech Spec Change (Elton)    Closed        Duplicate of item 74
: 80. Develop list of planned License Conditions
: 81. Submit Licensing Basis Preservation      Complete Review Results
: 82. IPE RAI Questions                        7/26/10
: 83. Anti Trust RAI                          8/13/10


data 40. Discrepancy between A95 and A97 for Rev bars in Section 5.5.2.1; A97 P 5.5-9 no Rev bars, A95 P5.5-14 no Rev bars With A98 Complete 41. Section 5.5.2.4 last paragraph address Tech Spec requirement words W/ A98 Complete 42. Provide categorization table for A92 thru A97 (Stockton)
Page 10 of 10 No.                 Description                 Status Additional Comments
Step 1 6/2/10A Step 2 - TBD Step 1 - Disks provided on 6/8/10 Step 2 - Need to add a column that identifies change by Amendment Number 43. Issue PER and extent of condition for FSAR errors (Metzler/Stockton) Complete PER 233219 44. Plan for combining Unit 1 and Unit 2 FSARs post U2 Licensing Closed to Item 52 45. Plan for NRC review of Fire Protection Report 5/11/10 mtg Duplicate of 31 46. Issue letter to change TVA WBN Licensing personnel and distribution lists for NRR and Region (Crouch) Complete I 47. Add Station Blackout section to FSAR W/ A98 Closed - See Item 71 48. Provide FMEA for 125 VDC system (Pointer) Complete Presentation made in bi-weekly meeting49. NRC review of vendor procurement documents (Charlton) Complete Audit Scheduled for July 50. Schedule for Maintenance Rule Implementation Closed Addressed by Reg Framework Letter 51. ACRS Meeting Preparations SR Refurb (Valves, Pumps, Motors) -
: 84. Security Plan Update based on telecon 7/21/10
totals, refurb, replace Fire Protection Program Buried Piping & Cables, other technical issues (Pointer) August 2010 Review Slides for October Meeting 52. Discuss status of the U1/U2 Integration Team. Who is responsible for plant from now until U2 Licensing? (Pointer) 8/20/10 When does U1 PORC assume control of U2?  Will discuss at August Page 7 of 10    No. Description Status Additional Comments mtg at WBN 53. Develop Plan for early Tech Spec verification (Elton/Stockton)
: 85. Hazardous Chemical RAI for             7/23/10 Emergency Planning from e-mail
Need Schedule Describe how the Tech Spec template was developed 54. Discuss dual unit operator licenses (Metzler) Discuss at next WRAG meeting Mtg held on 7/20 between U1 and Region. 55. Provide plan for providing a single Emergency Plan for Unit 1 & 2 to NRC Closed - Discussed on 5/17. Will minimize Unit 1 revisions. 56. March 2009 Emergency Plan response showed additional staffing in Rev 88 but not in Rev 89. Address why it changed.
: 86. SAMA Riskman vs CAFTA comparison       8/15/10
Information provided to Joel Wiebe on 5/11/10. Amendment 98 did not replace the template. This was explained in a letter dated 3/11/10. 57. Provide Appendix R discussion of RCP #1 Seals need for cooling.
: 87. FSAR Amendment 100 with RAI incorporation and Setpoint Methodology writeup
5/20/10A Unit 2 will have the same seals as Unit 1 therefore post fire cooling is required. 58. For info in the FSAR that is "as-designed/not confirmed yet" such as stress, is the info Unit 2 as designed or Unit 1 as constructed? (Knuettel) 7/6/10A Provided discussion regarding how issue is tracked via UVAs.
: 88. Refurb Program followup items
NRC stated no need for submittal at this time. 59. Eagle 21 FAT Issues
: 89. Baseline list of OMAs                 8/6/10
: 1. Provide NRC with difference form from WBN Design change package  EDCR 52319 Unit Diff Form provided
: 90. Fire Protection Report Common         8/6/10 Sections
: 2. Provide NRC a statement of the new power supplies have been installed by TVA in WBN 1 - that how the equipment was installed via equivalency evaluation from Westinghouse.
: 91. MSO scenarios                         8/20/10
WO 08-813412-000
: 92. Markup of Report Changes from Rev 5   8/30/10 to 40
: 3. Provide NRC with Rack 5 issue cause determination and corrective actions needed for resolution 12/3/10    Need Submittal Page 8 of 10    No. Description Status Additional Comments 4. Was a PER written and an Extent of Condition performed?  Westinghouse PER initiated. Cause analysis and extent of condition in process (Lyons)  60. Biweekly meeting on Shared Systems 5/25/10A Complete - See Item 68 for follow up meeting 61. Rx Systems RAI FSAR 15.2.14  Inadvertent SI @ Power - RIS on subject not addressed FSAR 5.2.2 and 5.5.13 - Does not address Overpressure Protection relief capacity at power (Elton) Closed to Item 13 Confirmed contained in the list for Item 13 62. A97 Sect 5.5.1.2 - Verify if TVA will do a periodic ISI inspection of the RCP flywheel versus taking credit for the vibration monitoring system (Pointer)
: 93. Final Fire Protection Report Submitted 12/17/10 94.}}
Closed Addressed in NRC EMCB RAI 63. Provide discussion of missing QA Records  Was a PER written?  What was the cause?  What is the regulatory impact?  What happened from 1985 to 1995 on Unit 1 pipe supports that makes Unit 1 different than Unit 2?  Why was the same process not applied to Unit 2?  What went wrong?  How did we lose the records?  Address 10CFR50 Appendix B Control of Records. Does the CAP and/or Implementation Plan need to be changed? (Stephenson) 8/5/10 IEB 79-14 records were found. The HAUUP records (in punch card format) have also been located. In process of procuring new machine to read cards to verify all records present.
: 64. Confirm acceptability of shifting EP drill from May 2011 to July 2011 to support other state drills. (Crouch) 7/29/10 - Discuss status No NRC objections.
Need FEMA and state of TN concurrence Meeting with state on 7/16/10 65. Three issues identified regarding environmental items:
: 1. Three reports (Baxter)
: 2. Water samples different
: 3. Addressing three reactor events Closed 7/6/10A Page 9 of 10    No. Description Status Additional Comments (locked rotor, RCP shaft break, ???) Look at ML101370186 for NRC telecom minutes for 5/15/10. (Lyons) 66. Control Room Lighting RAI (Elton) Closed to Item
: 13. 67. Instrumentation RAI List (Knuettel)
Ongoing Next Submittal planned for 7/23/10 68. Shared Systems Meeting (Crouch) 7/20/10  69. Emergency Preparedness RAI (Lyons) Complete  70. Part 70 and 50 License RAI regarding EP and Security from NMSS (Lyons) 7/30/10 Corporate providing response 71. NRC reviewing the Station Blackout Design Criteria to determine if it provides the info they are requesting. (Stockton)
Complete NRC stated that answering the FSAR RAI questions will provide the required info. 72. Questions on A98 rev bars- Sections 8.3.1.1, 9.4, 11.2.6, 11.3, 15.2 (Stockton)
Closed Discussed with NRC 73. Appendix R changes from Rev 0 to current (Boyd/Woodfin) Closed to Item 31  74. Technical Specifications Change WBN-TS-10 Control Rod Assemblies (Elton) 8/15/10  75. Provide letter regarding Conformal Coatings on Eagle 21 boards. Complete  76. Provide commitment letter on B.5.b assumptions and backup power to H 2  igniters being the same as Unit 1 - (i.e.,procedural guidance)
Closed 7/01/10A 77. Answer RAI related to Spent Fuel Pool Heat Loads specific to Unit 2 only. Closed to Item 13  78. X-750 Bolt Material Issue (Elton)
Closed Submittal issued 6/29/10A 79. Control Rod Tech Spec Change (Elton)
Closed Duplicate of item 74 80. Develop list of planned License Conditions
: 81. Submit Licensing Basis Preservation Review Results Complete  82. IPE RAI Questions 7/26/10  83. Anti Trust RAI 8/13/10 Page 10 of 10    No. Description Status Additional Comments 84. Security Plan Update based on telecon 7/21/10 85. Hazardous Chemical RAI for Emergency Planning from e-mail 7/23/10  86. SAMA Riskman vs CAFTA comparison 8/15/10 87. FSAR Amendment 100 with RAI incorporation and Se tpoint Methodology writeup   88. Refurb Program followup items
: 89. Baseline list of OMAs 8/6/10 90. Fire Protection Report Common Sections 8/6/10 91. MSO scenarios 8/20/10 92. Markup of Report Changes from Rev 5 to 40 8/30/10 93. Final Fire Protection Report Submitted 12/17/10 94.}}

Revision as of 15:46, 13 November 2019

2010/07/22 Watts Bar 2 OL - Bucket List 7/22/10
ML102030229
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 07/22/2010
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML102030229 (12)


Text

WBN2Public Resource From: Crouch, William D [wdcrouch@tva.gov]

Sent: Thursday, July 22, 2010 7:24 AM To: Wiebe, Joel; Milano, Patrick; Arent, Gordon

Subject:

Bucket List 7/22/10 Attachments: NRC PM Open Items List 7-22-10.docx For the 9 am phone call William D. (Bill) Crouch (423) 3652004 WBN (256) 7777676 Cell 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 48 Mail Envelope Properties (B75BE6D61CDE4A468D264343045CAC4F062D4B7C)

Subject:

Bucket List 7/22/10 Sent Date: 7/22/2010 7:24:19 AM Received Date: 7/22/2010 7:25:16 AM From: Crouch, William D Created By: wdcrouch@tva.gov Recipients:

"Wiebe, Joel" <Joel.Wiebe@nrc.gov>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None "Arent, Gordon" <garent@tva.gov>

Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 108 7/22/2010 7:25:16 AM NRC PM Open Items List 7-22-10.docx 44423 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Page 1 of 10 NRC PM Open Items List 7/22/10 (423) 751-6338 ID 657601 No. Description Status Additional Comments Respond to Refurbishment meeting C - 9/22 questions Respond to Replacement Items C - 9/15 question Letter on MSIP C - 11/04 List of I&C systems and affected C - 9/17 FSAR section List of open commitments C - 10/1 Resolve fifth DG licensing basis C- 11/24 NPG Issue Rod FSAR A95 Krich EDCR Proc Appendix J C - 9/8 FSAR drawings C - 10/13 List of Project Milestones C - 9/24 Public Meeting Part 70 License C - 10/22 Application submitted 11/11 Decision on incorporating TSTF-493 Follow BFN path (this will require you to develop a C - 11/18 setpoint control program)

Other Unit 1 TSs that require revision for dual-unit operation (a list of any to C - 11/30 start with)

Provide info on your material purchases so that NRC can decide if vendor C - 10/6 inspections are warranted.

Test sequence schedule for Eagle-21 Factory Acceptance Testing C - 11/23 PRA/IPE/ submittal in Jan 2010 C - 2/9/10 Estimated schedule for cold and hot C - 9/24 functional testing On-site emergency preparedness drill C - 9/24 Current lists of items recommended in SECY 07-0096: e.g., betterments, List Available adopt updated standards for Unit 2 Now where it would not significantly detract from design and operational consistency between Units 1 and 2, opportunities to resolve GSIs, exemptions/reliefs Evacuation time estimates and State/local EP Plans C - 12/3 Support Contracts C - 12/14

Page 2 of 10 No. Description Status Additional Comments Security Plan update (cyber security) C - 11/23 FSAR Chapter 7 I&C C - 12/14 A-96 Commitment list for WRAG C - 2/18/10 List ready Big FSAR drawings for 9.2.1, 9.2.2 C- 1/20 and 9.2.5 Refurbishment Electrical RAI C - 2/5/10 Draft I&C RAI 3/8/10 Complete RM-1000 Proprietary Documents 3/8/10 Ps will be in I&C and schedule for nonP RAI response Presevice Inspection/Refurbishment - Regional Request example implementing procedures for 12/31/09 Complete.

audit Additional information related to GLs/ Region II request -

Bulletins / TMI items Bulletins sent Environmental RAIs 3/12/10 Step 1 Complete TS / TRM meeting ? 3/30/10 Meeting Set Preservice Inspection Additional 3/12/10 Drawings and Information 04/02/2010 preservice scope to 04/19/2010 be provided In-signoff

1. PSI Commitments - Revised PSI Complete procedure and ASME Inspection Plan and Schedule (Chinn)
2. Security Plan update 05/28/10 RAI response 05/14/10A submitted. Plan submitted.
3. List of TVA QA and Bechtel self- List of self assessments on implementation of 8/30/10 assessment licensing basis program, refurb compiled. Ready program, etc. (Metzler) for NRC review.
4. EAL procedure revisions (Walt Lee) 04/10/2010 RAIs received (Lyons) 04/20/2010 In Review/Signoff 04/29/10 RAIs submitted 4/26 8/6/10 NRC questions: Are the EALs the same for U1 and U2?

Potential RAI on evacuation time estimate.

5. Antitrust Info - Gap analysis 3/12/10 Complete 04/02/2010 04/23/2010 04/29/10 5/13/10A

Page 3 of 10 No. Description Status Additional Comments

6. Step 1 - Submit Cyber Security Step 1 - Update Cyber Plan/Controls and Implementation 7/23/10 Security Plan IAW Schedule. State will be ready for NEI 08-09 Rev 6 inspection by April 2011. Step 2 - TBD per NRC letter dated 5/24/10.

Step 2 - Conduct Cyber Security Self NRC Inspection Assessment (Pointer) early 2011 Need TVA letter to state ready for inspection in April 2011

7. NUREG-0847 Appendix update 01/31/2010 Letter to update the (Pointer) 04/30/2010 TVA appendices 5/26/10 from NUREG-0847 7/23/10 including the USIs.
8. IDVP Rationale for system selection 4/22/10 System selected 5/12/10A CCS and RHR.

Scheduled for week of 9/28/10.

Wally Justice to lead. NRC Question: Who did the IDVP for U1?

9. SBO assumptions W/ A98 FSAR A75 sent, needs additional clarification to ensure assumptions and coping strategy remain unchanged.-

Need to Docket result. Define where in FSAR the info is located. Info provided. See item 71.

10. Environmental RAIs Step 2 due Complete 4/30/10 05/12/10A
11. Regulatory Framework Update 3/18/10 Complete 4/29 4/9/10 4/30/2010
12. IPEEE submittal 3/31/10 In Review/Signoff 04/19/2010 Comment 04/30/10 incorporation in progress Complete - Fed Exd out
13. FSAR RAIs (Elton) 7/30/10
14. FSAR RAIs 11, 12, 14 Closed to Item 13

Page 4 of 10 No. Description Status Additional Comments

15. FSAR RAIs 3.8-1 thru 3.8-5 Closed to Item 13
16. FSAR RAIs 3.5.1 & 3.5.3, 3.10 Closed to Item 13
17. FSAR RAIs 3.2.2 Closed to Item 13
18. FSAR RAIs 2.3 Closed to Item 13
19. FSAR RAIs 9.4.4 & 9.4.8 Closed to Item 13
20. FSAR RAIs 9.3.2, 9.2.6 Closed to Item 13
21. FSAR RAIs 11.3 & 11.4 Closed to Item 13
22. Amendment 98 4/15/10 Complete 4/23/10 4/30/10 5/7/10A
23. Hydrology Section 2.4 w/A98 Complete
24. Buried Piping/Cable White Paper 6/3/10A Complete (Lyons)
25. ACRS Meeting Preparations Complete Develop Agenda SR Refurb (Valves, Pumps, Motors) -

totals, refurb, replace Fire Protection Program Buried Piping & Cables, other technical issues (Crouch)

26. Refurbishment Mtg - Overall Program: Complete Purpose of meeting Region/NRR/TVA (Crouch/Charlton) accomplished by NRR review of Refurb program document and Region inspection of program
27. SAMA RAIs (Metzler) Step 1 - 2-Step Approach 3/31/10 Step 1 - Address 5/14/10 Initial RAIs 5/28/10 Step 1 Step 2 - Provide 7/23/10 Step 1 segue to new PRA 8/15/10 Step 2 and impact on SAMA
28. Indemnity Letter 04/02/2010 Complete 04/23/2010 04/29/10
29. 3/12/2010 submittal rejected by 5/11/10A Complete ADAMs due to duplicate and missing pages
  • duplicate documents for Rosemount 3051 Vendor document dated March of 2008,
  • Duplicate documents dated November 2009 with missing pages 3-1 through 3-6

Page 5 of 10 No. Description Status Additional Comments

  • Duplicate CAM documents,
  • EDCR 523343-A missing pages 1, 11,12,13,14,15,16 & 17 of 17- need to resubmit with correct documentation
  • RM-100 Vendor test report missing page 6 of Appendix F Need to confirm duplicates are not required Provide missing sheets to Joel
30. 12/14/2009 Cultural resources submittal 4/26/10 Complete rejected by ADAMS Complete
  • Missing pages 3, 5, & 7 and 4/23/10 now is lost.
  • We need to resubmit with correct documentation again.
31. TVA - what is the schedule for the Fire Complete Will provide another Protection Plan submittal accounting for 7/16/10A briefing on Fire WBN 2 within the plan? What changes Protection in an have occurred to the Unit 1 plan since upcoming bi-weekly last submitted to NRC? meeting (Knuettel/Woodfin)
32. Part 70 and 50 License Telecon 05/05/2010A Telecon Held regarding EP and Security with NMSS
33. Pre-1995 Program Review Status for 04/30/2010 Closed - Duplicate Generic Letters and TMI items of Item 11
34. Electrical RAIs (Includes Control Room 05/27/2010A Complete Lighting?)
35. IPE/PRA RAIs on Peer Review Complete Include information (Metzler) regarding the status of the F&Os Additional questions during 5/13/10 telecon
36. Internal Setpoint Methodology 5/12/10A Complete
37. Information for upcoming NRC visit to 4/23/10 Complete Westinghouse for Eagle 21 FAT
  • Updated GANT Chart - not required
  • Points of Contact
  • Testing to be Performed
  • Location & Hotels
38. Find & Forward: Radiation Records Closed Addressed by RAI

Page 6 of 10 No. Description Status Additional Comments Data Collection and Analysis date on SNM License January 4, 1994.

39. GL 2004-02 submittal of post Unit 1 Step 1 7/30/10 Step 1 Report w/o RAIs (Chinn) test data Step 2 9/15/10 Step 2 Include test data
40. Discrepancy between A95 and A97 for With A98 Complete Rev bars in Section 5.5.2.1; A97 P 5.5-9 no Rev bars, A95 P5.5-14 no Rev bars
41. Section 5.5.2.4 last paragraph address W/ A98 Complete Tech Spec requirement words
42. Provide categorization table for A92 Step 1 6/2/10A Step 1 - Disks thru A97 (Stockton) provided on 6/8/10 Step 2 - TBD Step 2 - Need to add a column that identifies change by Amendment Number
43. Issue PER and extent of condition for Complete PER 233219 FSAR errors (Metzler/Stockton)
44. Plan for combining Unit 1 and Unit 2 Closed to Item 52 FSARs post U2 Licensing
45. Plan for NRC review of Fire Protection 5/11/10 mtg Duplicate of 31 Report
46. Issue letter to change TVA WBN Complete I Licensing personnel and distribution lists for NRR and Region (Crouch)
47. Add Station Blackout section to FSAR W/ A98 Closed - See Item 71
48. Provide FMEA for 125 VDC system Complete Presentation made (Pointer) in bi-weekly meeting
49. NRC review of vendor procurement Complete Audit Scheduled for documents (Charlton) July
50. Schedule for Maintenance Rule Closed Addressed by Reg Implementation Framework Letter
51. ACRS Meeting Preparations August 2010 Review Slides for SR Refurb (Valves, Pumps, Motors) - October Meeting totals, refurb, replace Fire Protection Program Buried Piping & Cables, other technical issues (Pointer)
52. Discuss status of the U1/U2 Integration 8/20/10 When does U1 Team. Who is responsible for plant PORC assume from now until U2 Licensing? (Pointer) control of U2? Will discuss at August

Page 7 of 10 No. Description Status Additional Comments mtg at WBN

53. Develop Plan for early Tech Spec Need Describe how the verification (Elton/Stockton) Schedule Tech Spec template was developed
54. Discuss dual unit operator licenses Discuss at Mtg held on 7/20 (Metzler) next WRAG between U1 and meeting Region.
55. Provide plan for providing a single Closed - Discussed Emergency Plan for Unit 1 & 2 to NRC on 5/17. Will minimize Unit 1 revisions.
56. March 2009 Emergency Plan response Information showed additional staffing in Rev 88 but provided to Joel not in Rev 89. Address why it changed. Wiebe on 5/11/10.

Amendment 98 did not replace the template. This was explained in a letter dated 3/11/10.

57. Provide Appendix R discussion of RCP 5/20/10A Unit 2 will have the
  1. 1 Seals need for cooling. same seals as Unit 1 therefore post fire cooling is required.
58. For info in the FSAR that is as- 7/6/10A Provided discussion designed/not confirmed yet such as regarding how issue stress, is the info Unit 2 as designed or is tracked via UVAs.

Unit 1 as constructed? (Knuettel) NRC stated no need for submittal at this time.

59. Eagle 21 FAT Issues 12/3/10 Need Submittal
1. Provide NRC with difference form from WBN Design change package EDCR 52319 Unit Diff Form provided
2. Provide NRC a statement of the new power supplies have been installed by TVA in WBN 1 -

that how the equipment was installed via equivalency evaluation from Westinghouse.

WO 08-813412-000

3. Provide NRC with Rack 5 issue cause determination and corrective actions needed for resolution

Page 8 of 10 No. Description Status Additional Comments

4. Was a PER written and an Extent of Condition performed?

Westinghouse PER initiated.

Cause analysis and extent of condition in process (Lyons)

60. Biweekly meeting on Shared Systems 5/25/10A Complete - See Item 68 for follow up meeting
61. Rx Systems RAI Closed to Item Confirmed 13 contained in the list FSAR 15.2.14 Inadvertent SI @ Power for Item 13

- RIS on subject not addressed FSAR 5.2.2 and 5.5.13 - Does not address Overpressure Protection relief capacity at power (Elton)

62. A97 Sect 5.5.1.2 - Verify if TVA will Closed Addressed in NRC do a periodic ISI inspection of the RCP EMCB RAI flywheel versus taking credit for the vibration monitoring system (Pointer)
63. Provide discussion of missing QA 8/5/10 IEB 79-14 records Records Was a PER written? What was were found. The the cause? What is the regulatory HAUUP records (in impact? What happened from 1985 to punch card format) 1995 on Unit 1 pipe supports that makes have also been located. In process Unit 1 different than Unit 2? Why was of procuring new the same process not applied to Unit 2? machine to read What went wrong? How did we lose the cards to verify all records? Address 10CFR50 Appendix records present.

B Control of Records. Does the CAP and/or Implementation Plan need to be changed? (Stephenson)

64. Confirm acceptability of shifting EP 7/29/10 - No NRC objections.

drill from May 2011 to July 2011 to Discuss status Need FEMA and support other state drills. (Crouch) state of TN concurrence Meeting with state on 7/16/10

65. Three issues identified regarding Closed environmental items: 7/6/10A
1. Three reports (Baxter)
2. Water samples different
3. Addressing three reactor events

Page 9 of 10 No. Description Status Additional Comments (locked rotor, RCP shaft break,

???)

Look at ML101370186 for NRC telecom minutes for 5/15/10.

(Lyons)

66. Control Room Lighting RAI (Elton) Closed to Item 13.
67. Instrumentation RAI List (Knuettel) Ongoing Next Submittal planned for 7/23/10
68. Shared Systems Meeting (Crouch) 7/20/10
69. Emergency Preparedness RAI (Lyons) Complete
70. Part 70 and 50 License RAI regarding 7/30/10 Corporate providing EP and Security from NMSS (Lyons) response
71. NRC reviewing the Station Blackout Complete NRC stated that Design Criteria to determine if it answering the provides the info they are requesting. FSAR RAI (Stockton) questions will provide the required info.
72. Questions on A98 rev bars- Sections Closed Discussed with 8.3.1.1, 9.4, 11.2.6, 11.3, 15.2 NRC (Stockton)
73. Appendix R changes from Rev 0 to Closed to Item current (Boyd/Woodfin) 31
74. Technical Specifications Change WBN- 8/15/10 TS-10 Control Rod Assemblies (Elton)
75. Provide letter regarding Conformal Complete Coatings on Eagle 21 boards.
76. Provide commitment letter on B.5.b Closed 7/01/10A assumptions and backup power to H2 igniters being the same as Unit 1 -

(i.e.,procedural guidance)

77. Answer RAI related to Spent Fuel Pool Closed to Item Heat Loads specific to Unit 2 only. 13
78. X-750 Bolt Material Issue (Elton) Closed Submittal issued 6/29/10A
79. Control Rod Tech Spec Change (Elton) Closed Duplicate of item 74
80. Develop list of planned License Conditions
81. Submit Licensing Basis Preservation Complete Review Results
82. IPE RAI Questions 7/26/10
83. Anti Trust RAI 8/13/10

Page 10 of 10 No. Description Status Additional Comments

84. Security Plan Update based on telecon 7/21/10
85. Hazardous Chemical RAI for 7/23/10 Emergency Planning from e-mail
86. SAMA Riskman vs CAFTA comparison 8/15/10
87. FSAR Amendment 100 with RAI incorporation and Setpoint Methodology writeup
88. Refurb Program followup items
89. Baseline list of OMAs 8/6/10
90. Fire Protection Report Common 8/6/10 Sections
91. MSO scenarios 8/20/10
92. Markup of Report Changes from Rev 5 8/30/10 to 40
93. Final Fire Protection Report Submitted 12/17/10 94.