Line 3: Line 3:
| issue date = 06/30/2011
| issue date = 06/30/2011
| title = Memo from R. Nelson to J. Clifford, Final Response to TIA 2011-004, Peach Bottom Atomic Power Station Units 2 and 3 Spent Fuel Pool Neutron Absorber Degradation
| title = Memo from R. Nelson to J. Clifford, Final Response to TIA 2011-004, Peach Bottom Atomic Power Station Units 2 and 3 Spent Fuel Pool Neutron Absorber Degradation
| author name = Nelson R A
| author name = Nelson R
| author affiliation = NRC/NRR/DPR
| author affiliation = NRC/NRR/DPR
| addressee name = Clifford J W
| addressee name = Clifford J
| addressee affiliation = NRC/RGN-I/DRP
| addressee affiliation = NRC/RGN-I/DRP
| docket = 05000277, 05000278
| docket = 05000277, 05000278
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY  
{{#Wiki_filter:OFFICIAL USE ONLY - PROPRIETARY INFORMATION June 30, 2011 MEMORANDUM TO: James W. Clifford, Deputy Director Division of Reactor Projects Region I FROM:                   Robert A. Nelson, Deputy Director /RA/ by CRegan for Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
- PROPRIETARY INFORMATION OFFICIAL USE ONLY
- PROPRIETARY INFORMATION June 30, 2011 MEMORANDUM TO:   James W. Clifford, Deputy Director Division of Reactor Projects Region I FROM:     Robert A. Nelson, Deputy Director /RA/ by CRegan for Division of Policy and Rulemaking   Office of Nuclear Reactor Regulation  


==SUBJECT:==
==SUBJECT:==
FINAL RESPONSE TO TASK INTERFACE AGREEMENT 2011-004, PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 SPENT FUEL POOL NEUTRON ABSORBER DEGRADATION  
FINAL RESPONSE TO TASK INTERFACE AGREEMENT 2011-004, PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 SPENT FUEL POOL NEUTRON ABSORBER DEGRADATION By letter dated January 25, 2011 (Agencywide Documents Access and Management System Accession No. ML110250738), the U.S. Nuclear Regulatory Commission Region I Office requested assistance from the Office of Nuclear Reactor Regulation (NRR) in evaluating Peach Bottom Atomic Power Station (PBAPS) Operability Determination (OD) 10-007 (Reference 10).
 
By letter dated January 25, 2011 (Agencywide Documents Access and Management System Accession No. ML110250738), the U.S. Nuclear Regulatory Commission Region I Office requested assistance from the Office of Nuclear Reactor Regulation (NRR) in evaluating Peach Bottom Atomic Power Station (PBAPS) Operability Determination (OD) 10-007 (Reference 10).
PBAPS performed OD 10-007 to address degradation of the spent fuel pool (SFP) neutron absorber Boraflex. Task Interface Agreement (TIA) 2011-004 specifically requested:
PBAPS performed OD 10-007 to address degradation of the spent fuel pool (SFP) neutron absorber Boraflex. Task Interface Agreement (TIA) 2011-004 specifically requested:
: 1. NRR conduct a technical assessment of OD 10-007 that PBAPS is using to support operability of the SFPs through 2014. If NRR determines that OD 10-007 does not provide reasonable assurance of operability through 2014, the Region I Office requests that NRR provide an estimate of when SFP operability will be challenged, including technical bases for any earlier time limitations.
: 1. NRR conduct a technical assessment of OD 10-007 that PBAPS is using to support operability of the SFPs through 2014. If NRR determines that OD 10-007 does not provide reasonable assurance of operability through 2014, the Region I Office requests that NRR provide an estimate of when SFP operability will be challenged, including technical bases for any earlier time limitations.
: 2. NRR review whether the licensee's analyses as documented in OD 10-007 employ appropriate assumptions and calculation methodologies to demonstrate with reasonable assurance that the subcritical margin limit for the SFP as specified by Technical Specification 4.3.1.1.b (K effective 0.95) will continue to be met.
: 2. NRR review whether the licensees analyses as documented in OD 10-007 employ appropriate assumptions and calculation methodologies to demonstrate with reasonable assurance that the subcritical margin limit for the SFP as specified by Technical Specification 4.3.1.1.b (Keffective 0.95) will continue to be met.
The NRR staff's assessment is documented in the enclosed evaluation and is based on all available documents as of April 1, 2011. This date was chosen to allow the staff to review all licensee documents up to a reasonable point that supported the licensee's operability determination in an effective and timely manner. The NRR staff is aware that the licensee has prepared additional documentation that may, after a thorough review, alter the conclusions in this TIA response. In order to support the Region I Office's request for a timely review, the NRR staff chose not to delay issuance of this TIA response so that additional information could be reviewed.
The NRR staffs assessment is documented in the enclosed evaluation and is based on all available documents as of April 1, 2011. This date was chosen to allow the staff to review all licensee documents up to a reasonable point that supported the licensees operability determination in an effective and timely manner. The NRR staff is aware that the licensee has prepared additional documentation that may, after a thorough review, alter the conclusions in this TIA response. In order to support the Region I Offices request for a timely review, the NRR staff chose not to delay issuance of this TIA response so that additional information could be reviewed.


==Enclosures:==
==Enclosures:==
: 1. NRR staff assessment (Non-Proprietary) 2. NRR staff assessment (Proprietary)
: 1. NRR staff assessment (Non-Proprietary)
CONTACT: Barry W. Miller, NRR/DPR (301) 415-4117Notice: The document transmitted herewith contains proprietary information. When separated from the enclosure, this document is decontrolled.
: 2. NRR staff assessment (Proprietary)
OFFICIAL USE ONLY  
CONTACT: Barry W. Miller, NRR/DPR (301) 415-4117 Notice: The document transmitted herewith contains proprietary information. When separated from the enclosure, this document is decontrolled.
- PROPRIETARY INFORMATION OFFICIAL USE ONLY
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
- PROPRIETARY INFORMATION June 30, 2011 MEMORANDUM TO:  James W. Clifford, Deputy Director Division of Reactor Projects        Region I


FROM:     Robert A. Nelson, Deputy Director /RA/ by CRegan for Division of Policy and Rulemaking   Office of Nuclear Reactor Regulation  
OFFICIAL USE ONLY - PROPRIETARY INFORMATION June 30, 2011 MEMORANDUM TO: James W. Clifford, Deputy Director Division of Reactor Projects Region I FROM:                     Robert A. Nelson, Deputy Director /RA/ by CRegan for Division of Policy and Rulemaking Office of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==
FINAL RESPONSE TO TASK INTERFACE AGREEMENT 2011-004, PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 SPENT FUEL POOL NEUTRON ABSORBER DEGRADATION  
FINAL RESPONSE TO TASK INTERFACE AGREEMENT 2011-004, PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 SPENT FUEL POOL NEUTRON ABSORBER DEGRADATION By letter dated January 25, 2011 (Agencywide Documents Access and Management System Accession No. ML110250738), the U.S. Nuclear Regulatory Commission Region I Office requested assistance from the Office of Nuclear Reactor Regulation (NRR) in evaluating Peach Bottom Atomic Power Station (PBAPS) Operability Determination (OD) 10-007 (Reference 10).
 
PBAPS performed OD 10-007 to address degradation of the spent fuel pool (SFP) neutron absorber Boraflex. Task Interface Agreement (TIA) 2011-004 specifically requested:
By letter dated January 25, 2011 (Agencywide Documents Access and Management System Accession No. ML110250738), the U.S. Nuclear Regulatory Commission Region I Office requested assistance from the Office of Nuclear Reactor Regulation (NRR) in evaluating Peach Bottom Atomic Power Station (PBAPS) Operability Determination (OD) 10-007 (Reference 10). PBAPS performed OD 10-007 to address degradation of the spent fuel pool (SFP) neutron absorber Boraflex. Task Interface Agreement (TIA) 2011-004 specifically requested:
NRR conduct a technical assessment of OD 10-007 that PBAPS is using to support operability of the SFPs through 2014. If NRR determines that OD 10-007 does not provide reasonable assurance of operability through 2014, the Region I Office requests that NRR provide an estimate of when SFP operability will be challenged, including technical bases for any earlier time limitations.
NRR conduct a technical assessment of OD 10-007 that PBAPS is using to support operability of the SFPs through 2014. If NRR determines that OD 10-007 does not provide reasonable assurance of operability through 2014, the Region I Office requests that NRR provide an estimate of when SFP operability will be challenged, including technical bases for any earlier time limitations.
: 1. NRR conduct a technical assessment of OD 10-007 that PBAPS is using to support operability of the SFPs through 2014. If NRR determines that OD 10-007 does not provide reasonable assurance of operability through 2014, the Region I Office requests that NRR provide an estimate of when SFP operability will be challenged, including technical bases for any earlier time limitations.
: 1. NRR conduct a technical assessment of OD 10-007 that PBAPS is using to support operability of the SFPs through 2014. If NRR determines that OD 10-007 does not provide reasonable assurance of operability through 2014, the Region I Office requests that NRR provide an estimate of when SFP operability will be challenged, including technical bases for any earlier time limitations.
: 2. NRR review whether the licensee's analyses as documented in OD 10-007 employ appropriate assumptions and calculation methodologies to demonstrate with reasonable assurance that the subcritical margin limit for the SFP as specified by Technical Specification 4.3.1.1.b (K effective  0.95) will continue to be met.
: 2. NRR review whether the licensees analyses as documented in OD 10-007 employ appropriate assumptions and calculation methodologies to demonstrate with reasonable assurance that the subcritical margin limit for the SFP as specified by Technical Specification 4.3.1.1.b (Keffective 0.95) will continue to be met.
The NRR staff's assessment is documented in the enclosed evaluation and is based on all available documents as of April 1, 2011. This date was chosen to allow the staff to review all licensee documents up to a reasonable point that supported the licensee's operability determination in an effective and timely manner. The NRR staff is aware that the licensee has prepared additional documentation that may, after a thorough review, alter the conclusions in this TIA response. In order to support the Region I Office's request for a timely review, the NRR staff chose not to delay issuance of this TIA response so that additional information could be reviewed.
The NRR staffs assessment is documented in the enclosed evaluation and is based on all available documents as of April 1, 2011. This date was chosen to allow the staff to review all licensee documents up to a reasonable point that supported the licensees operability determination in an effective and timely manner. The NRR staff is aware that the licensee has prepared additional documentation that may, after a thorough review, alter the conclusions in this TIA response. In order to support the Region I Offices request for a timely review, the NRR staff chose not to delay issuance of this TIA response so that additional information could be reviewed.


==Enclosures:==
==Enclosures:==
: 1. NRR staff assessment (Non-Proprietary) 2. NRR staff assessment (Proprietary)
: 1. NRR staff assessment (Non-Proprietary)
CONTACT: Barry W. Miller, NRR/DPR (301) 415-4117 DISTRIBUTION: PLPB Reading File RidsNrrDpr John Jolicoeur PUBLIC     Fred Bower RidsRgn1MailCenter Paul Krohn RidsNrrLADBaxley RidsRgn2MailCenter RidsAcrsAcnwMailCtr Barry Miller RidsRgn3MailCenter RidsRgn4MailCenter RidsNrrDprPgcb RidsNrrPMPeachBottom RidsNrrDciCsgb RidsNrrDssSrxb ADAMS ACCESSION NO: ML11158A268 OFFICE NRR/DPR/PLPB NRR/DPR/PLPB NRR/DSS/SRXB NRR/DCI/CSGB NRR/DPR/PLPB NAME BMiller DBaxley AUlses RTaylor (EMurphy for) JJolicoeur DATE         06/15/11   6 /16 /11         06/24/11         06/25/11 06/29 /11 OFFICE NRR/DPR     NAME RNelson (CRegan for)
: 2. NRR staff assessment (Proprietary)
DATE 06/ 30/11     OFFICIAL RECORD COPY Notice: The document transmitted herewith contains proprietary information. When separated from the enclosure, this document is decontrolled.}}
CONTACT: Barry W. Miller, NRR/DPR (301) 415-4117 DISTRIBUTION:             PLPB Reading File     RidsNrrDpr             John Jolicoeur PUBLIC                   Fred Bower             RidsRgn1MailCenter     Paul Krohn RidsNrrLADBaxley         RidsRgn2MailCenter     RidsAcrsAcnwMailCtr     Barry Miller RidsRgn3MailCenter       RidsRgn4MailCenter     RidsNrrDprPgcb         RidsNrrPMPeachBottom RidsNrrDciCsgb           RidsNrrDssSrxb ADAMS ACCESSION NO: ML11158A268 OFFICE     NRR/DPR/PLPB         NRR/DPR/PLPB       NRR/DSS/SRXB       NRR/DCI/CSGB       NRR/DPR/PLPB NAME       BMiller             DBaxley           AUlses             RTaylor           JJolicoeur (EMurphy for)
DATE             06/15/11         6 /16 /11             06/24/11           06/25/11     06/29 /11 OFFICE     NRR/DPR NAME       RNelson (CRegan for)
DATE       06/ 30/11 OFFICIAL RECORD COPY OFFICIAL USE ONLY - PROPRIETARY INFORMATION Notice: The document transmitted herewith contains proprietary information. When separated from the enclosure, this document is decontrolled.}}

Latest revision as of 18:51, 12 November 2019

Memo from R. Nelson to J. Clifford, Final Response to TIA 2011-004, Peach Bottom Atomic Power Station Units 2 and 3 Spent Fuel Pool Neutron Absorber Degradation
ML11158A269
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/30/2011
From: Nelson R
Division of Policy and Rulemaking
To: Clifford J
Division Reactor Projects I
Miller, B W, NRR/DPR, 415-4117
Shared Package
ML11158A268 List:
References
TIA 11-004
Download: ML11158A269 (2)


Text

OFFICIAL USE ONLY - PROPRIETARY INFORMATION June 30, 2011 MEMORANDUM TO: James W. Clifford, Deputy Director Division of Reactor Projects Region I FROM: Robert A. Nelson, Deputy Director /RA/ by CRegan for Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

SUBJECT:

FINAL RESPONSE TO TASK INTERFACE AGREEMENT 2011-004, PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 SPENT FUEL POOL NEUTRON ABSORBER DEGRADATION By letter dated January 25, 2011 (Agencywide Documents Access and Management System Accession No. ML110250738), the U.S. Nuclear Regulatory Commission Region I Office requested assistance from the Office of Nuclear Reactor Regulation (NRR) in evaluating Peach Bottom Atomic Power Station (PBAPS) Operability Determination (OD)10-007 (Reference 10).

PBAPS performed OD 10-007 to address degradation of the spent fuel pool (SFP) neutron absorber Boraflex. Task Interface Agreement (TIA) 2011-004 specifically requested:

1. NRR conduct a technical assessment of OD 10-007 that PBAPS is using to support operability of the SFPs through 2014. If NRR determines that OD 10-007 does not provide reasonable assurance of operability through 2014, the Region I Office requests that NRR provide an estimate of when SFP operability will be challenged, including technical bases for any earlier time limitations.
2. NRR review whether the licensees analyses as documented in OD 10-007 employ appropriate assumptions and calculation methodologies to demonstrate with reasonable assurance that the subcritical margin limit for the SFP as specified by Technical Specification 4.3.1.1.b (Keffective 0.95) will continue to be met.

The NRR staffs assessment is documented in the enclosed evaluation and is based on all available documents as of April 1, 2011. This date was chosen to allow the staff to review all licensee documents up to a reasonable point that supported the licensees operability determination in an effective and timely manner. The NRR staff is aware that the licensee has prepared additional documentation that may, after a thorough review, alter the conclusions in this TIA response. In order to support the Region I Offices request for a timely review, the NRR staff chose not to delay issuance of this TIA response so that additional information could be reviewed.

Enclosures:

1. NRR staff assessment (Non-Proprietary)
2. NRR staff assessment (Proprietary)

CONTACT: Barry W. Miller, NRR/DPR (301) 415-4117 Notice: The document transmitted herewith contains proprietary information. When separated from the enclosure, this document is decontrolled.

OFFICIAL USE ONLY - PROPRIETARY INFORMATION

OFFICIAL USE ONLY - PROPRIETARY INFORMATION June 30, 2011 MEMORANDUM TO: James W. Clifford, Deputy Director Division of Reactor Projects Region I FROM: Robert A. Nelson, Deputy Director /RA/ by CRegan for Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

SUBJECT:

FINAL RESPONSE TO TASK INTERFACE AGREEMENT 2011-004, PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 SPENT FUEL POOL NEUTRON ABSORBER DEGRADATION By letter dated January 25, 2011 (Agencywide Documents Access and Management System Accession No. ML110250738), the U.S. Nuclear Regulatory Commission Region I Office requested assistance from the Office of Nuclear Reactor Regulation (NRR) in evaluating Peach Bottom Atomic Power Station (PBAPS) Operability Determination (OD)10-007 (Reference 10).

PBAPS performed OD 10-007 to address degradation of the spent fuel pool (SFP) neutron absorber Boraflex. Task Interface Agreement (TIA) 2011-004 specifically requested:

NRR conduct a technical assessment of OD 10-007 that PBAPS is using to support operability of the SFPs through 2014. If NRR determines that OD 10-007 does not provide reasonable assurance of operability through 2014, the Region I Office requests that NRR provide an estimate of when SFP operability will be challenged, including technical bases for any earlier time limitations.

1. NRR conduct a technical assessment of OD 10-007 that PBAPS is using to support operability of the SFPs through 2014. If NRR determines that OD 10-007 does not provide reasonable assurance of operability through 2014, the Region I Office requests that NRR provide an estimate of when SFP operability will be challenged, including technical bases for any earlier time limitations.
2. NRR review whether the licensees analyses as documented in OD 10-007 employ appropriate assumptions and calculation methodologies to demonstrate with reasonable assurance that the subcritical margin limit for the SFP as specified by Technical Specification 4.3.1.1.b (Keffective 0.95) will continue to be met.

The NRR staffs assessment is documented in the enclosed evaluation and is based on all available documents as of April 1, 2011. This date was chosen to allow the staff to review all licensee documents up to a reasonable point that supported the licensees operability determination in an effective and timely manner. The NRR staff is aware that the licensee has prepared additional documentation that may, after a thorough review, alter the conclusions in this TIA response. In order to support the Region I Offices request for a timely review, the NRR staff chose not to delay issuance of this TIA response so that additional information could be reviewed.

Enclosures:

1. NRR staff assessment (Non-Proprietary)
2. NRR staff assessment (Proprietary)

CONTACT: Barry W. Miller, NRR/DPR (301) 415-4117 DISTRIBUTION: PLPB Reading File RidsNrrDpr John Jolicoeur PUBLIC Fred Bower RidsRgn1MailCenter Paul Krohn RidsNrrLADBaxley RidsRgn2MailCenter RidsAcrsAcnwMailCtr Barry Miller RidsRgn3MailCenter RidsRgn4MailCenter RidsNrrDprPgcb RidsNrrPMPeachBottom RidsNrrDciCsgb RidsNrrDssSrxb ADAMS ACCESSION NO: ML11158A268 OFFICE NRR/DPR/PLPB NRR/DPR/PLPB NRR/DSS/SRXB NRR/DCI/CSGB NRR/DPR/PLPB NAME BMiller DBaxley AUlses RTaylor JJolicoeur (EMurphy for)

DATE 06/15/11 6 /16 /11 06/24/11 06/25/11 06/29 /11 OFFICE NRR/DPR NAME RNelson (CRegan for)

DATE 06/ 30/11 OFFICIAL RECORD COPY OFFICIAL USE ONLY - PROPRIETARY INFORMATION Notice: The document transmitted herewith contains proprietary information. When separated from the enclosure, this document is decontrolled.