Line 5: Line 5:
| author name = Mahoney M
| author name = Mahoney M
| author affiliation = NRC/NRR/DORL/LPLIII-2
| author affiliation = NRC/NRR/DORL/LPLIII-2
| addressee name = Lashley P H
| addressee name = Lashley P
| addressee affiliation = FirstEnergy Corp
| addressee affiliation = FirstEnergy Corp
| docket = 05000440
| docket = 05000440
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:From: Mahoney, MSent: Thursday, N oTo: Wohl, Maril y
{{#Wiki_filter:From:                     Mahoney, Michael M
Sent:                     Thursday, No ovember 17, 2011 1:57 PM To:                       Wohl, Marilyyn


==Subject:==
==Subject:==
FW: Accept athe Frequen
FW: Acceptaance Review Results for Perry 10 CFR 50.55a Request to Modify the Frequency of Control Rod Drive System Valve Testing - TAC M ME7380 Here is the email to add to ADAMS.
 
Michael Mahoney Davis-Besse, Perry and FENOC Fleet Pro oject Manager, Licensing Branch III-2 U. S. Nuclear Regulatory Commission Division of Operating Reactor Licensingg Office of Nuclear Reactor Regulation Phone: (301)415-3867 Email: Michael.Mahoney@NRC.GOV From: Mahoney, Michael Sent: Wednesday, November 16, 2011 12:32 PM To: phlashley@firstenergycorp.com; cjh heintz@firstenergycorp.com; kjnevins@firstenergycorp p.com Cc: Zimmerman, Jacob; Farnan, Michae  el
Here is the email to add to ADAMS.  
 
Michael Mahoney Davis-Besse, Perry and FENOC Fleet Pr oU. S. Nuclear Regulatory Commission Division of Operating Reactor Licensin gOffice of Nuclear Reactor Regulation Phone: (301)415-3867 Email: Michael.Mahoney@NRC.GOV From: Mahoney, Michael Sent: Wednesday, November 16, 2011 To: phlashley@firstenergycorp.com
; c jhCc: Zimmerman, Jacob; Farnan, Micha e


==Subject:==
==Subject:==
Acceptance Review Results f oControl Rod Drive System Valve Testin g Phil Lashley Licensing Supervisor Davis-Besse Nuclear Power Plant, UFirstEnergy Nuclear Operating Com
Acceptance Review Results fo  or Perry 10 CFR 50.55a Request to Modify the Frequen ncy of Control Rod Drive System Valve Testing g - TAC ME7380 November 16, 2011 Phil Lashley Licensing Supervisor Davis-Besse Nuclear Power Plant, Unit  U 1 FirstEnergy Nuclear Operating Company


==Dear Mr. Lashley,==
==Dear Mr. Lashley,==
By letter L-11-9287 dated October 1System (ADAMS) Accession No. M L(FENOC, the licensee) submitted a TRequest, VR-1, Revision 1, to modi fthe Perry Nuclear Power Plant, Unit The purpose of this e-mail is to pro v(NRC) staffs acceptance review of t hdetermine if there is sufficient techn icomplete its detailed technical revie wwhether the application has any rea dcharacterization of the regulatory re q Michael ovember 17, 2011 1:57 PM y n ance Review Results for Perry 10 CFR 50.55a Request cy of Control Rod Drive System Valve Testing - TAC M oject Manager, Licensing Branch III-2 g 12:32 PM heintz@firstener gycorp.com; k jnevins@firstener gycor p e l or Perry 10 CFR 50.55a Request to Modify the Freque n g - TAC ME7380 November 16, 2011 Unit 1 pan y 6, 2011 (Agencywide Documents Access and M L112900204), FirstEnergy Nuclear Operating Co m Title 10 to the Code of Federal Regulations (CF R fy the frequency of control rod drive system valv e1. vide the results of the U.S. Nuclear Regulatory C o his application. The acceptance review was per f ical information in scope and depth to allow the N w. The acceptance review is also intended to id e dily apparent information insufficiencies in its quirements or the licensing basis of the plant. to Modify ME7380 p.com ncy of anagement mpany R) 50.55a e testing for ommission formed to NRC staff to entify Pursuant to Sections 50.55a(a)(3)(i
)demonstrate that the proposed alte rsafety, or that compliance with the shardship or unusual difficulty withou The NRC staff has reviewed your a pinformation in sufficient detail to en areview and make an independent a sapplication in terms of regulatory re qand the environment. If additional i ntechnical review, you will be advise d If you have any questions, please c oavailable in ADAMS.


Docket No. 50-440 Sincerely, Michael Mahoney Davis-Besse, Perry and FENOC Fleet Pr oU. S. Nuclear Regulatory Commission Division of Operating Reactor Licensin gOffice of Nuclear Reactor Regulation Phone: (301)415-3867 Email: Michael.Mahoney@NRC.GOV
By letter L-11-9287 dated October 16, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML        L112900204), FirstEnergy Nuclear Operating Com      mpany (FENOC, the licensee) submitted a Title T    10 to the Code of Federal Regulations (CFR  R) 50.55a Request, VR-1, Revision 1, to modiffy the frequency of control rod drive system valve    e testing for the Perry Nuclear Power Plant, Unit 1.
    ) and 50.55a(a)(3)(iii) of 10 CFR, the applicant s h rnative would provide an acceptable level of qual i specified requirements of Section 50.55a would r et a compensating increase in the level of quality o pplication and concluded that it does provide tec h able the NRC staff to proceed with its detailed te c ssessment regarding the acceptability of the pro p quirements and the protection of public health an nformation is needed for the NRC staff to compl e d by separate correspondence.
The purpose of this e-mail is to prov vide the results of the U.S. Nuclear Regulatory Co  ommission (NRC) staffs acceptance review of th    his application. The acceptance review was perfformed to determine if there is sufficient techniical information in scope and depth to allow the N NRC staff to complete its detailed technical review  w. The acceptance review is also intended to ide  entify whether the application has any read    dily apparent information insufficiencies in its characterization of the regulatory req  quirements or the licensing basis of the plant.
ontact me. A copy of this email will be made pu b oject Manager, Licensing Branch III-2 g h all ity and esult in or safety.
 
h nical c hnical p osed d safety ete its blicly}}
Pursuant to Sections 50.55a(a)(3)(i)) and 50.55a(a)(3)(iii) of 10 CFR, the applicant sh  hall demonstrate that the proposed alterrnative would provide an acceptable level of qualiity and safety, or that compliance with the specified s        requirements of Section 50.55a would re  esult in hardship or unusual difficulty without a compensating increase in the level of quality o   or safety.
The NRC staff has reviewed your ap    pplication and concluded that it does provide tech hnical information in sufficient detail to enaable the NRC staff to proceed with its detailed tecchnical review and make an independent as      ssessment regarding the acceptability of the prop  posed application in terms of regulatory req quirements and the protection of public health and safety and the environment. If additional in  nformation is needed for the NRC staff to comple  ete its technical review, you will be advised  d by separate correspondence.
If you have any questions, please co  ontact me. A copy of this email will be made pub  blicly available in ADAMS.
Docket No. 50-440 Sincerely, Michael Mahoney Davis-Besse, Perry and FENOC Fleet Pro oject Manager, Licensing Branch III-2 U. S. Nuclear Regulatory Commission Division of Operating Reactor Licensingg Office of Nuclear Reactor Regulation Phone: (301)415-3867 Email: Michael.Mahoney@NRC.GOV}}

Latest revision as of 11:48, 12 November 2019

Acceptance Review Results for Perry 10 CFR 50.5a Request to Modify the Frequency of Control Rod Drive System Valve Testing
ML113210583
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/16/2011
From: Michael Mahoney
Plant Licensing Branch III
To: Lashley P
FirstEnergy Corp
mahoney, m NRR/DORL/LPLIII-2 415-3867
References
TAC ME7380
Download: ML113210583 (2)


Text

From: Mahoney, Michael M

Sent: Thursday, No ovember 17, 2011 1:57 PM To: Wohl, Marilyyn

Subject:

FW: Acceptaance Review Results for Perry 10 CFR 50.55a Request to Modify the Frequency of Control Rod Drive System Valve Testing - TAC M ME7380 Here is the email to add to ADAMS.

Michael Mahoney Davis-Besse, Perry and FENOC Fleet Pro oject Manager, Licensing Branch III-2 U. S. Nuclear Regulatory Commission Division of Operating Reactor Licensingg Office of Nuclear Reactor Regulation Phone: (301)415-3867 Email: Michael.Mahoney@NRC.GOV From: Mahoney, Michael Sent: Wednesday, November 16, 2011 12:32 PM To: phlashley@firstenergycorp.com; cjh heintz@firstenergycorp.com; kjnevins@firstenergycorp p.com Cc: Zimmerman, Jacob; Farnan, Michae el

Subject:

Acceptance Review Results fo or Perry 10 CFR 50.55a Request to Modify the Frequen ncy of Control Rod Drive System Valve Testing g - TAC ME7380 November 16, 2011 Phil Lashley Licensing Supervisor Davis-Besse Nuclear Power Plant, Unit U 1 FirstEnergy Nuclear Operating Company

Dear Mr. Lashley,

By letter L-11-9287 dated October 16, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML L112900204), FirstEnergy Nuclear Operating Com mpany (FENOC, the licensee) submitted a Title T 10 to the Code of Federal Regulations (CFR R) 50.55a Request, VR-1, Revision 1, to modiffy the frequency of control rod drive system valve e testing for the Perry Nuclear Power Plant, Unit 1.

The purpose of this e-mail is to prov vide the results of the U.S. Nuclear Regulatory Co ommission (NRC) staffs acceptance review of th his application. The acceptance review was perfformed to determine if there is sufficient techniical information in scope and depth to allow the N NRC staff to complete its detailed technical review w. The acceptance review is also intended to ide entify whether the application has any read dily apparent information insufficiencies in its characterization of the regulatory req quirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(a)(3)(i)) and 50.55a(a)(3)(iii) of 10 CFR, the applicant sh hall demonstrate that the proposed alterrnative would provide an acceptable level of qualiity and safety, or that compliance with the specified s requirements of Section 50.55a would re esult in hardship or unusual difficulty without a compensating increase in the level of quality o or safety.

The NRC staff has reviewed your ap pplication and concluded that it does provide tech hnical information in sufficient detail to enaable the NRC staff to proceed with its detailed tecchnical review and make an independent as ssessment regarding the acceptability of the prop posed application in terms of regulatory req quirements and the protection of public health and safety and the environment. If additional in nformation is needed for the NRC staff to comple ete its technical review, you will be advised d by separate correspondence.

If you have any questions, please co ontact me. A copy of this email will be made pub blicly available in ADAMS.

Docket No. 50-440 Sincerely, Michael Mahoney Davis-Besse, Perry and FENOC Fleet Pro oject Manager, Licensing Branch III-2 U. S. Nuclear Regulatory Commission Division of Operating Reactor Licensingg Office of Nuclear Reactor Regulation Phone: (301)415-3867 Email: Michael.Mahoney@NRC.GOV