| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 13
| page count = 13
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:gc gELERAYED 9l BUTION DEMONSTRATION SYSTEM REGULATO, INFORMATION, DISTRIBUTION STEM (RIDE)ACCESSION NBR:8911010196 DOC.DATE: 89/10/26, NOTARIZED:
{{#Wiki_filter:gc gELERAYED           9l     BUTION         DEMONSTRATION         SYSTEM REGULATO, INFORMATION, DISTRIBUTION STEM       (RIDE)
NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina~AUTH.NAME AUTHOR AFFILIATION CUTTER,A.B.
ACCESSION NBR:8911010196         DOC.DATE:   89/10/26, NOTARIZED: NO       DOCKET  I FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina           05000400
Carolina Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
  ~ AUTH. NAME         AUTHOR AFFILIATION CUTTER,A.B.         Carolina Power 6 Light Co.
RECIP.NAME         RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Application for amend to License NPF-63,clarifying requirements of Item 6.a of Tech Spec Table 3.3-3.DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR (ENCL/SIZE: TITLE: OR Submittal:
Application for amend to License NPF-63,clarifying requirements of Item 6.a of Tech Spec Table 3.3-3.
General Distribution NOTES:Application for permit renewal filed.DOCKET I 05000400 D 05000400 8 RECIPIENT ID CODE/NAME PD2-1 LA BECKER,D COPIES RECIPIENT~LTTR ENCL ID CODE/NAME 1 1..PD2-1 PD 5 5 COPIES LTTR ENCL 1 1 INTERNAL: ACRS NRR/DEST/ESB 8D NRR/DEST/MTB 9H NRR/DOEA/TSB 11 OC/LFMB FILE 01 EXTERNAL: LPDR NSIC 6 6 1 1 1 1 1 1 1 0 1 1 1 1 1 1 NRR/DEST/ADS 7E NRR/DEST/ICSB NRR/DEST/RSB 8E NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB NRC PDR 1 1 1 1 1 1 1 1 1 0 1 1 1 1~D R I h TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 25 I s~,<<a4*I CHAL Carolina Power&Ltght Company P.O.Box 155 t~Raleigh, N.C.27602 OCT 2 6 1989 A.B CUTTER Vice President Nuclear Services Department SERIAL: NLS-89-161 10CFR50.90 United States Nuclear Regulatory Commission ATTENTION:
DISTRIBUTION CODE: AOOID       COPIES RECEIVED:LTR       ( ENCL / SIZE:
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 REQUEST FOR LICENSE AMENDMENT AUXILIARY FEEDWATER MANUAL INITIATION Gentlemen:
TITLE:   OR Submittal: General Distribution D
In accordance with the Code of Federal Regulations, Title 10, Parts 50.90 and 2.101, Carolina Power&Light Company (CP&L)hereby requests a revision to the Technical Specifications for the Shearon Harris Nuclear Power Plant.The proposed amendment clarifies the requirements of Item 6.a of Technical Specification Table 3.3-3, Engineered Safety Features Actuation System Instrumentation.
NOTES:Application for permit renewal filed.                                 05000400 8
Currently, the required number of channels for manual initiation of auxiliary feedwater is listed as one per pump.This is correct for the motor driven auxiliary feedwater pumps;however, the turbine driven auxiliary feedwater pump has two control channels, one of which is required to manually start the pump.The proposed amendment reflects this configuration.
RECIPIENT        COPIES            RECIPIENT       COPIES ID CODE/NAME   ~ LTTR ENCL       ID CODE/NAME   LTTR ENCL PD2-1 LA              1     1  .. PD2-1 PD           1    1 BECKER,D              5     5 INTERNAL: ACRS                     6    6      NRR/DEST/ADS 7E    1    1 NRR/DEST/ESB 8D        1    1      NRR/DEST/ICSB      1     1         ~    D NRR/DEST/MTB 9H        1    1      NRR/DEST/RSB 8E    1    1 NRR/DOEA/TSB 11        1    1      NUDOCS-ABSTRACT     1    1 OC/LFMB                1    0      OGC/HDS1           1    0 FILE      01      1    1      RES/DSIR/EIB       1     1 EXTERNAL: LPDR                    1     1       NRC PDR            1     1 NSIC                  1     1 R
As a result of this change, Technical Specification Table 3.3-3, Action 23 has also been revised.Enclosure 1 provides a detailed description of the proposed changes and the basis for the changes.Enclosure 2 details the basis for the Company's determination that the proposed changes do not involve a significant hazards consideration. is an environmental evaluation which demonstrates that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10CFR51.22(c)(9), therefore, pursuant to 10CFR51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the issuance of the amendment. provides the proposed Technical Specification pages.8911010196 891026'DR ADDCK 05000400 P PNU 0 P L, IVI N$h>>"4w Document Control Desk NLS-89-161
I h
/Page 2 Please refer any questions regarding this submittal to Mr.Steven Chaplin at (919)546-6623.Your ry trul A.B.Cutter ABC/MAT  
TOTAL NUMBER OF COPIES REQUIRED: LTTR           27   ENCL   25
 
I s ~, <<a4
* I
 
CHAL Carolina Power & Ltght Company P.O. Box 155 t ~ Raleigh, N.C. 27602 OCT 2 6 1989 A. B CUTTER                                                             SERIAL: NLS-89-161 Vice President                                                          10CFR50.90 Nuclear Services Department United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington,       DC   20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO.NPF-63 REQUEST FOR LICENSE AMENDMENT AUXILIARY FEEDWATER MANUAL INITIATION Gentlemen:
In accordance with the Code of Federal Regulations, Title 10, Parts 50.90 and 2.101, Carolina Power & Light Company (CP&L) hereby requests a revision to the Technical Specifications for the Shearon Harris Nuclear Power Plant.
The proposed amendment         clarifies the requirements of Item 6.a of Technical Specification Table 3.3-3, Engineered Safety Features Actuation System Instrumentation. Currently, the required number of channels for manual initiation of auxiliary feedwater is listed as one per pump. This is correct for the motor driven auxiliary feedwater pumps; however, the turbine driven auxiliary feedwater pump has two control channels, one of which is required to manually start the pump.
The proposed amendment         reflects this configuration.                 As a result of this change,     Technical Specification Table 3.3-3, Action                   23 has also been revised.
Enclosure       1 provides   a detailed description of the proposed                 changes and the basis       for the changes.
Enclosure 2 details the basis for the Company's determination that the proposed changes do not involve a significant hazards consideration.
Enclosure 3 is an environmental evaluation which demonstrates that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10CFR51.22(c)(9), therefore, pursuant to 10CFR51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the issuance of the amendment.
Enclosure 4 provides the proposed Technical Specification pages.
8911010196 891026
  'DR         ADDCK 05000400 P                         PNU
 
0     P L, IVI N $
h
              >>"4w
 
Document Control Desk NLS-89-161   / Page 2 Please refer any questions regarding this submittal to Mr. Steven Chaplin at (919)     546-6623.
Your     ry trul A. B. Cutter ABC/MAT


==Enclosures:==
==Enclosures:==
: 1. Basis  for Change Request
: 2. 10CFR50.92  Evaluation
: 3. Environmental Evaluation
: 4. Technical Specification Pages cc:    Mr. R. A. Becker Mr. W. H. Bradford Mr. Dayne H. Brown Mr. S. D. Ebneter A. B. Cutter, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power &
Light Company.
otary (Seal)'OTARY My  commission expires:    ///Q 7/QP                                                '
e PUBLIC
                                                                      '<<lttillliiiii'
                            '1 E
                    'C
                      >'Cl,
          ~ge<C<<
l I    1 ~4 a'
    ]J I      I
ENCLOSURE 1 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400 OPERATING LICENSE NPF-63 REQUEST FOR LICENSE AMENDMENT AFW MANUAL INITIATION BASIS FOR CHANGE RE UEST Pro osed Chan e The proposed amendment    clarifies the requirements of Item 6.a of Technical Specification Table 3.3-3, Engineered Safety Features Actuation System Instrumentation. Currently, the required number of channels for manual initiation of auxiliary feedwater is listed as one per pump. This is correct for the motor driven auxiliary feedwater pumps; however, the turbine driven auxiliary feedwater pump has two control channels per pump, one of which is required to manually start the pump. The proposed amendment incorporates a separate line item for the motor and turbine driven pumps reflecting the number of channels required for each pump. In addition, the action statement associated with Technical Specification Table 3.3-3, Item 6.a (Action 23) has been revised to maintain consistency with the revised limiting condition for operation.
Basis Item 6.a of Technical Specification Table 3.3-3, Engineered Safety Features Actuation System Instrumentation specifies the number of channels required for manual initiation of the auxiliary feedwater pumps. The existing requirement calls for one channel per pump. This is correct for the motor driven auxiliary feedwater pumps; however, does not accurately reflect the design for the turbine driven auxiliary it feedwater pump. Two channels exist for manual initiation of the turbine driven auxiliary feedwater pump, one for each of the two steam admission valves. Opening of one steam admission valve is sufficient to start the pump. The requested revision to Item 6.a incorporates a separate line item for the motor and turbine driven pumps reflecting the number of channels required for each pump. The proposed change would require the turbine driven auxiliary feedwater pump to be declared inoperable    if either control channel is inoperable. This is more restrictive than the existing Technical Specification which could be interpreted to allow indefinite operation with one of the turbine driven auxiliary feedwater pump cont'rol channels inoperable.
In addition, the action statement associated with Item 6.a (Action 23) has been revised to maintain consistency    with the revised limiting condition for operation.


1.Basis for Change Request 2.10CFR50.92 Evaluation 3.Environmental Evaluation 4.Technical Specification Pages cc: Mr.R.A.Becker Mr.W.H.Bradford Mr.Dayne H.Brown Mr.S.D.Ebneter A.B.Cutter, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief;and the sources of his information are officers, employees, contractors, and agents of Carolina Power&Light Company.My commission expires:///Q 7/QP otary (Seal)'OTARY
'e PUBLIC'<<lttillliiiii'
'1 E~ge<C<<l I 1~4 a']J I I'C>'Cl, ENCLOSURE 1 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO.50-400 OPERATING LICENSE NPF-63 REQUEST FOR LICENSE AMENDMENT AFW MANUAL INITIATION BASIS FOR CHANGE RE UEST Pro osed Chan e The proposed amendment clarifies the requirements of Item 6.a of Technical Specification Table 3.3-3, Engineered Safety Features Actuation System Instrumentation.
Currently, the required number of channels for manual initiation of auxiliary feedwater is listed as one per pump.This is correct for the motor driven auxiliary feedwater pumps;however, the turbine driven auxiliary feedwater pump has two control channels per pump, one of which is required to manually start the pump.The proposed amendment incorporates a separate line item for the motor and turbine driven pumps reflecting the number of channels required for each pump.In addition, the action statement associated with Technical Specification Table 3.3-3, Item 6.a (Action 23)has been revised to maintain consistency with the revised limiting condition for operation.
Basis Item 6.a of Technical Specification Table 3.3-3, Engineered Safety Features Actuation System Instrumentation specifies the number of channels required for manual initiation of the auxiliary feedwater pumps.The existing requirement calls for one channel per pump.This is correct for the motor driven auxiliary feedwater pumps;however, it does not accurately reflect the design for the turbine driven auxiliary feedwater pump.Two channels exist for manual initiation of the turbine driven auxiliary feedwater pump, one for each of the two steam admission valves.Opening of one steam admission valve is sufficient to start the pump.The requested revision to Item 6.a incorporates a separate line item for the motor and turbine driven pumps reflecting the number of channels required for each pump.The proposed change would require the turbine driven auxiliary feedwater pump to be declared inoperable if either control channel is inoperable.
This is more restrictive than the existing Technical Specification which could be interpreted to allow indefinite operation with one of the turbine driven auxiliary feedwater pump cont'rol channels inoperable.
In addition, the action statement associated with Item 6.a (Action 23)has been revised to maintain consistency with the revised limiting condition for operation.
I~
I~
The action statement reference to"...one less than the Minimum was changed to"...less than the Minimum..." so that Action Statement 23 now reads: With the number of OPERABLE channels less than the Minimum Channels OPERABLE requirement, declare the associated equipment inoperable and take the appropriate ACTION required in accordance with the specific equipment specification.
The action statement reference to "... one less than the Minimum was changed to "... less than the Minimum ..." so that Action Statement 23 now reads:
With regard to the AFW pumps, if one or more instrument channels are inoperable for any pump, that pump is declared inoperable and the appropriate Action Statement of LCO 3.7.1.2, Auxiliary Feedwater System, is then followed.Action Statement 23 also applies to Technical Specification Table 3.3-3 Item 4.a.l, Individual MSIV Closure.However, the proposed change to Action 23 has no affect on the compensatory measures required in the event of an inoperable channel.El-2 ENCLOSURE 2 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO.50-400 OPERATING LICENSE NPF-63 REQUEST FOR LICENSE AMENDMENT AFW MANUAL INITIATION 10CFR50 92 EVALUATION The Commission has provided standards in 10CFR50.92(c) for determining whether a significant hazards consideration exists.A proposed amendment to an operating license for a facility involves no significant hazards consideration if operation of the faci.lity in accordance with the proposed amendment would not: (1)involve a significant increase in the probability or consequences of an accident previously evaluated, (2)create the possibility of a new or different kind of accident from any accident previously evaluated, or (3)involve a significant reduction in a margin of safety.Carolina Power&Light Company has reviewed this proposed license amendment request and determined that its adoption would not involve a significant hazards consideration.
With the number of OPERABLE channels less than the Minimum Channels OPERABLE requirement, declare the associated equipment inoperable and take the appropriate ACTION required in accordance with the specific equipment specification.
The bases for this determination are as follows: Pro osed Chan e The proposed amendment clarifies the requirements of Item 6.a of Technical Specification Table 3.3-3, Engineered Safety Features Actuation System Instrumentation.
With regard to the AFW pumps,   if one or more instrument channels are inoperable for any pump, that pump is declared inoperable and the appropriate Action Statement of LCO 3.7.1.2, Auxiliary Feedwater System, is then followed.
Currently, the required number of channels for manual initiation of auxiliary:feedwater is listed as one per pump.This is correct for the motor driven auxiliary feedwater pumps;however, the turbine driven auxiliary feedwater pump has two control channels, one of which is required to manually start the pump.The proposed amendment incorporates a separate line item for the motor and turbine driven pumps reflecting the number of channels required for each pump.In addition, the action statement associated with Technical Specifi.cation Table 3.3-3, Item 6.a (Action 23)has been revised to maintain consistency with the revised limiting condition for operation.
Action Statement 23 also applies to Technical Specification Table 3.3-3 Item 4.a.l, Individual   MSIV Closure. However, the proposed change to Action 23 has no affect on the compensatory measures required in the event of an inoperable channel.
Basis The change does not involve a significant hazards consideration for the following reasons: The proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.
El-2
The proposed amendment does not introduce any new equipment nor does it require any existing equipment or systems to perform a different type of function than they are currently designed to perform.The change is being made so that Technical Specification Table 3.3-3, Item 6.a more accurately reflects actual plant design, thereby avoiding possible operator error.
 
The proposed change requires the turbine driven auxiliary feedwater pump to be declared inoperable if either control channel is inoperable.
ENCLOSURE 2 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400 OPERATING LICENSE NPF-63 REQUEST FOR LICENSE AMENDMENT AFW MANUAL INITIATION 10CFR50 92 EVALUATION The Commission has   provided standards in 10CFR50.92(c) for determining whether a   significant hazards consideration exists. A proposed amendment to an operating license for a facility involves no significant hazards consideration   if operation of the faci.lity in accordance with the proposed amendment would not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety. Carolina Power & Light Company has reviewed this proposed license amendment request and determined that its adoption would not involve a significant hazards consideration. The bases for this determination are as follows:
This is more restrictive than the existing Technical Specification which could be interpreted to allow indefinite operation with one of the turbine driven auxiliary feedwater pump control channels inoperable.
Pro osed Chan e The proposed amendment   clarifies the requirements of Item 6.a of Technical Specification Table 3.3-3, Engineered Safety Features Actuation System Instrumentation. Currently, the required number of channels for manual initiation of auxiliary:feedwater is listed as one per pump. This is correct for the motor driven auxiliary feedwater pumps; however, the turbine driven auxiliary feedwater pump has two control channels, one of which is required to manually start the pump.
In addition, the action statement associated with Item 6.a (Action 23)has been revised to maintain consistency with the revised limiting condition for operation.
The proposed amendment incorporates a separate line item for the motor and turbine driven pumps reflecting the number of channels required for each pump. In addition, the action statement associated with Technical Specifi.cation Table 3.3-3, Item 6.a (Action 23) has been revised to maintain consistency with the revised limiting condition for operation.
Action Statement 23 also applies to Technical Specification Table 3.3-3 Item 4.a.l, Individual MSIV Closure.However, the proposed change to Action 23 has no affect on the compensatory measures required in the event of an inoperable channel.2.As stated in Item 1, the proposed amendment does not: (1)alter any existing equipment; or (2)introduce any new equipment.
Basis The change does   not involve   a significant hazards consideration for the following reasons:
The proposed amendment     does not involve a significant increase in the probability or consequences of an accident previously evaluated. The proposed amendment does not introduce any new equipment nor does   it require any existing equipment or systems   to perform a different type of function than they are currently designed to perform. The change is being made so that Technical Specification Table 3.3-3, Item 6.a more accurately reflects actual plant design, thereby avoiding possible operator error.
 
The proposed change requires   the turbine driven auxiliary feedwater pump to be declared     inoperable if either control channel is inoperable. This is more     restrictive than the existing Technical Specification which could be interpreted to allow indefinite operation with one of the turbine driven auxiliary feedwater pump control channels inoperable.
In addition, the action statement associated with Item 6.a (Action
: 23) has been revised to maintain consistency with the revised limiting condition for operation.
Action Statement 23 also applies to Technical Specification Table 3.3-3 Item 4.a.l, Individual MSIV Closure. However, the proposed change to Action 23 has no affect on the compensatory measures required in the event of an inoperable channel.
: 2. As stated in Item 1, the proposed amendment does not: (1) alter any existing equipment; or (2) introduce any new equipment.
Therefore, the proposed amendment can not create the possibility of a new or different kind of accident from any accident previously evaluated.
Therefore, the proposed amendment can not create the possibility of a new or different kind of accident from any accident previously evaluated.
3.The proposed amendment does not introduce any new equipment nor does it require any existing equipment or systems to perform a different type of function than they are currently designed to perform.The change is being made so that Technical Specification Table 3.3-3, Item 6.a more accurately reflects actual plant design.The proposed change requires the turbine driven auxiliary feedwater pump to be declared inoperable if either control channel is inoperable.
: 3. The proposed amendment does not introduce any new equipment nor does it require any existing equipment or systems to perform a different type of function than they are currently designed to perform. The change is being made so that Technical Specification Table 3.3-3, Item 6.a more accurately reflects actual plant design. The proposed change requires the turbine driven auxiliary feedwater   pump to be declared inoperable   if either control channel is inoperable. This is more restrictive than the existing Technical Specification which could be interpreted to allow indefinite operation with one of the turbine driven auxiliary feedwater pump control channels inoperable.
This is more restrictive than the existing Technical Specification which could be interpreted to allow indefinite operation with one of the turbine driven auxiliary feedwater pump control channels inoperable.
In addition, the action statement associated with Item 6.a (Action
In addition, the action statement associated with Item 6.a (Action 23)has been revised to maintain consistency with the revised limiting condition for operation.
: 23) has been revised to maintain consistency with the revised limiting condition for operation.
Action Statement 23 also applies to Technical Specification Table 3.3-3 Item 4.a.l, Individual MSIV Closure.However, the proposed change to Action 23 has no affect on the compensatory measures required in the event of an inoperable channel.Based on the above reasoning, the Company has determined that the proposed amendment represents an enhancement and does not involve a reduction in the margin of safety.E2-2 ENCLOSURE 3 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 REQUEST FOR LICENSE AMENDMENT ENVIRONMENTAL CONSIDERATION 10CFR51.22(c)(9) provides criterion for and identification of licensing and regulatory actions eligible for categorical exclusion from performing an environmental assessment.
Action Statement 23 also applies to Technical Specification Table 3.3-3 Item 4.a.l, Individual MSIV Closure. However, the proposed change to Action 23 has no affect on the compensatory measures required in the event of an inoperable channel.
A proposed amendment to an operating license for a facility requires no environmental assessment if operation of the facility in accordance with the proposed amendment would not: (1)involve a significant hazards consideration;
Based on the above reasoning,     the Company has determined that the proposed amendment represents     an enhancement and does not involve a reduction in the margin of safety.
'(2)result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite;and (3)result in an increase in individual or cumulative occupational radiation exposure.Carolina Power&Light Company has reviewed this request and determined that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10CFR51.22(c)(9).
E2-2
Pursuant to 10CFR51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
 
The basis for this determination follows: Pro osed Chan e The proposed amendment clarifies the requirements of Item 6.a of Technical Specification Table 3.3-3, Engineered Safety Features Actuation System Instrumentation.
ENCLOSURE 3 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT ENVIRONMENTAL CONSIDERATION 10CFR51.22(c)(9) provides     criterion for and identification of licensing and regulatory actions eligible for categorical exclusion from performing an environmental assessment.       A proposed amendment to an operating license for a facility requires no environmental assessment         if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant hazards consideration; '(2) result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite; and (3) result in an increase in individual or cumulative occupational radiation exposure.
Currently, the required number of channels for manual initiation of auxiliary feedwater is listed as one per pump.This is correct for the motor driven auxiliary feedwater pumps;however, the turbine driven auxiliary feedwater pump has two control channels, one of which is required to manually start the pump.The proposed amendment incorporates a separate line item for the motor and turbine driven pumps reflecting the number of channels required for each pump.In addition, the action statement associated with Technical Specification Table 3.3-3, Item 6.a (Action 23)has been revised to maintain consistency with the revised limiting condition for operation.
Carolina Power & Light Company has reviewed this request and determined that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10CFR51.22(c)(9). Pursuant to 10CFR51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment. The basis for this determination follows:
Basis The change meets the eligibility criteria for categorical exclusion set forth in 10CFR51.22(c)(9) for the following reasons: As demonstrated in Enclosure 2, the proposed amendment does not involve a significant hazards consideration.
Pro osed Chan e The proposed amendment     clarifies the requirements of Item 6.a of Technical Specification Table 3.3-3, Engineered Safety Features Actuation System Instrumentation. Currently, the required number of channels for manual initiation of auxiliary feedwater is listed as one per pump. This is correct for the motor driven auxiliary feedwater pumps; however, the turbine driven auxiliary feedwater pump has two control channels, one of which is required to manually start the pump.
The proposed amendment does not result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite.The proposed amendment does not introduce any new equipment nor does it require any existing equipment or systems to perform a different type of function than they are currently designed to perform.The change is being made so that Technical Specification Table 3.3-3, Item 6.a more accurately reflects actual plant design.As such, the change can not affect the types or amounts of any effluents that may be released offsite.The proposed amendment does not result in an increase in individual or cumulative occupational radiation exposure.The proposed change revises the Technical Specifications to more accurately reflect actual plant design.No additional surveillances or testing results from the amendment.
The proposed amendment incorporates a separate line item for the motor and turbine driven pumps reflecting the number of channels required for each pump. In addition, the action statement associated with Technical Specification Table 3.3-3, Item 6.a (Action 23) has been revised to maintain consistency with the revised limiting condition for operation.
Therefore, the amendment has no affect on either individual or cumulative occupational radiation exposure.E3-2}}
Basis The change meets   the eligibility criteria for categorical exclusion set forth in 10CFR51.22(c)(9) for the following reasons:
As demonstrated   in Enclosure 2, the proposed   amendment does not involve a significant hazards consideration.
The proposed amendment     does not result in a significant change in the types or   significant increase in the amounts of any effluents that may be released offsite. The proposed amendment does not introduce any new equipment nor does       it require any existing
 
equipment or systems to perform a different type of function than they are currently designed to perform. The change is being made so that Technical Specification Table 3.3-3, Item 6.a more accurately reflects actual plant design. As such, the change can not affect the types or amounts of any effluents that may be released offsite.
The proposed amendment does not result in an increase in individual or cumulative occupational radiation exposure. The proposed change revises the Technical Specifications to more accurately reflect actual plant design. No additional surveillances or testing results from the amendment. Therefore, the amendment has no affect on either individual or cumulative occupational radiation exposure.
E3-2}}

Latest revision as of 23:41, 9 November 2019

Application for Amend to License NPF-63,clarifying Requirements of Item 6.a of Tech Spec Table 3.3-3, ESF Actuation Sys Instrumentation.
ML18022A726
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/26/1989
From: Cutter A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18022A727 List:
References
NLS-89-161, NUDOCS 8911010196
Download: ML18022A726 (13)


Text

gc gELERAYED 9l BUTION DEMONSTRATION SYSTEM REGULATO, INFORMATION, DISTRIBUTION STEM (RIDE)

ACCESSION NBR:8911010196 DOC.DATE: 89/10/26, NOTARIZED: NO DOCKET I FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400

~ AUTH. NAME AUTHOR AFFILIATION CUTTER,A.B. Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Application for amend to License NPF-63,clarifying requirements of Item 6.a of Tech Spec Table 3.3-3.

DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR ( ENCL / SIZE:

TITLE: OR Submittal: General Distribution D

NOTES:Application for permit renewal filed. 05000400 8

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME ~ LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 .. PD2-1 PD 1 1 BECKER,D 5 5 INTERNAL: ACRS 6 6 NRR/DEST/ADS 7E 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/ICSB 1 1 ~ D NRR/DEST/MTB 9H 1 1 NRR/DEST/RSB 8E 1 1 NRR/DOEA/TSB 11 1 1 NUDOCS-ABSTRACT 1 1 OC/LFMB 1 0 OGC/HDS1 1 0 FILE 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 R

I h

TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 25

I s ~, <<a4

  • I

CHAL Carolina Power & Ltght Company P.O. Box 155 t ~ Raleigh, N.C. 27602 OCT 2 6 1989 A. B CUTTER SERIAL: NLS-89-161 Vice President 10CFR50.90 Nuclear Services Department United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO.NPF-63 REQUEST FOR LICENSE AMENDMENT AUXILIARY FEEDWATER MANUAL INITIATION Gentlemen:

In accordance with the Code of Federal Regulations, Title 10, Parts 50.90 and 2.101, Carolina Power & Light Company (CP&L) hereby requests a revision to the Technical Specifications for the Shearon Harris Nuclear Power Plant.

The proposed amendment clarifies the requirements of Item 6.a of Technical Specification Table 3.3-3, Engineered Safety Features Actuation System Instrumentation. Currently, the required number of channels for manual initiation of auxiliary feedwater is listed as one per pump. This is correct for the motor driven auxiliary feedwater pumps; however, the turbine driven auxiliary feedwater pump has two control channels, one of which is required to manually start the pump.

The proposed amendment reflects this configuration. As a result of this change, Technical Specification Table 3.3-3, Action 23 has also been revised.

Enclosure 1 provides a detailed description of the proposed changes and the basis for the changes.

Enclosure 2 details the basis for the Company's determination that the proposed changes do not involve a significant hazards consideration.

Enclosure 3 is an environmental evaluation which demonstrates that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10CFR51.22(c)(9), therefore, pursuant to 10CFR51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the issuance of the amendment.

Enclosure 4 provides the proposed Technical Specification pages.

8911010196 891026

'DR ADDCK 05000400 P PNU

0 P L, IVI N $

h

>>"4w

Document Control Desk NLS-89-161 / Page 2 Please refer any questions regarding this submittal to Mr. Steven Chaplin at (919) 546-6623.

Your ry trul A. B. Cutter ABC/MAT

Enclosures:

1. Basis for Change Request
2. 10CFR50.92 Evaluation
3. Environmental Evaluation
4. Technical Specification Pages cc: Mr. R. A. Becker Mr. W. H. Bradford Mr. Dayne H. Brown Mr. S. D. Ebneter A. B. Cutter, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power &

Light Company.

otary (Seal)'OTARY My commission expires: ///Q 7/QP '

e PUBLIC

'<<lttillliiiii'

'1 E

'C

>'Cl,

~ge<C<<

l I 1 ~4 a'

]J I I

ENCLOSURE 1 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400 OPERATING LICENSE NPF-63 REQUEST FOR LICENSE AMENDMENT AFW MANUAL INITIATION BASIS FOR CHANGE RE UEST Pro osed Chan e The proposed amendment clarifies the requirements of Item 6.a of Technical Specification Table 3.3-3, Engineered Safety Features Actuation System Instrumentation. Currently, the required number of channels for manual initiation of auxiliary feedwater is listed as one per pump. This is correct for the motor driven auxiliary feedwater pumps; however, the turbine driven auxiliary feedwater pump has two control channels per pump, one of which is required to manually start the pump. The proposed amendment incorporates a separate line item for the motor and turbine driven pumps reflecting the number of channels required for each pump. In addition, the action statement associated with Technical Specification Table 3.3-3, Item 6.a (Action 23) has been revised to maintain consistency with the revised limiting condition for operation.

Basis Item 6.a of Technical Specification Table 3.3-3, Engineered Safety Features Actuation System Instrumentation specifies the number of channels required for manual initiation of the auxiliary feedwater pumps. The existing requirement calls for one channel per pump. This is correct for the motor driven auxiliary feedwater pumps; however, does not accurately reflect the design for the turbine driven auxiliary it feedwater pump. Two channels exist for manual initiation of the turbine driven auxiliary feedwater pump, one for each of the two steam admission valves. Opening of one steam admission valve is sufficient to start the pump. The requested revision to Item 6.a incorporates a separate line item for the motor and turbine driven pumps reflecting the number of channels required for each pump. The proposed change would require the turbine driven auxiliary feedwater pump to be declared inoperable if either control channel is inoperable. This is more restrictive than the existing Technical Specification which could be interpreted to allow indefinite operation with one of the turbine driven auxiliary feedwater pump cont'rol channels inoperable.

In addition, the action statement associated with Item 6.a (Action 23) has been revised to maintain consistency with the revised limiting condition for operation.

I~

The action statement reference to "... one less than the Minimum was changed to "... less than the Minimum ..." so that Action Statement 23 now reads:

With the number of OPERABLE channels less than the Minimum Channels OPERABLE requirement, declare the associated equipment inoperable and take the appropriate ACTION required in accordance with the specific equipment specification.

With regard to the AFW pumps, if one or more instrument channels are inoperable for any pump, that pump is declared inoperable and the appropriate Action Statement of LCO 3.7.1.2, Auxiliary Feedwater System, is then followed.

Action Statement 23 also applies to Technical Specification Table 3.3-3 Item 4.a.l, Individual MSIV Closure. However, the proposed change to Action 23 has no affect on the compensatory measures required in the event of an inoperable channel.

El-2

ENCLOSURE 2 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400 OPERATING LICENSE NPF-63 REQUEST FOR LICENSE AMENDMENT AFW MANUAL INITIATION 10CFR50 92 EVALUATION The Commission has provided standards in 10CFR50.92(c) for determining whether a significant hazards consideration exists. A proposed amendment to an operating license for a facility involves no significant hazards consideration if operation of the faci.lity in accordance with the proposed amendment would not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety. Carolina Power & Light Company has reviewed this proposed license amendment request and determined that its adoption would not involve a significant hazards consideration. The bases for this determination are as follows:

Pro osed Chan e The proposed amendment clarifies the requirements of Item 6.a of Technical Specification Table 3.3-3, Engineered Safety Features Actuation System Instrumentation. Currently, the required number of channels for manual initiation of auxiliary:feedwater is listed as one per pump. This is correct for the motor driven auxiliary feedwater pumps; however, the turbine driven auxiliary feedwater pump has two control channels, one of which is required to manually start the pump.

The proposed amendment incorporates a separate line item for the motor and turbine driven pumps reflecting the number of channels required for each pump. In addition, the action statement associated with Technical Specifi.cation Table 3.3-3, Item 6.a (Action 23) has been revised to maintain consistency with the revised limiting condition for operation.

Basis The change does not involve a significant hazards consideration for the following reasons:

The proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated. The proposed amendment does not introduce any new equipment nor does it require any existing equipment or systems to perform a different type of function than they are currently designed to perform. The change is being made so that Technical Specification Table 3.3-3, Item 6.a more accurately reflects actual plant design, thereby avoiding possible operator error.

The proposed change requires the turbine driven auxiliary feedwater pump to be declared inoperable if either control channel is inoperable. This is more restrictive than the existing Technical Specification which could be interpreted to allow indefinite operation with one of the turbine driven auxiliary feedwater pump control channels inoperable.

In addition, the action statement associated with Item 6.a (Action

23) has been revised to maintain consistency with the revised limiting condition for operation.

Action Statement 23 also applies to Technical Specification Table 3.3-3 Item 4.a.l, Individual MSIV Closure. However, the proposed change to Action 23 has no affect on the compensatory measures required in the event of an inoperable channel.

2. As stated in Item 1, the proposed amendment does not: (1) alter any existing equipment; or (2) introduce any new equipment.

Therefore, the proposed amendment can not create the possibility of a new or different kind of accident from any accident previously evaluated.

3. The proposed amendment does not introduce any new equipment nor does it require any existing equipment or systems to perform a different type of function than they are currently designed to perform. The change is being made so that Technical Specification Table 3.3-3, Item 6.a more accurately reflects actual plant design. The proposed change requires the turbine driven auxiliary feedwater pump to be declared inoperable if either control channel is inoperable. This is more restrictive than the existing Technical Specification which could be interpreted to allow indefinite operation with one of the turbine driven auxiliary feedwater pump control channels inoperable.

In addition, the action statement associated with Item 6.a (Action

23) has been revised to maintain consistency with the revised limiting condition for operation.

Action Statement 23 also applies to Technical Specification Table 3.3-3 Item 4.a.l, Individual MSIV Closure. However, the proposed change to Action 23 has no affect on the compensatory measures required in the event of an inoperable channel.

Based on the above reasoning, the Company has determined that the proposed amendment represents an enhancement and does not involve a reduction in the margin of safety.

E2-2

ENCLOSURE 3 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT ENVIRONMENTAL CONSIDERATION 10CFR51.22(c)(9) provides criterion for and identification of licensing and regulatory actions eligible for categorical exclusion from performing an environmental assessment. A proposed amendment to an operating license for a facility requires no environmental assessment if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant hazards consideration; '(2) result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite; and (3) result in an increase in individual or cumulative occupational radiation exposure.

Carolina Power & Light Company has reviewed this request and determined that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10CFR51.22(c)(9). Pursuant to 10CFR51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment. The basis for this determination follows:

Pro osed Chan e The proposed amendment clarifies the requirements of Item 6.a of Technical Specification Table 3.3-3, Engineered Safety Features Actuation System Instrumentation. Currently, the required number of channels for manual initiation of auxiliary feedwater is listed as one per pump. This is correct for the motor driven auxiliary feedwater pumps; however, the turbine driven auxiliary feedwater pump has two control channels, one of which is required to manually start the pump.

The proposed amendment incorporates a separate line item for the motor and turbine driven pumps reflecting the number of channels required for each pump. In addition, the action statement associated with Technical Specification Table 3.3-3, Item 6.a (Action 23) has been revised to maintain consistency with the revised limiting condition for operation.

Basis The change meets the eligibility criteria for categorical exclusion set forth in 10CFR51.22(c)(9) for the following reasons:

As demonstrated in Enclosure 2, the proposed amendment does not involve a significant hazards consideration.

The proposed amendment does not result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite. The proposed amendment does not introduce any new equipment nor does it require any existing

equipment or systems to perform a different type of function than they are currently designed to perform. The change is being made so that Technical Specification Table 3.3-3, Item 6.a more accurately reflects actual plant design. As such, the change can not affect the types or amounts of any effluents that may be released offsite.

The proposed amendment does not result in an increase in individual or cumulative occupational radiation exposure. The proposed change revises the Technical Specifications to more accurately reflect actual plant design. No additional surveillances or testing results from the amendment. Therefore, the amendment has no affect on either individual or cumulative occupational radiation exposure.

E3-2