|
|
(One intermediate revision by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 08/03/2010 | | | issue date = 08/03/2010 |
| | title = Acceptance Review Results of Relief Request 13R-06 for Clinton Power Station, Unit No. 1 | | | title = Acceptance Review Results of Relief Request 13R-06 for Clinton Power Station, Unit No. 1 |
| | author name = DiFrancesco N J | | | author name = Difrancesco N |
| | author affiliation = NRC/NRR/DORL/LPLIII-2 | | | author affiliation = NRC/NRR/DORL/LPLIII-2 |
| | addressee name = Mathews M | | | addressee name = Mathews M |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:From: DiFrancesco, Nicholas Sent: Tuesday, August 03, 2010 4:31 PM To: 'Mitchel.Mathews@exeloncorp.com' Cc: 'Peterson, Jim L:(GenCo-Nuc)' | | {{#Wiki_filter:From: DiFrancesco, Nicholas Sent: Tuesday, August 03, 2010 4:31 PM To: 'Mitchel.Mathews@exeloncorp.com' Cc: 'Peterson, Jim L:(GenCo-Nuc)' |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Acceptance Review Results of Relief Request I3R-06 for Clinton Power Station, Unit No. 1 (TAC ME4238) | | Acceptance Review Results of Relief Request I3R-06 for Clinton Power Station, Unit No. 1 (TAC ME4238) |
| Mr. Mathews, By letter dated July 13, 2010, Exelon Generation Company, LLC (the licensee) submitted relief request (RR) No. I3R-06 related to use of Code Case N-513-2 for Clinton Power Station (CPS), Unit No. 1 (ADAMS Accession No. ML101940408). The proposed RR would allow the use of ASME Code Case N-513-2 as an acceptable method for evaluating the structural integrity of flaws identified in moderate energy piping for the 3rd Inservice Inspection Interval at CPS. The purpose of this message is to provide the results of the Nuclear Regulatory Commission (NRC) staff's acceptance review of this submittal. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review was also intended to identify whether the applications have any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | | Mr. Mathews, By letter dated July 13, 2010, Exelon Generation Company, LLC (the licensee) submitted relief request (RR) No. I3R-06 related to use of Code Case N-513-2 for Clinton Power Station (CPS), |
| | Unit No. 1 (ADAMS Accession No. ML101940408). The proposed RR would allow the use of ASME Code Case N-513-2 as an acceptable method for evaluating the structural integrity of flaws identified in moderate energy piping for the 3rd Inservice Inspection Interval at CPS. The purpose of this message is to provide the results of the Nuclear Regulatory Commission (NRC) staff's acceptance review of this submittal. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review was also intended to identify whether the applications have any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety. | | Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety. |
| The NRC staff has reviewed your application and has concluded that it provides technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendments in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence. | | The NRC staff has reviewed your application and has concluded that it provides technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendments in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence. |
| In accordance with our process as described in LIC-109, "Acceptance Review Procedures," I am placing a copy of this email in ADAMS as a publicly-available, official agency record. | | In accordance with our process as described in LIC-109, "Acceptance Review Procedures," I am placing a copy of this email in ADAMS as a publicly-available, official agency record. |
| Sincerely, Nicholas DiFrancesco Project Manager Nuclear Regulatory Commission Division of Operating Reactor Licensing nicholas.difrancesco@nrc.gov Tel: (301) 415-1115 Fax: (301) 415-1222 E-mail Properties Mail Envelope Properties () | | Sincerely, Nicholas DiFrancesco Project Manager Nuclear Regulatory Commission Division of Operating Reactor Licensing nicholas.difrancesco@nrc.gov Tel: (301) 415-1115 Fax: (301) 415-1222 E-mail Properties |
| | |
| | Mail Envelope Properties () |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Acceptance Review Results of Relief Request I3R-06 for Clinton Power | | Acceptance Review Results of Relief Request I3R-06 for Clinton Power Station, Unit No. 1 (TAC ME4238) |
| | | Sent Date: 08/03/2010 4:02:48 PM Received Date: 08/03/2010 4:30:00 PM From: DiFrancesco, Nicholas Created By: Nicholas.DiFrancesco@nrc.gov Recipients: |
| Station, Unit No. 1 (TAC ME4238) | | 'Mitchel.Mathews@exeloncorp.com' ('Mitchel.Mathews@exeloncorp.com') |
| Sent Date: 08/03/2010 4:02:48 PM Received Date: 08/03/2010 4:30:00 PM From: DiFrancesco, Nicholas | | Tracking Status: None James.Peterson@exeloncorp.com ('Peterson, Jim L:(GenCo-Nuc)') |
