ML12170B104: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 13: Line 13:
| page count = 1
| page count = 1
}}
}}
=Text=
{{#Wiki_filter:Updated 6/11/12 WORKSHOP #4, Issue Compilation Davis-Besse Loss of Feedwater Event You have been provided with a description of a loss of feedwater event that occurred at the Davis-Besse plant in 1985. This material was extracted in its entirety from NUREG-1154 (Loss of Main and Auxiliary Feedwater at the Davis-Besse Plant on June 9, 1985).
Your TEAM assignment
* After considering the event, compile a list of issues that, in your judgment, warrant further evaluation (i.e., what piqued your regulatory interest).
* Prepare a presentation of your results and be ready to discuss the technical logic of your selections as directed by the instructor.}}

Latest revision as of 03:01, 12 November 2019

0772 - G105 - Conducting Inspections - Workshop #4 Scenario
ML12170B104
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/18/2012
From:
Office of the Chief Human Capital Officer
To:
References
Download: ML12170B104 (1)


Text

Updated 6/11/12 WORKSHOP #4, Issue Compilation Davis-Besse Loss of Feedwater Event You have been provided with a description of a loss of feedwater event that occurred at the Davis-Besse plant in 1985. This material was extracted in its entirety from NUREG-1154 (Loss of Main and Auxiliary Feedwater at the Davis-Besse Plant on June 9, 1985).

Your TEAM assignment

  • After considering the event, compile a list of issues that, in your judgment, warrant further evaluation (i.e., what piqued your regulatory interest).
  • Prepare a presentation of your results and be ready to discuss the technical logic of your selections as directed by the instructor.