IR 05000327/2012403: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/28/2012
| issue date = 03/28/2012
| title = IR 05000327-12-403 and 05000328-12-403, 2/10/2012, Sequoyah Nuclear Plant
| title = IR 05000327-12-403 and 05000328-12-403, 2/10/2012, Sequoyah Nuclear Plant
| author name = Desai B B
| author name = Desai B
| author affiliation = NRC/RGN-II/DRS/PSB2
| author affiliation = NRC/RGN-II/DRS/PSB2
| addressee name = Shea J W
| addressee name = Shea J
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
| docket = 05000327, 05000328
| docket = 05000327, 05000328
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES arch 28, 2012
[[Issue date::March 28, 2012]]


Mr. Joseph Manager, Corp. Nuclear Licensing Programs Tennessee Valley Authority 1101 Market Street, LP 4B-C Chattanooga, TN 37402-2801
==SUBJECT:==
 
SEQUOYAH NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000327/2012403 AND 05000328/2012403
SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000327/2012403 AND 05000328/2012403


==Dear Mr. Shea:==
==Dear Mr. Shea:==
On February 10, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Sequoyah Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on February 9, 2012, with Mr. J. Carlin and other members of your staff. A re-exit meeting was conducted by telephone on March 2, 2012, with Mr. J. Carlin and other Sequoyah staff members This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
On February 10, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Sequoyah Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on February 9, 2012, with Mr. J. Carlin and other members of your staff. A re-exit meeting was conducted by telephone on March 2, 2012, with Mr. J. Carlin and other Sequoyah staff members This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection. Based on the results of this inspection, no findings were identified. Enclosure (s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this transmittal document is decontrolled. TVA 2 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room ADAMS or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).
 
Sincerely,/RA/ Binoy B. Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos. 50-327, 50-328 License Nos. DPR-77, DPR-79


===Enclosure:===
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.
Inspection Report 05000327/2012403 and 05000328/2012403


===w/Attachment:===
Based on the results of this inspection, no findings were identified.
Supp Info (OUO) cc w/encl.: (See page 3) TVA 2 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room ADAMS or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).


Sincerely,/RA/
Enclosure (s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s),
Binoy B. Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos. 50-327, 50-328 License Nos. DPR-77, DPR-79
this transmittal document is decontrolled. TVA  2 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room ADAMS or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.


===Enclosure:===
Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Inspection Report 05000327/2012403 and 05000328/2012403


===w/Attachment:===
Sincerely,
Supp Info (OUO) cc w/encl.: (See page 3)
/RA/
Distribution w/encl: R. Pascarelli, NRR ((Regulatory Conferences Only))
Binoy B. Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos. 50-327, 50-328 License Nos. DPR-77, DPR-79 Enclosure:
RidsNrrPMSequoyah Resource C. Evans, RII EICS (Part 72 Only) L. Douglas, RII EICS (Linda Douglas)
Inspection Report 05000327/2012403 and 05000328/2012403 w/Attachment: Supp Info (OUO)
B. Westreich, NSIR (hard copy w/ encl) RIDSNRRDIRS PUBLIC - OUO REMOVED S. Coker, NSIR R. Albert, NSIR (*) See previous concurrence page X PUBLICLY AVAILABLE w/out OUO NON-PUBLICLY AVAILABLE SENSITIVE X NON-SENSITIVE - OUO REMOVED ADAMS: X Yes ACCESSION NUMBER X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\PSBII\REACTORS\SEQUOYAH\REPORTS\2012\SEQUOYAH 2012403 INSP REPORT OUO REMOVED.DOC OFFICE RII: DRS RII: DRS RII: DRS RII: DRP SIGNATURE RA*/JT Via Email RA*/JW Via Email RA/BD RA*/Via Email NAME J. TORNOW J. WALLO B. DESAI S. SHAEFFER DATE 03/27/20212 03/27/2012 03/28/2012 03/27/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO TVA 3 cc w/Encl: G. M. Cook Manager Licensing Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000 Mark Findlay General Manager, Security Operations Tennessee Valley Authority 1101 Market Street, EB 10B-C Chattanooga, TN 37402-2801 F. A. Little Manager Site Security Operations Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000
cc w/encl.: (See page 3) X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII: DRS RII: DRS RII: DRS RII: DRP SIGNATURE RA*/JT Via Email RA*/JW Via Email RA/BD RA*/Via Email NAME J. TORNOW J. WALLO B. DESAI S. SHAEFFER DATE 03/27/20212 03/27/2012 03/28/2012 03/27/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO TVA   3 cc w/Encl:
G. M. Cook Manager Licensing Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000 Mark Findlay General Manager, Security Operations Tennessee Valley Authority 1101 Market Street, EB 10B-C Chattanooga, TN 37402-2801 F. A. Little Manager Site Security Operations Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000
}}
}}

Latest revision as of 05:44, 12 November 2019

IR 05000327-12-403 and 05000328-12-403, 2/10/2012, Sequoyah Nuclear Plant
ML12090A680
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/28/2012
From: Binoy Desai
NRC/RGN-II/DRS/PSB2
To: James Shea
Tennessee Valley Authority
References
IR-12-403
Download: ML12090A680 (4)


Text

UNITED STATES arch 28, 2012

SUBJECT:

SEQUOYAH NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000327/2012403 AND 05000328/2012403

Dear Mr. Shea:

On February 10, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Sequoyah Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on February 9, 2012, with Mr. J. Carlin and other members of your staff. A re-exit meeting was conducted by telephone on March 2, 2012, with Mr. J. Carlin and other Sequoyah staff members This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.

Based on the results of this inspection, no findings were identified.

Enclosure (s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s),

this transmittal document is decontrolled. TVA 2 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room ADAMS or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Binoy B. Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos. 50-327, 50-328 License Nos. DPR-77, DPR-79 Enclosure:

Inspection Report 05000327/2012403 and 05000328/2012403 w/Attachment: Supp Info (OUO)

cc w/encl.: (See page 3) X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII: DRS RII: DRS RII: DRS RII: DRP SIGNATURE RA*/JT Via Email RA*/JW Via Email RA/BD RA*/Via Email NAME J. TORNOW J. WALLO B. DESAI S. SHAEFFER DATE 03/27/20212 03/27/2012 03/28/2012 03/27/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO TVA 3 cc w/Encl:

G. M. Cook Manager Licensing Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000 Mark Findlay General Manager, Security Operations Tennessee Valley Authority 1101 Market Street, EB 10B-C Chattanooga, TN 37402-2801 F. A. Little Manager Site Security Operations Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000