| number = ML14111A367
| number = ML14111A367
| issue date = 03/21/2014
| issue date = 03/21/2014
| title = River Bend -2014-03-Draft Outline Comments
| title = 2014-03-Draft Outline Comments
| author name = Gaddy V G
| author name = Gaddy V
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Attachment 6 OBDI 202 - I OLE Process Rev 1 DRAFT OUTLINE COMMENTS Facility: River Bend First Exam Date:
{{#Wiki_filter:DRAFT OUTLINE COMMENTS Facility:   River Bend                               First Exam Date:         3/21/14 Written Exam Outline Comment                                       Resolution In Tier 1, Group 2 for the RO, System     K/A moved.
3/21/14 Written Exam Outline Comment Resolution 1 In Tier 1, Group 2 for the RO, System 295008 is High Reactor Water Level, but the K/A is for High Containment Temperature. Need to move the K/A to system 295011.
295008 is High Reactor Water Level, but the K/A is for High Containment Temperature. Need to move the K/A to system 295011.
K/A moved.
2 3
2   3   4   5     Administrative JPM Outline (Date) Comment Resolution 1 JPMs A5, A7, and A8 appear to be RO JPMs. Need to convert at least one to an SRO level JPM.
4 5
JPM's A7 and A8 replaced.
Administrative JPM Outline (Date)
2   3   4   5 Control Room / In
Comment                                       Resolution JPMs A5, A7, and A8 appear to be RO       JPMs A7 and A8 replaced.
-Plant System JPM Outline (Date) Comment Resolution 1 Check with exam author to determine if JPM S5 is a one step JPM.
JPMs. Need to convert at least one to an SRO level JPM.
Determined that the JPM is not one step due to alternate path.
2 3
2   3   4   5 Attachment 6 OBDI 202 - I OLE Process Rev 1 Simulator Scenario Outline Comments (Date) Comment Resolution 1 Scenario 1  
4 5
- Replace Event 2 with an I/C malfunction for the ATC.
Control Room / In-Plant System JPM Outline (Date)
Comment                                       Resolution Check with exam author to determine if   Determined that the JPM is not one step due 1
JPM S5 is a one step JPM.                to alternate path.
2 3
4 5                     OBDI 202 - IOLE Process                             Rev 1
 
Simulator Scenario Outline Comments (Date)
Comment                                       Resolution Scenario 1 - Replace Event 2 with an         Scenario revised to incorporate comments.
I/C malfunction for the ATC.
If Event 6 is an action required in response to Event 5, eliminate Event 6.
If Event 6 is an action required in response to Event 5, eliminate Event 6.
What is the cause of the uncontrolled pressure drop and what is the remed y? What alternate leg of the EOPs is exercised in this scenario?
1 What is the cause of the uncontrolled pressure drop and what is the remedy?
Scenario revised to incorporate comments.
What alternate leg of the EOPs is exercised in this scenario?
2 Scenario 2
Scenario 2 - Make Event 2 Event 1.          Scenario revised to incorporate comments.
- Make Event 2 Event 1.
Delete Event 1 and 3.
Delete Event 1 and 3.
Add an I/C malfunction for the ATC before the major event.
Add an I/C malfunction for the ATC before the major event.
What alternate leg of the EOPs is exercised in this scenario?
2 What alternate leg of the EOPs is exercised in this scenario?
If Event 6 directly leads to Event 7 then it is part of the major event.
If Event 6 directly leads to Event 7 then it is part of the major event.
Scenario revised to incorporate comments.
Scenario 3 - Make Event 2 Event 1.          Scenario revised to incorporate comments.
3 Scenario 3
- Make Event 2 Event 1.
Delete Events 1 and 3.
Delete Events 1 and 3.
Add an I/C for the BOP before the major event.
Add an I/C for the BOP before the major event.
Does Event 5 result in a loss of both CRD pumps? What are the Tech Spec implications?
Does Event 5 result in a loss of both CRD pumps? What are the Tech Spec 3
implications?
What alternate leg of the EOPs is exercised in this scenario?
What alternate leg of the EOPs is exercised in this scenario?
Add a second Tech Spec event.
Add a second Tech Spec event.
What are the expected actions for Event 8? Scenario revised to incorporate comments.
What are the expected actions for Event 8?
4 Scenario 4  
Scenario 4 - Delete Event 2.                Scenario revised to incorporate comments.
- Delete Event 2.
Component names were added. Note that Add a Tech Spec Event for the BOP           Scenario 4 is the spare.
Add a Tech Spec Event for the BOP before the major event.
4 before the major event.
What is the significance of the loss of Scenario revised to incorporate comments. Component names were added.
What is the significance of the loss of                       OBDI 202 - IOLE Process                              Rev 1
Note that Scenario 4 is the spare.


Attachment 6 OBDI 202 - I OLE Process Rev 1 RHR A in event 7?
RHR A in event 7?
What alternate leg of the EOPs is exercised in this scenario?
What alternate leg of the EOPs is exercised in this scenario?
What is HDL
What is HDL-P1A?
-P1A?
What is CNM-FV114?
What is CNM-FV114? What is the significance of Event 9?
What is the significance of Event 9?
5}}
5                     OBDI 202 - IOLE Process Rev 1}}

Latest revision as of 06:36, 4 November 2019

2014-03-Draft Outline Comments
ML14111A367
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/21/2014
From: Vincent Gaddy
Operations Branch IV
To:
Entergy Operations
laura hurley
References
50-458/14-03
Download: ML14111A367 (3)


Text

DRAFT OUTLINE COMMENTS Facility: River Bend First Exam Date: 3/21/14 Written Exam Outline Comment Resolution In Tier 1, Group 2 for the RO, System K/A moved.

295008 is High Reactor Water Level, but 1 the K/A is for High Containment Temperature. Need to move the K/A to system 295011.

2 3

4 5

Administrative JPM Outline (Date)

Comment Resolution JPMs A5, A7, and A8 appear to be RO JPMs A7 and A8 replaced.

1 JPMs. Need to convert at least one to an SRO level JPM.

2 3

4 5

Control Room / In-Plant System JPM Outline (Date)

Comment Resolution Check with exam author to determine if Determined that the JPM is not one step due 1

JPM S5 is a one step JPM. to alternate path.

2 3

4 5 OBDI 202 - IOLE Process Rev 1

Simulator Scenario Outline Comments (Date)

Comment Resolution Scenario 1 - Replace Event 2 with an Scenario revised to incorporate comments.

I/C malfunction for the ATC.

If Event 6 is an action required in response to Event 5, eliminate Event 6.

1 What is the cause of the uncontrolled pressure drop and what is the remedy?

What alternate leg of the EOPs is exercised in this scenario?

Scenario 2 - Make Event 2 Event 1. Scenario revised to incorporate comments.

Delete Event 1 and 3.

Add an I/C malfunction for the ATC before the major event.

2 What alternate leg of the EOPs is exercised in this scenario?

If Event 6 directly leads to Event 7 then it is part of the major event.

Scenario 3 - Make Event 2 Event 1. Scenario revised to incorporate comments.

Delete Events 1 and 3.

Add an I/C for the BOP before the major event.

Does Event 5 result in a loss of both CRD pumps? What are the Tech Spec 3

implications?

What alternate leg of the EOPs is exercised in this scenario?

Add a second Tech Spec event.

What are the expected actions for Event 8?

Scenario 4 - Delete Event 2. Scenario revised to incorporate comments.

Component names were added. Note that Add a Tech Spec Event for the BOP Scenario 4 is the spare.

4 before the major event.

What is the significance of the loss of OBDI 202 - IOLE Process Rev 1

RHR A in event 7?

What alternate leg of the EOPs is exercised in this scenario?

What is HDL-P1A?

What is CNM-FV114?

What is the significance of Event 9?

5 OBDI 202 - IOLE Process Rev 1