| {{#Wiki_filter:'~ Entergy Entergy Nuclear Operations, Inc.Vermont Yankee 320 Governor Hunt Rd Vernon, VT 05354 Tel 802 257 7711 Coley C. Chappell Licensing Manager BVY 13-084 September 9, 2013 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 | | {{#Wiki_filter:Entergy Nuclear Operations, Inc. |
| | '~ Entergy Vermont Yankee 320 Governor Hunt Rd Vernon, VT 05354 Tel 802 257 7711 Coley C. Chappell Licensing Manager BVY 13-084 September 9, 2013 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| | Revision of Technical Specification Bases Page Vermont Yankee Nuclear Power Station Docket No. 50-271 License No. DPR-28 |
|
| |
|
| ==REFERENCE:== | | ==REFERENCE:== |
| | Letter, USNRC to Entergy, "Vermont Yankee Nuclear Power Station - |
| | Issuance of Amendment to Renewed Facility Operating License RE: Change to Licensing Basis Regarding Station Blackout (TAC NO. MF0422)," NVY 13-090, dated August 15, 2013 |
|
| |
|
| Revision of Technical Specification Bases Page Vermont Yankee Nuclear Power Station Docket No. 50-271 License No. DPR-28 Letter, USNRC to Entergy, "Vermont Yankee Nuclear Power Station -Issuance of Amendment to Renewed Facility Operating License RE: Change to Licensing Basis Regarding Station Blackout (TAC NO. MF0422)," NVY 13-090, dated August 15, 2013
| | ==Dear Sir or Madam:== |
|
| |
|
| ==Dear Sir or Madam:==
| | This letter provides revised a Vermont Yankee Nuclear Power Station (VY) Technical Specification (TS) Bases page. The TS Bases were revised in conjunction with an Amendment to Renewed Facility Operating License DPR-28 issued in the referenced letter. |
| This letter provides revised a Vermont Yankee Nuclear Power Station (VY) Technical Specification (TS) Bases page. The TS Bases were revised in conjunction with an Amendment to Renewed Facility Operating License DPR-28 issued in the referenced letter.This change, processed in accordance with our TS Bases Control Program (TS 6.7.E), was determined not to require prior NRC approval. | | This change, processed in accordance with our TS Bases Control Program (TS 6.7.E), was determined not to require prior NRC approval. The revised Bases page is provided in Attachment 1 for your information and for updating and inclusion with your copy of VY TS. No NRC action is required in conjunction with this submittal. |
| The revised Bases page is provided in Attachment 1 for your information and for updating and inclusion with your copy of VY TS. No NRC action is required in conjunction with this submittal. | |
| There are no new regulatory commitments being made in this submittal. | | There are no new regulatory commitments being made in this submittal. |
| Should you have any questions concerning this submittal, please contact me at 802-451-3166. | | Should you have any questions concerning this submittal, please contact me at 802-451-3166. |
| Sincerely, CcD! | | Sincerely, CcD! |
| BVY 13-084 / Page 2 of 2 | | |
| | BVY 13-084 / Page 2 of 2 |
|
| |
|
| ==Attachment:== | | ==Attachment:== |
| : 1. Revised Technical Specification Bases Page cc: Mr. William M. Dean Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 Mr. Douglas V. Pickett, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 08C2A Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC 320 Governor Hunt Rd Vernon, Vermont 05354 Mr. Christopher Recchia, Commissioner VT Department of Public Service 112 State Street -Drawer 20 Montpelier, Vermont 05620-2601 BVY 13-084 Docket No. 50-271 Attachment 1 Vermont Yankee Nuclear Power Station Revised Technical Specification Bases Page VYNPS BASES: 3.10 AUXILIARY ELECTRIC POWER SYSTEMS A. The objective of this Specification is to assure that adequate power will be available to operate the emergency safeguards equipment. | | : 1. Revised Technical Specification Bases Page cc: Mr. William M. Dean Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 Mr. Douglas V. Pickett, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 08C2A Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC 320 Governor Hunt Rd Vernon, Vermont 05354 Mr. Christopher Recchia, Commissioner VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620-2601 |
| Adequate power can be provided by any one of the following sources: an immediate access source through both startup transformers, backfeed through the main transformer, or either of the two diesel generators. | | |
| The backfeed through the main transformer is a delayed access off-site power source. The delayed access source is made available by opening the generator no load disconnect switch and establishing a feed from the 345 kV switchyard through the main generator step up transformer and unit auxiliary transformer to the 4.16 kV buses. The delayed access source is available within an hour of loss of main generator capability to assure that fuel design limits and design conditions of the reactor coolant pressure boundary are not exceeded.Electric power can be supplied from the off-site transmission network to the on-site Emergency Safeguards Electric Power Distribution System by two independent sources, one immediate access and one delayed access, designed and located so as to minimize to the extent practicable the likelihood of their simultaneous failure under operating and postulated accident and environmental conditions. | | BVY 13-084 Docket No. 50-271 Attachment 1 Vermont Yankee Nuclear Power Station Revised Technical Specification Bases Page |
| An additional on-site Station Blackout Diesel Generator and an off-site source, a 4160 V tie line to Vernon Hydroelectric Station, can supply either 4160 V emergency bus.The on-site Station Blackout Diesel Generator is used to meet station blackout licensing requirements. | | |
| The 4160 V tie line is used to meet Appendix R licensing requirements. | | VYNPS BASES: |
| Off-site power is supplied to the Vermont Yankee (VY) 345 kV switchyard from the transmission network via two independent 345 kV tie lines from the Vernon 345 kV switchyard. | | 3.10 AUXILIARY ELECTRIC POWER SYSTEMS A. The objective of this Specification is to assure that adequate power will be available to operate the emergency safeguards equipment. |
| Both 345 kV tie lines are sized to carry the entire output of Vermont Yankee. Each 345 kV tie line is protected by two diverse and redundant channels of line protection. | | Adequate power can be provided by any one of the following sources: an immediate access source through both startup transformers, backfeed through the main transformer, or either of the two diesel generators. |
| The loss of one tie line does not affect the reliability or operability of the other. The new Vernon 345 kV switchyard is located just north of the VY 345 kV switchyard. | | The backfeed through the main transformer is a delayed access off-site power source. The delayed access source is made available by opening the generator no load disconnect switch and establishing a feed from the 345 kV switchyard through the main generator step up transformer and unit auxiliary transformer to the 4.16 kV buses. The delayed access source is available within an hour of loss of main generator capability to assure that fuel design limits and design conditions of the reactor coolant pressure boundary are not exceeded. |
| The Vernon 345 kV switchyard is connected to the 345 kV grid by four 345 kV transmission lines utilizing a "breaker and a half" scheme. With this redundant configuration, either 345 kV tie line meets the requirements for an operable delayed access source.In the VY 345 kV switchyard, a 400 MVA autotransformer is connected between the 345 kV north bus and the VY 115 kV bus through the K-I breaker. A second 400 MVA transformer, located in the new Vernon switchyard, connects the Vernon 345 kV switchyard to the Vernon 115 kV yard. This second autotransformer also feeds the VY 115 kV switchyard through the 115 kV K-40 tie line from the Vernon 115 kV switchyard. | | Electric power can be supplied from the off-site transmission network to the on-site Emergency Safeguards Electric Power Distribution System by two independent sources, one immediate access and one delayed access, designed and located so as to minimize to the extent practicable the likelihood of their simultaneous failure under operating and postulated accident and environmental conditions. An additional on-site Station Blackout Diesel Generator and an off-site source, a 4160 V tie line to Vernon Hydroelectric Station, can supply either 4160 V emergency bus. |
| The two autotransformers are operated in parallel to feed the VY 115 kV bus but are physically separated and electrically independent. | | The on-site Station Blackout Diesel Generator is used to meet station blackout licensing requirements. The 4160 V tie line is used to meet Appendix R licensing requirements. |
| The loss of one autotransformer will not cause loss of the other one. The two autotransformers are the normal source of power for the 115 kV bus and the station startup transformers. | | Off-site power is supplied to the Vermont Yankee (VY) 345 kV switchyard from the transmission network via two independent 345 kV tie lines from the Vernon 345 kV switchyard. Both 345 kV tie lines are sized to carry the entire output of Vermont Yankee. Each 345 kV tie line is protected by two diverse and redundant channels of line protection. The loss of one tie line does not affect the reliability or operability of the other. The new Vernon 345 kV switchyard is located just north of the VY 345 kV switchyard. The Vernon 345 kV switchyard is connected to the 345 kV grid by four 345 kV transmission lines utilizing a "breaker and a half" scheme. With this redundant configuration, either 345 kV tie line meets the requirements for an operable delayed access source. |
| They also feed the 115 kV transmission line to Chestnut Hill/Vernon Road.The immediate access source power is provided to the 4160 buses through two startup transformers fed from the VY 115 kV switchyard through disconnect T-3. It is available within seconds following a design basis accident to assure core cooling, containment integrity and other vital functions are being maintained. | | In the VY 345 kV switchyard, a 400 MVA autotransformer is connected between the 345 kV north bus and the VY 115 kV bus through the K-I breaker. A second 400 MVA transformer, located in the new Vernon switchyard, connects the Vernon 345 kV switchyard to the Vernon 115 kV yard. This second autotransformer also feeds the VY 115 kV switchyard through the 115 kV K-40 tie line from the Vernon 115 kV switchyard. The two autotransformers are operated in parallel to feed the VY 115 kV bus but are physically separated and electrically independent. The loss of one autotransformer will not cause loss of the other one. The two autotransformers are the normal source of power for the 115 kV bus and the station startup transformers. They also feed the 115 kV transmission line to Chestnut Hill/Vernon Road. |
| The normal supply to the VY 115 kV switchyard bus is from the two paralleled, but independent, 345 kV/115 kV autotransformers described above. In the unlikely event that both autotransformers are out of service, an alternate immediate access source through the Chestnut Hill/Vernon Road line, Vernon 115 kV yard and K-40 Tie Line may be made available. | | The immediate access source power is provided to the 4160 buses through two startup transformers fed from the VY 115 kV switchyard through disconnect T-3. It is available within seconds following a design basis accident to assure core cooling, containment integrity and other vital functions are being maintained. The normal supply to the VY 115 kV switchyard bus is from the two paralleled, but independent, 345 kV/115 kV autotransformers described above. In the unlikely event that both autotransformers are out of service, an alternate immediate access source through the Chestnut Hill/Vernon Road line, Vernon 115 kV yard and K-40 Tie Line may be made available. Its availability is dependent on its preloading of the Chestnut Hill/Vernon Road line which must be limited by system Amendment No. 2-'&, 14, 4-5-&, BVv -0 S2, 2--3, BVY 08 060, RVY 10 924, 220 |
| Its availability is dependent on its preloading of the Chestnut Hill/Vernon Road line which must be limited by system Amendment No. 2-'&, 14, 4-5-&, BVv -0 S2, 2--3, BVY 08 060, RVY 10 924,.VY 10 05, 258 220}} | | .VY 10 05, 258}} |
|
---|
Category:Letter type:BVY
MONTHYEARBVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-025, Pre-Notice of Disbursement from Decommissioning Trust2023-11-0202 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 BVY 23-022, Pre-Notice of Disbursement from Decommissioning Trust2023-08-23023 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-020, Pre-Notice of Disbursement from Decommissioning Trust2023-08-0202 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-08-0202 August 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-019, Update to 2022 Radiological Effluent Release Report2023-07-24024 July 2023 Update to 2022 Radiological Effluent Release Report BVY 23-018, Update to Nuclear Onsite Property Damage Insurance2023-07-12012 July 2023 Update to Nuclear Onsite Property Damage Insurance BVY 23-017, Pre-Notice of Disbursement from Decommissioning Trust2023-06-29029 June 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-016, 10 CFR 72.48 Report2023-06-0505 June 2023 10 CFR 72.48 Report BVY 23-015, Report of Investigation Pursuant to 1O CFR 20, Appendix G2023-06-0505 June 2023 Report of Investigation Pursuant to 1O CFR 20, Appendix G BVY 23-014, Pre-Notice of Disbursement from Decommissioning Trust2023-05-31031 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-013, 2022 Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Radiological Environmental Operating Report BVY 23-011, 2022 Radiological Effluent Release Report2023-05-10010 May 2023 2022 Radiological Effluent Release Report BVY 23-012, Pre-Notice of Disbursement from Decommissioning Trust2023-05-0202 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-009, 2022 Individual Monitoring NRC Form 5 Report2023-04-24024 April 2023 2022 Individual Monitoring NRC Form 5 Report BVY 23-008, Pre-Notice of Disbursement from Decommissioning Trust2023-04-0606 April 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-006, Status of Decommissioning and Spent Fuel Management Fund for Year Ending 20222023-03-29029 March 2023 Status of Decommissioning and Spent Fuel Management Fund for Year Ending 2022 BVY 23-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-03-29029 March 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-005, Nuclear Onsite Property Damage Insurance2023-03-13013 March 2023 Nuclear Onsite Property Damage Insurance BVY 23-004, Pre-Notice of Disbursement from Decommissioning Trust2023-03-0202 March 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-003, Pre-Notice of Disbursement from Decommissioning Trust2023-01-31031 January 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-030, Documentary Evidence of Performance Bond2022-12-30030 December 2022 Documentary Evidence of Performance Bond BVY 22-028, Re Proof of Financial Protection2022-11-28028 November 2022 Re Proof of Financial Protection BVY 22-027, Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station2022-11-11011 November 2022 Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station BVY 22-026, Pre-Notice of Disbursement from Decommissioning Trust2022-10-31031 October 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-025, Pre-Notice of Disbursement from Decommissioning Trust2022-10-0404 October 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-023, Pre-Notice of Disbursement from Decommissioning Trust2022-09-0101 September 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-022, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-22022 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-16016 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-020, Pre-Notice of Disbursement from Decommissioning Trust2022-08-0101 August 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-019, Pre-Notice of Disbursement from Decommissioning Trust2022-07-0606 July 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-013, Notification of Revised Decommissioning Cost Estimate2022-06-17017 June 2022 Notification of Revised Decommissioning Cost Estimate BVY 22-018, Pre-Notice of Disbursement from Decommissioning Trust2022-06-0808 June 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-015, 2021 Radiological Environmental Operating Report2022-05-0505 May 2022 2021 Radiological Environmental Operating Report BVY 22-017, Pre-Notice of Disbursement from Decommissioning Trust2022-05-0505 May 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-014, 2021 Radiological Effluent Release Report2022-04-28028 April 2022 2021 Radiological Effluent Release Report BVY 22-012, Biennial Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d)2022-04-12012 April 2022 Biennial Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) BVY 22-011, Pre-Notice of Disbursement from Decommissioning Trust2022-04-0404 April 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-009, Status of Decommissioning and Spent Fuel Management Fund for the Year Ending 20212022-03-23023 March 2022 Status of Decommissioning and Spent Fuel Management Fund for the Year Ending 2021 BVY 22-008, Pre-Notice of Disbursement from Decommissioning Trust2022-02-24024 February 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-005, ISFSI Decommissioning Funding Plan2022-02-24024 February 2022 ISFSI Decommissioning Funding Plan 2024-01-04
[Table view] Category:Technical Specification
MONTHYEARBVY 15-055, Revision of Technical Specifications Bases Pages2015-11-16016 November 2015 Revision of Technical Specifications Bases Pages BVY 15-024, Revision of Technical Specifications Bases Pages2015-03-25025 March 2015 Revision of Technical Specifications Bases Pages ML14231A0172014-08-13013 August 2014 Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 4 ML14202A2062014-07-16016 July 2014 Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 2 BVY 14-049, Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 32014-06-11011 June 2014 Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 3 ML13323A5182013-11-14014 November 2013 Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel BVY 13-084, Revision of Technical Specification Bases Page2013-09-0909 September 2013 Revision of Technical Specification Bases Page BVY 13-053, Revision of Technical Specifications Bases Pages2013-07-24024 July 2013 Revision of Technical Specifications Bases Pages BVY 13-062, Revised of Technical Specification Bases Pages2013-06-26026 June 2013 Revised of Technical Specification Bases Pages BVY 13-043, Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit2013-05-14014 May 2013 Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit BVY 13-023, License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 22013-04-29029 April 2013 License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 2 BVY 13-022, Revision of Technical Specification Bases Pages2013-03-26026 March 2013 Revision of Technical Specification Bases Pages BVY 12-078, Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information2012-11-20020 November 2012 Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information BVY 12-055, Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information2012-08-0707 August 2012 Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information BVY 12-018, Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change2012-04-17017 April 2012 Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change BVY 12-006, Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance2012-02-0101 February 2012 Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance BVY 12-005, Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change2012-02-0101 February 2012 Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change BVY 11-068, Revision of Technical Specification Bases Pages Due to License Amendment 2482011-09-30030 September 2011 Revision of Technical Specification Bases Pages Due to License Amendment 248 BVY 11-042, Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves2011-05-16016 May 2011 Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves BVY 11-037, Revision of Technical Specification Bases Pages Due to License Amendment 2462011-04-21021 April 2011 Revision of Technical Specification Bases Pages Due to License Amendment 246 BVY 10-059, Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool2010-11-0808 November 2010 Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool BVY 10-056, Submittal of Revision of Technical Specification Bases Pages2010-10-0606 October 2010 Submittal of Revision of Technical Specification Bases Pages BVY 10-047, Revision of Technical Specifications Bases Page2010-08-18018 August 2010 Revision of Technical Specifications Bases Page BVY 10-027, Revision of Technical Specification Bases Pages2010-05-21021 May 2010 Revision of Technical Specification Bases Pages BVY 10-017, Technical Specifications Proposed Change No. 290 Administrative Changes2010-04-13013 April 2010 Technical Specifications Proposed Change No. 290 Administrative Changes BVY 10-021, Revision of Technical Specification Bases Pages2010-03-31031 March 2010 Revision of Technical Specification Bases Pages BVY 09-074, Revision of Technical Specifications Bases Pages2009-12-0909 December 2009 Revision of Technical Specifications Bases Pages BVY 09-072, Technical Specification Bases Pages Associated with License Amendment 2362009-12-0909 December 2009 Technical Specification Bases Pages Associated with License Amendment 236 BVY 09-068, Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves2009-12-0303 December 2009 Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves BVY 09-055, Revision of Technical Specifications Bases Page2009-09-28028 September 2009 Revision of Technical Specifications Bases Page BVY 09-052, Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves2009-09-16016 September 2009 Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves BVY 09-051, Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls2009-08-26026 August 2009 Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls BVY 09-044, Revision of Technical Specifications Bases Pages2009-07-28028 July 2009 Revision of Technical Specifications Bases Pages BVY 09-029, Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test2009-05-0505 May 2009 Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test BVY 09-021, Submittal of Revision of Technical Specification Bases Pages2009-03-31031 March 2009 Submittal of Revision of Technical Specification Bases Pages BVY 09-014, Submittal of Revised Technical Specification Bases Pages2009-02-24024 February 2009 Submittal of Revised Technical Specification Bases Pages BVY 09-012, Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements2009-02-24024 February 2009 Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements ML0836500072008-12-18018 December 2008 Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 BVY 08-087, Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 62008-12-18018 December 2008 Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 BVY 08-087, Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations2008-12-18018 December 2008 Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations BVY 08-081, Submittal of Revision of Technical Specification Bases Page 292008-11-17017 November 2008 Submittal of Revision of Technical Specification Bases Page 29 BVY 08-076, Revision of Technical Specification Bases Pages2008-10-14014 October 2008 Revision of Technical Specification Bases Pages BVY 08-052, Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements2008-09-22022 September 2008 Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements BVY 08-059, Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications2008-09-22022 September 2008 Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications BVY 08-069, Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems2008-09-22022 September 2008 Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems BVY 08-066, Submittal of Corrected Technical Specification Page2008-08-26026 August 2008 Submittal of Corrected Technical Specification Page BVY 08-060, Submittal of Revision of Technical Specification Bases Page 2202008-08-25025 August 2008 Submittal of Revision of Technical Specification Bases Page 220 BVY 08-046, Revision of Technical Specification Bases Page 972008-07-28028 July 2008 Revision of Technical Specification Bases Page 97 BVY 08-031, Revision of Technical Specification Bases Page2008-05-29029 May 2008 Revision of Technical Specification Bases Page BVY 08-001, Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications2008-02-12012 February 2008 Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications 2015-03-25
[Table view] Category:Bases Change
MONTHYEARBVY 15-055, Revision of Technical Specifications Bases Pages2015-11-16016 November 2015 Revision of Technical Specifications Bases Pages BVY 15-024, Revision of Technical Specifications Bases Pages2015-03-25025 March 2015 Revision of Technical Specifications Bases Pages ML14231A0172014-08-13013 August 2014 Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 4 ML14202A2062014-07-16016 July 2014 Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 2 ML13323A5182013-11-14014 November 2013 Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel BVY 13-084, Revision of Technical Specification Bases Page2013-09-0909 September 2013 Revision of Technical Specification Bases Page BVY 13-053, Revision of Technical Specifications Bases Pages2013-07-24024 July 2013 Revision of Technical Specifications Bases Pages BVY 13-062, Revised of Technical Specification Bases Pages2013-06-26026 June 2013 Revised of Technical Specification Bases Pages BVY 13-043, Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit2013-05-14014 May 2013 Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit BVY 13-023, License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 22013-04-29029 April 2013 License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 2 BVY 13-022, Revision of Technical Specification Bases Pages2013-03-26026 March 2013 Revision of Technical Specification Bases Pages BVY 12-078, Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information2012-11-20020 November 2012 Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information BVY 12-055, Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information2012-08-0707 August 2012 Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information BVY 12-018, Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change2012-04-17017 April 2012 Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change BVY 12-006, Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance2012-02-0101 February 2012 Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance BVY 12-005, Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change2012-02-0101 February 2012 Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change BVY 11-068, Revision of Technical Specification Bases Pages Due to License Amendment 2482011-09-30030 September 2011 Revision of Technical Specification Bases Pages Due to License Amendment 248 BVY 11-042, Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves2011-05-16016 May 2011 Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves BVY 11-037, Revision of Technical Specification Bases Pages Due to License Amendment 2462011-04-21021 April 2011 Revision of Technical Specification Bases Pages Due to License Amendment 246 BVY 10-056, Submittal of Revision of Technical Specification Bases Pages2010-10-0606 October 2010 Submittal of Revision of Technical Specification Bases Pages BVY 10-047, Revision of Technical Specifications Bases Page2010-08-18018 August 2010 Revision of Technical Specifications Bases Page BVY 10-027, Revision of Technical Specification Bases Pages2010-05-21021 May 2010 Revision of Technical Specification Bases Pages BVY 10-017, Technical Specifications Proposed Change No. 290 Administrative Changes2010-04-13013 April 2010 Technical Specifications Proposed Change No. 290 Administrative Changes BVY 10-021, Revision of Technical Specification Bases Pages2010-03-31031 March 2010 Revision of Technical Specification Bases Pages BVY 09-072, Technical Specification Bases Pages Associated with License Amendment 2362009-12-0909 December 2009 Technical Specification Bases Pages Associated with License Amendment 236 BVY 09-074, Revision of Technical Specifications Bases Pages2009-12-0909 December 2009 Revision of Technical Specifications Bases Pages BVY 09-068, Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves2009-12-0303 December 2009 Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves BVY 09-055, Revision of Technical Specifications Bases Page2009-09-28028 September 2009 Revision of Technical Specifications Bases Page BVY 09-044, Revision of Technical Specifications Bases Pages2009-07-28028 July 2009 Revision of Technical Specifications Bases Pages BVY 09-021, Submittal of Revision of Technical Specification Bases Pages2009-03-31031 March 2009 Submittal of Revision of Technical Specification Bases Pages BVY 09-014, Submittal of Revised Technical Specification Bases Pages2009-02-24024 February 2009 Submittal of Revised Technical Specification Bases Pages BVY 08-087, Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 62008-12-18018 December 2008 Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 ML0836500072008-12-18018 December 2008 Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 BVY 08-087, Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations2008-12-18018 December 2008 Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations BVY 08-081, Submittal of Revision of Technical Specification Bases Page 292008-11-17017 November 2008 Submittal of Revision of Technical Specification Bases Page 29 BVY 08-076, Revision of Technical Specification Bases Pages2008-10-14014 October 2008 Revision of Technical Specification Bases Pages BVY 08-052, Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements2008-09-22022 September 2008 Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements BVY 08-069, Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems2008-09-22022 September 2008 Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems BVY 08-060, Submittal of Revision of Technical Specification Bases Page 2202008-08-25025 August 2008 Submittal of Revision of Technical Specification Bases Page 220 BVY 08-046, Revision of Technical Specification Bases Page 972008-07-28028 July 2008 Revision of Technical Specification Bases Page 97 BVY 08-031, Revision of Technical Specification Bases Page2008-05-29029 May 2008 Revision of Technical Specification Bases Page BVY 07-052, Revision of Technical Specification Bases Pages2007-07-31031 July 2007 Revision of Technical Specification Bases Pages BVY 07-043, Revision of Technical Specification Bases Pages2007-06-21021 June 2007 Revision of Technical Specification Bases Pages BVY 07-015, Technical Specifications Proposed Change No. 272 - Transmittal of Final Retyped Technical Specifications Pages2007-03-14014 March 2007 Technical Specifications Proposed Change No. 272 - Transmittal of Final Retyped Technical Specifications Pages BVY 06-028, Technical Specifications Proposed Change No. 272, Relocation of LCO 3.6.I and SR 4.6.I and Addition of LCO 3.0.8 Regarding Snubbers2006-04-22022 April 2006 Technical Specifications Proposed Change No. 272, Relocation of LCO 3.6.I and SR 4.6.I and Addition of LCO 3.0.8 Regarding Snubbers BVY 06-001, Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 44 Extended Power Uprate - Revised License and Technical Specifications2006-01-10010 January 2006 Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 44 Extended Power Uprate - Revised License and Technical Specifications BVY 05-099, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 39 Extended Power Uprate - Risk Analysis of Containment Overpressure2005-10-26026 October 2005 Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 39 Extended Power Uprate - Risk Analysis of Containment Overpressure BVY 05-074, Transmittal of Vermont Yankee Technical Specification Proposed Change No. 263 - Supplement No. 31 Extended Power Uprate - Response for Additional Information2005-08-0404 August 2005 Transmittal of Vermont Yankee Technical Specification Proposed Change No. 263 - Supplement No. 31 Extended Power Uprate - Response for Additional Information BVY 05-072, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 30 Extended Power Uprate - Response to Request for Additional Information2005-08-0101 August 2005 Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 30 Extended Power Uprate - Response to Request for Additional Information ML0511902932005-04-22022 April 2005 Response to Request for Additional Information - Technical Specification Proposed Change No. 268. One- Time Integrated Leak Rate Test (ILRT) . One-time Integrated Leak Rate Test (ILRT) Interval Extension 2015-03-25
[Table view] |
Text
Entergy Nuclear Operations, Inc.
'~ Entergy Vermont Yankee 320 Governor Hunt Rd Vernon, VT 05354 Tel 802 257 7711 Coley C. Chappell Licensing Manager BVY 13-084 September 9, 2013 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
Revision of Technical Specification Bases Page Vermont Yankee Nuclear Power Station Docket No. 50-271 License No. DPR-28
REFERENCE:
Letter, USNRC to Entergy, "Vermont Yankee Nuclear Power Station -
Issuance of Amendment to Renewed Facility Operating License RE: Change to Licensing Basis Regarding Station Blackout (TAC NO. MF0422)," NVY 13-090, dated August 15, 2013
Dear Sir or Madam:
This letter provides revised a Vermont Yankee Nuclear Power Station (VY) Technical Specification (TS) Bases page. The TS Bases were revised in conjunction with an Amendment to Renewed Facility Operating License DPR-28 issued in the referenced letter.
This change, processed in accordance with our TS Bases Control Program (TS 6.7.E), was determined not to require prior NRC approval. The revised Bases page is provided in Attachment 1 for your information and for updating and inclusion with your copy of VY TS. No NRC action is required in conjunction with this submittal.
There are no new regulatory commitments being made in this submittal.
Should you have any questions concerning this submittal, please contact me at 802-451-3166.
Sincerely, CcD!
BVY 13-084 / Page 2 of 2
Attachment:
- 1. Revised Technical Specification Bases Page cc: Mr. William M. Dean Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 Mr. Douglas V. Pickett, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 08C2A Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC 320 Governor Hunt Rd Vernon, Vermont 05354 Mr. Christopher Recchia, Commissioner VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620-2601
BVY 13-084 Docket No. 50-271 Attachment 1 Vermont Yankee Nuclear Power Station Revised Technical Specification Bases Page
VYNPS BASES:
3.10 AUXILIARY ELECTRIC POWER SYSTEMS A. The objective of this Specification is to assure that adequate power will be available to operate the emergency safeguards equipment.
Adequate power can be provided by any one of the following sources: an immediate access source through both startup transformers, backfeed through the main transformer, or either of the two diesel generators.
The backfeed through the main transformer is a delayed access off-site power source. The delayed access source is made available by opening the generator no load disconnect switch and establishing a feed from the 345 kV switchyard through the main generator step up transformer and unit auxiliary transformer to the 4.16 kV buses. The delayed access source is available within an hour of loss of main generator capability to assure that fuel design limits and design conditions of the reactor coolant pressure boundary are not exceeded.
Electric power can be supplied from the off-site transmission network to the on-site Emergency Safeguards Electric Power Distribution System by two independent sources, one immediate access and one delayed access, designed and located so as to minimize to the extent practicable the likelihood of their simultaneous failure under operating and postulated accident and environmental conditions. An additional on-site Station Blackout Diesel Generator and an off-site source, a 4160 V tie line to Vernon Hydroelectric Station, can supply either 4160 V emergency bus.
The on-site Station Blackout Diesel Generator is used to meet station blackout licensing requirements. The 4160 V tie line is used to meet Appendix R licensing requirements.
Off-site power is supplied to the Vermont Yankee (VY) 345 kV switchyard from the transmission network via two independent 345 kV tie lines from the Vernon 345 kV switchyard. Both 345 kV tie lines are sized to carry the entire output of Vermont Yankee. Each 345 kV tie line is protected by two diverse and redundant channels of line protection. The loss of one tie line does not affect the reliability or operability of the other. The new Vernon 345 kV switchyard is located just north of the VY 345 kV switchyard. The Vernon 345 kV switchyard is connected to the 345 kV grid by four 345 kV transmission lines utilizing a "breaker and a half" scheme. With this redundant configuration, either 345 kV tie line meets the requirements for an operable delayed access source.
In the VY 345 kV switchyard, a 400 MVA autotransformer is connected between the 345 kV north bus and the VY 115 kV bus through the K-I breaker. A second 400 MVA transformer, located in the new Vernon switchyard, connects the Vernon 345 kV switchyard to the Vernon 115 kV yard. This second autotransformer also feeds the VY 115 kV switchyard through the 115 kV K-40 tie line from the Vernon 115 kV switchyard. The two autotransformers are operated in parallel to feed the VY 115 kV bus but are physically separated and electrically independent. The loss of one autotransformer will not cause loss of the other one. The two autotransformers are the normal source of power for the 115 kV bus and the station startup transformers. They also feed the 115 kV transmission line to Chestnut Hill/Vernon Road.
The immediate access source power is provided to the 4160 buses through two startup transformers fed from the VY 115 kV switchyard through disconnect T-3. It is available within seconds following a design basis accident to assure core cooling, containment integrity and other vital functions are being maintained. The normal supply to the VY 115 kV switchyard bus is from the two paralleled, but independent, 345 kV/115 kV autotransformers described above. In the unlikely event that both autotransformers are out of service, an alternate immediate access source through the Chestnut Hill/Vernon Road line, Vernon 115 kV yard and K-40 Tie Line may be made available. Its availability is dependent on its preloading of the Chestnut Hill/Vernon Road line which must be limited by system Amendment No. 2-'&, 14, 4-5-&, BVv -0 S2, 2--3, BVY 08 060, RVY 10 924, 220
.VY 10 05, 258