ML102940006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/20/2010
| issue date = 10/20/2010
| title = Draft Questions Re Boric Acid Precipitation Analysis for the Proposed Large-Break LOCA Amendment
| title = Draft Questions Re Boric Acid Precipitation Analysis for the Proposed Large-Break LOCA Amendment
| author name = Tam P S
| author name = Tam P
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
| addressee name = Scarpello M K, Waters J R
| addressee name = Scarpello M, Waters J
| addressee affiliation = Indiana Michigan Power Co, American Electric Power Co
| addressee affiliation = Indiana Michigan Power Co, American Electric Power Co
| docket = 05000316
| docket = 05000316
| license number = DPR-074
| license number = DPR-074
| contact person = Tam P S
| contact person = Tam P
| case reference number = TAC ME1017
| case reference number = TAC ME1017
| document type = E-Mail
| document type = E-Mail
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Accession No. ML102940006  
{{#Wiki_filter:Accession No. ML102940006 From:                     Tam, Peter Sent:                     Wednesday, October 20, 2010 4:00 PM To:                       'hletheridge@aep.com'; mkscarpello@aep.com; jrwaters@aep.com Cc:                       Huang, Tai; Ward, Leonard; Mendiola, Anthony; Ulses, Anthony; Pascarelli, Robert
 
From: Tam, Peter Sent: Wednesday, October 20, 2010 4:00 PM To: 'hletheridge@aep.com'; mkscarpello@aep.com; jrwaters@aep.com Cc: Huang, Tai; Ward, Leonard; Mendiola, Anthony; Ulses, Anthony; Pascarelli, Robert  


==Subject:==
==Subject:==
D. C. Cook Unit 2 - Draft questions for the 10/21/10 conference call re. the proposed LBLOCA amendment (TAC ME1017)
D. C. Cook Unit 2 - Draft questions for the 10/21/10 conference call re. the proposed LBLOCA amendment (TAC ME1017)
Michael: Following please find draft questions regarding post-LOCA boric acid precipitation that we would discuss with you in the 10/21/10 conference call.  
Michael:
: 1. Information regarding the D.C. Cook Unit 2 NSSS:  
Following please find draft questions regarding post-LOCA boric acid precipitation that we would discuss with you in the 10/21/10 conference call.
: a. Volume of the lower plenum, core and upper plenum below the bottom elevation of the hot leg, each identified separately. Also provide heights of these regions  
: 1. Information regarding the D.C. Cook Unit 2 NSSS:
: b. Loop friction and geometry pressure losses from the core exit through the steam generators to the inlet nozzle of the reactor vessel. Also, provide the locked rotor RCP k-factor. Please provide the mass flow rates, flow areas, k-factors, and coolant temperatures for the pressure losses provided( upper plenum, hot legs, SGs, suction legs, RCPs, and discharge legs). Please include the reduced SG flow areas due to plugged tubes. Please also provide the loss from each of the intact cold legs through the annulus to a single broken cold leg. Please also provide the equivalent loop resistance for the broken loop and separately for the intact loop.  
: a. Volume of the lower plenum, core and upper plenum below the bottom elevation of the hot leg, each identified separately. Also provide heights of these regions
: c. Capacity and boron concentration of the RWST.  
: b. Loop friction and geometry pressure losses from the core exit through the steam generators to the inlet nozzle of the reactor vessel. Also, provide the locked rotor RCP k-factor. Please provide the mass flow rates, flow areas, k-factors, and coolant temperatures for the pressure losses provided( upper plenum, hot legs, SGs, suction legs, RCPs, and discharge legs). Please include the reduced SG flow areas due to plugged tubes. Please also provide the loss from each of the intact cold legs through the annulus to a single broken cold leg. Please also provide the equivalent loop resistance for the broken loop and separately for the intact loop.
: d. Capacity of the condensate storage tank  
: c. Capacity and boron concentration of the RWST.
: e. Flushing flow rate at the time of switch to simultaneous injection  
: d. Capacity of the condensate storage tank
: f. HPSI runout flow rate  
: e. Flushing flow rate at the time of switch to simultaneous injection
: g. Capacities and boron concentrations for BIT storage tanks
: f. HPSI runout flow rate
: h. Flow rate into the RCS from the BIT  
: g. Capacities and boron concentrations for BIT storage tanks
: 2. Please provide the following elevation data:  
: h. Flow rate into the RCS from the BIT
: a. bottom elevation of the suction leg horizontal leg piping, cold leg diameter  
: 2. Please provide the following elevation data:
: b. top elevation of the cold leg at the reactor coolant pump discharge  
: a. bottom elevation of the suction leg horizontal leg piping, cold leg diameter
: c. top elevation of the core (also height of core)  
: b. top elevation of the cold leg at the reactor coolant pump discharge
: d. bottom elevation of the downcomer
: c. top elevation of the core (also height of core)
: d. bottom elevation of the downcomer
: 3. Please provide the limiting bottom and top skewed axial power shapes.
: 3. Please provide the limiting bottom and top skewed axial power shapes.
The NRC staff will finalize a list of questions based on the above, as well as several sets of draft questions previously transmitted to you by e-mail. You will be requested to formally respond to the formal RAI.  
The NRC staff will finalize a list of questions based on the above, as well as several sets of draft questions previously transmitted to you by e-mail. You will be requested to formally respond to the formal RAI.
 
Peter S. Tam Senior Project Manager (for D. C. Cook and Monticello)
Peter S. Tam Senior Project Manager (for D. C. Cook and Monticello) Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Tel. 301-415-1451 E-mail Properties Mail Envelope Properties (3D6B1F4F51D25E4E9B6C93FF92DAE5171443BF9B37)
 
Tel. 301-415-1451 E-mail Properties Mail Envelope Properties (3D6B1F4F51D25E4E9B6C93FF92DAE5171443BF9B37)  


==Subject:==
==Subject:==
D. C. Cook Unit 2 - Draft questions for the 10/21/10 conference call re. the proposed LBLOCA amendment (TAC ME1017)
D. C. Cook Unit 2 - Draft questions for the 10/21/10 conference call re. the proposed LBLOCA amendment (TAC ME1017)
Sent Date:       10/20/2010 4:00:30 PM Received Date:       10/20/2010 4:00:00 PM From:               Tam, Peter  
Sent Date:     10/20/2010 4:00:30 PM Received Date:       10/20/2010 4:00:00 PM From:           Tam, Peter Created By:       Peter.Tam@nrc.gov Recipients:
 
Created By:         Peter.Tam@nrc.gov  
 
Recipients:
hletheridge@aep.com ('hletheridge@aep.com')
hletheridge@aep.com ('hletheridge@aep.com')
Tracking Status: None mkscarpello@aep.com (mkscarpello@aep.com)
Tracking Status: None mkscarpello@aep.com (mkscarpello@aep.com)
Tracking Status: None jrwaters@aep.com (jrwaters@aep.com)                 Tracking Status: None Tai.Huang@nrc.gov (Huang, Tai)
Tracking Status: None jrwaters@aep.com (jrwaters@aep.com)
Tracking Status: None Tai.Huang@nrc.gov (Huang, Tai)
Tracking Status: None Leonard.Ward@nrc.gov (Ward, Leonard)
Tracking Status: None Leonard.Ward@nrc.gov (Ward, Leonard)
Tracking Status: None Anthony.Mendiola@nrc.gov (Mendiola, Anthony)
Tracking Status: None Anthony.Mendiola@nrc.gov (Mendiola, Anthony)
Tracking Status: None Anthony.Ulses@nrc.gov (Ulses, Anthony)
Tracking Status: None Anthony.Ulses@nrc.gov (Ulses, Anthony)
Tracking Status: None Robert.Pascarelli@nrc.gov (Pascarelli, Robert)
Tracking Status: None Robert.Pascarelli@nrc.gov (Pascarelli, Robert)
Tracking Status: None  
Tracking Status: None
 
Post Office: HQCLSTR02.nrc.gov
 
Files                Size        Date & Time
 
MESSAGE        12090        10/20/2010
 
Options Expiration Date:
Priority:                        olImportanceNormal ReplyRequested:        False Return Notification:        False


Sensitivity:         olNormal Recipients received:}}
Post Office:
HQCLSTR02.nrc.gov Files          Size    Date & Time MESSAGE          12090    10/20/2010 Options Expiration Date:
Priority:              olImportanceNormal ReplyRequested:      False Return Notification:    False Sensitivity:     olNormal Recipients received:}}

Latest revision as of 07:31, 13 November 2019

Draft Questions Re Boric Acid Precipitation Analysis for the Proposed Large-Break LOCA Amendment
ML102940006
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/20/2010
From: Tam P
Plant Licensing Branch III
To: Scarpello M, Waters J
Indiana Michigan Power Co, American Electric Power Co
Tam P
References
TAC ME1017
Download: ML102940006 (3)


Text

Accession No. ML102940006 From: Tam, Peter Sent: Wednesday, October 20, 2010 4:00 PM To: 'hletheridge@aep.com'; mkscarpello@aep.com; jrwaters@aep.com Cc: Huang, Tai; Ward, Leonard; Mendiola, Anthony; Ulses, Anthony; Pascarelli, Robert

Subject:

D. C. Cook Unit 2 - Draft questions for the 10/21/10 conference call re. the proposed LBLOCA amendment (TAC ME1017)

Michael:

Following please find draft questions regarding post-LOCA boric acid precipitation that we would discuss with you in the 10/21/10 conference call.

1. Information regarding the D.C. Cook Unit 2 NSSS:
a. Volume of the lower plenum, core and upper plenum below the bottom elevation of the hot leg, each identified separately. Also provide heights of these regions
b. Loop friction and geometry pressure losses from the core exit through the steam generators to the inlet nozzle of the reactor vessel. Also, provide the locked rotor RCP k-factor. Please provide the mass flow rates, flow areas, k-factors, and coolant temperatures for the pressure losses provided( upper plenum, hot legs, SGs, suction legs, RCPs, and discharge legs). Please include the reduced SG flow areas due to plugged tubes. Please also provide the loss from each of the intact cold legs through the annulus to a single broken cold leg. Please also provide the equivalent loop resistance for the broken loop and separately for the intact loop.
c. Capacity and boron concentration of the RWST.
d. Capacity of the condensate storage tank
e. Flushing flow rate at the time of switch to simultaneous injection
f. HPSI runout flow rate
g. Capacities and boron concentrations for BIT storage tanks
h. Flow rate into the RCS from the BIT
2. Please provide the following elevation data:
a. bottom elevation of the suction leg horizontal leg piping, cold leg diameter
b. top elevation of the cold leg at the reactor coolant pump discharge
c. top elevation of the core (also height of core)
d. bottom elevation of the downcomer
3. Please provide the limiting bottom and top skewed axial power shapes.

The NRC staff will finalize a list of questions based on the above, as well as several sets of draft questions previously transmitted to you by e-mail. You will be requested to formally respond to the formal RAI.

Peter S. Tam Senior Project Manager (for D. C. Cook and Monticello)

Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Tel. 301-415-1451 E-mail Properties Mail Envelope Properties (3D6B1F4F51D25E4E9B6C93FF92DAE5171443BF9B37)

Subject:

D. C. Cook Unit 2 - Draft questions for the 10/21/10 conference call re. the proposed LBLOCA amendment (TAC ME1017)

Sent Date: 10/20/2010 4:00:30 PM Received Date: 10/20/2010 4:00:00 PM From: Tam, Peter Created By: Peter.Tam@nrc.gov Recipients:

hletheridge@aep.com ('hletheridge@aep.com')

Tracking Status: None mkscarpello@aep.com (mkscarpello@aep.com)

Tracking Status: None jrwaters@aep.com (jrwaters@aep.com)

Tracking Status: None Tai.Huang@nrc.gov (Huang, Tai)

Tracking Status: None Leonard.Ward@nrc.gov (Ward, Leonard)

Tracking Status: None Anthony.Mendiola@nrc.gov (Mendiola, Anthony)

Tracking Status: None Anthony.Ulses@nrc.gov (Ulses, Anthony)

Tracking Status: None Robert.Pascarelli@nrc.gov (Pascarelli, Robert)

Tracking Status: None

Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 12090 10/20/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: