Letter Sequence Draft RAI |
|---|
|
|
MONTHYEARAEP-NRC-2009-18, License Amendment Request for Adoption TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 262009-03-19019 March 2009 License Amendment Request for Adoption TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 Project stage: Request AEP-NRC-2009-25, Small Break Loss-of-Coolant Accident Evaluation Model Reanalysis2009-03-30030 March 2009 Small Break Loss-of-Coolant Accident Evaluation Model Reanalysis Project stage: Request ML0911700962009-04-27027 April 2009 E-mail Transmitting Acceptance Review of License Amendment Request Regarding Large Break Loss-of-Coolant Accident Analysis Methodology Project stage: Acceptance Review ML0919802662009-07-17017 July 2009 Draft RAIs for License Amendment Request Large Break Loss-of-Coolant Accident Methodology Project stage: Draft RAI ML0919802562009-07-17017 July 2009 E-mail Transmitting Draft Requests for Additional Information Large Break Loss-of-Coolant Accident License Amendment Request Project stage: Draft RAI ML0922400072009-08-11011 August 2009 E-mail Transmitting Revised Draft Requests for Additional Information Large Break LOCA License Amendment Request Project stage: Draft RAI ML0922400112009-08-11011 August 2009 Revised Draft Requests for Additional Information Associated with Large Break LOCA License Amendment Request Project stage: Draft RAI ML0926100292009-09-22022 September 2009 Request for Additional Information License Amendment Request Associated with Large Break LOCA Analysis Methodology Project stage: RAI AEP-NRC-2009-71, Response to Request for Additional Information Regarding a License Amendment Request Associated with the Large-Break Loss-of-Coolant Accident Analysis Methodology2009-11-20020 November 2009 Response to Request for Additional Information Regarding a License Amendment Request Associated with the Large-Break Loss-of-Coolant Accident Analysis Methodology Project stage: Response to RAI ML1000403272010-01-12012 January 2010 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1017302012010-06-21021 June 2010 Transmitting Draft RAI the Proposed Amendment Concerning Large-Break LOCA Project stage: Draft RAI ML1020305552010-07-22022 July 2010 Revised Draft RAI on Boron Precipitation Analysis for the Proposed Large-Break LOCA Amendment Project stage: Draft RAI ML1029400062010-10-20020 October 2010 Draft Questions Re Boric Acid Precipitation Analysis for the Proposed Large-Break LOCA Amendment Project stage: Draft Approval ML1030505662010-11-0101 November 2010 Draft Request for Additional Information Re. Downcomer Boiling for the Proposed LBLOCA Amendment Project stage: Draft RAI AEP-NRC-2011-15, Response to Second Request for Additional Information Regarding Amendment Request Associated with the Large-Break Loss-of-Coolant Accident Analysis Methodology2011-02-24024 February 2011 Response to Second Request for Additional Information Regarding Amendment Request Associated with the Large-Break Loss-of-Coolant Accident Analysis Methodology Project stage: Request ML1108101032011-03-11011 March 2011 Commitment to Perform Updated Boric Acid Precipitation Analysis for Recirculation Phase of a Postulated Large-Break Loss-Of-coolant Accident Project stage: Other AEP-NRC-2011-25, Change to Proposed Technical Specification Page Regarding Large-Break Loss-Of-Coolant Accident Analysis Approval2011-03-25025 March 2011 Change to Proposed Technical Specification Page Regarding Large-Break Loss-Of-Coolant Accident Analysis Approval Project stage: Other ML1107307832011-03-31031 March 2011 (CNP-2)-Issuance of Amendment No. 297 Re. Large-Break Loss-of-Coolant Accident Analysis Project stage: Approval ML11083A0332011-04-12012 April 2011 Withholding from Public Disclosure, Westinghouse Reports, D.C. Cook Unit 2 (AMP) Post-LOCA Responses to Request for Additional Information (Rai), & Supplemental Information to Support Informal NRC Audit of 12 . Project stage: RAI ML1114508892011-05-25025 