ML13273A202: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 09/19/2013 | | issue date = 09/19/2013 | ||
| title = Response to RIS 2013-06, Preparation and Scheduling of Operator Licensing Examinations. | | title = Response to RIS 2013-06, Preparation and Scheduling of Operator Licensing Examinations. | ||
| author name = Lynch J | | author name = Lynch J | ||
| author affiliation = Entergy Nuclear Operations, Inc | | author affiliation = Entergy Nuclear Operations, Inc | ||
| addressee name = | | addressee name = | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:vEntergy Entergy Nuclear Operations, Inc.600 Rocky Hill Road Plymouth, MA 02360 Pilgrim Nuclear Power Station September 19, 2013 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 | {{#Wiki_filter:vEntergy Entergy Nuclear Operations, Inc. | ||
600 Rocky Hill Road Plymouth, MA 02360 Pilgrim Nuclear Power Station September 19, 2013 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Response to RIS 2013-06 "Preparation and Scheduling of Operator Licensing Examinations" LETTER NUMBER: 2.13.077 | Entergy Nuclear Operations, Inc. | ||
Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Response to RIS 2013-06 "Preparation and Scheduling of Operator Licensing Examinations" LETTER NUMBER: 2.13.077 | |||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
On June 7, 2013, the NRC issued Regulatory Issue Summary (RIS) 2013-06, "Preparation and Scheduling of Operator Licensing Examinations". | On June 7, 2013, the NRC issued Regulatory Issue Summary (RIS) 2013-06, "Preparation and Scheduling of Operator Licensing Examinations". | ||
This RIS requested information from licensees regarding proposed licensed operator examinations schedules and estimated number of applicants in order to assist the NRC in planning resources. | This RIS requested information from licensees regarding proposed licensed operator examinations schedules and estimated number of applicants in order to assist the NRC in planning resources. Accordingly, the requested information is provided on the enclosed NRC Form 536. | ||
Accordingly, the requested information is provided on the enclosed NRC Form 536.There are no commitments contained in this letter.Please contact me at (508) 830-8403, if there are any questions regarding this subject.Sincerely, Joseph R.Lynch Manager, Licensing JRL/fm | There are no commitments contained in this letter. | ||
Please contact me at (508) 830-8403, if there are any questions regarding this subject. | |||
Sincerely, Joseph R.Lynch Manager, Licensing JRL/fm | |||
==Enclosure:== | ==Enclosure:== | ||
Completed NRC Form 536 cc: Mr. William M. Dean Senior Resident Inspector Regional Administrator, Region 1 Pilgrim Nuclear Power Station U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-2713 | |||
ýADC) | |||
Enclosure to Pilgrim Letter 2.13.077 Completed NRC Form 536 (1 page) | Enclosure to Pilgrim Letter 2.13.077 Completed NRC Form 536 (1 page) | ||
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30(2014 (09-2011) | |||
Estimated burden per response to comply with this voluntary information collection request 1 hour. This information collection is used to plan budgets and resources for operator examinations. | NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30(2014 (09-2011) Estimated burden per response to comply with this voluntary information collection request 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (1.5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-1020Z (3150-0131), Office ot Management and Budget, Washington, DC 20503. Ifa means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. | ||
Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (1.5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-1020Z (3150-0131), Office ot Management and Budget, Washington, DC 20503. | FACILITY NRC REGION PILGRIM NUCLEAR POWER STATION I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 15 CY 16 CY 17 CY 18 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 15 CY 16 CY 17 CY 18 NUMBER OF REACTOR 0 0 5 0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 6 0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 PROPOSED DATES PRIMARY DATE N/A N/A 1/30/2017 N/A ALTERNATE DATE N/A N/A 2/6/2017 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 15 CY 16 PROPOSED -- _, -- | ||
FACILITY NRC REGION PILGRIM NUCLEAR POWER STATION I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 15 CY 16 CY 17 CY 18 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 15 CY 16 CY 17 CY 18 NUMBER OF REACTOR 0 0 5 0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS | NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 l1 0 0 0 0 CANDIDATES NRC FORM 536 (09-2011)}} | ||
-INSTANT 6 0 NUMBER OF SENIOR REACTOR OPERATORS | |||
-UPGRADE 0 0 NUMBER OF SENIOR REACTOR OPERATORS | |||
-LIMITED 0 PROPOSED DATES PRIMARY DATE N/A N/A 1/30/2017 N/A ALTERNATE DATE N/A N/A 2/6/2017 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 15 CY 16 PROPOSED --_, --NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 l1 0 0 0 0 CANDIDATES NRC FORM 536 (09-2011)}} |
Latest revision as of 13:06, 4 November 2019
ML13273A202 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 09/19/2013 |
From: | Jeffery Lynch Entergy Nuclear Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
2.13.077 | |
Download: ML13273A202 (3) | |
Text
vEntergy Entergy Nuclear Operations, Inc.
600 Rocky Hill Road Plymouth, MA 02360 Pilgrim Nuclear Power Station September 19, 2013 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Response to RIS 2013-06 "Preparation and Scheduling of Operator Licensing Examinations" LETTER NUMBER: 2.13.077
Dear Sir or Madam:
On June 7, 2013, the NRC issued Regulatory Issue Summary (RIS) 2013-06, "Preparation and Scheduling of Operator Licensing Examinations".
This RIS requested information from licensees regarding proposed licensed operator examinations schedules and estimated number of applicants in order to assist the NRC in planning resources. Accordingly, the requested information is provided on the enclosed NRC Form 536.
There are no commitments contained in this letter.
Please contact me at (508) 830-8403, if there are any questions regarding this subject.
Sincerely, Joseph R.Lynch Manager, Licensing JRL/fm
Enclosure:
Completed NRC Form 536 cc: Mr. William M. Dean Senior Resident Inspector Regional Administrator, Region 1 Pilgrim Nuclear Power Station U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-2713
ýADC)
Enclosure to Pilgrim Letter 2.13.077 Completed NRC Form 536 (1 page)
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30(2014 (09-2011) Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (1.5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-1020Z (3150-0131), Office ot Management and Budget, Washington, DC 20503. Ifa means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION PILGRIM NUCLEAR POWER STATION I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 15 CY 16 CY 17 CY 18 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 15 CY 16 CY 17 CY 18 NUMBER OF REACTOR 0 0 5 0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 6 0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 PROPOSED DATES PRIMARY DATE N/A N/A 1/30/2017 N/A ALTERNATE DATE N/A N/A 2/6/2017 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 15 CY 16 PROPOSED -- _, --
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 l1 0 0 0 0 CANDIDATES NRC FORM 536 (09-2011)