| | | Tracking Status: None Post Office: |
| Created By: Nicholas.DiFrancesco@nrc.gov | | Files Size Date & Time MESSAGE 10990 08/03/2010 Options Expiration Date: |
| | | Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received:}} |
| Recipients: | |
| 'Mitchel.Mathews@exeloncorp.com' ('Mitchel.Mathews@exeloncorp.com') Tracking Status: None James.Peterson@exeloncorp.com ('Peterson, Jim L:(GenCo-Nuc)') Tracking Status: None
| |
| | |
| Post Office: | |
| | |
| Files Size Date & Time | |
| | |
| MESSAGE 10990 08/03/2010 | |
| | |
| Options Expiration Date: | |
| Priority: olImportanceNormal ReplyRequested: False Return Notification: False | |
| | |
| Sensitivity: olNormal Recipients received:}} | |
Letter Sequence Acceptance Review |
---|
|
|
|
|
---|
Category:Acceptance Review Letter
MONTHYEARML21077A1772021-04-0808 April 2021 Withdrawal of Requested Exemption from Certain Requirement in 10 CFR 50.55a (Epids L-2021-LLE-0014, 0015, & 0016) ML16308A3532016-11-0303 November 2016 Acceptance Review Concerning Changes to Emergency Plan for Permanently Defueled Condition (CAC No. MF8279)(RS-16-143)(L-LL-2016-29478) ML16263A0292016-09-19019 September 2016 Acceptance Review Concerning Changes to Admin Control Section (CAC No. MF8224)(RS-16-153) ML16231A3902016-09-0606 September 2016 Acceptance of Requested Licensing Action Request for Exemption Related to Security Measures in an Emergency or During Severe Weather (CAC MF8275 - MF8278) ML16202A0712016-07-21021 July 2016 Acceptance of Requested Licensing Action Regarding Certified Fuel Handler Training Program ML16133A4522016-05-16016 May 2016 Acceptance Review Concerning Scram Time Testing (CAC No. MF7559)(RS-16-046) ML16104A0552016-04-25025 April 2016 Acceptance Review Concerning Permanent Extension of Type a and Type C Leak Rate Test Frequencies (CAC No. MF7290) (RS-16-015) ML16076A1722016-03-17017 March 2016 Acceptance Review Concerning Incorporation of Revised Alternative Source Term (CAC No. MF7336) (RS-16-019) ML1116804112011-06-17017 June 2011 Acceptance Review for Exelon Threshold Determination Request (TAC ME6269 - ME6287) ML1021600242010-08-0303 August 2010 Acceptance Review Results of Relief Request 13R-06 for Clinton Power Station, Unit No. 1 ML1008800852010-07-21021 July 2010 Fleet - Acceptance Review Implementation of Emergency Action Level Schemes Developed from NEI 99-01m Rev. 5 ML1005503402010-02-0202 February 2010 Acceptance Review of Clinton Power Station, Unit 1 - 3rd Inservice Inspections Interval for Relief Request Nos. 13R-01 Through 13R-05 2021-04-08
[Table view] Category:E-Mail
MONTHYEARML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24064A1222024-02-0606 February 2024 Biennial Problem and Identification Inspection Request for Information ML23363A0302023-12-29029 December 2023 NRR E-mail Capture - Preliminary RAIs for Clinton Partial Site Release ML23338A0402023-12-0404 December 2023 NRR E-mail Capture - Ready for Clean TS Pages and Updated Review Hours for Clinton Power Station, Unit 1, Request for License Amendment to Revise Technical Specifications Section 3.8.3 ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23261A0032023-09-15015 September 2023 NRR E-mail Capture - NRC Acceptance Review of Clinton Amendment Request to Revise Timing of Reactor Water Cleanup Isolation Valves ML23230B1682023-08-18018 August 2023 NRR E-mail Capture - Clinton Power Station, Unit 1, Preliminary Requests for Additional Information (Rais) Related to the Amendment Request to Revise Diesel Generator Starting Air Technical Specifications ML23219A2142023-08-0404 August 2023 NRR E-mail Capture - NRC Acceptance Review of Clinton Request for Partial Site Release ML23194A1102023-07-13013 July 2023 NRR E-mail Capture - Non-acceptance of Clinton Request for Partial Site Release ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23087A0122023-03-28028 March 2023 NRR E-mail Capture - NRC Acceptance Review of Clinton License Amendment Request to Revise Technical Specifications 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air (L-2023-LLA-0034) ML23033A0332023-02-0101 February 2023 NRR E-mail Capture - NRC Acceptance Review of Clinton License Amendment Request to Adopt TSTF-332 (L-2023-LLA-0007) ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22301A0902022-10-28028 October 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-301, Revision 2 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22173A0382022-06-21021 June 2022 NRR E-mail Capture - Request for Additional Information (RAI) Regarding Clinton License Amendment Request for Secondary Containment Design Basis (L-2022-LLA-0055) ML22165A1912022-06-14014 June 2022 NRR E-mail Capture - NRC Acceptance Review of Clinton Request to Adopt TSTF-269 (L-2022-LLA-0077) ML22165A1902022-06-14014 June 2022 NRR E-mail Capture - NRC Acceptance Review of Clinton Request to Adopt TSTF-230 (L-2022-LLA-0076) ML23089A0182022-05-24024 May 2022 NRR E-mail Capture - Clinton Power Station Acceptance Review Results - Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan ML22116A0422022-04-26026 April 2022 NRR E-mail Capture - NRC Acceptance Review of Clinton License Amendment Request to Revise Secondary Containment Design Basis ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21252A0042021-08-26026 August 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood/Byron/Clinton - Adoption of TSTF-273, Safety Function Determination Program Clarifications ML21225A0392021-08-13013 August 2021 NRR E-mail Capture - Preliminary Request for Additional Information Regarding Clinton Request to Revise Degraded Voltage Instrumentation Setpoints ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21203A3062021-07-21021 July 2021 NRR E-mail Capture - NRC Acceptance Review - Clinton - Third Inservice Inspection Interval Relief Request I3R-18 ML21190A0192021-07-0808 July 2021 NRR E-mail Capture - Exelon Fleet - Request for Additional Information Regarding Adoption of TSTF-582 and TSTF-583-T ML21182A0722021-06-29029 June 2021 SUNSI and Proprietary Review Determination Email Regarding: Tn CoC 1042 (Eos) Amendment 3 Rsi Responses ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21057A1012021-02-26026 February 2021 NRR E-mail Capture - Clarification of Second Round RAI - Clinton TSTF-505 License Amendment Request ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21057A1002021-02-17017 February 2021 NRR E-mail Capture - Second Round RAI - Clinton TSTF-505 License Amendment Request ML21041A5442021-02-10010 February 2021 NRR E-mail Capture - NRC Acceptance Review for Clinton Request for License Amendment to Revise Degraded Voltage Relay Allowable Values (L-2021-LLA-0005) ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML20350B5602020-12-15015 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-582 and TSTF-583-T (EPIDs L-2020-LLA-0253 and L-2020-LLA-0254) ML20350B5582020-12-14014 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Alternative Request for Documentation of Replacement of Pressure Retaining Bolting ML20346A1012020-12-11011 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for an Alternative to Use ASME Code Case N-893 (EPIDs L-2020-LLR-0147 and L-2020-LLR-0148) 2024-07-12
[Table view] |
Text
From: DiFrancesco, Nicholas Sent: Tuesday, August 03, 2010 4:31 PM To: 'Mitchel.Mathews@exeloncorp.com' Cc: 'Peterson, Jim L:(GenCo-Nuc)'
Subject:
Acceptance Review Results of Relief Request I3R-06 for Clinton Power Station, Unit No. 1 (TAC ME4238)
Mr. Mathews, By letter dated July 13, 2010, Exelon Generation Company, LLC (the licensee) submitted relief request (RR) No. I3R-06 related to use of Code Case N-513-2 for Clinton Power Station (CPS),
Unit No. 1 (ADAMS Accession No. ML101940408). The proposed RR would allow the use of ASME Code Case N-513-2 as an acceptable method for evaluating the structural integrity of flaws identified in moderate energy piping for the 3rd Inservice Inspection Interval at CPS. The purpose of this message is to provide the results of the Nuclear Regulatory Commission (NRC) staff's acceptance review of this submittal. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review was also intended to identify whether the applications have any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.
The NRC staff has reviewed your application and has concluded that it provides technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendments in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.
In accordance with our process as described in LIC-109, "Acceptance Review Procedures," I am placing a copy of this email in ADAMS as a publicly-available, official agency record.
Sincerely, Nicholas DiFrancesco Project Manager Nuclear Regulatory Commission Division of Operating Reactor Licensing nicholas.difrancesco@nrc.gov Tel: (301) 415-1115 Fax: (301) 415-1222 E-mail Properties
Mail Envelope Properties ()
Subject:
Acceptance Review Results of Relief Request I3R-06 for Clinton Power Station, Unit No. 1 (TAC ME4238)
Sent Date: 08/03/2010 4:02:48 PM Received Date: 08/03/2010 4:30:00 PM From: DiFrancesco, Nicholas Created By: Nicholas.DiFrancesco@nrc.gov Recipients:
'Mitchel.Mathews@exeloncorp.com' ('Mitchel.Mathews@exeloncorp.com')
Tracking Status: None James.Peterson@exeloncorp.com ('Peterson, Jim L:(GenCo-Nuc)')
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 10990 08/03/2010 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: