ML12312A237: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML12312A237 | | number = ML12312A237 | ||
| issue date = 01/02/2013 | | issue date = 01/02/2013 | ||
| title = | | title = Request for Withholding Information from Public Disclosure, 10/3/12 Affidavit Executed by E. Schrull, GE-Hitachi Nuclear Energy Americas LLC, for NEDC-33671P, Revision 1 Dated October 2012 | ||
| author name = Wang A | | author name = Wang A | ||
| author affiliation = NRC/NRR/DORL/LPLIV | | author affiliation = NRC/NRR/DORL/LPLIV | ||
| addressee name = | | addressee name = | ||
Line 9: | Line 9: | ||
| docket = 05000416 | | docket = 05000416 | ||
| license number = NPF-029 | | license number = NPF-029 | ||
| contact person = Wang A | | contact person = Wang A | ||
| case reference number = TAC ME9873 | | case reference number = TAC ME9873 | ||
| document type = Letter, Proprietary Information Review | | document type = Letter, Proprietary Information Review | ||
| page count = 3 | | page count = 3 | ||
| project = TAC:ME9873 | | project = TAC:ME9873 | ||
| stage = Withholding Request | | stage = Withholding Request Acceptance | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 January 2, 2013 Vice President, Operations Entergy Operations, Inc. Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 GRAND GULF NUCLEAR STATION, UNIT 1 -REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. ME9873) | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 2, 2013 Vice President, Operations Entergy Operations, Inc. | ||
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 | |||
==SUBJECT:== | |||
GRAND GULF NUCLEAR STATION, UNIT 1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. ME9873) | |||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
By letter dated October 26,2012, you submitted an affidavit dated October 3,2012, executed by Edward D. Schrull, GE-Hitachi Nuclear Energy Americas LLC, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: Attachment 2, "GNRO-2012/00125 | |||
-GEH Report NEDC-33671P, Rev 0, "Safety Analysis Report For Operation With Final Feedwater Temperature Reduction At Grand Gulf Nuclear Station" (Proprietary)." A publicly available version of Attachment 2, designated as NEDO-33671, Rev. 0, is in the Agencywide Documents Access and Management System (ADAMS) at Accession No. | By letter dated October 26,2012, you submitted an affidavit dated October 3,2012, executed by Edward D. Schrull, GE-Hitachi Nuclear Energy Americas LLC, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: | ||
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over GEH and/or other companies. | Attachment 2, "GNRO-2012/00125 - GEH Report NEDC-33671P, Rev 0, "Safety Analysis Report For Operation With Final Feedwater Temperature Reduction At Grand Gulf Nuclear Station" (Proprietary)." | ||
: b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licenSing of a similar product. We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. | A publicly available version of Attachment 2, designated as NEDO-33671, Rev. 0, is in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML12306A519. The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: | ||
Therefore, the Attachment 2, | : a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over GEH and/or other companies. | ||
Safety Analysis Report For Operation With Final Feedwater Temperature Reduction At Grand Gulf Nuclear Station (Proprietary)," marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. | : b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licenSing of a similar product. | ||
-2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. | We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the Attachment 2, "GNRO-2012/00125 Safety Analysis Report For Operation With Final Feedwater Temperature Reduction At Grand Gulf Nuclear Station (Proprietary)," marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. | ||
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. | |||
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. | -2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. | ||
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. | ||
If you have any questions, please contact me at 301-415-1445 or via e-mail at alan. wang@nrc.gov. | If you have any questions, please contact me at 301-415-1445 or via e-mail at alan. wang@nrc.gov. | ||
Sincerely, Dhh Alan Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 Edward D. Schrull Vice President, Regulatory Affairs Services Licensing GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Rd. Wilmington, NC 28401 Additional distribution via Listserv | Sincerely, Dhh ~".Jo.,O Alan Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 cc: Edward D. Schrull Vice President, Regulatory Affairs Services Licensing GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Rd. | ||
-2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. | Wilmington, NC 28401 Additional distribution via Listserv | ||
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. | |||
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. | -2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. | ||
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. | ||
If you have any questions, please contact me at 301-415-1445 or via e-mail at alan.wang@nrc.gov. Sincerely, IRA! Alan Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 Edward D. Schrull Vice President, Regulatory Affairs Services Licensing GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Rd. Wilmington, NC 28401 Additional distribution via Listserv DISTRIBUTION: | If you have any questions, please contact me at 301-415-1445 or via e-mail at alan.wang@nrc.gov. | ||
PUBLIC LPLIV rtf | Sincerely, IRA! | ||
Alan Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 cc: Edward D. Schrull Vice President, Regulatory Affairs Services Licensing GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Rd. | |||
Wilmington, NC 28401 Additional distribution via Listserv DISTRIBUTION: | |||
PUBLIC RidsNrrLAJBurkhardt Resource LPLIV rtf RidsOgcRp Resource RidsAcrsAcnw_MaiICTR Resource RidsNrrDorlLpl4 Resource RidsNrrPMGrandGulf Resource RidsRgn4MailCenter Resource RidsNrrDssSxrb Resource ADAMS Accession No ML12312A237 OFFICE NRR/LPL4/PM NRRlLPL3-1/LAit NRR/LPL4/LA DSS/SXRB/BC NRR/LPL4/BC NRR/LPL4/PM CJackson NAME AWang ELee JBurkhardt (SMiranda for) MMarkley AWang DATE 12/19/12 12/04/12 1216112 12/20/12 112113 1/2113 OFFICIAL RECORD COpy}} |
Latest revision as of 20:23, 11 November 2019
ML12312A237 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 01/02/2013 |
From: | Wang A Plant Licensing Branch IV |
To: | Entergy Operations |
Wang A | |
References | |
TAC ME9873 | |
Download: ML12312A237 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 2, 2013 Vice President, Operations Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
SUBJECT:
GRAND GULF NUCLEAR STATION, UNIT 1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. ME9873)
Dear Sir or Madam:
By letter dated October 26,2012, you submitted an affidavit dated October 3,2012, executed by Edward D. Schrull, GE-Hitachi Nuclear Energy Americas LLC, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
Attachment 2, "GNRO-2012/00125 - GEH Report NEDC-33671P, Rev 0, "Safety Analysis Report For Operation With Final Feedwater Temperature Reduction At Grand Gulf Nuclear Station" (Proprietary)."
A publicly available version of Attachment 2, designated as NEDO-33671, Rev. 0, is in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML12306A519. The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
- a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over GEH and/or other companies.
- b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licenSing of a similar product.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the Attachment 2, "GNRO-2012/00125 Safety Analysis Report For Operation With Final Feedwater Temperature Reduction At Grand Gulf Nuclear Station (Proprietary)," marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
-2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions, please contact me at 301-415-1445 or via e-mail at alan. wang@nrc.gov.
Sincerely, Dhh ~".Jo.,O Alan Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 cc: Edward D. Schrull Vice President, Regulatory Affairs Services Licensing GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Rd.
Wilmington, NC 28401 Additional distribution via Listserv
-2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions, please contact me at 301-415-1445 or via e-mail at alan.wang@nrc.gov.
Sincerely, IRA!
Alan Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 cc: Edward D. Schrull Vice President, Regulatory Affairs Services Licensing GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Rd.
Wilmington, NC 28401 Additional distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrLAJBurkhardt Resource LPLIV rtf RidsOgcRp Resource RidsAcrsAcnw_MaiICTR Resource RidsNrrDorlLpl4 Resource RidsNrrPMGrandGulf Resource RidsRgn4MailCenter Resource RidsNrrDssSxrb Resource ADAMS Accession No ML12312A237 OFFICE NRR/LPL4/PM NRRlLPL3-1/LAit NRR/LPL4/LA DSS/SXRB/BC NRR/LPL4/BC NRR/LPL4/PM CJackson NAME AWang ELee JBurkhardt (SMiranda for) MMarkley AWang DATE 12/19/12 12/04/12 1216112 12/20/12 112113 1/2113 OFFICIAL RECORD COpy