ML12200A367: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML12200A367
| number = ML12200A367
| issue date = 07/18/2012
| issue date = 07/18/2012
| title = Grand Gulf Nuclear Station - Notification of NRC Initial Operator Licensing Examination 05000416-12-301
| title = Notification of NRC Initial Operator Licensing Examination 05000416-12-301
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Douet J R
| addressee name = Douet J
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000416
| docket = 05000416
| license number = NPF-029
| license number = NPF-029
| contact person = vlm/Steely C D
| contact person = vlm/Steely C
| document report number = IR-12-301
| document report number = IR-12-301
| document type = Letter
| document type = Letter
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::IR 05000416/2012301]]
See also: [[see also::IR 05000416/2012301]]


=Text=
=Text=
{{#Wiki_filter:July 18, 2012  
{{#Wiki_filter:UNITE D S TATE S
                                NUC LEAR RE GULATOR Y C OMMI S SI ON
                                                  RE G IO N I V
James R. Douet  
                                              1600 EAST LAMAR BLVD
Site Vice President Operations  
                                        AR L INGTON , TEXAS 7 60 11 - 4511
Entergy Operations, Inc.  
                                              July 18, 2012
Grand Gulf Nuclear Station  
James R. Douet
P.O. Box 756  
Site Vice President Operations
Port Gibson, MS 39150
Entergy Operations, Inc.
Grand Gulf Nuclear Station
P.O. Box 756
Port Gibson, MS 39150
SUBJECT:        GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC INITIAL
                OPERATOR LICENSING EXAMINATION 05000416/2012301
Dear Mr. Douet:
In a telephone conversation on January 9, 2012 between Messrs. Will Ryder, Mark Pait and
Chris Steely, Chief Examiner, arrangements were made for the administration of licensing
examinations at Grand Gulf Nuclear Station during the week of December 10, 2012.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 9, Supplement 1, and NUREG-1123, Knowledge and Abilities Catalog for
Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will
discuss with your staff any changes that might be necessary before the examinations are
administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by September 7, 2012. The written examinations, operating tests, and supporting
reference materials identified in Attachment 3 to ES-201 will be due by October 12, 2012.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR
55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines,
examinations, and tests before they are submitted to the NRC for review and approval. All
materials shall be complete and ready-to-use. We request that any personal, proprietary,
sensitive unclassified, or safeguards information in your response be contained in a separate
enclosure and appropriately marked. Any delay in receiving the required examinations and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled. In addition, your support for on-site validation of the
examinations is required during the week of October 22, 2012.


Mr. Douet                                    -2-
In order to conduct the requested written examinations and operating tests, it will be necessary
SUBJECT: GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000416/2012301 
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
Dear Mr. Douet:  
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval number
3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if
any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If
the applications are not received at least 30 days before the examination date, a postponement
may be necessary. Signed applications certifying that all training has been completed should be
submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on February 28, 2013. The public reporting burden
for this collection of information is estimated to average 50 hours per response, including the
time for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the
electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-
rm/adams.html.


Mr. Douet                                    -3-
In a telephone conversation on January 9, 2012 between Messrs. Will Ryder, Mark Pait and Chris Steely, Chief Examiner, arrangements were made for the administration of licensing
Thank you for your cooperation in this matter. Mr. Ryder and Pait have been advised of the
examinations at Grand Gulf Nuclear Station during the week of December 10, 2012.
policies and guidelines referenced in this letter. If you have any questions regarding the NRCs
examination procedures and guidelines, please contact Mr. Steely at 817-200-1432, or myself at
817-200-1159.
                                              Sincerely,
                                              /RA/
                                              Mark S. Haire, Chief
                                              Operations Branch
                                              Division of Reactor Safety
Docket: 50-416
License: NPF-29


As agreed during the telephone conversation, your staff will prepare the examinat
ions based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power
Reactors," Revision 9, S
upplement 1, and NUREG-1123, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revi
sion 2, Supplement 1.  The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are
administered.


 
  ML12200A367
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by September 7, 2012. The written examinations, operating tests, and supporting
  ADAMS:        No     6 Yes       6 SUNSI Review Complete       Reviewer Initials: CDS
reference materials identified in Attachment 3 to ES-201 will be due by Oc
                                  6 Publicly Available           6 Non-Sensitive
tober 12, 2012.  Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR
                                    Non-publicly Available         Sensitive
 
OE: OB                 C: OB
55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval.  All
CSteely                 MHaire
materials shall be complete and ready-to-use.  We request that any personal, proprietary,
/RA/                   /RA/
sensitive unclassified, or safeguards information in your response be contained in a separate
7/18/12                 7/18/12
enclosure and appropriately marked.  Any delay in receiving the required examinations and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled.  In addition, your support for on-site validation of the
examinations is required during the week of October 22, 2012.
 
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
Mr. Douet - 2 -
  In order to conduct the requested written examinations and
operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
 
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
 
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval number
3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if
any) (OMB approval number 3150-0090) at least 30 days before the first examination date.  If
the applications are not received at least 30 days before the examination date, a postponement
may be necessary.  Signed applications certifying that all training has been completed should be
submitted at least 14 days before the first examination date.
 
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013.  The public reporting burden
for this collection of information is estimated to average 50 hours per response, including the
time for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information.  Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV. 
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosures will be available electronically for public
inspection in the NRC'
s Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the
electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.   
Mr. Douet - 3 -
Thank you for your cooperation in this matter.  Mr. Ryder and Pait have been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Steely at 817-200-1432, or myself at
817-200-1159.
 
      Sincerely, 
 
       /RA/ 
      Mark S. Haire, Chief Operations Branch      Division of Reactor Safety
 
Docket:  50-416
License:  NPF-29
 
 
 
  ML12200A367 ADAMS:    No       Yes SUNSI Review Complete Reviewer Initials: CDS  
  Publicly Available   Non-Sensitive  
  Non-publicly Available   Sensitive OE: OB C: OB   CSteely MHaire   /RA/ /RA/   7/18/12 7/18/12
}}
}}

Latest revision as of 01:46, 12 November 2019

Notification of NRC Initial Operator Licensing Examination 05000416-12-301
ML12200A367
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/18/2012
From: Mark Haire
Operations Branch IV
To: Douet J
Entergy Operations
vlm/Steely C
References
IR-12-301
Download: ML12200A367 (4)


See also: IR 05000416/2012301

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

RE G IO N I V

1600 EAST LAMAR BLVD

AR L INGTON , TEXAS 7 60 11 - 4511

July 18, 2012

James R. Douet

Site Vice President Operations

Entergy Operations, Inc.

Grand Gulf Nuclear Station

P.O. Box 756

Port Gibson, MS 39150

SUBJECT: GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC INITIAL

OPERATOR LICENSING EXAMINATION 05000416/2012301

Dear Mr. Douet:

In a telephone conversation on January 9, 2012 between Messrs. Will Ryder, Mark Pait and

Chris Steely, Chief Examiner, arrangements were made for the administration of licensing

examinations at Grand Gulf Nuclear Station during the week of December 10, 2012.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power

Reactors, Revision 9, Supplement 1, and NUREG-1123, Knowledge and Abilities Catalog for

Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will

discuss with your staff any changes that might be necessary before the examinations are

administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by September 7, 2012. The written examinations, operating tests, and supporting

reference materials identified in Attachment 3 to ES-201 will be due by October 12, 2012.

Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines,

examinations, and tests before they are submitted to the NRC for review and approval. All

materials shall be complete and ready-to-use. We request that any personal, proprietary,

sensitive unclassified, or safeguards information in your response be contained in a separate

enclosure and appropriately marked. Any delay in receiving the required examinations and

reference materials, or the submittal of inadequate or incomplete materials, may cause the

examinations to be rescheduled. In addition, your support for on-site validation of the

examinations is required during the week of October 22, 2012.

Mr. Douet -2-

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior operator license applications (Office of Management and Budget (OMB) approval number

3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if

any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If

the applications are not received at least 30 days before the examination date, a postponement

may be necessary. Signed applications certifying that all training has been completed should be

submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on February 28, 2013. The public reporting burden

for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the

time for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the

electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-

rm/adams.html.

Mr. Douet -3-

Thank you for your cooperation in this matter. Mr. Ryder and Pait have been advised of the

policies and guidelines referenced in this letter. If you have any questions regarding the NRCs

examination procedures and guidelines, please contact Mr. Steely at 817-200-1432, or myself at

817-200-1159.

Sincerely,

/RA/

Mark S. Haire, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-416

License: NPF-29

ML12200A367

ADAMS: No 6 Yes 6 SUNSI Review Complete Reviewer Initials: CDS

6 Publicly Available 6 Non-Sensitive

Non-publicly Available Sensitive

OE: OB C: OB

CSteely MHaire

/RA/ /RA/

7/18/12 7/18/12