ML111600054: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML111600054
| number = ML111600054
| issue date = 06/08/2011
| issue date = 06/08/2011
| title = Byron Information Request to Support Upcoming PI & R Inspection at Byron Station
| title = Information Request to Support Upcoming PI & R Inspection at Byron Station
| author name = Duncan E R
| author name = Duncan E
| author affiliation = NRC/RGN-III/DRP/B3
| author affiliation = NRC/RGN-III/DRP/B3
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000454, 05000455
| docket = 05000454, 05000455
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 8, 2011 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555
-4352 June 8, 2011 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555


==SUBJECT:==
==SUBJECT:==
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION AT BYRON STATION
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION AT BYRON STATION


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==


This letter is to request information to support our PI&R inspection beginning August 1 5, 20 11 , at Byron Station. This inspection will be performed in accordance with NRC Inspection Procedure 71152.
This letter is to request information to support our PI&R inspection beginning August 15, 2011, at Byron Station. This inspection will be performed in accordance with NRC Inspection Procedure 71152.
Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.  
Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.
The documents requested are copies of condition reports and lists of information, necessary to ensure the inspection team is adequately prepared for the inspection. The information may be provided in either CD-ROM or hard copy format and should be ready for NRC review by July 25, 2011. Mr. Raymond Ng, the Lead Inspector, will contact your staff to determine the best method of providing the requested information.
If there are any questions about the material requested, or the inspection in general, please do not hesitate to call Mr. Ng at 630-829-9574 or email at raymond.ng@nrc.gov.


The documents requested are copies of condition reports and lists of information, necessary to ensure the inspection team is adequately prepared for the inspection. The information may be provided in either CD
M. Pacilio                                     In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-ROM or hard copy format and should be ready for NRC review by July 25 , 2011. Mr. Raymond Ng, the Lead Inspector, will contact your staff to determine the best method of providing the requested information.
Sincerely,
If there are any questions about the material requested, or the inspection in general, please do not hesitate to call Mr.
                                                /RA/
Ng at 630-829-9 574 or email at raymond.ng@nrc.gov
Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket No. 50-454; 50-455 License No. NPF-37; NPF-66
.
M. Pacilio In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,       /RA/ Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket No. 50
-454; 50-455 License No. NPF
-37; NPF-66


==Enclosure:==
==Enclosure:==
Requested Information to Support PI&R Inspection cc w/encl:      Distribution via ListServ


Requested Information to Support PI&R Inspection cc w/encl:
Requested Information to Support Problem Identification and Resolution (PI&R) Inspection
Distribution via ListServ
: 1. A copy of administrative procedure(s) for the corrective action program (CAP), trending program, quality assurance audit program, self-assessment program, corrective action effectiveness review program, and industry experience review program.
 
: 2. A copy of the employee concerns program/Ombudsman administrative procedure.
1 Enclosure  Requested Information to Support Problem Identification and Resolution (PI&R) Inspection
: 3. A copy of quality assurance (QA) audits of the corrective action program completed since July 1, 2009.
: 1. A copy of administrative procedure(s) for the corrective action program (CAP), trending program, quality assurance audit program, self
: 4. The plan for self-assessments of the corrective action program and a copy of completed self-assessments of the corrective action program since July 1, 2009.
-assessment program, corrective action effectiveness review program, and industry experience review program
: 5. A list of self-assessments completed since July 1, 2009, with a brief description of areas where findings were identified.
. 2. A copy of the employee concerns program/Ombudsman administrative procedure
. 3. A copy of quality assurance (QA) audits of the corrective action program completed since July 1, 2009
. 4. The plan for self
-assessments of the corrective action program and a copy of completed self-assessments of the corrective action program since July 1, 2009
. 5. A list of self
-assessments completed since July 1, 2009, with a brief description of areas where findings were identified.
: 6. A list of QA audits completed since July 1, 2009, with a brief description of areas where findings were identified.
: 6. A list of QA audits completed since July 1, 2009, with a brief description of areas where findings were identified.
: 7. A list of root cause evaluations completed since July 1, 2009, with a brief description of the issue. 8. A list of apparent cause evaluations completed since July 1, 2009, with a brief description of the issu
: 7. A list of root cause evaluations completed since July 1, 2009, with a brief description of the issue.
: e. 9. A list of all open condition reports sorted by significance level and then initiation date. Include the date initiated, a description of the issue, system affected, significance level, and priority level.
: 8. A list of apparent cause evaluations completed since July 1, 2009, with a brief description of the issue.
: 10. A list of condition reports closed since July 1, 2009 , sorted by significance level and then initiation date. Include a description, the significance level, the priority level, the date initiated and closed, system affected and whether there was an associated operability evaluation
: 9. A list of all open condition reports sorted by significance level and then initiation date.
.
Include the date initiated, a description of the issue, system affected, significance level, and priority level.
: 10. A list of condition reports closed since July 1, 2009, sorted by significance level and then initiation date. Include a description, the significance level, the priority level, the date initiated and closed, system affected and whether there was an associated operability evaluation.
: 11. A list of effectiveness reviews completed since July 1, 2009, with a brief description of areas where findings were identified.
: 11. A list of effectiveness reviews completed since July 1, 2009, with a brief description of areas where findings were identified.
: 12. A list of condition reports initiated since July 1, 2009
: 12. A list of condition reports initiated since July 1, 2009, that involve inadequate or ineffective corrective actions. Include the date initiated, a brief description, status, significance level of the issue, system affected and priority level to correct.
, that involve inadequate or ineffective corrective actions. Include the date initiated, a brief description, status, significance level of the issue, system affected and priority level to correct.
: 13. A list of condition reports initiated since July 1, 2009, that identify trends of conditions adverse to quality. Include the date initiated, a brief description, status, significance level, and priority level for each item.
: 13. A list of condition reports initiated since July 1, 2009
1                                    Enclosure
, that identify trends of conditions adverse to quality. Include the date initiated, a brief description, status, significance level, and priority level for each item
: 14. A copy of any performance reports for the past 2 years used to track the corrective action program effectiveness.
.
: 15. A list of operating experience documents received since July 1, 2009, and any associated condition reports.
2 Enclosure 14. A copy of any performance reports for the past 2 years used to track the corrective action program effectiveness
: 16. A list of test failures (IST or Technical Specifications surveillances) since July 1, 2009, with a brief description of component/system, which failed.
. 15. A list of operating experience documents received since July 1, 2009
: 17. A list of condition reports issued during the past two refueling outages sorted by system and component, including a brief description, status, significance level, and priority level for each item.
, and any associated condition reports
: 18. A list of Maintenance Rule (a)(1) systems and components, and the associated health reports since July 1, 2009.
. 16. A list of test failures (IST or Technical Specifications surveillances) since July 1, 2009 , with a brief description of component/system
: 19. A list of rework items and repeat failures since July 1, 2009.
, which failed
: 20. A current list of operator workarounds and burdens, with a listing of condition reports and work order/work order request generated to address those items and the last two evaluations of the impact of operator workarounds and burdens
. 17. A list of condition reports issued during the past two refueling outages sorted by system and component, including a brief description, status, significan ce level, and priority level for each item
: 21. Copies of corrective actions taken for issues identified in NRC findings since July 1, 2009.
. 18. A list of Maintenance Rule (a)(1) systems and components, and the associated health reports since July 1, 2009
: 22. A copy of the most recent operating experience program effectiveness review.
. 19. A list of rework items and repeat failures since July 1, 2009
: 23. A list of the top ten risk significant systems and top ten risk significant components.
. 20. A current list of operator workarounds and burdens, with a listing of condition reports and work order/work order request generated to address those items and the last two evaluations of the impact of operator workarounds and burdens
: 24. A list of the dates, times, and location for all scheduled meetings associated with the implementation of the CAP.
: 21. Copies of corrective actions taken for issues identified in NRC findings since July 1, 2009. 22. A copy of the most recent operating experience program effectiveness review
: 25. A list of current operability determinations.
. 23. A list of the top ten risk significant systems and top ten risk significant components
: 26. A copy of the latest Byron Station organizational chart and phone listing.
.
: 27. Results of any safety culture/safety conscious work environment survey or self-assessment completed since January 2009.
: 24. A list of the dates, times, and location for all scheduled meetings associated with the implementation of the CAP. 25. A list of current operability determinations
: 28. Description of changes made to the corrective action program since the last PI&R inspection.
. 26. A copy of the latest Byron Station organizational chart and phone listing
Documents requested to be available on-site during the inspection:
. 27. Results of any safety culture/safety conscious work environment survey or self-assessment completed since January 200
: a. Updated Final Safety Analysis Report.
: 9. 28. Description of changes made to the corrective action program since the last PI&R inspection.
: b. Technical Specifications.
Documents requested to be available on
: c. Procedures and procedure index.
-site during the inspection
2                                  Enclosure
: a. Updated Final Safety Analysis Report
: d. Copies of any self-assessments and associated condition reports generated in preparation for the inspection.
. b. Technical Specifications
: e. A copy of the QA manual.
.
: f. A list of issues brought to the ECP/ombudsman and the actions taken for resolution.
: c. Procedures and procedure index
: g. A list of the organization codes used in the CAP.
.
3                              Enclosure
3 Enclosure d. Copies of any self
-assessments and associated condition reports generated in preparation for the inspection
. e. A copy of the QA manual
. f. A list of issues brought to the ECP/ombudsman and the actions taken for resolution
.
: g. A list of the organization codes used in the CAP
.
M. Pacilio In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room). 


Sincerely,       /RA/ Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket No. 50
M. Pacilio                                                                In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-454; 50-455 License No. NPF
Sincerely,
-37; NPF-66
                                                                          /RA/
Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket No. 50-454; 50-455 License No. NPF-37; NPF-66


==Enclosure:==
==Enclosure:==
 
Requested Information to Support PI&R Inspection cc w/encl:               Distribution via ListServ DOCUMENT NAME: G:\DRPIII\BYRO\Byron PIR 2011008 Info Request.doc Publicly Available                           Non-Publicly Available                   Sensitive                 Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE             RIII                                 RIII NAME               RNg:dtp                             EDuncan DATE               06/08/11                             06/08/11 OFFICIAL RECORD COPY
Requested Information to Support PI&R Inspection cc w/encl:
Distribution via ListServ
 
DOCUMENT NAME:
G:\DRPIII\BYRO\Byron PIR 2011008 Info Request.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII   RIII           NAME RNg:dtp EDuncan     DATE 06/08/11 06/08/11     OFFICIAL RECORD COPY


Letter to M. Pacilio from E Duncan dated June 8, 2011.
Letter to M. Pacilio from E Duncan dated June 8, 2011.
Line 112: Line 89:
==SUBJECT:==
==SUBJECT:==
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION AT BYRON STATION DISTRIBUTION:
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION AT BYRON STATION DISTRIBUTION:
Daniel Merzke
Daniel Merzke RidsNrrDorlLpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource}}
 
RidsNrrDorlLpl3
-2 Resource RidsNrrPMByron Resource
 
RidsNrrDirsIrib Resource Cynthia Pederson
 
Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource}}

Latest revision as of 19:48, 12 November 2019

Information Request to Support Upcoming PI & R Inspection at Byron Station
ML111600054
Person / Time
Site: Byron  Constellation icon.png
Issue date: 06/08/2011
From: Eric Duncan
Region 3 Branch 3
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
References
Download: ML111600054 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 8, 2011 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555

SUBJECT:

INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION AT BYRON STATION

Dear Mr. Pacilio:

This letter is to request information to support our PI&R inspection beginning August 15, 2011, at Byron Station. This inspection will be performed in accordance with NRC Inspection Procedure 71152.

Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.

The documents requested are copies of condition reports and lists of information, necessary to ensure the inspection team is adequately prepared for the inspection. The information may be provided in either CD-ROM or hard copy format and should be ready for NRC review by July 25, 2011. Mr. Raymond Ng, the Lead Inspector, will contact your staff to determine the best method of providing the requested information.

If there are any questions about the material requested, or the inspection in general, please do not hesitate to call Mr. Ng at 630-829-9574 or email at raymond.ng@nrc.gov.

M. Pacilio In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket No. 50-454; 50-455 License No. NPF-37; NPF-66

Enclosure:

Requested Information to Support PI&R Inspection cc w/encl: Distribution via ListServ

Requested Information to Support Problem Identification and Resolution (PI&R) Inspection

1. A copy of administrative procedure(s) for the corrective action program (CAP), trending program, quality assurance audit program, self-assessment program, corrective action effectiveness review program, and industry experience review program.
2. A copy of the employee concerns program/Ombudsman administrative procedure.
3. A copy of quality assurance (QA) audits of the corrective action program completed since July 1, 2009.
4. The plan for self-assessments of the corrective action program and a copy of completed self-assessments of the corrective action program since July 1, 2009.
5. A list of self-assessments completed since July 1, 2009, with a brief description of areas where findings were identified.
6. A list of QA audits completed since July 1, 2009, with a brief description of areas where findings were identified.
7. A list of root cause evaluations completed since July 1, 2009, with a brief description of the issue.
8. A list of apparent cause evaluations completed since July 1, 2009, with a brief description of the issue.
9. A list of all open condition reports sorted by significance level and then initiation date.

Include the date initiated, a description of the issue, system affected, significance level, and priority level.

10. A list of condition reports closed since July 1, 2009, sorted by significance level and then initiation date. Include a description, the significance level, the priority level, the date initiated and closed, system affected and whether there was an associated operability evaluation.
11. A list of effectiveness reviews completed since July 1, 2009, with a brief description of areas where findings were identified.
12. A list of condition reports initiated since July 1, 2009, that involve inadequate or ineffective corrective actions. Include the date initiated, a brief description, status, significance level of the issue, system affected and priority level to correct.
13. A list of condition reports initiated since July 1, 2009, that identify trends of conditions adverse to quality. Include the date initiated, a brief description, status, significance level, and priority level for each item.

1 Enclosure

14. A copy of any performance reports for the past 2 years used to track the corrective action program effectiveness.
15. A list of operating experience documents received since July 1, 2009, and any associated condition reports.
16. A list of test failures (IST or Technical Specifications surveillances) since July 1, 2009, with a brief description of component/system, which failed.
17. A list of condition reports issued during the past two refueling outages sorted by system and component, including a brief description, status, significance level, and priority level for each item.
18. A list of Maintenance Rule (a)(1) systems and components, and the associated health reports since July 1, 2009.
19. A list of rework items and repeat failures since July 1, 2009.
20. A current list of operator workarounds and burdens, with a listing of condition reports and work order/work order request generated to address those items and the last two evaluations of the impact of operator workarounds and burdens
21. Copies of corrective actions taken for issues identified in NRC findings since July 1, 2009.
22. A copy of the most recent operating experience program effectiveness review.
23. A list of the top ten risk significant systems and top ten risk significant components.
24. A list of the dates, times, and location for all scheduled meetings associated with the implementation of the CAP.
25. A list of current operability determinations.
26. A copy of the latest Byron Station organizational chart and phone listing.
27. Results of any safety culture/safety conscious work environment survey or self-assessment completed since January 2009.
28. Description of changes made to the corrective action program since the last PI&R inspection.

Documents requested to be available on-site during the inspection:

a. Updated Final Safety Analysis Report.
b. Technical Specifications.
c. Procedures and procedure index.

2 Enclosure

d. Copies of any self-assessments and associated condition reports generated in preparation for the inspection.
e. A copy of the QA manual.
f. A list of issues brought to the ECP/ombudsman and the actions taken for resolution.
g. A list of the organization codes used in the CAP.

3 Enclosure

M. Pacilio In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket No. 50-454; 50-455 License No. NPF-37; NPF-66

Enclosure:

Requested Information to Support PI&R Inspection cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\DRPIII\BYRO\Byron PIR 2011008 Info Request.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME RNg:dtp EDuncan DATE 06/08/11 06/08/11 OFFICIAL RECORD COPY

Letter to M. Pacilio from E Duncan dated June 8, 2011.

SUBJECT:

INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION AT BYRON STATION DISTRIBUTION:

Daniel Merzke RidsNrrDorlLpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource