ML13101A347: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:
E. Roy Hawkens, Chairman Dr. Anthony J. Baratta Dr. Gary S. Arnold In the Matter of SOUTHERN CALIFORNIA EDISON CO.
E. Roy Hawkens, Chairman Dr. Anthony J. Baratta Dr. Gary S. Arnold In the Matter of                                     Docket Nos. 50-361-CAL, 50-362-CAL SOUTHERN CALIFORNIA EDISON CO.
(San Onofre Nuclear Generating Station, Units 2 and 3) 
ASLBP No. 13-924-01-CAL-BD01 (San Onofre Nuclear Generating Station, Units 2 and 3)
 
Docket Nos. 50-361-CAL, 50-362-CAL
 
ASLBP No. 13-924-01-CAL-BD01
 
April 11, 2013 ORDER (Adopting Transcript Corrections)
April 11, 2013 ORDER (Adopting Transcript Corrections)
On March 22, 2013, we held an oral argument 1 in the Atomic Safety and Licensing Board Panel's (ASLBP's) Rockville, Maryland Hearing Room on the issues referred by the Commission in CLI-12-20.
On March 22, 2013, we held an oral argument1 in the Atomic Safety and Licensing Board Panels (ASLBPs) Rockville, Maryland Hearing Room on the issues referred by the Commission in CLI-12-20.2 On April 5, 2013, the parties to this proceeding -- Friends of the Earth, Southern California Edison Company, and the NRC Staff -- filed a joint motion for correction of the March 22 oral argument transcript.3 1
2   On April 5, 2013, the parties to this proceeding -- Friends of the Earth, Southern California Edison Company, and the NRC Staff -- filed a joint motion for correction of the March 22 oral argument transcript.
See Licensing Board Order (Setting Oral Argument) (Feb. 22, 2013) at 2 (unpublished).
3 1 See Licensing Board Order (Setting Oral Argument) (Feb. 22, 2013) at 2 (unpublished).
2 In CLI-12-20, the Commission referred to the ASLBP the following two issues, which arose from the June 18, 2012 intervention petition filed by Petitioner challenging a Confirmatory Action Letter (CAL) issued by the NRC to SCE on March 27, 2012:
2 In CLI-12-20, the Commission referred to the ASLBP the following two issues, which arose from the June 18, 2012 intervention petition filed by Petitioner challenging a Confirmatory Action Letter (CAL) issued by the NRC to SCE on March 27, 2012:
(1) whether the CAL constitutes a de facto license amendment that is subject to a hearing opportunity, and if yes, (2) whether Petitioner's hearing request meets the agency's standing and contention admissibility requirements. See Southern Cal. Edison Co. (San Onofre Nuclear Generating Station, Units 2 and 3), CLI-12-20, 76 NRC __, __ slip op. at 5 (Nov. 8, 2012).
(1) whether the CAL constitutes a de facto license amendment that is subject to a hearing opportunity, and if yes, (2) whether Petitioners hearing request meets the agencys standing and contention admissibility requirements. See Southern Cal. Edison Co. (San Onofre Nuclear Generating Station, Units 2 and 3), CLI-12-20, 76 NRC __, __
slip op. at 5 (Nov. 8, 2012).
3 See Joint Motion for Correction of Transcript of March 22, 2013 Oral Argument (Apr. 5, 2013).
3 See Joint Motion for Correction of Transcript of March 22, 2013 Oral Argument (Apr. 5, 2013).


2     Pursuant to 10 C.F.R. § 2.327(d), this Board adopts the corrections proposed by the parties as presented in Appendix A to this Order, and we also adopt several additional corrections identified in Appendix B to this Order. It is so ORDERED.       FOR THE ATOMIC SAFETY           AND LICENSING BOARD  
2 Pursuant to 10 C.F.R. § 2.327(d), this Board adopts the corrections proposed by the parties as presented in Appendix A to this Order, and we also adopt several additional corrections identified in Appendix B to this Order.
 
It is so ORDERED.
_________________________________ E. Roy Hawkens, Chairman ADMINISTRATIVE JUDGE Issued at Rockville, Maryland this 11th day of April 2013.    
FOR THE ATOMIC SAFETY AND LICENSING BOARD
                                                      /RA/
_________________________________
E. Roy Hawkens, Chairman ADMINISTRATIVE JUDGE Issued at Rockville, Maryland this 11th day of April 2013.


3     APPENDIX A ADOPTED CORRECTIONS TO THE TRANSCRIPT OF THE ORAL ARGUMENT HELD ON MARCH 22, 2013 (DOCKET NO. 50-361-CAL/50-362-CAL)
3 APPENDIX A ADOPTED CORRECTIONS TO THE TRANSCRIPT OF THE ORAL ARGUMENT HELD ON MARCH 22, 2013 (DOCKET NO. 50-361-CAL/50-362-CAL)
Page Line Delete Insert 6 20 "concludes and" "concludes that it" 6 25 "In order" "In our order" 7 7 "if wishes" "if it wishes" 7 19 "is not" "is not to" 9 11 "issues" "issues regarding" 9 20 "also the NRC" "also with the NRC" 9 20 "My left" "To my left" 10 8 "a Request for" "Request for" 10 15 "recert" "restart" 12 5 "o0ne?"
Page Line                   Delete                                     Insert 6   20           concludes and                           concludes that it 6   25                 In order                             In our order 7     7                 if wishes                             if it wishes 7   19                   is not                               is not to 9   11                   issues                           issues regarding 9   20             also the NRC                         also with the NRC 9   20                   My left                             To my left 10     8             a Request for                             Request for 10   15                   recert                                 restart 12     5                   o0ne?                                   one?
"one?" 12 7 "an" "the" 13 7 "us" "SCE's announcement" 13 14 "believe the" "believe that the" 13 16 "that we have voluntary" "that it would be a voluntary" 14 8 "precedence" "precedent" 15 7 "If" "These" 17 21 "conceived" "conceded" 18 9 " [no insert] 18 12 [no deletion] [insert quotation mark at the end of sentence]
12     7                       an                                     the 13     7                       us                       SCEs announcement 13   14               believe the                           believe that the 13   16       that we have voluntary                 that it would be a voluntary 14     8             precedence                               precedent 15     7                       If                                 These 17   21               conceived                               conceded 18     9                                                         [no insert]
18 18 " [no insert] 18 19 "Unite" "Unit" 18 20 [no deletion] [insert quotation mark at the end of sentence] 20 16 [delete period after "CAL"] [insert comma after "CAL" and change uppercase T to lowercase in "this"] 20 24 "MR. AYRES" "JUDGE HAWKENS" 22 3 "stuck" "shut" 23 5 "I think" "I see" 24 4 [delete period after "I'm sorry"] [insert dash between "I'm sorry" and "if you need to make a change-"] 26 13 "figured" "triggered" 27 13 "in that instance" [insert "and that is" after "others" and before "the Commission"] 28 2 [no deletion] [insert commas on either side of "as I read it"] 28 4 [no deletion] [insert comma after "next step"] 28 5 [no deletion] [insert comma after "proceeding"] 28 13 [no deletion] [insert comma after "Judge"] 30 25 "they're" "you're" 31 2 "decision" "position" 33 19 [delete period after "conclusions"] [insert comma after "conclusions"] 36 8 "Results are" "Results in" 4    Page Line  Delete  Insert  36 13 "how do" "how far do" 41 18 "ASOP" "ASLB" 43 12 "called" "culled" 44 5 "deducting" "deducing" 44 14 [delete comma after "triggering"] [insert dashes before and after "triggering"] 46 18 [no deletion] [insert comma after "that"] 46 19 [no deletion] [insert comma after "us"] 48 19 [delete comma after "that"] [insert dash after "that"] 48  21 [delete comma after second "tubes"] [insert dash after the second "tubes" on line 21] 51 13 "whether restart" "whether Edison's restart" 53 6 "rights." "rights" 53  7 "And"  "until" 53 25 "has already" "is already" 54 19 "if they know it" "if it knows it" 59 10 "Can't make a" "It can't make a" 59 12 "eminent" "imminent" 59 18 "3 or" "3, or" 60 9 "precedent the" "precedent that" 60 13 "of referred issue" "of the referred issue" 62 5 "is clearly" "was clearly" 66  22  "was well before" "was submitted well before" 64 3  "at restart" "at the restart" 64  18 "de factor" "de facto" 65 10 "is if by" "is that if by" 66 24  "you've indicated" "you've just indicated" 68 13 "submit amendment. And it's a formal" "submit an amendment, then it's a formal" 68 25 "barr" "bar" 69 7 "are submitting application" "aren't submitting an application" 70 14  "statement" "statements" 70 20 "tubing" "tube" 71 11 "contact for AVBs" "contact force between the AVBs" 72 6 "mixed" "next" 72 16 "assessment" "assessments" 74 11 "or" "are" 74 21 "every time the inspections" "every time we do the routine inspections" 75 24 ", it" ". It" 75 25 "generator or tube" "generator tube" 76 3 "fueling" "refueling" 76 5 "conservative." "conservative here." 76 5 "have five month period where" "have a five month period" 76  8  "paragraph" "paragraph of" 76 25 "eight criterion C2" "eighth criterion in (c)(2)"
18   12               [no deletion]           [insert quotation mark at the end of sentence]
77 6 "or" "where" 77 19 "an" "any" 5    Page  Line  Delete  Insert  78 3 "this" "the" 78 19 "we have" "you have" 78 25 "under the 50.59" "under 50.59" 79 3 "is a" "is it a" 79 4 "method."
18   18                                                         [no insert]
"method?" 79  9 "we are okay" "you're okay" 80 2 "value" "volume" 80 9 "fitting" "thinning" 80 22 "going to go" "going to go the" 80  23 "would do" "would then be able to do" 80 25 "procedural" "proceduralized" 81 4 "we knew we" "we automatically knew we" 81 7 "were already screened" "were screened" 81 10 "directed coolant" "the reactor coolant" 81 16 "And I mentioned" "And as I mentioned" 81 19 "their" "the" 83 1 "state before" "state, and I believe this was before" 83 17 "Your Honor" "In general" 83 24 "for power" "at full power" 83 25 "do 100" "do a 100" 84 12 "in our" "without a" 84 13 "had raised a"  "agrees to" 85 15 "that" "then" 86 13 "every utility has" "other utilities have" 86 14 "to take" "taken" 86 19 "slight, quick clarification" "slight clarification" 86 22 "in" [no insert] 86 23 "our tech" "of that standard tech" 87 3 "analogous what" "analogous to what" 87 14 "in" "at" 87 16 "Okay. Also had a no" "But they also had a no" 88 8  "CAL" "CALs" 88 19 "could" "did" 88 23 "power. We're using to" "power. We're choosing to. We're choosing to" 88 24 "it" "we" 89 7 "agree" "don't believe" 89 24 "We are not" "I don't believe we are" 90 5 "seven" "70" 90 9 "that at" "that both at" 91 6 "taking" "doing" 91 10 "I like in" "I liken" 91 11 "the first line that we" "to the first time that we" 91 16 "power, we're not" "power, and we're not" 91 17 "yet. We" "yet, we" 92 5 "at" "that" 92  16 "organizations" "the regulations" 95 5 "Criteria for" "Criteria 14 for" 6    Page  Line  Delete  Insert  95 17 ADB AVB 96 2 "Yes. I don't" "Again, I don't" 96 3 "in describing" "in describing the" 96 5 "wearing" "wear" 96 8 "assessments which" "assessments, which" 96 9 "program. We" "program, we" 97 6 "indeed" "instead" 97 16 "different analysis. We're talking" "different analyses. You're talking" 97 19 "really different" "really two different" 98 17 "or" "for" 98 18 "if U tube steam" "If there are U tube steam" 98 24 "possibility for in plane" "possibility in a laboratory for in plane" 99 2 "Those were cases of out plane FEI" "I believe those were cases of out of plane FEI" 99 9 "if" "is" 99 24 "credit" "product" 100 1 "ADB content" "AVB contact" 100 2 "ADB content" "AVB contact," 100 3 "fraction we" "fraction, we" 100 14 "had high void" "had relatively high void" 100 15 "you get" "we have" 100 18 "have seen" "assume" 100 19 "presuming" "presumably" 101 6 "Although that sequence" "Although does that sequence" 101 7 "makes sense" "make sense" 102 2 "out right" "out one right" 102 3 "against on the" "against us on the" 102 4 "presumably we'll be enlisting a license" "presumably there'll be a notice of license" 105 14 "in" "and" 106 12 "Unit" [no insert]
18   19                   Unite                                     Unit 18   20               [no deletion]           [insert quotation mark at the end of sentence]
108 11 "period" "hearing" 109 23 "that"  "the" 110 19 "whether" "with their" 111 21 "that" "the" 112 7 "barr" "bar" 113 12 "there" "they" 113 14 "Do you mean now right" "You may now run" 113 15 "has" "is" 114 3 "a" [no insert] 114 8 "Honor. And that's your word" "Honor, as you're aware." 115 13 "and behalf" "and on behalf" 116 21 "end to" "ended" 117 20 "analysis and" "analysis aside and" 119 10 "give correct" "that said give corrective" 119 22 "in" "a" 122 12 "And" "No and" 124 18 "the same" "is saying" 7    Page  Line  Insert  Delete  126 22 "says as" "has" 126 25 "They" "The" 131 11 "but" "that" 131 16 "or" "and" 132 3 "licensee" "licensing" 132 4 "or" "are" 133 13 "would not" "are not going to" 134 5 "trying" "declining" 134 20 "would" "have" 134 21 "issue" "issued" 134 24 "would"  "have" 136 24 "any of these 50.59" "the 50.59 ones which" 137 24 "59(f)" "58 F 3rd 284" 138 9 "an act of" "in fact a" 140 2-3 "an option" "adoption" 141 1 "of" [no insert]
20   16     [delete period after CAL]       [insert comma after CAL and change uppercase T to lowercase in this]
142 14 "to" "and" 
20   24             MR. AYRES                           JUDGE HAWKENS 22     3                   stuck                                   shut 23     5                   I think                                 I see 24     4   [delete period after Im sorry]   [insert dash between Im sorry and if you need to make a change]
26   13                   figured                               triggered 27   13           in that instance           [insert and that is after others and before the Commission]
28     2               [no deletion]           [insert commas on either side of as I read it]
28     4               [no deletion]                 [insert comma after next step]
28     5               [no deletion]               [insert comma after proceeding]
28   13               [no deletion]                   [insert comma after Judge]
30   25                   theyre                                youre 31     2                 decision                                 position 33   19 [delete period after conclusions]       [insert comma after conclusions]
36     8               Results are                             Results in


8    APPENDIX B ADDITIONAL CORRECTIONS TO THE TRANSCRIPT OF THE ORAL ARGUMENT HELD ON MARCH 22, 2013 (DOCKET NO. 50-361-CAL/50-362-CAL)
4 Page Line                     Delete                                 Insert 36  13                    how do                            how far do 41  18                    ASOP                                  ASLB 43  12                    called                                culled 44    5                 deducting                              deducing 44  14  [delete comma after triggering]       [insert dashes before and after triggering]
Page Line Delete Insert 5 19 "processing" "proceeding" 12 20 [no deletion] [insert ". When and" after "event" and before "if"]
46  18                [no deletion]                 [insert comma after that]
29 25 "site" "cite" 34 11 "definitely" "definitively" 73 14 "JUDGE HAWKENS" "JUDGE BARATTA" 88 13-14 "couldn't get there from there." "ain't gonna get there from here." 101 10 "admissibility." "admissibility"?
46  19               [no deletion]                   [insert comma after us]
113 15 "power?" "power." 123 8 [no deletion] [insert period after "enforcement"] 136 19 "JUDGE BARATTA" "JUDGE ARNOLD" 144 12 "Standard" "standards in" 145 18 "59.50" "50.59" 147 2 [no deletion] [insert period after "case"]  
48  19      [delete comma after that]              [insert dash after that]
48  21  [delete comma after second        [insert dash after the second tubes on tubes]                          line 21]
51  13            whether restart                whether Edisons restart 53    6                    rights.                              rights 53    7                      And                                  until 53  25              has already                              is already 54  19              if they know it                        if it knows it 59  10              Cant make a                        It cant make a 59  12                  eminent                              imminent 59  18                      3 or                                3, or 60    9              precedent the                        precedent that 60  13            of referred issue                  of the referred issue 62    5                  is clearly                          was clearly 66  22            was well before                was submitted well before 64    3                  at restart                        at the restart 64  18                  de factor                              de facto 65  10                    is if by                          is that if by 66  24            youve indicated                    youve just indicated 68  13  submit amendment. And its a          submit an amendment, then its a formal                                                    formal 68  25                      barr                                  bar 69    7      are submitting application        arent submitting an application 70  14                statement                            statements 70  20                    tubing                                tube 71  11          contact for AVBs            contact force between the AVBs 72    6                    mixed                                  next 72  16              assessment                          assessments 74  11                        or                                  are 74  21      every time the inspections          every time we do the routine inspections 75  24                        , it                                  . It 75  25          generator or tube                      generator tube 76    3                    fueling                              refueling 76    5              conservative.                      conservative here.
76    5    have five month period where            have a five month period 76    8                paragraph                          paragraph of 76  25          eight criterion C2                eighth criterion in (c)(2) 77    6                        or                                where 77  19                        an                                  any


UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of  )      )
5 Page Line                Delete                                  Insert 78    3                  this                                the 78  19              we have                            you have 78  25        under the 50.59                        under 50.59 79    3                  is a                              is it a 79    4              method.                             method?
SOUTHERN CALIFORNIA EDISON CO. )
79    9          we are okay                          youre okay 80    2                value                              volume 80    9                fitting                            thinning 80  22            going to go                      going to go the 80  23              would do                would then be able to do 80  25            procedural                      proceduralized 81    4          we knew we                we automatically knew we 81    7  were already screened                      were screened 81  10        directed coolant                    the reactor coolant 81  16        And I mentioned                    And as I mentioned 81  19                  their                                the 83    1          state before          state, and I believe this was before 83   17            Your Honor                            In general 83  24              for power                        at full power 83  25                do 100                            do a 100 84  12                in our                            without a 84  13          had raised a                          agrees to 85  15                  that                                then 86  13        every utility has                  other utilities have 86  14                to take                              taken 86  19  slight, quick clarification                slight clarification 86  22                    in                            [no insert]
   )
86  23              our tech                  of that standard tech 87    3        analogous what                      analogous to what 87   14                    in                                    at 87  16    Okay. Also had a no                But they also had a no 88    8                  CAL                               CALs 88  19                could                                  did 88  23    power. Were using to      power. Were choosing to. Were choosing to 88  24                    it                                  we 89    7                agree                          dont believe 89  24            We are not                  I dont believe we are 90    5                seven                                  70 90    9                that at                          that both at 91    6                taking                              doing 91  10                I like in                           I liken 91  11      the first line that we            to the first time that we 91  16        power, were not                power, and were not 91  17               yet. We                              yet, we 92    5                    at                                  that 92  16          organizations                      the regulations 95    5            Criteria for                      Criteria 14 for
   ) Docket Nos. 50-361-CAL (San Onofre Nuclear Generating Station -        )                           50-362-CAL               Units 2 and 3) )


CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing ORDER (Adopting Transcript Corrections) have been served upon the following persons by Electronic Information Exchange.
6 Page Line                      Delete                                    Insert 95  17                        ADB                                      AVB 96  2                Yes. I dont                          Again, I dont 96  3                in describing                        in describing the 96  5                    wearing                                  wear 96  8          assessments which                      assessments, which 96  9              program. We                              program, we 97  6                    indeed                                instead 97  16  different analysis. Were talking    different analyses. Youre talking 97  19              really different                    really two different 98  17                        or                                      for 98  18            if U tube steam                  If there are U tube steam 98  24        possibility for in plane      possibility in a laboratory for in plane 99  2  Those were cases of out plane      I believe those were cases of out of FEI                                plane FEI 99  9                          if                                      is 99  24                      credit                              product 100  1                ADB content                            AVB contact 100  2                ADB content                            AVB contact, 100  3                  fraction we                            fraction, we 100  14              had high void                    had relatively high void 100  15                    you get                              we have 100  18                  have seen                                assume 100  19                  presuming                              presumably 101  6        Although that sequence              Although does that sequence 101  7              makes sense                              make sense 102  2                    out right                          out one right 102  3              against on the                        against us on the 102  4  presumably well be enlisting a        presumably therell be a notice of license                                                    license 105  14                        in                                    and 106  12                        Unit                              [no insert]
Office of Commission Appellate  
108  11                      period                                hearing 109  23                        that                                    the 110  19                    whether                                with their 111  21                        that                                    the 112  7                        barr                                    bar 113  12                      there                                  they 113  14        Do you mean now right                      You may now run 113  15                        has                                      is 114  3                          a                                [no insert]
114  8    Honor. And thats your word              Honor, as youre aware.
115  13                  and behalf                          and on behalf 116  21                      end to                                ended 117  20                analysis and                      analysis aside and 119  10                give correct                  that said give corrective 119  22                        in                                      a 122  12                        And                                No and 124 18                  the same                                is saying


Adjudication U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
7 Page Line        Insert                  Delete 126  22        says as                  has 126  25          They                    The 131  11          but                    that 131  16            or                    and 132  3      licensee              licensing 132  4            or                    are 133  13      would not          are not going to 134  5        trying              declining 134  20        would                  have 134  21        issue                  issued 134  24        would                  have 136  24  any of these 50.59  the 50.59 ones which 137 24          59(f)            58 F 3rd 284 138  9      an act of              in fact a 140 2-3      an option              adoption 141  1            of                [no insert]
142  14            to                    and


E-mail: ocaamail@nrc.gov
8 APPENDIX B ADDITIONAL CORRECTIONS TO THE TRANSCRIPT OF THE ORAL ARGUMENT HELD ON MARCH 22, 2013 (DOCKET NO. 50-361-CAL/50-362-CAL)
Page    Line                Delete                                  Insert 5    19              processing                            proceeding 12    20              [no deletion]          [insert . When and after event and before if]
29    25                  site                                  cite 34    11              definitely                          definitively 73    14        JUDGE HAWKENS                          JUDGE BARATTA 88  13-14  couldnt get there from there. aint gonna get there from here.
101    10            admissibility.                        admissibility?
113    15                power?                                power.
123      8              [no deletion]              [insert period after enforcement]
136    19        JUDGE BARATTA                          JUDGE ARNOLD 144    12              Standard                            standards in 145    18                59.50                                50.59 147      2              [no deletion]                  [insert period after case]


Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop - T-3 F23 Washington, DC  20555-0001
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of                                )
 
                                                )
E. Roy Hawkens Chief Administrative Judge E-mail:  roy.hawkens@nrc.gov
SOUTHERN CALIFORNIA EDISON CO.                 )
 
                                                )
Anthony J. Baratta
                                                )    Docket Nos. 50-361-CAL (San Onofre Nuclear Generating Station -        )                  50-362-CAL Units 2 and 3)                          )
 
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing ORDER (Adopting Transcript Corrections) have been served upon the following persons by Electronic Information Exchange.
Administrative Judge
Office of Commission Appellate                    Southern California Edison Company Adjudication                                  Douglas Porter, Esq.
 
U.S. Nuclear Regulatory Commission               Director and Managing Attorney Washington, DC 20555-0001                         Generation Policy and Resources E-mail: ocaamail@nrc.gov                         Law Department 2244 Walnut Grove Ave., GO1, Q3B, 335C Atomic Safety and Licensing Board Panel          Rosemead, CA 91770 U.S. Nuclear Regulatory Commission                Email: douglas.porter@sce.com Mail Stop - T-3 F23 Washington, DC 20555-0001                        Counsel for Licensee Morgan, Lewis & Bockius, LLP E. Roy Hawkens                                    1111 Pennsylvania, Ave. N.W.
Email:  anthony.baratta@nrc.gov Gary S. Arnold Administrative Judge
Chief Administrative Judge                        Washington, D.C. 20004 E-mail: roy.hawkens@nrc.gov                      Paul M. Bessette, Esq.
 
Kathryn M. Sutton, Esq.
Email:  gary.arnold@nrc.gov
Anthony J. Baratta                                Stephen J. Burdick, Esq.
 
Administrative Judge                              Steven P. Frantz, Esq.
U.S. Nuclear Regulatory Commission Office of the Secretary of the Commission Mail Stop O-16C1 Washington, DC 20555-0001  
Email: anthony.baratta@nrc.gov                    William E. Baer, Jr.
 
Mary Freeze, Legal Secretary Gary S. Arnold                                    Lena M. Long, Legal Secretary Administrative Judge                              E-mail: pbessette@morganlewis.com Email: gary.arnold@nrc.gov                                sburdick@morganlewis.com ksutton@morganlewis.com U.S. Nuclear Regulatory Commission                        wbaer@morganlewis.com Office of the Secretary of the Commission                sfrantz@morganlewis.com Mail Stop O-16C1                                          mfreeze@morganlewis.com Washington, DC 20555-0001                                 llong@morganlewis.com Hearing Docket E-mail: hearingdocket@nrc.gov
Hearing Docket E-mail: hearingdocket@nrc.gov Southern California Edison Company
 
Douglas Porter, Esq.
Director and Managing Attorney Generation Policy and Resources Law Department 2244 Walnut Grove Ave., GO1, Q3B, 335C  
 
Rosemead, CA 91770  
 
Email: douglas.porter@sce.com Counsel for Licensee  
 
Morgan, Lewis & Bockius, LLP 1111 Pennsylvania, Ave. N.W.
Washington, D.C. 20004 Paul M. Bessette, Esq. Kathryn M. Sutton, Esq.
Stephen J. Burdick, Esq.
Steven P. Frantz, Esq.
William E. Baer, Jr.
Mary Freeze, Legal Secretary Lena M. Long, Legal Secretary E-mail: pbessette@morganlewis.com sburdick@morganlewis.com ksutton@morganlewis.com
 
wbaer@morganlewis.com sfrantz@morganlewis.com
 
mfreeze@morganlewis.com llong@morganlewis.com
 
San Onofre Nuclear Generating Station, Units 2 and 3, Docket Nos. 50-361 and 50-362-CAL ORDER (Adopting Transcript Corrections) 2U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15 D21 Washington, DC 20555-0001 Edward Williamson, Esq.
David Roth, Esq.
Catherine Kanatas, Esq. David Cylkowski, Esq. Jeremy Wachutka, Esq.
 
Email:  edward.williamson@nrc.gov david.roth@nrc.gov catherine.kanatas@nrc.gov
 
david.cylkowski@nrc.gov jeremy.wachutka@nrc.gov
 
OGG Mail Center: ogcmailcenter@nrc.gov
 
Friends of the Earth Ayres Law Group 1707 L St., NW
 
Suite 850 Washington, D.C. 20036
 
Richard E. Ayres, Esq.
Jessica L. Olson, Esq. Kristin L. Hines, Esq.
Email:  ayresr@ayreslawgroup.com olsonj@ayreslawgroup.com hinesk@ayreslawgroup.com Natural Resources Defense Council Geoffrey H. Fettus, Esq.
 
1152 15 th Street, NW Suite 300 Washington, DC  20005 Email:  gfettus@nrdc.org
 
[Original signed by Herald M. Speiser        ]                                        Office of the Secretary of the Commission
 
Dated at Rockville, Maryland


this 11 th day of April, 2013}}
San Onofre Nuclear Generating Station, Units 2 and 3, Docket Nos. 50-361 and 50-362-CAL ORDER (Adopting Transcript Corrections)
U.S. Nuclear Regulatory Commission            Friends of the Earth Office of the General Counsel                  Ayres Law Group Mail Stop - O-15 D21                          1707 L St., NW Washington, DC 20555-0001                      Suite 850 Edward Williamson, Esq.                        Washington, D.C. 20036 David Roth, Esq.                              Richard E. Ayres, Esq.
Catherine Kanatas, Esq.                        Jessica L. Olson, Esq.
David Cylkowski, Esq.                          Kristin L. Hines, Esq.
Jeremy Wachutka, Esq.                          Email: ayresr@ayreslawgroup.com Email: edward.williamson@nrc.gov                        olsonj@ayreslawgroup.com david.roth@nrc.gov                            hinesk@ayreslawgroup.com catherine.kanatas@nrc.gov david.cylkowski@nrc.gov jeremy.wachutka@nrc.gov              Natural Resources Defense Council Geoffrey H. Fettus, Esq.
1152 15th Street, NW Suite 300 OGG Mail Center: ogcmailcenter@nrc.gov        Washington, DC 20005 Email: gfettus@nrdc.org
[Original signed by Herald M. Speiser    ]
Office of the Secretary of the Commission Dated at Rockville, Maryland this 11th day of April, 2013 2}}

Revision as of 20:39, 4 November 2019

Order (Adopting Transcript Corrections)
ML13101A347
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 04/11/2013
From: Hawkens E
Atomic Safety and Licensing Board Panel
To:
SECY RAS
References
RAS 24374, 50-361-CAL, 50-362-CAL, ASLBP 13-924-01-CAL-BD01, CLI-12-20
Download: ML13101A347 (10)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:

E. Roy Hawkens, Chairman Dr. Anthony J. Baratta Dr. Gary S. Arnold In the Matter of Docket Nos. 50-361-CAL, 50-362-CAL SOUTHERN CALIFORNIA EDISON CO.

ASLBP No. 13-924-01-CAL-BD01 (San Onofre Nuclear Generating Station, Units 2 and 3)

April 11, 2013 ORDER (Adopting Transcript Corrections)

On March 22, 2013, we held an oral argument1 in the Atomic Safety and Licensing Board Panels (ASLBPs) Rockville, Maryland Hearing Room on the issues referred by the Commission in CLI-12-20.2 On April 5, 2013, the parties to this proceeding -- Friends of the Earth, Southern California Edison Company, and the NRC Staff -- filed a joint motion for correction of the March 22 oral argument transcript.3 1

See Licensing Board Order (Setting Oral Argument) (Feb. 22, 2013) at 2 (unpublished).

2 In CLI-12-20, the Commission referred to the ASLBP the following two issues, which arose from the June 18, 2012 intervention petition filed by Petitioner challenging a Confirmatory Action Letter (CAL) issued by the NRC to SCE on March 27, 2012:

(1) whether the CAL constitutes a de facto license amendment that is subject to a hearing opportunity, and if yes, (2) whether Petitioners hearing request meets the agencys standing and contention admissibility requirements. See Southern Cal. Edison Co. (San Onofre Nuclear Generating Station, Units 2 and 3), CLI-12-20, 76 NRC __, __

slip op. at 5 (Nov. 8, 2012).

3 See Joint Motion for Correction of Transcript of March 22, 2013 Oral Argument (Apr. 5, 2013).

2 Pursuant to 10 C.F.R. § 2.327(d), this Board adopts the corrections proposed by the parties as presented in Appendix A to this Order, and we also adopt several additional corrections identified in Appendix B to this Order.

It is so ORDERED.

FOR THE ATOMIC SAFETY AND LICENSING BOARD

/RA/

_________________________________

E. Roy Hawkens, Chairman ADMINISTRATIVE JUDGE Issued at Rockville, Maryland this 11th day of April 2013.

3 APPENDIX A ADOPTED CORRECTIONS TO THE TRANSCRIPT OF THE ORAL ARGUMENT HELD ON MARCH 22, 2013 (DOCKET NO. 50-361-CAL/50-362-CAL)

Page Line Delete Insert 6 20 concludes and concludes that it 6 25 In order In our order 7 7 if wishes if it wishes 7 19 is not is not to 9 11 issues issues regarding 9 20 also the NRC also with the NRC 9 20 My left To my left 10 8 a Request for Request for 10 15 recert restart 12 5 o0ne? one?

12 7 an the 13 7 us SCEs announcement 13 14 believe the believe that the 13 16 that we have voluntary that it would be a voluntary 14 8 precedence precedent 15 7 If These 17 21 conceived conceded 18 9 [no insert]

18 12 [no deletion] [insert quotation mark at the end of sentence]

18 18 [no insert]

18 19 Unite Unit 18 20 [no deletion] [insert quotation mark at the end of sentence]

20 16 [delete period after CAL] [insert comma after CAL and change uppercase T to lowercase in this]

20 24 MR. AYRES JUDGE HAWKENS 22 3 stuck shut 23 5 I think I see 24 4 [delete period after Im sorry] [insert dash between Im sorry and if you need to make a change]

26 13 figured triggered 27 13 in that instance [insert and that is after others and before the Commission]

28 2 [no deletion] [insert commas on either side of as I read it]

28 4 [no deletion] [insert comma after next step]

28 5 [no deletion] [insert comma after proceeding]

28 13 [no deletion] [insert comma after Judge]

30 25 theyre youre 31 2 decision position 33 19 [delete period after conclusions] [insert comma after conclusions]

36 8 Results are Results in

4 Page Line Delete Insert 36 13 how do how far do 41 18 ASOP ASLB 43 12 called culled 44 5 deducting deducing 44 14 [delete comma after triggering] [insert dashes before and after triggering]

46 18 [no deletion] [insert comma after that]

46 19 [no deletion] [insert comma after us]

48 19 [delete comma after that] [insert dash after that]

48 21 [delete comma after second [insert dash after the second tubes on tubes] line 21]

51 13 whether restart whether Edisons restart 53 6 rights. rights 53 7 And until 53 25 has already is already 54 19 if they know it if it knows it 59 10 Cant make a It cant make a 59 12 eminent imminent 59 18 3 or 3, or 60 9 precedent the precedent that 60 13 of referred issue of the referred issue 62 5 is clearly was clearly 66 22 was well before was submitted well before 64 3 at restart at the restart 64 18 de factor de facto 65 10 is if by is that if by 66 24 youve indicated youve just indicated 68 13 submit amendment. And its a submit an amendment, then its a formal formal 68 25 barr bar 69 7 are submitting application arent submitting an application 70 14 statement statements 70 20 tubing tube 71 11 contact for AVBs contact force between the AVBs 72 6 mixed next 72 16 assessment assessments 74 11 or are 74 21 every time the inspections every time we do the routine inspections 75 24 , it . It 75 25 generator or tube generator tube 76 3 fueling refueling 76 5 conservative. conservative here.

76 5 have five month period where have a five month period 76 8 paragraph paragraph of 76 25 eight criterion C2 eighth criterion in (c)(2) 77 6 or where 77 19 an any

5 Page Line Delete Insert 78 3 this the 78 19 we have you have 78 25 under the 50.59 under 50.59 79 3 is a is it a 79 4 method. method?

79 9 we are okay youre okay 80 2 value volume 80 9 fitting thinning 80 22 going to go going to go the 80 23 would do would then be able to do 80 25 procedural proceduralized 81 4 we knew we we automatically knew we 81 7 were already screened were screened 81 10 directed coolant the reactor coolant 81 16 And I mentioned And as I mentioned 81 19 their the 83 1 state before state, and I believe this was before 83 17 Your Honor In general 83 24 for power at full power 83 25 do 100 do a 100 84 12 in our without a 84 13 had raised a agrees to 85 15 that then 86 13 every utility has other utilities have 86 14 to take taken 86 19 slight, quick clarification slight clarification 86 22 in [no insert]

86 23 our tech of that standard tech 87 3 analogous what analogous to what 87 14 in at 87 16 Okay. Also had a no But they also had a no 88 8 CAL CALs 88 19 could did 88 23 power. Were using to power. Were choosing to. Were choosing to 88 24 it we 89 7 agree dont believe 89 24 We are not I dont believe we are 90 5 seven 70 90 9 that at that both at 91 6 taking doing 91 10 I like in I liken 91 11 the first line that we to the first time that we 91 16 power, were not power, and were not 91 17 yet. We yet, we 92 5 at that 92 16 organizations the regulations 95 5 Criteria for Criteria 14 for

6 Page Line Delete Insert 95 17 ADB AVB 96 2 Yes. I dont Again, I dont 96 3 in describing in describing the 96 5 wearing wear 96 8 assessments which assessments, which 96 9 program. We program, we 97 6 indeed instead 97 16 different analysis. Were talking different analyses. Youre talking 97 19 really different really two different 98 17 or for 98 18 if U tube steam If there are U tube steam 98 24 possibility for in plane possibility in a laboratory for in plane 99 2 Those were cases of out plane I believe those were cases of out of FEI plane FEI 99 9 if is 99 24 credit product 100 1 ADB content AVB contact 100 2 ADB content AVB contact, 100 3 fraction we fraction, we 100 14 had high void had relatively high void 100 15 you get we have 100 18 have seen assume 100 19 presuming presumably 101 6 Although that sequence Although does that sequence 101 7 makes sense make sense 102 2 out right out one right 102 3 against on the against us on the 102 4 presumably well be enlisting a presumably therell be a notice of license license 105 14 in and 106 12 Unit [no insert]

108 11 period hearing 109 23 that the 110 19 whether with their 111 21 that the 112 7 barr bar 113 12 there they 113 14 Do you mean now right You may now run 113 15 has is 114 3 a [no insert]

114 8 Honor. And thats your word Honor, as youre aware.

115 13 and behalf and on behalf 116 21 end to ended 117 20 analysis and analysis aside and 119 10 give correct that said give corrective 119 22 in a 122 12 And No and 124 18 the same is saying

7 Page Line Insert Delete 126 22 says as has 126 25 They The 131 11 but that 131 16 or and 132 3 licensee licensing 132 4 or are 133 13 would not are not going to 134 5 trying declining 134 20 would have 134 21 issue issued 134 24 would have 136 24 any of these 50.59 the 50.59 ones which 137 24 59(f) 58 F 3rd 284 138 9 an act of in fact a 140 2-3 an option adoption 141 1 of [no insert]

142 14 to and

8 APPENDIX B ADDITIONAL CORRECTIONS TO THE TRANSCRIPT OF THE ORAL ARGUMENT HELD ON MARCH 22, 2013 (DOCKET NO. 50-361-CAL/50-362-CAL)

Page Line Delete Insert 5 19 processing proceeding 12 20 [no deletion] [insert . When and after event and before if]

29 25 site cite 34 11 definitely definitively 73 14 JUDGE HAWKENS JUDGE BARATTA 88 13-14 couldnt get there from there. aint gonna get there from here.

101 10 admissibility. admissibility?

113 15 power? power.

123 8 [no deletion] [insert period after enforcement]

136 19 JUDGE BARATTA JUDGE ARNOLD 144 12 Standard standards in 145 18 59.50 50.59 147 2 [no deletion] [insert period after case]

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

SOUTHERN CALIFORNIA EDISON CO. )

)

) Docket Nos. 50-361-CAL (San Onofre Nuclear Generating Station - ) 50-362-CAL Units 2 and 3) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing ORDER (Adopting Transcript Corrections) have been served upon the following persons by Electronic Information Exchange.

Office of Commission Appellate Southern California Edison Company Adjudication Douglas Porter, Esq.

U.S. Nuclear Regulatory Commission Director and Managing Attorney Washington, DC 20555-0001 Generation Policy and Resources E-mail: ocaamail@nrc.gov Law Department 2244 Walnut Grove Ave., GO1, Q3B, 335C Atomic Safety and Licensing Board Panel Rosemead, CA 91770 U.S. Nuclear Regulatory Commission Email: douglas.porter@sce.com Mail Stop - T-3 F23 Washington, DC 20555-0001 Counsel for Licensee Morgan, Lewis & Bockius, LLP E. Roy Hawkens 1111 Pennsylvania, Ave. N.W.

Chief Administrative Judge Washington, D.C. 20004 E-mail: roy.hawkens@nrc.gov Paul M. Bessette, Esq.

Kathryn M. Sutton, Esq.

Anthony J. Baratta Stephen J. Burdick, Esq.

Administrative Judge Steven P. Frantz, Esq.

Email: anthony.baratta@nrc.gov William E. Baer, Jr.

Mary Freeze, Legal Secretary Gary S. Arnold Lena M. Long, Legal Secretary Administrative Judge E-mail: pbessette@morganlewis.com Email: gary.arnold@nrc.gov sburdick@morganlewis.com ksutton@morganlewis.com U.S. Nuclear Regulatory Commission wbaer@morganlewis.com Office of the Secretary of the Commission sfrantz@morganlewis.com Mail Stop O-16C1 mfreeze@morganlewis.com Washington, DC 20555-0001 llong@morganlewis.com Hearing Docket E-mail: hearingdocket@nrc.gov

San Onofre Nuclear Generating Station, Units 2 and 3, Docket Nos. 50-361 and 50-362-CAL ORDER (Adopting Transcript Corrections)

U.S. Nuclear Regulatory Commission Friends of the Earth Office of the General Counsel Ayres Law Group Mail Stop - O-15 D21 1707 L St., NW Washington, DC 20555-0001 Suite 850 Edward Williamson, Esq. Washington, D.C. 20036 David Roth, Esq. Richard E. Ayres, Esq.

Catherine Kanatas, Esq. Jessica L. Olson, Esq.

David Cylkowski, Esq. Kristin L. Hines, Esq.

Jeremy Wachutka, Esq. Email: ayresr@ayreslawgroup.com Email: edward.williamson@nrc.gov olsonj@ayreslawgroup.com david.roth@nrc.gov hinesk@ayreslawgroup.com catherine.kanatas@nrc.gov david.cylkowski@nrc.gov jeremy.wachutka@nrc.gov Natural Resources Defense Council Geoffrey H. Fettus, Esq.

1152 15th Street, NW Suite 300 OGG Mail Center: ogcmailcenter@nrc.gov Washington, DC 20005 Email: gfettus@nrdc.org

[Original signed by Herald M. Speiser ]

Office of the Secretary of the Commission Dated at Rockville, Maryland this 11th day of April, 2013 2