May 2011 Changing a Schedule Conveyed by a Letter Dated 2/24/11 in Support of a Proposed Amendment Regarding the Large-break LOCA Analysis Project stage: Approval AEP-NRC-2011-41, Updated Boric Acid Precipitation Analysis for Recirculation Phase of a Postulated Large-Break Loss-of-Coolant Accident2011-06-30030 June 2011 Updated Boric Acid Precipitation Analysis for Recirculation Phase of a Postulated Large-Break Loss-of-Coolant Accident Project stage: Other ML11193A1462011-07-27027 July 2011 Determines That Submitted Information Dated 6/30/11 Is Proprietary and Is Withheld from Public Disclosure Project stage: Other ML1131202152011-11-0707 November 2011 Inform That TAC ME5865 Will Be Closed and the Issue of Lateral K Factor for LBLOCA Will No Longer Be Pursued Under D. C. Cook Unit 2 Docket Project stage: Other 2010-06-21
[Table View] |
Similar Documents at Cook |
|---|
|
Text
Accession No. ML101730201 From:
Tam, Peter Sent:
Monday, June 21, 2010 6:17 PM To:
hletheridge@aep.com; Joe Waters (jrwaters@aep.com)
Cc:
Huang, Tai; Pascarelli, Robert; Ward, Leonard; Mendiola, Anthony
Subject:
D. C. Cook Unit 2 Proposed LBLOCA Amendment - Draft RAI (TAC ME1017)
Helen and Joe:
By letter dated 3/19/2009, as supplemented on 11/20/2009, I&M requested an amendment to reflect the large-break LOCA reanalysis. Our review of the application is ongoing. We found that in order to complete our review, the following information is needed. Please review the following draft RAI question and let me know how you propose to disposition this draft question.
Please feel free to request a conference to discuss these questions and your proposed reply in a conference.
Please provide the results of the boric acid precipitation analysis (i.e., analysis report) that supports the D.C. Cook Unit 2 power level of 3479.8 MWt. The analysis should show the boric acid concentration versus time assuming no switch to simultaneous injection. The analysis should also list all of the key parameter inputs and assumptions applicable to the model used to identify the emergency operating procedure timing for switching to hot-leg injection. The evaluation of boric acid precipitation should have been submitted when the last power increase/uprate was requested in 2003 as part of the measurement uncertainty recapture (MUR) uprate. The boric acid precipitation report is not related to the LBLOCA best0-estimate model change currently under review, however, the NRC staff needs it because this analysis was not submitted previously, and therefore was not reviewed by the NRC staff as part of the 2003 MUR uprate to demonstrate that this evaluation bounds the current higher power level amendment.
This e-mail aims solely to prepare you for a conference call if you so desire one. This e-mail does not formally convey an NRC staff technical position. It also does not formally request for additional information unless you accept it as formal RAI.
Peter S. Tam, Senior Project Manager (for D. C. Cook, Kewaunee, and Monticello)
Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Tel. 301-415-1451
E-mail Properties Mail Envelope Properties (0A64B42AAA8FD4418CE1EB5240A6FED11B55DA8CB1)
Subject:
D. C. Cook Unit 2 Proposed LBLOCA Amendment - Draft RAI (TAC ME1017)
Sent Date:
6/21/2010 6:17:41 PM Received Date:
6/21/2010 6:17:00 PM From:
Tam, Peter Created By:
Peter.Tam@nrc.gov Recipients:
hletheridge@aep.com (hletheridge@aep.com)
Tracking Status: None jrwaters@aep.com (Joe Waters (jrwaters@aep.com))
Tracking Status: None Tai.Huang@nrc.gov (Huang, Tai)
Tracking Status: None Robert.Pascarelli@nrc.gov (Pascarelli, Robert)
Tracking Status: None Leonard.Ward@nrc.gov (Ward, Leonard)
Tracking Status: None Anthony.Mendiola@nrc.gov (Mendiola, Anthony)
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 11305 6/21/2010 Options Expiration Date:
Priority:
olImportanceNormal ReplyRequested: False Return Notification:
False Sensitivity:
olNormal Recipients received: