|
|
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1 DiabloCanyonNPEm Resource From:Pick, Greg Sent: Wednesday, November 10, 2010 8:34 AM To: Tan, Miranda | | {{#Wiki_filter:DiabloCanyonNPEm Resource From: Pick, Greg Sent: Wednesday, November 10, 2010 8:34 AM To: Tan, Miranda |
|
| |
|
| ==Subject:== | | ==Subject:== |
| RE: SAPN 50341879 (Regulator Material) thanks From: Tan, Miranda [mailto:M1TF@pge.com] | | RE: SAPN 50341879 (Regulator Material) thanks From: Tan, Miranda [mailto:M1TF@pge.com] |
| Sent: Tuesday, November 09, 2010 7:05 PM To: Pick, Greg Cc: Grebel, Terence | | Sent: Tuesday, November 09, 2010 7:05 PM To: Pick, Greg Cc: Grebel, Terence |
|
| |
|
| ==Subject:== | | ==Subject:== |
| SAPN 50341879 (Regulator Material) Importance: High Greg, I've updated the notification indicating that we will perform the walkdown and update the LRA to reflect the correct material as part of the annual update. SAP must be down. I am not able to download th e notification to email to you this afternoon. However, I will email you the updated notification tomorrow morning. | | SAPN 50341879 (Regulator Material) |
| Thanks, Miranda 805 781 9415 | | Importance: High |
| *********************
| | : Greg, I've updated the notification indicating that we will perform the walkdown and update the LRA to reflect the correct material as part of the annual update. SAP must be down. I am not able to download the notification to email to you this afternoon. However, I will email you the updated notification tomorrow morning. |
| | : Thanks, Miranda 805 781 9415 |
| | ********************* |
| 09/20/2010 14:34:18 Jana M. Orlando (JMSO) Phone 805/545-3126 09/16/2010 14:46:12 Philippe R. Soenen (PNS3) Phone 805/781-9782 During a license renewal regional inspection walkdown the material type for the Unit 2 AIR-I-I-1231A regulator was questions when compared to what SAP identifies the material to be. SAP identifies this component to be made of aluminum whereas the walkdown identified this component to be some type of copper alloy. | | 09/20/2010 14:34:18 Jana M. Orlando (JMSO) Phone 805/545-3126 09/16/2010 14:46:12 Philippe R. Soenen (PNS3) Phone 805/781-9782 During a license renewal regional inspection walkdown the material type for the Unit 2 AIR-I-I-1231A regulator was questions when compared to what SAP identifies the material to be. SAP identifies this component to be made of aluminum whereas the walkdown identified this component to be some type of copper alloy. |
| The component material needs to be verified int he field and SAP should be revised as necessary to reflect the actual material type. The license renewal application and the basis documents need to be revised as appropriate to reflect the correct material type. | | The component material needs to be verified int he field and SAP should be revised as necessary to reflect the actual material type. |
| | The license renewal application and the basis documents need to be revised as appropriate to reflect the correct material type. |
| There is no operability or functinal concern with this component it is only a documentation clarification. | | There is no operability or functinal concern with this component it is only a documentation clarification. |
| 09/20/2010 14:34:13 Jana M. Orlando (JMSO) Phone 805/545-3126 The issue/event documented on this notification was reviewed by the Notification Review Team (NRT) and determined to be the indicated significance level per OM7.ID1, Attachment 1, Category 18.1. If additional information is discovered that would affec t the significance level determination, contact a member of the NRT or e-mail DCPP NRT Members. | | 09/20/2010 14:34:13 Jana M. Orlando (JMSO) Phone 805/545-3126 The issue/event documented on this notification was reviewed by the Notification Review Team (NRT) and determined to be the indicated significance level per OM7.ID1, Attachment 1, Category 18.1. If additional information is discovered that would affect the significance level determination, contact a member of the NRT or e-mail DCPP NRT Members. |
| . DN closed to DA.
| | . |
| . 11/09/2010 16:44:51 Miranda Tan (M1TF)
| | DN closed to DA. |
| | . |
| | 11/09/2010 16:44:51 Miranda Tan (M1TF) |
| Walkdown will be performed to verify component material for both Unit 1 and Unit 2. The license renewal application will be updated to reflect the correct material type as part of the annual update. | | Walkdown will be performed to verify component material for both Unit 1 and Unit 2. The license renewal application will be updated to reflect the correct material type as part of the annual update. |
| | 1 |
|
| |
|
| Hearing Identifier: DiabloCanyon_LicenseRenewal_NonPublic Email Number: 2620 Mail Envelope Properties (Greg.Pick@nrc.gov20101110083300) | | Hearing Identifier: DiabloCanyon_LicenseRenewal_NonPublic Email Number: 2620 Mail Envelope Properties (Greg.Pick@nrc.gov20101110083300) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| RE: SAPN 50341879 (Regulator Material) Sent Date: 11/10/2010 8:33:32 AM Received Date: 11/10/2010 8:33:00 AM From: Pick, Greg Created By: Greg.Pick@nrc.gov Recipients: "Tan, Miranda" <M1TF@pge.com> | | RE: SAPN 50341879 (Regulator Material) |
| Tracking Status: None Post Office: Files Size Date & Time MESSAGE 2116 11/10/2010 8:33:00 AM | | Sent Date: 11/10/2010 8:33:32 AM Received Date: 11/10/2010 8:33:00 AM From: Pick, Greg Created By: Greg.Pick@nrc.gov Recipients: |
| | | "Tan, Miranda" <M1TF@pge.com> |
| Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:}} | | Tracking Status: None Post Office: |
| | Files Size Date & Time MESSAGE 2116 11/10/2010 8:33:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| | Recipients Received:}} |
2010/11/10 Diablo Canyon Lr - Sapn 50341879 (Regulator Material)ML110590280 |
Person / Time |
---|
Site: |
Diablo Canyon ![Pacific Gas & Electric icon.png](/w/images/f/ff/Pacific_Gas_%26_Electric_icon.png) |
---|
Issue date: |
11/10/2010 |
---|
From: |
NRC Region 4 |
---|
To: |
|
---|
References |
---|
Download: ML110590280 (2) |
|
|
---|
Category:E-Mail
MONTHYEARML23334A0912023-11-30030 November 2023 NRR E-mail Capture - Diablo Canyon 1 and 2 - Audit Questions for License Amendment Associated with TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23335A1012023-11-0606 November 2023 OEDO-23-00350-NRR - Screen-in Email - 10 CFR 2.206 Petition from Mother'S for Peace and Change.Org Regarding Diablo Canyon ML23306A0422023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Adopt 10 CFR 50.69, risk-informed Categorization and Treatment of SSCs ML23230A0702023-08-18018 August 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23165A2702023-06-14014 June 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule ML23157A2392023-06-0505 June 2023 Limited Appearance Statement from Nina Babiarz in the Matter of the Diablo Canyon ISFSI License Renewal Application ML23096A1792023-04-0606 April 2023 NRR E-mail Capture - Request for Additional Information Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23094A1032023-04-0404 April 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23076A0932023-03-16016 March 2023 16-2023 Email - Estimate of Spent Nuclear Fuel in Tons ML23067A0202023-03-0808 March 2023 NRR E-mail Capture - Diablo Canyon Nuclear Power Plant Evacuation Time Estimate Analysis Review ML23046A1132023-02-13013 February 2023 Transmittal Email, Paul Bessette to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23046A1042023-02-13013 February 2023 Transmittal Email, Diane Curran to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23052A2042023-01-10010 January 2023 E-mail from Paul Bessette Dated 01/10/2023 Regarding Diablo Canyon ML22326A1632022-11-21021 November 2022 Licensee Comment Email on Post-Shutdown Emergency Plan Amendment ML22266A0012022-09-22022 September 2022 (External Sender) E-Mail Diablo Canyon Power Plant, Unit Nos. 1 and 2 - Total Amount of Spent Nuclear Fuel Stored in Tons ML22241A1142022-08-29029 August 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions ML22194A8872022-07-11011 July 2022 September 2022 Emergency Preparedness Exercise Inspection - Request for Information Email ML22187A2652022-07-0606 July 2022 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Exemption Request for Part 73 force-on-force Training Due to COVID-19 ML22105A0702022-04-15015 April 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections ML22090A0832022-03-31031 March 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval of a Certified Fuel Handler Training and Retraining Program ML22089A1672022-03-29029 March 2022 Email - Acknowledgement of NRC Receipt of Diablo Canyon ISFSI Renewal Application ML22087A0412022-03-25025 March 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval of Alternative Security Measures for Early Warning System ML22061A2192022-03-0202 March 2022 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Changes to Emergency Plan for post-shutdown and Permanently Defueled Condition ML21323A0652021-11-19019 November 2021 NRR E-mail Capture - Acceptance Review - Diablo Canyon Revision of Emergency Plan for post-shutdown Condition ML21264A6722021-09-21021 September 2021 NRR E-mail Capture - Revised Schedule: Diablo Canyon Request to Revise Technical Specification to Reflect the Permanent Cessation of Reactor Operation ML21215A3432021-08-0303 August 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Request to Revise Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance ML21189A0462021-07-0707 July 2021 NRR E-mail Capture - Draft Request for Additional Information - Diablo Canyon Emergency Amendment Request to Revise Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML21188A0382021-07-0707 July 2021 (External_Sender) DCPP Draft Emergency LAR - Asw DCL-21-046, Email for Emergency LAR for TS 3.7.8, Auxiliary Saltwater (Asw) System2021-07-0707 July 2021 Email for Emergency LAR for TS 3.7.8, Auxiliary Saltwater (Asw) System ML21189A0662021-07-0707 July 2021 NRR E-mail Capture - Additional Draft Request for Additional Information - Diablo Canyon Emergency Amendment Request to Revise Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML21189A0442021-07-0707 July 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Emergency Amendment Request to Revise Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML21124A0612021-05-0404 May 2021 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance ML21104A3642021-04-14014 April 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition ML21062A0642021-03-0202 March 2021 NRR E-mail Capture - Request for Additional Information for Diablo Canyon Generic Letter 2004-02 Submittal (L-2017-LRC-0000) ML21054A3112021-02-23023 February 2021 NRR E-mail Capture - Acceptance Review: Diablo Canyon Request for One-Time Exemption from Select 10 CFR 55.59 Requirements ML21012A4432021-01-12012 January 2021 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specification to Reflect the Permanent Cessation of Reactor Operation ML20328A3002020-11-23023 November 2020 Email from Cgnp to the NRC - Comment Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Dcdep Public Meeting - November 24, 2020 ML20329A0692020-11-23023 November 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon COVID-19 Exemption Request to Extend force-on-force Exercise ML20323A4532020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon COVID-19 Exemption Request to Extend Firearms Requalification ML20261H4232020-09-17017 September 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Unit 2 Fall 2019 Steam Generator Tube Inspection Report ML20239A9492020-08-26026 August 2020 (External Sender) E-Mail Comment by D. Lochbaum Regarding Diablo Canyon Unit 1 AFW System Piping ML20239A7282020-08-24024 August 2020 (External-Sender) E-mail Comments on No Significant Hazards Determination for Diablo Canyon LAR ML20239A7752020-08-24024 August 2020 (External-Sender) E-mail Comments on No Significant Hazards Determination for Diablo Canyon LAR ML20240A2302020-08-23023 August 2020 (External-Sender) E-mail Public Comment by D. Lochbaum Regarding Diablo Canyon Safety Issue ML20234A2422020-08-20020 August 2020 NRR E-mail Capture - Diablo Canyon Additional Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G EPID: L-2020-LLA-017 ML20233A8592020-08-19019 August 2020 Mothers for Peace Public Comment on Exigent LAR to Modify TS 3.7.5, Auxiliary Feedwater System ML20233A3222020-08-18018 August 2020 Comment (4) e-mail from D. Lochbaum Regarding Diablo Canyon Exigent LAR ML20231A2372020-08-17017 August 2020 NRR E-mail Capture - Diablo Canyon Additional Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G EPID: L-2020-LLA-017 ML20232C6482020-08-17017 August 2020 Lochbaum Public Comment 1 on Exigent LAR to Modify TS 3.7.5, Auxiliary Feedwater System ML20230A0732020-08-14014 August 2020 NRR E-mail Capture - Diablo Canyon Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G 2023-08-18
[Table view] |
Text
DiabloCanyonNPEm Resource From: Pick, Greg Sent: Wednesday, November 10, 2010 8:34 AM To: Tan, Miranda
Subject:
RE: SAPN 50341879 (Regulator Material) thanks From: Tan, Miranda [1]
Sent: Tuesday, November 09, 2010 7:05 PM To: Pick, Greg Cc: Grebel, Terence
Subject:
SAPN 50341879 (Regulator Material)
Importance: High
- Greg, I've updated the notification indicating that we will perform the walkdown and update the LRA to reflect the correct material as part of the annual update. SAP must be down. I am not able to download the notification to email to you this afternoon. However, I will email you the updated notification tomorrow morning.
- Thanks, Miranda 805 781 9415
09/20/2010 14:34:18 Jana M. Orlando (JMSO) Phone 805/545-3126 09/16/2010 14:46:12 Philippe R. Soenen (PNS3) Phone 805/781-9782 During a license renewal regional inspection walkdown the material type for the Unit 2 AIR-I-I-1231A regulator was questions when compared to what SAP identifies the material to be. SAP identifies this component to be made of aluminum whereas the walkdown identified this component to be some type of copper alloy.
The component material needs to be verified int he field and SAP should be revised as necessary to reflect the actual material type.
The license renewal application and the basis documents need to be revised as appropriate to reflect the correct material type.
There is no operability or functinal concern with this component it is only a documentation clarification.
09/20/2010 14:34:13 Jana M. Orlando (JMSO) Phone 805/545-3126 The issue/event documented on this notification was reviewed by the Notification Review Team (NRT) and determined to be the indicated significance level per OM7.ID1, Attachment 1, Category 18.1. If additional information is discovered that would affect the significance level determination, contact a member of the NRT or e-mail DCPP NRT Members.
.
DN closed to DA.
.
11/09/2010 16:44:51 Miranda Tan (M1TF)
Walkdown will be performed to verify component material for both Unit 1 and Unit 2. The license renewal application will be updated to reflect the correct material type as part of the annual update.
1
Hearing Identifier: DiabloCanyon_LicenseRenewal_NonPublic Email Number: 2620 Mail Envelope Properties (Greg.Pick@nrc.gov20101110083300)
Subject:
RE: SAPN 50341879 (Regulator Material)
Sent Date: 11/10/2010 8:33:32 AM Received Date: 11/10/2010 8:33:00 AM From: Pick, Greg Created By: Greg.Pick@nrc.gov Recipients:
"Tan, Miranda" <M1TF@pge.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2116 11/10/2010 8:33:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: