(One intermediate revision by the same user not shown) |
Line 5: |
Line 5: |
| | author name = Mahoney M | | | author name = Mahoney M |
| | author affiliation = NRC/NRR/DORL/LPLIII-2 | | | author affiliation = NRC/NRR/DORL/LPLIII-2 |
| | addressee name = Lashley P H | | | addressee name = Lashley P |
| | addressee affiliation = FirstEnergy Corp | | | addressee affiliation = FirstEnergy Corp |
| | docket = 05000440 | | | docket = 05000440 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:From: Mahoney, MSent: Thursday, N oTo: Wohl, Maril y | | {{#Wiki_filter:From: Mahoney, Michael M |
| | Sent: Thursday, No ovember 17, 2011 1:57 PM To: Wohl, Marilyyn |
|
| |
|
| ==Subject:== | | ==Subject:== |
| FW: Accept athe Frequen | | FW: Acceptaance Review Results for Perry 10 CFR 50.55a Request to Modify the Frequency of Control Rod Drive System Valve Testing - TAC M ME7380 Here is the email to add to ADAMS. |
| | | Michael Mahoney Davis-Besse, Perry and FENOC Fleet Pro oject Manager, Licensing Branch III-2 U. S. Nuclear Regulatory Commission Division of Operating Reactor Licensingg Office of Nuclear Reactor Regulation Phone: (301)415-3867 Email: Michael.Mahoney@NRC.GOV From: Mahoney, Michael Sent: Wednesday, November 16, 2011 12:32 PM To: phlashley@firstenergycorp.com; cjh heintz@firstenergycorp.com; kjnevins@firstenergycorp p.com Cc: Zimmerman, Jacob; Farnan, Michae el |
| Here is the email to add to ADAMS. | |
| | |
| Michael Mahoney Davis-Besse, Perry and FENOC Fleet Pr oU. S. Nuclear Regulatory Commission Division of Operating Reactor Licensin gOffice of Nuclear Reactor Regulation Phone: (301)415-3867 Email: Michael.Mahoney@NRC.GOV From: Mahoney, Michael Sent: Wednesday, November 16, 2011 To: phlashley@firstenergycorp.com | |
| ; c jhCc: Zimmerman, Jacob; Farnan, Micha e | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Acceptance Review Results f oControl Rod Drive System Valve Testin g Phil Lashley Licensing Supervisor Davis-Besse Nuclear Power Plant, UFirstEnergy Nuclear Operating Com | | Acceptance Review Results fo or Perry 10 CFR 50.55a Request to Modify the Frequen ncy of Control Rod Drive System Valve Testing g - TAC ME7380 November 16, 2011 Phil Lashley Licensing Supervisor Davis-Besse Nuclear Power Plant, Unit U 1 FirstEnergy Nuclear Operating Company |
|
| |
|
| ==Dear Mr. Lashley,== | | ==Dear Mr. Lashley,== |
| By letter L-11-9287 dated October 1System (ADAMS) Accession No. M L(FENOC, the licensee) submitted a TRequest, VR-1, Revision 1, to modi fthe Perry Nuclear Power Plant, Unit The purpose of this e-mail is to pro v(NRC) staffs acceptance review of t hdetermine if there is sufficient techn icomplete its detailed technical revie wwhether the application has any rea dcharacterization of the regulatory re q Michael ovember 17, 2011 1:57 PM y n ance Review Results for Perry 10 CFR 50.55a Request cy of Control Rod Drive System Valve Testing - TAC M oject Manager, Licensing Branch III-2 g 12:32 PM heintz@firstener gycorp.com; k jnevins@firstener gycor p e l or Perry 10 CFR 50.55a Request to Modify the Freque n g - TAC ME7380 November 16, 2011 Unit 1 pan y 6, 2011 (Agencywide Documents Access and M L112900204), FirstEnergy Nuclear Operating Co m Title 10 to the Code of Federal Regulations (CF R fy the frequency of control rod drive system valv e1. vide the results of the U.S. Nuclear Regulatory C o his application. The acceptance review was per f ical information in scope and depth to allow the N w. The acceptance review is also intended to id e dily apparent information insufficiencies in its quirements or the licensing basis of the plant. to Modify ME7380 p.com ncy of anagement mpany R) 50.55a e testing for ommission formed to NRC staff to entify Pursuant to Sections 50.55a(a)(3)(i
| |
| )demonstrate that the proposed alte rsafety, or that compliance with the shardship or unusual difficulty withou The NRC staff has reviewed your a pinformation in sufficient detail to en areview and make an independent a sapplication in terms of regulatory re qand the environment. If additional i ntechnical review, you will be advise d If you have any questions, please c oavailable in ADAMS.
| |
|
| |
|
| Docket No. 50-440 Sincerely, Michael Mahoney Davis-Besse, Perry and FENOC Fleet Pr oU. S. Nuclear Regulatory Commission Division of Operating Reactor Licensin gOffice of Nuclear Reactor Regulation Phone: (301)415-3867 Email: Michael.Mahoney@NRC.GOV
| | By letter L-11-9287 dated October 16, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML L112900204), FirstEnergy Nuclear Operating Com mpany (FENOC, the licensee) submitted a Title T 10 to the Code of Federal Regulations (CFR R) 50.55a Request, VR-1, Revision 1, to modiffy the frequency of control rod drive system valve e testing for the Perry Nuclear Power Plant, Unit 1. |
| ) and 50.55a(a)(3)(iii) of 10 CFR, the applicant s h rnative would provide an acceptable level of qual i specified requirements of Section 50.55a would r et a compensating increase in the level of quality o pplication and concluded that it does provide tec h able the NRC staff to proceed with its detailed te c ssessment regarding the acceptability of the pro p quirements and the protection of public health an nformation is needed for the NRC staff to compl e d by separate correspondence.
| | The purpose of this e-mail is to prov vide the results of the U.S. Nuclear Regulatory Co ommission (NRC) staffs acceptance review of th his application. The acceptance review was perfformed to determine if there is sufficient techniical information in scope and depth to allow the N NRC staff to complete its detailed technical review w. The acceptance review is also intended to ide entify whether the application has any read dily apparent information insufficiencies in its characterization of the regulatory req quirements or the licensing basis of the plant. |
| ontact me. A copy of this email will be made pu b oject Manager, Licensing Branch III-2 g h all ity and esult in or safety. | | |
| h nical c hnical p osed d safety ete its blicly}}
| | Pursuant to Sections 50.55a(a)(3)(i)) and 50.55a(a)(3)(iii) of 10 CFR, the applicant sh hall demonstrate that the proposed alterrnative would provide an acceptable level of qualiity and safety, or that compliance with the specified s requirements of Section 50.55a would re esult in hardship or unusual difficulty without a compensating increase in the level of quality o or safety. |
| | The NRC staff has reviewed your ap pplication and concluded that it does provide tech hnical information in sufficient detail to enaable the NRC staff to proceed with its detailed tecchnical review and make an independent as ssessment regarding the acceptability of the prop posed application in terms of regulatory req quirements and the protection of public health and safety and the environment. If additional in nformation is needed for the NRC staff to comple ete its technical review, you will be advised d by separate correspondence. |
| | If you have any questions, please co ontact me. A copy of this email will be made pub blicly available in ADAMS. |
| | Docket No. 50-440 Sincerely, Michael Mahoney Davis-Besse, Perry and FENOC Fleet Pro oject Manager, Licensing Branch III-2 U. S. Nuclear Regulatory Commission Division of Operating Reactor Licensingg Office of Nuclear Reactor Regulation Phone: (301)415-3867 Email: Michael.Mahoney@NRC.GOV}} |
Letter Sequence Acceptance Review |
---|
|
|
|
Similar Documents at Perry |
---|
Category:E-Mail
MONTHYEARML24309A1682024-11-0404 November 2024 Email: Perry LRA - RCI (Set 2) ML24276A1002024-10-0202 October 2024 Email: Perry LRA - Requests for Confirmatory Information (RCI) ML24276A1282024-10-0202 October 2024 LRA - Requests for Additional Information - Round 1 (Set 3) - Email to Applicant ML24247A0212024-09-0606 September 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Perry License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2024-0006782) ML24241A1012024-08-28028 August 2024 LRA - Requests for Additional Information - Round 1 (Set 2)_Email to Applicant ML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24192A2222024-07-0909 July 2024 LRA Changes - Selective Leaching Program (AMP XI.33) ML24192A2232024-07-0808 July 2024 License Renewal Clarification (AMP XI.33) ML24103A1262024-05-0808 May 2024 Email to Phil Lashley Decision on the Exemption Request for Perry ML24127A1992024-05-0606 May 2024 NRR E-mail Capture - (External_Sender) Perry License Renewal Scoping and Screening Breakout Question B.2.24 (Partial TRP-55) ML24103A1272024-05-0303 May 2024 Email to Phil Lashley Availability of Environmental Assessment for the Perry Exemption ML24120A3222024-04-26026 April 2024 Response from State of Oh Regarding Review of Environmental Assessment for Perry HI-STORM Exemption Request ML24120A3212024-04-25025 April 2024 Email to State of Oh Requesting Review of EA for Perry HI-STORM Exemption Request ML24061A1002024-03-29029 March 2024 Energy Harbor Fleet- Closing of Transaction Between Vistra Operations Company LLC and Energy Harbor Nuclear Corporation (Email) ML24080A3922024-03-20020 March 2024 NRR E-mail Capture - Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Power Station Unit No. 1, and Perry Nuclear Power Plant, Unit No. - Acceptance of Requested Licensing Action Exemption for Final Safety Analysis Report Update ML24074A4272024-03-14014 March 2024 NRR E-mail Capture - Final RAI - Perry Request for Relief - Proposed Inservice Inspection Alternative VR-9 ML24052A0092024-02-16016 February 2024 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-264 ML24017A2392024-01-17017 January 2024 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Valve Testing Frequency Alternative VR-9 ML23226A0742023-08-14014 August 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Remove the Table of Contents from the Technical Specifications ML23180A2322023-06-29029 June 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-276-A, Revision 2 ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23095A3442023-04-0505 April 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Licensing Action Request Regarding Irradiated Fuel Management Plan ML23010A2892023-01-10010 January 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Delay in Issuance of License Amendment Regarding Revising the Methodology Used for Flood Hazard Analysis ML22341A0322022-11-30030 November 2022 10 CFR Part 21 Notification from Curtiss-Wright Nuclear Division for Qualtech Np Supplied Eaton TRM5 Timing Relays ML22241A0362022-08-29029 August 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Adopt TSTF-541, Revision 2 ML22167A1002022-06-16016 June 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Delay in Issuance of License Amendment and Exemptions Regarding Revising the Methodology Used for Flood Hazard Analysis (EPIDs No.L-2021-LLA-0067, L-2021-LLE-0022, L-2021-LLE-0023) ML22136A2122022-05-16016 May 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 ML22089A2452022-03-30030 March 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request VR-12 ML22020A0702022-01-18018 January 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Inservice Inspection Alternative IR-063 ML22020A0712022-01-18018 January 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Alternative VR-12 ML22020A0722022-01-18018 January 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Alternative Requests Regarding VR-10 and VR-11 Inservice Valve Testing ML21140A2802021-05-20020 May 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment and Exemptions Regarding Revising the Methodology Used for Flood Hazard Analysis (Epids: L-2021-LLA-0067, L-2021-LLE-0022, L-2021-LLE-0023) ML21110A6852021-04-19019 April 2021 NRR E-mail Capture - Final RAI - Perry - Request to Review the Emergency Plan ML21084A2562021-03-25025 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Adopt TSTF-002, Revision 1 ML21077A0012021-03-17017 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Correction to Acceptance of Relief Requests Regarding VR-3 VR-4, VR-5, VR-6, VR-7, and VR-8 Valve Testing Extensions (Epids: L-2021-LLR-0007 Through L-2021-LLR-0012) ML21070A4042021-03-11011 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant -Acceptance of License Amendment Request to Adopt TSTF-230, Revision 1 ML21063A1342021-03-0404 March 2021 E-Mail Concurrence - SR-2 SE ML21063A1982021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-8, Revision 0 ML21063A1962021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-7, Revision 0 ML21063A1952021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-6, Revision 0 ML21063A1912021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-3, Revision 0 ML21063A1922021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-4, Revision 0 ML21063A1932021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-5, Revision 0 ML21050A1032021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Requests VR-3, Rev. 0 and VR-5, Rev. 0 ML21050A1072021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request VR-7, Rev. 0 ML21050A1112021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Requests VR-4, Rev. 0 and VR-6, Rev. 0 ML21054A1742021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Requests Regarding VR-3 and VR-5 Valve Testing Extensions ML21054A1782021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Request Regarding VR-7 Check Valve Testing Extension ML21054A1802021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Requests Regarding VR-4, VR-6, and VR-8 Valve Testing Extensions ML21049A2702021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request SR-2, Rev. 0 (EPID: L-2021-LLR-0005) (2nd Round RAI) 2024-09-06
[Table view] |
Text
From: Mahoney, Michael M
Sent: Thursday, No ovember 17, 2011 1:57 PM To: Wohl, Marilyyn
Subject:
FW: Acceptaance Review Results for Perry 10 CFR 50.55a Request to Modify the Frequency of Control Rod Drive System Valve Testing - TAC M ME7380 Here is the email to add to ADAMS.
Michael Mahoney Davis-Besse, Perry and FENOC Fleet Pro oject Manager, Licensing Branch III-2 U. S. Nuclear Regulatory Commission Division of Operating Reactor Licensingg Office of Nuclear Reactor Regulation Phone: (301)415-3867 Email: Michael.Mahoney@NRC.GOV From: Mahoney, Michael Sent: Wednesday, November 16, 2011 12:32 PM To: phlashley@firstenergycorp.com; cjh heintz@firstenergycorp.com; kjnevins@firstenergycorp p.com Cc: Zimmerman, Jacob; Farnan, Michae el
Subject:
Acceptance Review Results fo or Perry 10 CFR 50.55a Request to Modify the Frequen ncy of Control Rod Drive System Valve Testing g - TAC ME7380 November 16, 2011 Phil Lashley Licensing Supervisor Davis-Besse Nuclear Power Plant, Unit U 1 FirstEnergy Nuclear Operating Company
Dear Mr. Lashley,
By letter L-11-9287 dated October 16, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML L112900204), FirstEnergy Nuclear Operating Com mpany (FENOC, the licensee) submitted a Title T 10 to the Code of Federal Regulations (CFR R) 50.55a Request, VR-1, Revision 1, to modiffy the frequency of control rod drive system valve e testing for the Perry Nuclear Power Plant, Unit 1.
The purpose of this e-mail is to prov vide the results of the U.S. Nuclear Regulatory Co ommission (NRC) staffs acceptance review of th his application. The acceptance review was perfformed to determine if there is sufficient techniical information in scope and depth to allow the N NRC staff to complete its detailed technical review w. The acceptance review is also intended to ide entify whether the application has any read dily apparent information insufficiencies in its characterization of the regulatory req quirements or the licensing basis of the plant.
Pursuant to Sections 50.55a(a)(3)(i)) and 50.55a(a)(3)(iii) of 10 CFR, the applicant sh hall demonstrate that the proposed alterrnative would provide an acceptable level of qualiity and safety, or that compliance with the specified s requirements of Section 50.55a would re esult in hardship or unusual difficulty without a compensating increase in the level of quality o or safety.
The NRC staff has reviewed your ap pplication and concluded that it does provide tech hnical information in sufficient detail to enaable the NRC staff to proceed with its detailed tecchnical review and make an independent as ssessment regarding the acceptability of the prop posed application in terms of regulatory req quirements and the protection of public health and safety and the environment. If additional in nformation is needed for the NRC staff to comple ete its technical review, you will be advised d by separate correspondence.
If you have any questions, please co ontact me. A copy of this email will be made pub blicly available in ADAMS.
Docket No. 50-440 Sincerely, Michael Mahoney Davis-Besse, Perry and FENOC Fleet Pro oject Manager, Licensing Branch III-2 U. S. Nuclear Regulatory Commission Division of Operating Reactor Licensingg Office of Nuclear Reactor Regulation Phone: (301)415-3867 Email: Michael.Mahoney@NRC.GOV