Line 3: |
| | issue date = 08/17/2011 | | | issue date = 08/17/2011 |
| | title = Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examination | | | title = Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examination |
| | author name = Perino C L | | | author name = Perino C |
| | author affiliation = Entergy Operations, Inc | | | author affiliation = Entergy Operations, Inc |
| | addressee name = | | | addressee name = |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Ah Enteigy Entergy Operations, Inc.7003 Bald Hill Road PO. Box 756 Port Gibson, MS 39150 Tel 601 437 6299 Christina L. Perino Manager Licensing GNRO-2011/00068 August 17, 2011 U.S. Nuclear Regulatory Commission Attention: | | {{#Wiki_filter:Ah Entergy Operations, Inc. |
| Document Control Desk Washington, D.C. 20555-0001 | | Enteigy 7003 Bald Hill Road PO. Box 756 Port Gibson, MS 39150 Tel 601 437 6299 Christina L. Perino Manager Licensing GNRO-2011/00068 August 17, 2011 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| Response to NRC Regulatory Issue Summary 2011-04"Preparation and Scheduling of Operator Licensing Examinations" Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29 | | Response to NRC Regulatory Issue Summary 2011-04 "Preparation and Scheduling of Operator Licensing Examinations" Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29 |
|
| |
|
| ==Dear Sir or Madam:== | | ==Dear Sir or Madam:== |
| NRC Regulatory Issue Summary 2011-04 (GNRI-2011/00072), "Preparation and Scheduling of Operator Licensing Examinations," requests licensees to provide the estimated number of candidates to be examined during calendar years 2013 through 2016.The updated information for Grand Gulf Nuclear Station is provided in the attached NRC Form 536. This information represents the best estimate currently available. | | |
| | NRC Regulatory Issue Summary 2011-04 (GNRI-2011/00072), "Preparation and Scheduling of Operator Licensing Examinations," requests licensees to provide the estimated number of candidates to be examined during calendar years 2013 through 2016. |
| | The updated information for Grand Gulf Nuclear Station is provided in the attached NRC Form 536. This information represents the best estimate currently available. |
| There are no commitments contained in this submittal. | | There are no commitments contained in this submittal. |
| If you have any questions or require additional information regarding this matter, please contact Michael K. Rasch at 601-437-6362. | | If you have any questions or require additional information regarding this matter, please contact Michael K. Rasch at 601-437-6362. |
| Sincerely, CLP/SW | | Sincerely, CLP/SW |
|
| |
|
| ==Attachment:== | | ==Attachment:== |
| | NRC Form 536 "Operator Licensing Examination Data" cc: (See Next Page) |
| | |
| | GNRO-2011/00068 Page 2 of 2 cc: NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 Nancy Salgaso, Chief Operator Licensing and Human Performance Branch (IOLB) |
| | Mail Stop O-6-F-2 Division of Inspection and Regional Support (DIRS) |
| | U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission ATTN: Mr. Alan Wang, NRR/DORL (w/2) |
| | Mail Stop OWFN/8 B1 Washington, D.C. 20555-0001 U. S. Nuclear Regulatory Commission ATTN: Ms. Laura Hurley 612 East Lamar Blvd, Suite 400 Arlington, TX 76011-4125 U.S. Nuclear Regulatory Commission ATTN: Mr. Elmo E. Collins, Jr. |
| | 612 East Lamar Blvd, Suite 400 Arlington, TX 76011-4125 U. S. Nuclear Regulatory Commission ATTN: Mr. Mark Haire 612 East Lamar Blvd, Suite 400 Arlington, TX 76011-4125 |
|
| |
|
| NRC Form 536 "Operator Licensing Examination Data" cc: (See Next Page)
| | NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per response to comply with this voluntary information collection request 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S. |
| GNRO-2011/00068 Page 2 of 2 cc: NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 Nancy Salgaso, Chief Operator Licensing and Human Performance Branch (IOLB)Mail Stop O-6-F-2 Division of Inspection and Regional Support (DIRS)U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission ATTN: Mr. Alan Wang, NRR/DORL (w/2)Mail Stop OWFN/8 B1 Washington, D.C. 20555-0001 U. S. Nuclear Regulatory Commission ATTN: Ms. Laura Hurley 612 East Lamar Blvd, Suite 400 Arlington, TX 76011-4125 U.S. Nuclear Regulatory Commission ATTN: Mr. Elmo E. Collins, Jr.612 East Lamar Blvd, Suite 400 Arlington, TX 76011-4125 U. S. Nuclear Regulatory Commission ATTN: Mr. Mark Haire 612 East Lamar Blvd, Suite 400 Arlington, TX 76011-4125 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)
| | OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. |
| Estimated burden per response to comply with this voluntary information collection request 1 hour. This information collection is used to plan budgets and resources for operator examinations. | | FACILITY NRC REGION Grand Gulf Nuclear Station 50-416 P.O. Box 756 Port Gibson, MS 39150 IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 Cy 2015 Cy 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2 0 13 CY 2 0 1 4 CY 2 0 1 5 CY 2 016 NUMBER OF REACTOR 0 4 5 4 OPERATORS NUMBER OF SENIOR REACTOR 15 13 8 2 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 11/11/2013 03/03/2014 11/09/2015 10/10/2016 ALTERNATE DATE 11/18/2013 03/10/2014 11/16/2015 10/17/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 21 0 0 0 13 0 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER}} |
| Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. | |
| FACILITY NRC REGION Grand Gulf Nuclear Station 50-416 P.O. Box 756 Port Gibson, MS 39150 IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 Cy 2015 Cy 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2 0 1 3 CY 2 0 1 4 CY 2 0 1 5 CY 2 016 NUMBER OF REACTOR 0 4 5 4 OPERATORS NUMBER OF SENIOR REACTOR 15 13 8 2 OPERATORS | |
| -INSTANT NUMBER OF SENIOR REACTOR OPERATORS | |
| -UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS | |
| -LIMITED PROPOSED DATES PRIMARY DATE 11/11/2013 03/03/2014 11/09/2015 10/10/2016 ALTERNATE DATE 11/18/2013 03/10/2014 11/16/2015 10/17/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 21 0 0 0 13 0 0 0 CANDIDATES NRC FORM 536 (10-2008)PRINTED ON RECYCLED PAPER}} | |
|
---|
Category:Letter type:GNRO
MONTHYEARGNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors GNRO-2021/00037, 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 12021-11-30030 November 2021 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 1 GNRO-2021/00017, Notification of Readiness for Supplemental Inspection2021-06-22022 June 2021 Notification of Readiness for Supplemental Inspection GNRO-2021/00014, Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency2021-06-0101 June 2021 Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency GNRO-2021/00015, Annual Radioactive Effluent Release Report2021-04-28028 April 2021 Annual Radioactive Effluent Release Report GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 20202021-04-19019 April 2021 Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 GNRO-2021/00012, Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.22062021-04-13013 April 2021 Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.2206 GNRO-2020/00045, 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis2020-12-16016 December 2020 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2020/00034, Notification of Spent Fuel Cask Use2020-10-0808 October 2020 Notification of Spent Fuel Cask Use GNRO-2020/00033, Response to NRC Integrated Inspection Report 05000416/20200022020-09-10010 September 2020 Response to NRC Integrated Inspection Report 05000416/2020002 GNRO-2020/00029, Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 20202020-08-18018 August 2020 Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 2020 GNRO-2020/00022, Report of Technical Specification Bases Changes2020-07-21021 July 2020 Report of Technical Specification Bases Changes GNRO-2020/00027, Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-07-16016 July 2020 Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00023, Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-06-26026 June 2020 Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2020/00020, Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-05-0505 May 2020 Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00018, Annual Radiological Effluent Release Report2020-04-30030 April 2020 Annual Radiological Effluent Release Report GNRO-2020/00016, Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.22062020-04-16016 April 2020 Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.2206 GNRO-2020/00015, Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test2020-04-0707 April 2020 Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test GNRO-2020/00007, Spent Fuel Storage Radioactive Effluent Release Report for 20192020-02-20020 February 2020 Spent Fuel Storage Radioactive Effluent Release Report for 2019 GNRO-2020/00006, License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-02-19019 February 2020 License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2019/00052, Report of Changes and Errors to 10 CFR 50.46 Analysis2019-12-13013 December 2019 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2019/00051, Notification of Readiness of 92723 Inspection2019-12-11011 December 2019 Notification of Readiness of 92723 Inspection GNRO-2019/00045, Emergency Plan, Revision 792019-10-29029 October 2019 Emergency Plan, Revision 79 GNRO-2019/00037, Notification of Spent Fuel Cask Use2019-09-20020 September 2019 Notification of Spent Fuel Cask Use GNRO-2019/00036, Correction to Gnro 2019-00017 Emergency Plan Revision 782019-08-0808 August 2019 Correction to Gnro 2019-00017 Emergency Plan Revision 78 GNRO-2019/00027, Notification of Readiness of 95001 Supplemental Inspections2019-07-0303 July 2019 Notification of Readiness of 95001 Supplemental Inspections GNRO-2019/00031, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report2019-06-25025 June 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.2019-06-13013 June 2019 Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. GNRO-2019/00026, Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval2019-05-0606 May 2019 Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval GNRO-2019/00024, Annual Radioactive Effluent Release Report2019-04-30030 April 2019 Annual Radioactive Effluent Release Report GNRO-2019/00020, Annual Radiological Operating Report (AREOR)2019-04-30030 April 2019 Annual Radiological Operating Report (AREOR) GNRO-2019/00022, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.22062019-04-22022 April 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 GNRO-2019/00017, Emergency Plan, Revision 782019-03-14014 March 2019 Emergency Plan, Revision 78 GNRO-2019/00014, Snubber Testing Program for Fourth Inspection Interval2019-03-13013 March 2019 Snubber Testing Program for Fourth Inspection Interval GNRO-2019/00012, Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2019-03-0606 March 2019 Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program GNRO-2019/00016, Spent Fuel Storage Radioactive Effluent Release Report for 20182019-02-21021 February 2019 Spent Fuel Storage Radioactive Effluent Release Report for 2018 GNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation2019-01-23023 January 2019 Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation GNRO-2018/00057, Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan2018-12-0404 December 2018 Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan GNRO-2018/00055, Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ...2018-11-30030 November 2018 Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ... GNRO-2018/00054, Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval2018-11-30030 November 2018 Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval GNRO-2018/00052, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information2018-10-24024 October 2018 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information GNRO-2018/00051, Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-10-23023 October 2018 Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control GNRO-2018/00046, Submittal of 2018 Report of Changes and Errors to 10CFR50.462018-10-16016 October 2018 Submittal of 2018 Report of Changes and Errors to 10CFR50.46 GNRO-2018/00047, Submittal of 2018 Inservice Inspection Summary Report2018-10-16016 October 2018 Submittal of 2018 Inservice Inspection Summary Report GNRO-2018/00048, Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62018-10-10010 October 2018 Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 GNRO-2018/00042, Core Operating Limits Report Cycle 22, Revision 12018-09-18018 September 2018 Core Operating Limits Report Cycle 22, Revision 1 GNRO-2018/00043, Revised Offsite Dose Calculation Manual2018-09-18018 September 2018 Revised Offsite Dose Calculation Manual GNRO-2018/00039, Report of Technical Specification Bases Changes2018-08-20020 August 2018 Report of Technical Specification Bases Changes GNRO-2018/00040, Report of 10CFR50.59 Evaluations and Commitment Change Evaluations - July 1, 2016 Through June 30, 20182018-08-20020 August 2018 Report of 10CFR50.59 Evaluations and Commitment Change Evaluations - July 1, 2016 Through June 30, 2018 2023-06-06
[Table view] Category:Schedule and Calendars
MONTHYEARML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML21354A7512021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 6 of 18 ML21354A7522021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 7 of 18 ML21354A7532021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 8 of 18 ML21126A3032021-05-10010 May 2021 Entergy Operations, Inc. Pre-Submittal Meeting - Grand Gulf Nuclear Station, Unit 1 Relief Request to Adopt Performance-based Testing for Pressure Isolation Valves (Pivs) ML21083A1422021-03-22022 March 2021 Strategy 4 ML21083A1372021-03-22022 March 2021 NEIMA Reporting ML21083A1382021-03-22022 March 2021 Rulemaking ML21083A1392021-03-22022 March 2021 Strategy 1 ML21083A1402021-03-22022 March 2021 Strategy 2 ML21083A1412021-03-22022 March 2021 Strategy 3 ML21083A1432021-03-22022 March 2021 Strategy 5 ML21083A1442021-03-22022 March 2021 Strategy 6 ML20365A0702020-12-30030 December 2020 Schedule Change to Open Phase Condition Detection Implementation ML20318A3862020-11-13013 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic ML16012A3912016-02-0303 February 2016 Schedule Revision for the Review of the Grand Gulf Nuclear Station, License Renewal Application ML13297A2502013-10-30030 October 2013 Schedule Revision for the Environmental Review of the Grand Gulf Nuclear Station License Renewal Application ML13002A4302013-02-26026 February 2013 Revision of Schedule for the Conduct of a Review of the Grand Gulf Nuclear Station, License Renewal Application ML12242A5452012-09-0707 September 2012 Revision of Schedule for the Conduct of Review of the Grand Gulf Nuclear Station, LRA ML11335A3402011-12-16016 December 2011 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Application from Entergy Operations, Inc. for Renewal of the Operating License for Gulf Nuclear Station, Uni GNRO-2011/00068, Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examination2011-08-17017 August 2011 Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examination CNRO-2011-00003, Unit 1, Updated Schedule of Submittal of Future License Renewal Applications2011-06-22022 June 2011 Unit 1, Updated Schedule of Submittal of Future License Renewal Applications 2023-05-10
[Table view] |
Text
Ah Entergy Operations, Inc.
Enteigy 7003 Bald Hill Road PO. Box 756 Port Gibson, MS 39150 Tel 601 437 6299 Christina L. Perino Manager Licensing GNRO-2011/00068 August 17, 2011 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
SUBJECT:
Response to NRC Regulatory Issue Summary 2011-04 "Preparation and Scheduling of Operator Licensing Examinations" Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29
Dear Sir or Madam:
NRC Regulatory Issue Summary 2011-04 (GNRI-2011/00072), "Preparation and Scheduling of Operator Licensing Examinations," requests licensees to provide the estimated number of candidates to be examined during calendar years 2013 through 2016.
The updated information for Grand Gulf Nuclear Station is provided in the attached NRC Form 536. This information represents the best estimate currently available.
There are no commitments contained in this submittal.
If you have any questions or require additional information regarding this matter, please contact Michael K. Rasch at 601-437-6362.
Sincerely, CLP/SW
Attachment:
NRC Form 536 "Operator Licensing Examination Data" cc: (See Next Page)
GNRO-2011/00068 Page 2 of 2 cc: NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 Nancy Salgaso, Chief Operator Licensing and Human Performance Branch (IOLB)
Mail Stop O-6-F-2 Division of Inspection and Regional Support (DIRS)
U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission ATTN: Mr. Alan Wang, NRR/DORL (w/2)
Mail Stop OWFN/8 B1 Washington, D.C. 20555-0001 U. S. Nuclear Regulatory Commission ATTN: Ms. Laura Hurley 612 East Lamar Blvd, Suite 400 Arlington, TX 76011-4125 U.S. Nuclear Regulatory Commission ATTN: Mr. Elmo E. Collins, Jr.
612 East Lamar Blvd, Suite 400 Arlington, TX 76011-4125 U. S. Nuclear Regulatory Commission ATTN: Mr. Mark Haire 612 East Lamar Blvd, Suite 400 Arlington, TX 76011-4125
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Grand Gulf Nuclear Station 50-416 P.O. Box 756 Port Gibson, MS 39150 IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 Cy 2015 Cy 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2 0 13 CY 2 0 1 4 CY 2 0 1 5 CY 2 016 NUMBER OF REACTOR 0 4 5 4 OPERATORS NUMBER OF SENIOR REACTOR 15 13 8 2 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 11/11/2013 03/03/2014 11/09/2015 10/10/2016 ALTERNATE DATE 11/18/2013 03/10/2014 11/16/2015 10/17/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 21 0 0 0 13 0 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER