ML111751463: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML111751463
| number = ML111751463
| issue date = 06/23/2011
| issue date = 06/23/2011
| title = Grand Gulf Nuclear Station - Notification Of NRC Initial Operator Licensing Examination 05000416/2011301
| title = Notification of NRC Initial Operator Licensing Examination 05000416/2011301
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Douet J R
| addressee name = Douet J
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000416
| docket = 05000416
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::IR 05000416/2011301]]
See also: [[see also::IR 05000416/2011301]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES
[[Issue date::June 23, 2011]]
                                  NUC LE AR RE G UL AT O RY C O M M I S S I O N
                                                      R E GI ON I V
                                          612 EAST LAMAR BLVD , SU I TE 400
                                            AR LI N GTON , TEXAS 76011-4125
                                                    June 23, 2011
James R. Douet
Site Vice President Operations
Entergy Operations, Inc.
Grand Gulf Nuclear Station
P.O. Box 756
Port Gibson, MS 39150
SUBJECT:         GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC INITIAL
                OPERATOR LICENSING EXAMINATION 05000416/2011301
Dear Mr. Douet:
In a telephone conversation on May 16, 2011 between Messrs. Will Ryder, Mark Pait and Chris
Steely, Chief Examiner, arrangements were made for the administration of licensing
examinations at Grand Gulf Nuclear Station during the week of December 5, 2011.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 9, Supplement 1, and NUREG-1123, Knowledge and Abilities Catalog for
Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will
discuss with your staff any changes that might be necessary before the examinations are
administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by August 19, 2011. The written examinations, operating tests, and supporting
reference materials identified in Attachment 3 to ES-201 will be due by October 14, 2011.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
outlines, examinations, and tests before they are submitted to the NRC for review and approval.
All materials shall be complete and ready-to-use. We request that any personal, proprietary,
sensitive unclassified, or safeguards information in your response be contained in a separate
enclosure and appropriately marked. Any delay in receiving the required examinations and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled. In addition, your support for on-site validation of the
examinations is required during the week of October 31, 2011.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,


James Site Vice President Operations Entergy Operations, Inc.
Mr. J. Douet                                     -2-
 
temperatures, and levels) generated during the dynamic operating tests until the examination
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
results are final.
 
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
SUBJECT: GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000416/2011301
effect while the written examinations and operating tests are being administered.
 
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
==Dear Mr. Douet:==
senior operator license applications (Office of Management and Budget (OMB) approval number
In a telephone conversation on May 16, 2011 between Messrs. Will Ryder, Mark Pait and Chris Steely, Chief Examiner, arrangements were made for the administration of licensing examinations at Grand Gulf Nuclear Station during the week of December 5, 2011.
3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if
 
any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1123, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
the applications are not received at least 30 days before the examination date, a postponement
 
may be necessary. Signed applications certifying that all training has been completed should be
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by August 19, 2011. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by October 14, 2011. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval.
submitted at least 14 days before the first examination date.
 
This letter contains information collections that are subject to the Paperwork Reduction Act of
All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of October 31, 2011.
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
 
approval number 3150-0018, which expires on February 28, 2013. The public reporting burden
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, Mr. temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
for this collection of information is estimated to average 50 hours per response, including the
 
time for reviewing instructions, gathering and maintaining the data needed, and completing and
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
reviewing the collection of information. Send comments regarding this burden estimate or any
 
other aspect of these information collections, including suggestions for reducing the burden, to
To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
 
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.
INFOCOLLECTS@NRC.GOV.
 
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
information collection, unless it displays a currently valid OMB control number.
 
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
enclosures will be available electronically for public inspection in the NRCs Public Document
 
Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide
Thank you for your cooperation in this matter. Mr. Ryder and Pait have been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Steely at 817-276-4432, or myself at 817-860-8159.
Documents Access and Management System (ADAMS). ADAMS is accessible from the
 
electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-
Sincerely,/RA/
rm/adams.html.
Mark S. Haire, Chief Operations Branch Division of Reactor Safety  
Thank you for your cooperation in this matter. Mr. Ryder and Pait have been advised of the
 
policies and guidelines referenced in this letter. If you have any questions regarding the NRCs
cc: Distribution via ListServ Docket: 50-416 License: NPF-29
examination procedures and guidelines, please contact Mr. Steely at 817-276-4432, or myself at
817-860-8159.
                                                Sincerely,
                                                /RA/
                                                Mark S. Haire, Chief
                                                Operations Branch
                                                Division of Reactor Safety
cc:     Distribution via ListServ


J. Douet                                      -3-
Docket: 50-416
License: NPF-29
Electronic distribution by RIV:
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov)
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
Line 68: Line 117:
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Alan.Wang@nrc.gov) Branch chief, DRS/OB (Mark.Haire@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)
Branch chief, DRS/OB (Mark.Haire@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource RIV/ETA:OEDO (Stephanie.Bush-Goddard@nrc.gov)
OEMail Resource
DRS/TSB STA (Dale.Powers@nrc.gov)  
RIV/ETA:OEDO (Stephanie.Bush-Goddard@nrc.gov)
 
DRS/TSB STA (Dale.Powers@nrc.gov)
R:\ ADAMS ML ADAMS: No Yes SUNSI Review Complete Reviewer Initials: CDS Publicly Available Non-Sensitive Non-publicly Available Sensitive OE: OB C: OB CSteely MHaire /RA/ /RA/ 6/20/11 6/23/11 OFFICIAL RECORD COPY   T=Telephone E=E-mail F=Fax
R:\                                                         ADAMS ML
ADAMS:       No     6 Yes       6 SUNSI Review Complete       Reviewer Initials: CDS
                                  6 Publicly Available           6 Non-Sensitive
                                    Non-publicly Available         Sensitive
OE: OB                 C: OB
CSteely                 MHaire
/RA/                   /RA/
6/20/11                 6/23/11
OFFICIAL RECORD COPY                                   T=Telephone     E=E-mail       F=Fax
}}
}}

Latest revision as of 19:17, 12 November 2019

Notification of NRC Initial Operator Licensing Examination 05000416/2011301
ML111751463
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/23/2011
From: Mark Haire
Operations Branch IV
To: Douet J
Entergy Operations
References
50-416/11-301
Download: ML111751463 (3)


See also: IR 05000416/2011301

Text

UNITED STATES

NUC LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

June 23, 2011

James R. Douet

Site Vice President Operations

Entergy Operations, Inc.

Grand Gulf Nuclear Station

P.O. Box 756

Port Gibson, MS 39150

SUBJECT: GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC INITIAL

OPERATOR LICENSING EXAMINATION 05000416/2011301

Dear Mr. Douet:

In a telephone conversation on May 16, 2011 between Messrs. Will Ryder, Mark Pait and Chris

Steely, Chief Examiner, arrangements were made for the administration of licensing

examinations at Grand Gulf Nuclear Station during the week of December 5, 2011.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power

Reactors, Revision 9, Supplement 1, and NUREG-1123, Knowledge and Abilities Catalog for

Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will

discuss with your staff any changes that might be necessary before the examinations are

administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by August 19, 2011. The written examinations, operating tests, and supporting

reference materials identified in Attachment 3 to ES-201 will be due by October 14, 2011.

Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations

(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the

outlines, examinations, and tests before they are submitted to the NRC for review and approval.

All materials shall be complete and ready-to-use. We request that any personal, proprietary,

sensitive unclassified, or safeguards information in your response be contained in a separate

enclosure and appropriately marked. Any delay in receiving the required examinations and

reference materials, or the submittal of inadequate or incomplete materials, may cause the

examinations to be rescheduled. In addition, your support for on-site validation of the

examinations is required during the week of October 31, 2011.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

Mr. J. Douet -2-

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior operator license applications (Office of Management and Budget (OMB) approval number

3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if

any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If

the applications are not received at least 30 days before the examination date, a postponement

may be necessary. Signed applications certifying that all training has been completed should be

submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on February 28, 2013. The public reporting burden

for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the

time for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the

electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-

rm/adams.html.

Thank you for your cooperation in this matter. Mr. Ryder and Pait have been advised of the

policies and guidelines referenced in this letter. If you have any questions regarding the NRCs

examination procedures and guidelines, please contact Mr. Steely at 817-276-4432, or myself at

817-860-8159.

Sincerely,

/RA/

Mark S. Haire, Chief

Operations Branch

Division of Reactor Safety

cc: Distribution via ListServ

J. Douet -3-

Docket: 50-416

License: NPF-29

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Tom.Blount@nrc.gov)

Senior Resident Inspector (Rich.Smith@nrc.gov)

Resident Inspector (Andy.Barrett@nrc.gov)

Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)

Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)

Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)

GG Administrative Assistant (Alley.Farrell@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Branch chief, DRS/OB (Mark.Haire@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

RIV/ETA:OEDO (Stephanie.Bush-Goddard@nrc.gov)

DRS/TSB STA (Dale.Powers@nrc.gov)

R:\ ADAMS ML

ADAMS: No 6 Yes 6 SUNSI Review Complete Reviewer Initials: CDS

6 Publicly Available 6 Non-Sensitive

Non-publicly Available Sensitive

OE: OB C: OB

CSteely MHaire

/RA/ /RA/

6/20/11 6/23/11

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax