| issue date = 08/09/2013 | | issue date = 08/09/2013 | ||
| title = IR 05000327-13-406 and IR 05000328/13-406, Sequoyah Nuclear Plant, Material Control and Accounting Inspection Report (OUO Removed) | | title = IR 05000327-13-406 and IR 05000328/13-406, Sequoyah Nuclear Plant, Material Control and Accounting Inspection Report (OUO Removed) | ||
| author name = Shaeffer S | | author name = Shaeffer S | ||
| author affiliation = NRC/RGN-II/DRP/RPB6 | | author affiliation = NRC/RGN-II/DRP/RPB6 | ||
| addressee name = Shea J | | addressee name = Shea J | ||
| addressee affiliation = Tennessee Valley Authority | | addressee affiliation = Tennessee Valley Authority | ||
| docket = 05000327, 05000328 | | docket = 05000327, 05000328 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ust 9, 2013 | ||
==SUBJECT:== | |||
SEQUOYAH NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000327/2013406 AND 05000328/2013406 | |||
==Dear Mr. Shea:== | |||
On June 27, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a material control and accounting inspection at Sequoyah Nuclear Plant, Units 1 and 2. The enclosed inspection report documents the inspection results discussed on June 27, 2013 with Mr. J. | |||
Carlin and other members of his staff. | |||
This inspection examined activities conducted under your license as they relate to security and compliance with the | This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | ||
Based on the results of this inspection, no findings were identified. | Based on the results of this inspection, no findings were identified. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. | ||
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this | |||
In accordance with 10 CFR 2.390(b)(1)(ii), | In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1). | ||
Should you have any questions concerning this letter, please contact us. | Should you have any questions concerning this letter, please contact us. | ||
Sincerely, | Sincerely, | ||
/RA/ Scott M. Shaeffer, Chief Reactor Projects Branch 6 Division of Reactor Projects | /RA/ | ||
Scott M. Shaeffer, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79 Enclosure: NRC Material Control and Accounting Inspection Report 05000327/2013406 and 05000328/2013406 w/Attachment: Supplemental Information cc w/encl: (See page 3) _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE Via email Via email SMS /RA/ JDH /RA/ | |||
Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79 Enclosure: NRC Material Control and Accounting Inspection Report 05000327/2013406 and 05000328/2013406 w/Attachment: Supplemental Information | NAME WDeschaine GSmith SShaeffer JHamman DATE 08/08/2013 08/08/2013 09/09/2013 09/09/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/o encl: | ||
via ListServ Letter to Joseph from Scott Shaeffer dated August 9, 2013 SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000327/2013406 AND 05000328/2013406 Distribution w/encl: | |||
cc w/encl: (See page 3) | C. Evans, RII L. Douglas, RII OE Mail B. Westreich, NSIR E. McNiel, NSIR RIDSNRRDIRS R. Pascarelli, NRR RidsNrrPMSequoyah Resource | ||
_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE Via email Via email SMS /RA/ JDH /RA/ NAME WDeschaine GSmith SShaeffer JHamman DATE 08/08/2013 08/08/2013 09/09/2013 09/09/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/o encl: | |||
via ListServ Letter to Joseph from Scott Shaeffer dated August 9, 2013 | |||
SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000327/2013406 AND | |||
05000328/2013406 | |||
Distribution w/encl | |||
}} | }} |
Latest revision as of 14:56, 4 November 2019
ML13221A237 | |
Person / Time | |
---|---|
Site: | Sequoyah |
Issue date: | 08/09/2013 |
From: | Scott Shaeffer Reactor Projects Region 2 Branch 6 |
To: | James Shea Tennessee Valley Authority |
References | |
IR-13-406 | |
Download: ML13221A237 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION ust 9, 2013
SUBJECT:
SEQUOYAH NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000327/2013406 AND 05000328/2013406
Dear Mr. Shea:
On June 27, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a material control and accounting inspection at Sequoyah Nuclear Plant, Units 1 and 2. The enclosed inspection report documents the inspection results discussed on June 27, 2013 with Mr. J.
Carlin and other members of his staff.
This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Should you have any questions concerning this letter, please contact us.
Sincerely,
/RA/
Scott M. Shaeffer, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79 Enclosure: NRC Material Control and Accounting Inspection Report 05000327/2013406 and 05000328/2013406 w/Attachment: Supplemental Information cc w/encl: (See page 3) _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE Via email Via email SMS /RA/ JDH /RA/
NAME WDeschaine GSmith SShaeffer JHamman DATE 08/08/2013 08/08/2013 09/09/2013 09/09/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/o encl:
via ListServ Letter to Joseph from Scott Shaeffer dated August 9, 2013 SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000327/2013406 AND 05000328/2013406 Distribution w/encl:
C. Evans, RII L. Douglas, RII OE Mail B. Westreich, NSIR E. McNiel, NSIR RIDSNRRDIRS R. Pascarelli, NRR RidsNrrPMSequoyah Resource