ML18011A850: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/20/1995
| issue date = 03/20/1995
| title = Application for Amend to License NPF-63 to Relocate Cycle Specific Overpower & Overtemperature Delta T Trip Setpoint Parameters to COLR
| title = Application for Amend to License NPF-63 to Relocate Cycle Specific Overpower & Overtemperature Delta T Trip Setpoint Parameters to COLR
| author name = ROBINSON W R
| author name = Robinson W
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 14: Line 14:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 14
| page count = 14
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:P RIORITY 1 t (ACCELERATED RIDS PROCESSI'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9503230062 DOC.DATE: 95/03/20 NOTARIZED:
{{#Wiki_filter:t      P   RIORITY (ACCELERATED     RIDS PROCESSI INFORMATION DISTRIBUTION SYSTEM (RIDS)
YES FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROBINSON,W.R.
                                                                      'EGULATORY 1
Carolina Power&Light.Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET 05000400 P R  
ACCESSION NBR:9503230062               DOC.DATE:   95/03/20     NOTARIZED: YES               DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina                             05000400 AUTH. NAME           AUTHOR AFFILIATION ROBINSON,W.R.         Carolina Power & Light. Co.                                                       P RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
R


==SUBJECT:==
==SUBJECT:==
Application for amend to license NPF-63 to relocate cycle specific Overpower&Overtemperature Delta T trip setpoint parameters to COLR.DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTRj ENCL j SIZE: I 0 TITLE: OR Submittal:
Application for amend to license NPF-63 to relocate cycle specific Overpower & Overtemperature Delta T trip setpoint parameters to DISTRIBUTION CODE: AOOID TITLE:  OR COLR.
General Distribution NOTES:Application for permit renewal filed.+l'7 0 o5ooo4oo RECIPIENT ID CODE/NAME PD2-1 LA LE,N COPIES LTTR ENCL 1 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL 1 1 INTERNAL: ACRS NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 6 6~FAIRE CENTE~1 1 1 NRR/DSSA/SPLB 1 1 NUDOCS-ABSTRACT 1 0 1 1 1 1 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D C'N NOTE TO ALL"RIDS" RECIPIENTS:
COPIES RECEIVED:LTRj Submittal: General Distribution NOTES:Application for permit renewal filed.
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P!-37 (EXT.504-2083)TO ELIMIiVATE YOUR iVAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 16 4 F P Carolina Power&Light Company PO Box 165 New Hill NC 27562 gg 20 l995 Letter Number: HO-950506 William R.Robinson Vice President Harris Nuclear Plant SERIAL: HNP-95-031 10 CFR 50.90 United States Nuclear Regulatory Commission ATTENTION:
ENCL      j SIZE: I0  +l'7 o5ooo4oo 0
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 REQUEST FOR LICENSE AMENDMENT REACTOR TRIP SYSTEM INSTRUMENTATION SETPOINT RELOCATION TO THE COLR Gentlemen:
RECIPIENT                COPIES              RECIPIENT                 COPIES ID CODE/NAME             LTTR ENCL          ID  CODE/NAME              LTTR ENCL PD2-1 LA                       1     1     PD2-1 PD                       1    1 LE,N                            1     1 INTERNAL: ACRS                             6      6  ~FAIRE CENTE~ 1                  1    1 NRR/DRCH/HICB                   1      1      NRR/DSSA/SPLB                  1   1 NRR/DSSA/SRXB                  1     1     NUDOCS-ABSTRACT               1   1 OGC/HDS2                        1     0 EXTERNAL: NOAC                             1     1     NRC PDR                       1   1 D
In accordance with the Code of Federal Regulations, Title 10, Parts 50.90 and 2.101, Carolina Power 6 Light Company (CPGL)hereby requests a revision to the Technical Specifications (TS)for the Shearon Harris Nuclear Power Plant (SHNPP).This change proposes a revision to Technical Specification 2.2.1, Reactor Trip System Instrumentation Setpoints, to relocate cycle specific Overpower and Overtemperature Delta T trip setpoint parameters to the Core Operating Limits Report (COLR).Enclosure 1 provides a detailed description of the proposed changes and the basis for the changes.Enclosure 2 details, in accordance with 10 CFR 50.91(a), the basis for the Company's determination that the proposed changes do not involve a significant hazards consideration. provides an environmental evaluation which demonstrates that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
C' N
Therefore,.
NOTE TO ALL"RIDS" RECIPIENTS:
pursuant to 10 CFR 51.22(b), no environmental assessment needs to be prepared in connection with the issuance of the amendment. provides page change instructions for incorporating the proposed revisions. provides the proposed Technical Specification pages.In accordance with 10 CFR 50.91(b), CPSL is providing the State of North Carolina with a copy of the proposed license amendment.
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P!-37 (EXT. 504-2083 ) TO ELIMIiVATEYOUR iVAME FROM DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'T NEED!
CP&L requests approval of the proposed amendment by September 1, 1995 to support preparations for Cycle No.7 operation.
TOTAL NUMBER OF COPIES REQUIRED: LTTR                   17   ENCL             16
In order to allow time for procedure c 9503230062 950320 PDR ADOCK 05000400 PDR State Road1134 New Hill NC Tel 919362-2502 Fax 919362-2095 1 l Document Control Desk HNP-95-031
 
/Page 2 revision and orderly incorporation into copies of the Technical Specifications, CP&L requests that the proposed amendment, once approved by the NRC, be issued such that implementation will occur within 60 days of issuance of the amendment.
4 F
Please refer any questions regarding this submittal to Mr.D.C.McCarthy at (919)362-2100.Sincerely, W.R.Robinson SDG/sdc  
P
 
Carolina Power & Light Company                                                 William R. Robinson PO Box 165                                                                     Vice President New Hill NC 27562                                                             Harris Nuclear Plant gg     20 l995 Letter     Number: HO-950506                                           SERIAL:     HNP-95-031 10 CFR 50.90 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington,       DC   20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT REACTOR TRIP SYSTEM INSTRUMENTATION SETPOINT RELOCATION TO THE COLR Gentlemen:
In accordance with the           Code of Federal Regulations, Title 10, Parts 50.90 and 2.101,     Carolina     Power   6 Light Company (CPGL) hereby requests a revision to the Technical Specifications (TS) for the Shearon Harris Nuclear Power Plant (SHNPP).
This change proposes a revision to Technical Specification 2.2.1, Reactor Trip System Instrumentation Setpoints, to relocate cycle specific Overpower and Overtemperature Delta T trip setpoint parameters to the Core Operating Limits Report (COLR).
Enclosure 1 provides         a detailed description of the proposed       changes and the basis for the changes.
Enclosure     2 details,       in accordance with 10 CFR 50.91(a), the basis for the Company's     determination that the proposed changes do not involve a significant hazards consideration.
Enclosure 3 provides an environmental evaluation which demonstrates that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in       10   CFR   51.22(c)(9).       Therefore,. pursuant to 10 CFR 51.22(b), no environmental assessment           needs   to be prepared in connection with the issuance of the amendment.
Enclosure 4 provides page change instructions                   for incorporating the proposed revisions.
Enclosure      5  provides the proposed Technical Specification pages.
In accordance with 10 CFR 50.91(b), CPSL is providing the State of North Carolina with a copy of the proposed license amendment.
CP&L requests approval of the proposed amendment by September 1, 1995 to support preparations for Cycle No.7 operation. In order to allow time for procedure 9503230062 950320 PDR ADOCK 05000400 c                              PDR State Road1134 New Hill NC Tel 919362-2502   Fax 919362-2095
 
1 l
 
Document Control Desk HNP-95-031   / Page 2 revision   and orderly incorporation into copies of the Technical Specifications, CP&L   requests that the proposed amendment, once approved by the NRC, be issued such that implementation will occur within 60 days of issuance of the amendment.
Please refer any questions       regarding this submittal to Mr. D. C. McCarthy at (919) 362-2100.
Sincerely, W. R. Robinson SDG/sdc


==Enclosures:==
==Enclosures:==
: 1. Basis  for Change Request
: 2. 10 CFR 50.92 Evaluation
: 3. Environmental Considerations
: 4. Page Change  Instructions
: 5. Technical Specification Pages W. R. Robinson,    having been  first  duly sworn, did depose and say that the information contained herein is true      and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power 6 Light Company.
                                                            ;.s  P~
Notary (Seal)
My commission expires:      Cu /~I(0 l c:      Mr. Dayne H. Brown Mr. S. D. Ebneter Mr. S. A. Elrod Mr. N. B. Le
t f J
ENCLOSURE TO SERIAL:  HNP-95-031 ENCLOSURE 1 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT REACTOR  TRIP SYSTEM INSTRUMENTATION SETPOINT REVISION AND RELOCATION TO THE COLR BASIS FOR CHANGE RE UEST
~Back round The Shearon  Harris Nuclear Power Plant (SHNPP) Technical Specifications (TS) provide standards and restrictions on minimum equipment operability and on operation of the facility. The TS ensure that the plant is operated within its design basis and safety analyses.        A number of specifications address limits associated with reactor physics parameters that generally change with each reload core, requiring the processing of changes to TS to update these limits each fuel cycle. NRC Generic Letter 88-16, dated October 4, 1988, was issued to encourage licensees to prepare changes to TS related to cycle-specific parameters. These TS changes would relocate cycle-specific parameter limits from the TS to the Core Operating Limits Report (COLR). The Generic Letter states that      if  these limits are developed using an NRC-approved methodology, the license amendment process is an unnecessary burden on the licensee and the NRC. An alternative to including the values of these cycle-specific parameters in individual specifications was provided.        This alternative consisted of three separate actions to modify the plant's TS: (1) the addition of the definition of a named formal report that includes the values of cycle-specific parameter limits that have been established using an NRC-approved methodology and consistent with all applicable limits of the safety analysis, (2) the addition of an administrative reporting requirement to submit the formal report on cycle-specific parameter limits to the Commission for information, and (3) the modification of individudl TS to note that cycle-specific parameters shall be maintained within the limits provided in the defined formal report.
Amendment 15  to the SHNPP Operating License established a COLR, including the requisite reporting requirements, for many SHNPP cycle-specific TS limits. The purpose of this request is to allow the relocation of additional cycle-specific parameters  to the  SHNPP COLR.
Pro osed Chan e This change proposes a revision to Technical Specification 2.2.1, Reactor Trip System Instrumentation Setpoints, to relocate cycle specific Overpower and Overtemperature Delta T trip setpoint parameters to the Core Operating Limits Report.
Basis Technical Specification 2.2.1, Reactor Trip System Instrumentation Setpoints, specifies trip setpoints for a number of functions related to the reactor core's design and operation. The trip setpoints have been selected to ensure that the Page El-l
ENCLOSURE TO  SERIAL:  HNP-95-031 core and Reactor Coolant System are prevented from exceeding their Safety Limits during normal operation and during design basis anticipated operational occurrences.
This TS change deals with two trip functions containing cycle specific parameters, the Overtemperature Delta T (OTQT) and the Overpower Delta T (OPAT).
These functions are defined by equations in Footnotes (1) and (3), respectively, of Specification 2.2.1.      The Overtemperature  Delta T trip provides coze protection to prevent DNB for various combinations of pressure, power, coolant temperature, and axial power distribution. The trip function ensures that the core is always below the core Safety Limit specified in TS 2.1.1, Reactor Limits
- Reactor Core. The Overpower Delta T trip provides assurance of fuel integrity (e.g., no fuel pellet melting and less than 1% cladding strain) in overpower conditions, limits the required range for Overtemperature Delta T trip, and provides a backup to the High Neutron Flux trip. It does so by ensuring that the allowable heat generation rate (kW/ft) is not exceeded.
As  stated previously, this change proposes to relocate the specific values for cycle specific OTAT and OPAT parameters to the COLR. They include OTAT gains K K K OTAT function f,(AI), and OPAT gains K, and K,.
II Before each operating cycle, the TS values of the z'eactor trip setpoint parameters are reviewed in conjunction with core design changes to ensure that they remain valid and bounding for the next operating cycle. This ensures that the protection provided against departure from nucleate boiling and centerline fuel melt is maintained. This parameter verification is performed in accordance with the NRC approved methodology "Statistical Setpoint/Transient Methodology for Westinghouse Type Reactors," Siemens Power Corporation (EMF-92-081A), as listed in TS 6.9.1.6.2.1.      If a value(s) is not bounded,    then a revised value is selected, verified in accordance with the approved methodology and then incorporated into the TS via the TS amendment process. Revisions to the TS to update one or more of the above values have occurred for operating cycles 2, 3 and 6.
As  described in Generic Letter 88-16, relocation of the cycle-specific limits to the COLR eliminates the unnecessary administrative burden of processing change requests to the TS that would incorporate those limits that could be revised using NRC approved methodologies. With the OTdT and OPAT trip setpoint parameter values in the COLR, the TS remain in control of the implementation of the parameters and of the methodology used to verify the limits. The parameters would remain within the structure of the TS without requiring cycle-specific amendments to review and approve cycle-specific changes. Therefore, relocation of the Overpower and Overtemperature Delta T trip setpoint parameters to the COLR will have no adverse effects on the establishment or implementation of the Reactor Trip System Instrumentation Setpoints.
Conclusions Relocation of cycle dependent parameters from the TS to the COLR has no impact upon plant operation or safety. No safety-related equipment, safety function, or plant operation will be altered as a result of this proposed change. Since the applicable FSAR limits, i.e., the accident analysis basis, will be Page El-2
ENCLOSURE TO SERIAL:  HNP-95-031 maintained, and since the Technical Specifications will continue to require both OTBT and OPBT trip functions, as well as the establishment of their limits by NRC-approved methodologies, this proposed change is administrative in nature.
Page El-3
ENCLOSURE TO SERIAL:    HNP-95-031 ENCLOSURE 2 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO.      50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT REACTOR TRIP SYSTEM INSTRUMENTATION SETPOINT RELOCATION TO THE COLR 10 CFR 50.92 EVALUATION The Commission has provided standards in 10 CFR 50.92(c) for determining whether a significant hazards consideration exists. A proposed amendment to an operating license for a  facility  involves no significant hazards consideration      if operation of the  facility  in accordance with the proposed amendment would not: (1) involve a significant increase        in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety. Carolina Power & Light Company has reviewed this proposed license amendment request and determined that          its  adoption would not involve a significant hazards determinat'ion.                  The bases    for this determination are as follows:
Pro osed Chan e This change proposes a revision to Technical Specification 2.2.1, Reactor Trip System Instrumentation Setpoints, to relocate cycle specific Overpower and Overtemperature Delta T trip setpoint parameters to the Core Operating Limits Report (COLR).
Basis This change    does  not involve      a    significant hazards  consideration  for the following rea'sons:
The proposed    amendment    does not involve a significant increase        in the probability or    consequences of an accident previously evaluated.
The proposed  change of relocating Overtemperature Delta T (OTAT) and the Overpower Delta T (OPAT) trip setpoint parameters to the COLR has no influence or impact to the probability or consequences of an accident.
The revised TS will continue to implement the Reactor Trip System Instrumentation OTQT and OPAT setpoint limits through reference to the parameters  in the  COLR. In addition, the COLR is subject to the existing controls of    TS  6.9.1.6,  including the establishment of the parameter values using an NRC approved methodology.                Given that this change administratively relocates the selected trip setpoint parameter values to another TS-controlled document, there would be no increase in the probability or consequences of an accident previously evaluated.
The  proposed    amendment    does    not create the possibility of a new or different kind of accident        from any accident previously evaluated.
Page  E2-1
ENCLOSURE TO SERIAL:  HNP-95-031 No  safety-related equipment, safety function, or plant operation will be altered as a result of this proposed change. The limits are simply being relocated to another TS-controlled document.      The TS will continue to require operation within the required limits as established per NRC approved methodologies. Therefore, the proposed changes do not create the possibility of    a new or different kind of accident from any accident previously evaluated.
The proposed amendment does not involve    a significant reduction in the margin of safety.
Relocation of the Reactor Trip System Instrumentation OTDT and OPAT setpoint limits to the TS-controlled COLR has no effect on the trip system setpoints currently in force in TS 2.2.1. Future revisions to the trip setpoint parameters are governed by TS 6.9.1.6. TS 6.9.1.6 lists each TS that references values in the COLR and the NRC approved methodologies utilized in developing those values. Since this change is only an administrative relocation of the selected trip setpoint parameter values to another TS controlled document, the proposed changes do not involve a significant reduction in a margin of safety.
Page E2-2
ENCLOSURE TO SERIAL:    HNP-95-031 ENCLOSURE 3 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO.      50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT REACTOR TRIP SYSTEM INSTRUMENTATION SETPOINT RELOCATION TO THE COLR ENVIRONMENTAL CONSIDERATIONS 10 CFR 51.22(c)(9) provides criterion for and identification of licensing and regulatory actions eligible for categorical exclusion from performing an environmental assessment.        A proposed amendment to an operating license for a facility requires no environmental assessment            if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant hazards consideration; (2) result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite; (3) result in a significant increase in individual or cumulative occupational radiation exposure.          Carolina Power 6 Light Company has reviewed this request and determined that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Purs'uant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the issuance of the amendment. The basis for this determination follows:
Pro osed Chan e This change proposes a revision to Technical Specification 2.2.1, Reactor Trip System Instrumentation Setpoints, to relocate cycle specific Overpower and Overtemperature Delta T trip setpoint parameters to the Core Operating Limits Report (COLR).
Basis The change meets the    eligibility criteria for categorical      exclusion set forth in
.10  CFR  51.22(c)(9) for the following reasons:
As  demonstrated in Enclosure 2, the proposed amendment does not involve a significant  hazards consideration.
The proposed    amendment    does  not result in  a  significant change in the types or significant increase in the amounts        of any effluents that may be released offsite.
The proposed change    relocates numerical values for cycle-specific Reactor Trip  System Instrumentation OTAT and        OPAT setpoint limit parameters from the Technical Specifications to the existing COLR. The proposed amendment does not introduce any new equipment nor does            it  require any existing equipment or systems to perform a different type of function than they are currently designed to perform. Plant transient and accident response remains bounded by the FSAR accident analysis.            As such, the change can not affect the types or amounts of any effluents that may be released offsite.
Page E3-1
ENCLOSURE TO SERIAL:  HNP-95-031 The proposed  amendment does not result in a significant increase      in individual or cumulative occupational radiation exposure.
The proposed change relocates numerical values for cycle-specific Reactor Trip System Instrumentation OTAT and OPBT  setpoint limit parameters from the Technical Specifications to the existing COLR.          No additional surveillances or testing results from the amendment.      Therefore, the amendment has no affect on either individual or cumulative occupational radiation exposure.
Page E3-2


1.Basis for Change Request 2.10 CFR 50.92 Evaluation 3.Environmental Considerations 4.Page Change Instructions 5.Technical Specification Pages W.R.Robinson, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief;and the sources of his information are officers, employees, contractors, and agents of Carolina Power 6 Light Company.My commission expires: Cu/~I(0 l;.s P~Notary (Seal)c: Mr.Dayne H.Brown Mr.S.D.Ebneter Mr.S.A.Elrod Mr.N.B.Le t f J ENCLOSURE TO SERIAL: HNP-95-031 ENCLOSURE 1 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO.50-400/LICENSE NO.NPF-63 REQUEST FOR LICENSE AMENDMENT REACTOR TRIP SYSTEM INSTRUMENTATION SETPOINT REVISION AND RELOCATION TO THE COLR BASIS FOR CHANGE RE UEST~Back round The Shearon Harris Nuclear Power Plant (SHNPP)Technical Specifications (TS)provide standards and restrictions on minimum equipment operability and on operation of the facility.The TS ensure that the plant is operated within its design basis and safety analyses.A number of specifications address limits associated with reactor physics parameters that generally change with each reload core, requiring the processing of changes to TS to update these limits each fuel cycle.NRC Generic Letter 88-16, dated October 4, 1988, was issued to encourage licensees to prepare changes to TS related to cycle-specific parameters.
ENCLOSURE 4 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT REACTOR TRIP SYSTEM INSTRUMENTATION SETPOINT RELOCATION TO THE COLR PAGE CHANGE INSTRUCTIONS Removed Pa e                      Inserted  Pa e 2-7                               2-7 2-8                                2-8 2-8a 2-9                                2-9 6-24                               6-24 6-24a                              6-24a 6-24b                              6-24b}}
These TS changes would relocate cycle-specific parameter limits from the TS to the Core Operating Limits Report (COLR).The Generic Letter states that if these limits are developed using an NRC-approved methodology, the license amendment process is an unnecessary burden on the licensee and the NRC.An alternative to including the values of these cycle-specific parameters in individual specifications was provided.This alternative consisted of three separate actions to modify the plant's TS: (1)the addition of the definition of a named formal report that includes the values of cycle-specific parameter limits that have been established using an NRC-approved methodology and consistent with all applicable limits of the safety analysis, (2)the addition of an administrative reporting requirement to submit the formal report on cycle-specific parameter limits to the Commission for information, and (3)the modification of individudl TS to note that cycle-specific parameters shall be maintained within the limits provided in the defined formal report.Amendment 15 to the SHNPP Operating License established a COLR, including the requisite reporting requirements, for many SHNPP cycle-specific TS limits.The purpose of this request is to allow the relocation of additional cycle-specific parameters to the SHNPP COLR.Pro osed Chan e This change proposes a revision to Technical Specification 2.2.1, Reactor Trip System Instrumentation Setpoints, to relocate cycle specific Overpower and Overtemperature Delta T trip setpoint parameters to the Core Operating Limits Report.Basis Technical Specification 2.2.1, Reactor Trip System Instrumentation Setpoints, specifies trip setpoints for a number of functions related to the reactor core's design and operation.
The trip setpoints have been selected to ensure that the Page El-l ENCLOSURE TO SERIAL: HNP-95-031 core and Reactor Coolant System are prevented from exceeding their Safety Limits during normal operation and during design basis anticipated operational occurrences.
This TS change deals with two trip functions containing cycle specific parameters, the Overtemperature Delta T (OTQT)and the Overpower Delta T (OPAT).These functions are defined by equations in Footnotes (1)and (3), respectively, of Specification 2.2.1.The Overtemperature Delta T trip provides coze protection to prevent DNB for various combinations of pressure, power, coolant temperature, and axial power distribution.
The trip function ensures that the core is always below the core Safety Limit specified in TS 2.1.1, Reactor Limits-Reactor Core.The Overpower Delta T trip provides assurance of fuel integrity (e.g., no fuel pellet melting and less than 1%cladding strain)in overpower conditions, limits the required range for Overtemperature Delta T trip, and provides a backup to the High Neutron Flux trip.It does so by ensuring that the allowable heat generation rate (kW/ft)is not exceeded.As stated previously, this change proposes to relocate the specific values for cycle specific OTAT and OPAT parameters to the COLR.They include OTAT gains KKKOTAT function f,(AI), and OPAT gains K, and K,.II Before each operating cycle, the TS values of the z'eactor trip setpoint parameters are reviewed in conjunction with core design changes to ensure that they remain valid and bounding for the next operating cycle.This ensures that the protection provided against departure from nucleate boiling and centerline fuel melt is maintained.
This parameter verification is performed in accordance with the NRC approved methodology"Statistical Setpoint/Transient Methodology for Westinghouse Type Reactors," Siemens Power Corporation (EMF-92-081A), as listed in TS 6.9.1.6.2.1.
If a value(s)is not bounded, then a revised value is selected, verified in accordance with the approved methodology and then incorporated into the TS via the TS amendment process.Revisions to the TS to update one or more of the above values have occurred for operating cycles 2, 3 and 6.As described in Generic Letter 88-16, relocation of the cycle-specific limits to the COLR eliminates the unnecessary administrative burden of processing change requests to the TS that would incorporate those limits that could be revised using NRC approved methodologies.
With the OTdT and OPAT trip setpoint parameter values in the COLR, the TS remain in control of the implementation of the parameters and of the methodology used to verify the limits.The parameters would remain within the structure of the TS without requiring cycle-specific amendments to review and approve cycle-specific changes.Therefore, relocation of the Overpower and Overtemperature Delta T trip setpoint parameters to the COLR will have no adverse effects on the establishment or implementation of the Reactor Trip System Instrumentation Setpoints.
Conclusions Relocation of cycle dependent parameters from the TS to the COLR has no impact upon plant operation or safety.No safety-related equipment, safety function, or plant operation will be altered as a result of this proposed change.Since the applicable FSAR limits, i.e., the accident analysis basis, will be Page El-2 ENCLOSURE TO SERIAL: HNP-95-031 maintained, and since the Technical Specifications will continue to require both OTBT and OPBT trip functions, as well as the establishment of their limits by NRC-approved methodologies, this proposed change is administrative in nature.Page El-3 ENCLOSURE TO SERIAL: HNP-95-031 ENCLOSURE 2 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO.50-400/LICENSE NO.NPF-63 REQUEST FOR LICENSE AMENDMENT REACTOR TRIP SYSTEM INSTRUMENTATION SETPOINT RELOCATION TO THE COLR 10 CFR 50.92 EVALUATION The Commission has provided standards in 10 CFR 50.92(c)for determining whether a significant hazards consideration exists.A proposed amendment to an operating license for a facility involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not: (1)involve a significant increase in the probability or consequences of an accident previously evaluated, (2)create the possibility of a new or different kind of accident from any accident previously evaluated, or (3)involve a significant reduction in a margin of safety.Carolina Power&Light Company has reviewed this proposed license amendment request and determined that its adoption would not involve a significant hazards determinat'ion.
The bases for this determination are as follows: Pro osed Chan e This change proposes a revision to Technical Specification 2.2.1, Reactor Trip System Instrumentation Setpoints, to relocate cycle specific Overpower and Overtemperature Delta T trip setpoint parameters to the Core Operating Limits Report (COLR).Basis This change does not involve a significant hazards consideration for the following rea'sons: The proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.
The proposed change of relocating Overtemperature Delta T (OTAT)and the Overpower Delta T (OPAT)trip setpoint parameters to the COLR has no influence or impact to the probability or consequences of an accident.The revised TS will continue to implement the Reactor Trip System Instrumentation OTQT and OPAT setpoint limits through reference to the parameters in the COLR.In addition, the COLR is subject to the existing controls of TS 6.9.1.6, including the establishment of the parameter values using an NRC approved methodology.
Given that this change administratively relocates the selected trip setpoint parameter values to another TS-controlled document, there would be no increase in the probability or consequences of an accident previously evaluated.
The proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.
Page E2-1 ENCLOSURE TO SERIAL: HNP-95-031 No safety-related equipment, safety function, or plant operation will be altered as a result of this proposed change.The limits are simply being relocated to another TS-controlled document.The TS will continue to require operation within the required limits as established per NRC approved methodologies.
Therefore, the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated.
The proposed amendment does not involve a significant reduction in the margin of safety.Relocation of the Reactor Trip System Instrumentation OTDT and OPAT setpoint limits to the TS-controlled COLR has no effect on the trip system setpoints currently in force in TS 2.2.1.Future revisions to the trip setpoint parameters are governed by TS 6.9.1.6.TS 6.9.1.6 lists each TS that references values in the COLR and the NRC approved methodologies utilized in developing those values.Since this change is only an administrative relocation of the selected trip setpoint parameter values to another TS controlled document, the proposed changes do not involve a significant reduction in a margin of safety.Page E2-2 ENCLOSURE TO SERIAL: HNP-95-031 ENCLOSURE 3 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO.50-400/LICENSE NO.NPF-63 REQUEST FOR LICENSE AMENDMENT REACTOR TRIP SYSTEM INSTRUMENTATION SETPOINT RELOCATION TO THE COLR ENVIRONMENTAL CONSIDERATIONS 10 CFR 51.22(c)(9) provides criterion for and identification of licensing and regulatory actions eligible for categorical exclusion from performing an environmental assessment.
A proposed amendment to an operating license for a facility requires no environmental assessment if operation of the facility in accordance with the proposed amendment would not: (1)involve a significant hazards consideration; (2)result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite;(3)result in a significant increase in individual or cumulative occupational radiation exposure.Carolina Power 6 Light Company has reviewed this request and determined that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Purs'uant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the issuance of the amendment.
The basis for this determination follows: Pro osed Chan e This change proposes a revision to Technical Specification 2.2.1, Reactor Trip System Instrumentation Setpoints, to relocate cycle specific Overpower and Overtemperature Delta T trip setpoint parameters to the Core Operating Limits Report (COLR).Basis The change meets the eligibility criteria for categorical exclusion set forth in.10 CFR 51.22(c)(9) for the following reasons: As demonstrated in Enclosure 2, the proposed amendment does not involve a significant hazards consideration.
The proposed amendment does not result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite.The proposed change relocates numerical values for cycle-specific Reactor Trip System Instrumentation OTAT and OPAT setpoint limit parameters from the Technical Specifications to the existing COLR.The proposed amendment does not introduce any new equipment nor does it require any existing equipment or systems to perform a different type of function than they are currently designed to perform.Plant transient and accident response remains bounded by the FSAR accident analysis.As such, the change can not affect the types or amounts of any effluents that may be released offsite.Page E3-1 ENCLOSURE TO SERIAL: HNP-95-031 The proposed amendment does not result in a significant increase in individual or cumulative occupational radiation exposure.The proposed change relocates numerical values for cycle-specific Reactor Trip System Instrumentation OTAT and OPBT setpoint limit parameters from the Technical Specifications to the existing COLR.No additional surveillances or testing results from the amendment.
Therefore, the amendment has no affect on either individual or cumulative occupational radiation exposure.Page E3-2 ENCLOSURE 4 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO.50-400/LICENSE NO.NPF-63 REQUEST FOR LICENSE AMENDMENT REACTOR TRIP SYSTEM INSTRUMENTATION SETPOINT RELOCATION TO THE COLR PAGE CHANGE INSTRUCTIONS Removed Pa e 2-7 2-8 2-9 Inserted Pa e 2-7 2-8 2-8a 2-9 6-24 6-24a 6-24b 6-24 6-24a 6-24b}}

Latest revision as of 01:42, 10 November 2019

Application for Amend to License NPF-63 to Relocate Cycle Specific Overpower & Overtemperature Delta T Trip Setpoint Parameters to COLR
ML18011A850
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/20/1995
From: Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18011A852 List:
References
HNP-95-031, HNP-95-31, HO-950506, NUDOCS 9503230062
Download: ML18011A850 (14)


Text

t P RIORITY (ACCELERATED RIDS PROCESSI INFORMATION DISTRIBUTION SYSTEM (RIDS)

'EGULATORY 1

ACCESSION NBR:9503230062 DOC.DATE: 95/03/20 NOTARIZED: YES DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ROBINSON,W.R. Carolina Power & Light. Co. P RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

R

SUBJECT:

Application for amend to license NPF-63 to relocate cycle specific Overpower & Overtemperature Delta T trip setpoint parameters to DISTRIBUTION CODE: AOOID TITLE: OR COLR.

COPIES RECEIVED:LTRj Submittal: General Distribution NOTES:Application for permit renewal filed.

ENCL j SIZE: I0 +l'7 o5ooo4oo 0

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 LE,N 1 1 INTERNAL: ACRS 6 6 ~FAIRE CENTE~ 1 1 1 NRR/DRCH/HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D

C' N

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P!-37 (EXT. 504-2083 ) TO ELIMIiVATEYOUR iVAME FROM DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 16

4 F

P

Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant gg 20 l995 Letter Number: HO-950506 SERIAL: HNP-95-031 10 CFR 50.90 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT REACTOR TRIP SYSTEM INSTRUMENTATION SETPOINT RELOCATION TO THE COLR Gentlemen:

In accordance with the Code of Federal Regulations, Title 10, Parts 50.90 and 2.101, Carolina Power 6 Light Company (CPGL) hereby requests a revision to the Technical Specifications (TS) for the Shearon Harris Nuclear Power Plant (SHNPP).

This change proposes a revision to Technical Specification 2.2.1, Reactor Trip System Instrumentation Setpoints, to relocate cycle specific Overpower and Overtemperature Delta T trip setpoint parameters to the Core Operating Limits Report (COLR).

Enclosure 1 provides a detailed description of the proposed changes and the basis for the changes.

Enclosure 2 details, in accordance with 10 CFR 50.91(a), the basis for the Company's determination that the proposed changes do not involve a significant hazards consideration.

Enclosure 3 provides an environmental evaluation which demonstrates that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore,. pursuant to 10 CFR 51.22(b), no environmental assessment needs to be prepared in connection with the issuance of the amendment.

Enclosure 4 provides page change instructions for incorporating the proposed revisions.

Enclosure 5 provides the proposed Technical Specification pages.

In accordance with 10 CFR 50.91(b), CPSL is providing the State of North Carolina with a copy of the proposed license amendment.

CP&L requests approval of the proposed amendment by September 1, 1995 to support preparations for Cycle No.7 operation. In order to allow time for procedure 9503230062 950320 PDR ADOCK 05000400 c PDR State Road1134 New Hill NC Tel 919362-2502 Fax 919362-2095

1 l

Document Control Desk HNP-95-031 / Page 2 revision and orderly incorporation into copies of the Technical Specifications, CP&L requests that the proposed amendment, once approved by the NRC, be issued such that implementation will occur within 60 days of issuance of the amendment.

Please refer any questions regarding this submittal to Mr. D. C. McCarthy at (919) 362-2100.

Sincerely, W. R. Robinson SDG/sdc

Enclosures:

1. Basis for Change Request
2. 10 CFR 50.92 Evaluation
3. Environmental Considerations
4. Page Change Instructions
5. Technical Specification Pages W. R. Robinson, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power 6 Light Company.
.s P~

Notary (Seal)

My commission expires: Cu /~I(0 l c: Mr. Dayne H. Brown Mr. S. D. Ebneter Mr. S. A. Elrod Mr. N. B. Le

t f J

ENCLOSURE TO SERIAL: HNP-95-031 ENCLOSURE 1 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT REACTOR TRIP SYSTEM INSTRUMENTATION SETPOINT REVISION AND RELOCATION TO THE COLR BASIS FOR CHANGE RE UEST

~Back round The Shearon Harris Nuclear Power Plant (SHNPP) Technical Specifications (TS) provide standards and restrictions on minimum equipment operability and on operation of the facility. The TS ensure that the plant is operated within its design basis and safety analyses. A number of specifications address limits associated with reactor physics parameters that generally change with each reload core, requiring the processing of changes to TS to update these limits each fuel cycle. NRC Generic Letter 88-16, dated October 4, 1988, was issued to encourage licensees to prepare changes to TS related to cycle-specific parameters. These TS changes would relocate cycle-specific parameter limits from the TS to the Core Operating Limits Report (COLR). The Generic Letter states that if these limits are developed using an NRC-approved methodology, the license amendment process is an unnecessary burden on the licensee and the NRC. An alternative to including the values of these cycle-specific parameters in individual specifications was provided. This alternative consisted of three separate actions to modify the plant's TS: (1) the addition of the definition of a named formal report that includes the values of cycle-specific parameter limits that have been established using an NRC-approved methodology and consistent with all applicable limits of the safety analysis, (2) the addition of an administrative reporting requirement to submit the formal report on cycle-specific parameter limits to the Commission for information, and (3) the modification of individudl TS to note that cycle-specific parameters shall be maintained within the limits provided in the defined formal report.

Amendment 15 to the SHNPP Operating License established a COLR, including the requisite reporting requirements, for many SHNPP cycle-specific TS limits. The purpose of this request is to allow the relocation of additional cycle-specific parameters to the SHNPP COLR.

Pro osed Chan e This change proposes a revision to Technical Specification 2.2.1, Reactor Trip System Instrumentation Setpoints, to relocate cycle specific Overpower and Overtemperature Delta T trip setpoint parameters to the Core Operating Limits Report.

Basis Technical Specification 2.2.1, Reactor Trip System Instrumentation Setpoints, specifies trip setpoints for a number of functions related to the reactor core's design and operation. The trip setpoints have been selected to ensure that the Page El-l

ENCLOSURE TO SERIAL: HNP-95-031 core and Reactor Coolant System are prevented from exceeding their Safety Limits during normal operation and during design basis anticipated operational occurrences.

This TS change deals with two trip functions containing cycle specific parameters, the Overtemperature Delta T (OTQT) and the Overpower Delta T (OPAT).

These functions are defined by equations in Footnotes (1) and (3), respectively, of Specification 2.2.1. The Overtemperature Delta T trip provides coze protection to prevent DNB for various combinations of pressure, power, coolant temperature, and axial power distribution. The trip function ensures that the core is always below the core Safety Limit specified in TS 2.1.1, Reactor Limits

- Reactor Core. The Overpower Delta T trip provides assurance of fuel integrity (e.g., no fuel pellet melting and less than 1% cladding strain) in overpower conditions, limits the required range for Overtemperature Delta T trip, and provides a backup to the High Neutron Flux trip. It does so by ensuring that the allowable heat generation rate (kW/ft) is not exceeded.

As stated previously, this change proposes to relocate the specific values for cycle specific OTAT and OPAT parameters to the COLR. They include OTAT gains K K K OTAT function f,(AI), and OPAT gains K, and K,.

II Before each operating cycle, the TS values of the z'eactor trip setpoint parameters are reviewed in conjunction with core design changes to ensure that they remain valid and bounding for the next operating cycle. This ensures that the protection provided against departure from nucleate boiling and centerline fuel melt is maintained. This parameter verification is performed in accordance with the NRC approved methodology "Statistical Setpoint/Transient Methodology for Westinghouse Type Reactors," Siemens Power Corporation (EMF-92-081A), as listed in TS 6.9.1.6.2.1. If a value(s) is not bounded, then a revised value is selected, verified in accordance with the approved methodology and then incorporated into the TS via the TS amendment process. Revisions to the TS to update one or more of the above values have occurred for operating cycles 2, 3 and 6.

As described in Generic Letter 88-16, relocation of the cycle-specific limits to the COLR eliminates the unnecessary administrative burden of processing change requests to the TS that would incorporate those limits that could be revised using NRC approved methodologies. With the OTdT and OPAT trip setpoint parameter values in the COLR, the TS remain in control of the implementation of the parameters and of the methodology used to verify the limits. The parameters would remain within the structure of the TS without requiring cycle-specific amendments to review and approve cycle-specific changes. Therefore, relocation of the Overpower and Overtemperature Delta T trip setpoint parameters to the COLR will have no adverse effects on the establishment or implementation of the Reactor Trip System Instrumentation Setpoints.

Conclusions Relocation of cycle dependent parameters from the TS to the COLR has no impact upon plant operation or safety. No safety-related equipment, safety function, or plant operation will be altered as a result of this proposed change. Since the applicable FSAR limits, i.e., the accident analysis basis, will be Page El-2

ENCLOSURE TO SERIAL: HNP-95-031 maintained, and since the Technical Specifications will continue to require both OTBT and OPBT trip functions, as well as the establishment of their limits by NRC-approved methodologies, this proposed change is administrative in nature.

Page El-3

ENCLOSURE TO SERIAL: HNP-95-031 ENCLOSURE 2 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT REACTOR TRIP SYSTEM INSTRUMENTATION SETPOINT RELOCATION TO THE COLR 10 CFR 50.92 EVALUATION The Commission has provided standards in 10 CFR 50.92(c) for determining whether a significant hazards consideration exists. A proposed amendment to an operating license for a facility involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety. Carolina Power & Light Company has reviewed this proposed license amendment request and determined that its adoption would not involve a significant hazards determinat'ion. The bases for this determination are as follows:

Pro osed Chan e This change proposes a revision to Technical Specification 2.2.1, Reactor Trip System Instrumentation Setpoints, to relocate cycle specific Overpower and Overtemperature Delta T trip setpoint parameters to the Core Operating Limits Report (COLR).

Basis This change does not involve a significant hazards consideration for the following rea'sons:

The proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.

The proposed change of relocating Overtemperature Delta T (OTAT) and the Overpower Delta T (OPAT) trip setpoint parameters to the COLR has no influence or impact to the probability or consequences of an accident.

The revised TS will continue to implement the Reactor Trip System Instrumentation OTQT and OPAT setpoint limits through reference to the parameters in the COLR. In addition, the COLR is subject to the existing controls of TS 6.9.1.6, including the establishment of the parameter values using an NRC approved methodology. Given that this change administratively relocates the selected trip setpoint parameter values to another TS-controlled document, there would be no increase in the probability or consequences of an accident previously evaluated.

The proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.

Page E2-1

ENCLOSURE TO SERIAL: HNP-95-031 No safety-related equipment, safety function, or plant operation will be altered as a result of this proposed change. The limits are simply being relocated to another TS-controlled document. The TS will continue to require operation within the required limits as established per NRC approved methodologies. Therefore, the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated.

The proposed amendment does not involve a significant reduction in the margin of safety.

Relocation of the Reactor Trip System Instrumentation OTDT and OPAT setpoint limits to the TS-controlled COLR has no effect on the trip system setpoints currently in force in TS 2.2.1. Future revisions to the trip setpoint parameters are governed by TS 6.9.1.6. TS 6.9.1.6 lists each TS that references values in the COLR and the NRC approved methodologies utilized in developing those values. Since this change is only an administrative relocation of the selected trip setpoint parameter values to another TS controlled document, the proposed changes do not involve a significant reduction in a margin of safety.

Page E2-2

ENCLOSURE TO SERIAL: HNP-95-031 ENCLOSURE 3 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT REACTOR TRIP SYSTEM INSTRUMENTATION SETPOINT RELOCATION TO THE COLR ENVIRONMENTAL CONSIDERATIONS 10 CFR 51.22(c)(9) provides criterion for and identification of licensing and regulatory actions eligible for categorical exclusion from performing an environmental assessment. A proposed amendment to an operating license for a facility requires no environmental assessment if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant hazards consideration; (2) result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite; (3) result in a significant increase in individual or cumulative occupational radiation exposure. Carolina Power 6 Light Company has reviewed this request and determined that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Purs'uant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the issuance of the amendment. The basis for this determination follows:

Pro osed Chan e This change proposes a revision to Technical Specification 2.2.1, Reactor Trip System Instrumentation Setpoints, to relocate cycle specific Overpower and Overtemperature Delta T trip setpoint parameters to the Core Operating Limits Report (COLR).

Basis The change meets the eligibility criteria for categorical exclusion set forth in

.10 CFR 51.22(c)(9) for the following reasons:

As demonstrated in Enclosure 2, the proposed amendment does not involve a significant hazards consideration.

The proposed amendment does not result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite.

The proposed change relocates numerical values for cycle-specific Reactor Trip System Instrumentation OTAT and OPAT setpoint limit parameters from the Technical Specifications to the existing COLR. The proposed amendment does not introduce any new equipment nor does it require any existing equipment or systems to perform a different type of function than they are currently designed to perform. Plant transient and accident response remains bounded by the FSAR accident analysis. As such, the change can not affect the types or amounts of any effluents that may be released offsite.

Page E3-1

ENCLOSURE TO SERIAL: HNP-95-031 The proposed amendment does not result in a significant increase in individual or cumulative occupational radiation exposure.

The proposed change relocates numerical values for cycle-specific Reactor Trip System Instrumentation OTAT and OPBT setpoint limit parameters from the Technical Specifications to the existing COLR. No additional surveillances or testing results from the amendment. Therefore, the amendment has no affect on either individual or cumulative occupational radiation exposure.

Page E3-2