Proposed Tech Specs Table 3.3-3, ESF Actuation Sys Instrumentation.
ML18022A728
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/26/1989
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18022A727 List:
References
NUDOCS 8911010197
Download: ML18022A728 (5)


Text

ENCLOSURE 4 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400 OPERATING LICENSE NPF-63 REQUEST FOR LICENSE AMENDMENT AFW MANUAL INITIATION TECHNICAL SPECIFICATION PAGES 8911010197 89102b PDR ADOCK 05000400 P PNU

Y~LR ENG'INEEREO SAFETY FEATURES ACTUATION SYSTEH INSTRUMENTATION HINIHUH TOTAL NO. CHANNELS CHANNELS APPLICASLE FUNCTIONAL UNIT OF CHANNELS 'TO TRIP OPERABLE HOOES ACTION

6. Auxil iary Feedwater
a. Hanual Initiation tfpUmp 1J ~fog -J~vmpvmps g/p VIP g/PCO P X,x 3 g) TCebiur- dhVSiiP Pu~~ QA p a/mm ~7 ~A
b. Automatic Actuation 1,2,3 21 Logic and-Actuation Relays Steam Generator Mater Level--Low-Low
1) Start Hotor- 3/stm. gen. 2/stm. gen. 2/stm. gen. 1, 2, 3 15k Oriven Pumps in any in each stm. gen. stm. gen.
2) Start Turbine- 3/stm. gen. 2/stm. gen. 2/stm. gen. 1, 2, 3 15k Drive'n Pump in any in each 2 stm. gen. stm. gen.
d. Safety Injection See Item l. above for all Safety Injection initiating functions and Start Hotor-Oriven Pumps requirements.
e. Loss-of-Offsite Power See Item 9. below for Loss of Offsite Power initiating functions Start Hotor-Driven and requirements.

Pumps and Turbine-Oriven Pump

f. Trip of All Hain 1/pump 1/pump 1/pump 1, 2 15" Feedwater Pumps Start Hotor-Oriven Pumps

TABLE 3.3-3 Continued ACTION STATEMENTS Continued)

ACTION L9 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a. The inoperable channel is placed in the tripped condition within j hour, and
b. The Minimum Channels OPERABLE requirement is met; however, one additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing of other channels per Specification 4.3.2. 1.

ACTION 20 - With less than the Minimum Number of Channels OPERABLE, within l hour determine by observation of the associated permissive annunciator window(s) that the interlock is in its required state for the existing plant condition, or apply Specification 3.0.3.

ACTION 21 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requi rement, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2. 1 provided the other channel is OPERABLE.

ACTION 22 - With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

ACTION 23 - With the number of OPERABLE channels less than the Total Number of Channels, declare the ass cia e equipment inoperable and take the appropriate ACTION required in accordance with the specific equipment specification.

ACTION 24 - With'he numbe~ of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2. 1 provided the other channel is OPERABLE.

ACTION 25 " During CORE ALTERATIONS or movement of irradiated fuel within containment, comply with the ACTION statement of Specification 3.9.9.

SHEARON HARRIS - UNIT 1 3/4 3-27