ML102861079: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:REED COLLEGE October 5, 2010 5cIIntCbniif tr61' D&§k§.S; Nuclea aRegulatory Commission REACTOR Washington, DC 20555 RATRFACILITY 3203 Southeast Docket: 50-288 Woodstock Boulevard License No: R-1 12 Portland, Oregon 97202-8199 503/777-7222 We have reanalyzed the decommissioning costs for the Reed College Research Reactor.The new estimate is approximately  
{{#Wiki_filter:REED COLLEGE October 5, 2010 5cIIntCbniif tr61'   D&§k
$2,250,000.
                          §.S; NucleaaRegulatory Commission REACTOR             Washington, DC 20555 RATRFACILITY 3203 Southeast       Docket:           50-288 Woodstock Boulevard License No: R-1 12 Portland, Oregon 97202-8199 We have reanalyzed the decommissioning costs for the Reed College Research Reactor.
Please see attached for details.fax I declare under penalty of perjury that the foregoing is true and correct.503/777-7274  
telep*hone The new estimate is approximately $2,250,000. Please see attached for details.
"., eeartor@reed.edu Executed on S-web hrp:Hreactor.reed.edu S. D he reantzed R e-af'fi ReactorýJ Decommission Costs for the Reed College Research Reactor in 2010 Dollars A. LLRW Burial Costs: $105,000 Disposal costs at Richland, WA in 2010: z $200/ft 3.Volume of material to be disposed:
503/777-7222 fax I declare under penalty of perjury that the foregoing is true and correct.
522 ft 3 1. Aluminum tank liner and 6 inches of concrete next to the liner: 467 ft 3 2. Rotating Specimen Rack and Reflector:
503/777-7274                             ".,
12 ft 3 3. Core Support Structure:
eeartor@reed.edu         Executed on           S-web hrp:Hreactor.reed.edu S.       he D reantzed R MfDi~c6f-,TReed'M* e-af'fi Reactor
10 ft 3 4. Miscellaneous:
                                                                                                                    ýJ
25 ft 3 Disposal costs = ($200/ft 3) (522 ft 3) $105,000 B. Labor Costs: $1,600,000 Staff Work-years Rate ($/hr) Cost ($)Director 1.00 $50 $100,000 Assoc. Director 1.00 $20 $40,000 Clerical 0.25 $50 $25,000 Health Physicist 0.25 $50 $25,000 QA Engineer 0.25 $100 $50,000 Consultant 0.25 $100 $50,000 Labor Shift Engineer 1.00 $75 $150,000 Craftsmen 2.00 $75 $300,000 Crew Leader 0.50 $75 $75,000 Utility Operator 0.25 $75 $37,500 Labor 4.00 $75 $600,000 HP Tech 1.00 $75 $150,000 Total z $1,600,000 C. Support Costs for Spent Fuel Shipment:  
 
$100,000.D. 25% Contingency:  
Decommission Costs for the Reed College Research Reactor in 2010 Dollars A. LLRW Burial Costs: $105,000 Disposal costs at Richland, WA in 2010: z $200/ft3 .
$450,000.Total: $2,250,000
3 Volume of material to be disposed: 522 ft 3
: 1. Aluminum tank liner and 6 inches of concrete next to the liner: 467 ft 3
: 2. Rotating Specimen Rack and Reflector: 12 ft 3
: 3. Core Support Structure: 10 ft 3
: 4. Miscellaneous: 25 ft Disposal costs = ($200/ft3) (522 ft3)   $105,000 B. Labor Costs: $1,600,000 Staff         Work-years         Rate ($/hr)         Cost ($)
Director           1.00               $50           $100,000 Assoc. Director   1.00               $20             $40,000 Clerical           0.25               $50             $25,000 Health Physicist   0.25               $50             $25,000 QA Engineer       0.25             $100             $50,000 Consultant         0.25             $100             $50,000 Labor Shift Engineer     1.00               $75           $150,000 Craftsmen         2.00               $75           $300,000 Crew Leader       0.50               $75             $75,000 Utility Operator   0.25               $75             $37,500 Labor             4.00               $75           $600,000 HP Tech           1.00               $75           $150,000 Total                                           z $1,600,000 C. Support Costs for Spent Fuel Shipment: $100,000.
D. 25% Contingency: $450,000.
Total: $2,250,000
?}}
?}}

Latest revision as of 09:05, 13 November 2019

Reed College, Submittal of Decommissioning Costs for Research Reactor in 2010
ML102861079
Person / Time
Site: Reed College
Issue date: 10/05/2010
From: Frantz S
Reed College
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML102861079 (2)


Text

REED COLLEGE October 5, 2010 5cIIntCbniif tr61' D&§k

§.S; NucleaaRegulatory Commission REACTOR Washington, DC 20555 RATRFACILITY 3203 Southeast Docket: 50-288 Woodstock Boulevard License No: R-1 12 Portland, Oregon 97202-8199 We have reanalyzed the decommissioning costs for the Reed College Research Reactor.

telep*hone The new estimate is approximately $2,250,000. Please see attached for details.

503/777-7222 fax I declare under penalty of perjury that the foregoing is true and correct.

503/777-7274 ".,

eeartor@reed.edu Executed on S-web hrp:Hreactor.reed.edu S. he D reantzed R MfDi~c6f-,TReed'M* e-af'fi Reactor

ýJ

Decommission Costs for the Reed College Research Reactor in 2010 Dollars A. LLRW Burial Costs: $105,000 Disposal costs at Richland, WA in 2010: z $200/ft3 .

3 Volume of material to be disposed: 522 ft 3

1. Aluminum tank liner and 6 inches of concrete next to the liner: 467 ft 3
2. Rotating Specimen Rack and Reflector: 12 ft 3
3. Core Support Structure: 10 ft 3
4. Miscellaneous: 25 ft Disposal costs = ($200/ft3) (522 ft3) $105,000 B. Labor Costs: $1,600,000 Staff Work-years Rate ($/hr) Cost ($)

Director 1.00 $50 $100,000 Assoc. Director 1.00 $20 $40,000 Clerical 0.25 $50 $25,000 Health Physicist 0.25 $50 $25,000 QA Engineer 0.25 $100 $50,000 Consultant 0.25 $100 $50,000 Labor Shift Engineer 1.00 $75 $150,000 Craftsmen 2.00 $75 $300,000 Crew Leader 0.50 $75 $75,000 Utility Operator 0.25 $75 $37,500 Labor 4.00 $75 $600,000 HP Tech 1.00 $75 $150,000 Total z $1,600,000 C. Support Costs for Spent Fuel Shipment: $100,000.

D. 25% Contingency: $450,000.

Total: $2,250,000

?