ML15083A062: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/06/2015
| issue date = 03/06/2015
| title = 2015 Point Beach Nuclear Plant Initial License Examination Form ES-401-4
| title = 2015 Point Beach Nuclear Plant Initial License Examination Form ES-401-4
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:ES-401 Record of Rejected K/As Form ES-401-4   Tier / Group Randomly Selected K/A Reason for Rejection RO Tier 1 / Group 1 APE 022AK1.04 Loss of Reactor Coolant Makeup Reason for changing from manual to automatic control of charging flow valve controller: PBNP does not have a Charging Flow Valve Controller which has an automatic feature. Reselected 022AK1.03 RO Tier 1 / Group 1 EPE 038EK1.04 Steam Generator Tube Rupture (SGTR): Reflux boiling: Reflux boiling is not used as a mitigation strategy for SGTR at PBNP: Reselected 038EK1.01 RO Tier 1 / Group 1 APE 054K2.* Loss of Main Feedwater (MFW): No K2.* K/A with an RO Importance Rating :  Reselected 054G2.2.36 RO Tier 1 / Group 1 EPE 055EK2.* Loss of Offsite and Onsite Power (Station Blackout): No K2.* K/A with an RO : Reselected 055G2.4.8 RO Tier 1 / Group 1 W/E04EA2.1 LOCA Outside Containment: Facility conditions and selection of appropriate procedures during abnormal and emergency operations: Determined to be an SRO level question due to selection of procedures while within the EOP network: Reselected W/E04EA2.2 RO Tier 1 / Group 2 APE 059AK1.05 Accidental Liquid Radioactive-Waste Release: The calculation of offsite doses due to a release from the power plant: This is not an RO responsibility/job at PBNP: Reselected 059AK1.01 RO Tier 1 / Group 2 W/E13EA2.
{{#Wiki_filter:ES-401                           Record of Rejected K/As                     Form ES-401-4 Randomly Tier /
1 Steam Generator Overpressure: Facility conditions and selection of appropriate procedures during abnormal and emergency operations: This is not an RO responsibility at PBNP due to being a "Yellow" Critical Safety Function Path: Reselected W/E13EA2.2 RO Tier 2 / Group 1 SYS 010A3.01 Pressurizer Pressure Control System (PZR PCS): PRT temperature and pressure during PORV testing: No PORV testing is performed at PBNP which causes a temperature change in the PRT: Reselected 010A3.02 RO Tier 2 / Group 1 SYS 078K5.* Instrument Air System (IAS): No K5.* K/A 2.5: Reselected 078K1.04, see explanation below (061K1.*) RO Tier 2 / Group 1 SYS 061K1.* Auxiliary / Emergency Feedwater (AFW) System: Was not used due to no he randomly exchanged it with an already selected K/A (i.e., 061K1.*):  Reselected 061K5.05 RO Tier 2 / Group 1 SYS103K5.* Containment System:  No K5.* K/A with an RO Importance Rating :  Reselected 103K3.01, see explanation below (073K3.*) RO Tier 2 / Group 1 SYS 073K3.* Process Radiation (PRM) System: Was not used due to no 103K5.* K/A with 103 (Calready selected K/A (i.e., 073K3.*):  Reselected 073K5.01 RO Tier 2 / Group 1 SYS 076K4.01 Service Water System (SWS):  Conditions initiating automatic closure of closed cooling water auxiliary building header supply and return valves: The Auxiliary Building at PBNP does not have header supply and return valves with an automatic closure: Reselected 076K4.06 Tier / Group Randomly Selected K/A Reason for Rejection RO Tier 2 / Group 1 SYS 076K4.06 Service Water System (SWS): Service water train separation:  Train separation is only achieved by Service Water Pump power supplies at PBNP:  Reselected 076K4.02 RO Tier 2 / Group 2 SYS 029A4.04 Containment Purge System (CPS): Containment evacuation signal: Unable to construct a question with the required level of difficulty:  Reselected 029A4.01 RO Tier 2 / Group 2 SYS 029A4.01 Containment Purge System (CPS): Containment purge flow rate: Purge flow rate of the Containment Purge System is not monitored: No further A4.* K/A  029A3.01 due to A3 not being sampled within Tier 2/Group2 RO Tier 2 / Group 2 SYS 041K1.02 Steam Dump System (SDS) and Turbine Bypass Control: S/G level: Unable to construct a question with the required level of difficulty: Reselected 041K1.05 SRO Tier 1 / Group 1 APE 026G2.2.4 Loss of Component Cooling Water (CCW): (multi-unit license) Ability to explain the variations in control board/control room layouts, systems, instrumentation, and procedural actions between units at a facility: No differences between the units which leveraged as a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 026G2.2.38 SRO Tier 1 / Group 1 APE 040AA2.02 Steam Line Rupture:  Conditions requiring a reactor trip:  Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 040AA2.04 SRO Tier 1 / Group 2 APE 036G2.1.25 Fuel Handling Incidents:  Ability to interpret reference materials, such as graphs, curves, tables, etc:  Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 036G2.1.31 SRO Tier 1 / Group 2 APE 036G2.1.31 Fuel Handling Incidents:  Ability to locate control room switches, controls, and indications, and to determine that they correctly reflect the desired plant lineup.:  Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 036G2.1.23 SRO Tier 2 / Group 1 SYS 007A2.06 Pressurizer Relief Tank/Quench Tank System (PRTS): Bubble formation in PZR:  Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 007A2.07 SRO Tier 2 / Group 1 SYS 007A2.07 Pressurizer Relief Tank/Quench Tank System (PRTS): Recirculating quench tank:  There are no procedures at PBNP which accomplish this task. Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 007A2.01 SRO Tier 2 / Group 2 SYS 011G2.1.31 Pressurizer Level Control System (PZR LCS): Ability to locate control room switches, controls, and indications, and to determine that they correctly reflect the desired plant lineup: Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 011G2.1.32 Tier / Group Randomly Selected K/A Reason for Rejection RO Tier 2 / Group 2 SYS 022G2.2.4 Containment Spray System (CSS): (multi-unit license) Ability to explain the variations in control board/control room layouts, systems, instrumentation, and procedural actions between units at a facility:  Unable to write a question to meet this K/A due to no major differences between units for this system: Reselected 022G2.2.39 RO Tier 2 / Group 1 SYS 078K1.04 Instrument Air System (IAS): Cooling water to compressor: Unable to write a question to meet this K/A due only one station air compressor has cooling water supplied to it, and there is a question focused on this in the test already (SRO Tier 1/Group 1, 065A204 - Typical conditions which could cause a compressor trip (e.g., high temperature): Reselected 078K1.05 RO Tier 1 / Group 2 APE 033AA2.12 Loss of Intermediate Range Nuclear Instrumentation: Ability to determine and interpret the following as they apply to the Loss of Intermediate Range Nuclear Instrumentation: Maximum allowable channel disagreement.: Submitted question was determined to not be discriminatorily valid. Unable to write a replacement question that meets this KA and that has discrimination validity. Discussed with Chief Examiner and obtained approval to redraw: Reselected 033AA2.01}}
Selected                              Reason for Rejection Group K/A RO Tier 1 / APE       Loss of Reactor Coolant Makeup Group 1    022AK1.04  Reason for changing from manual to automatic control of charging flow valve controller: PBNP does not have a Charging Flow Valve Controller which has an automatic feature. Reselected 022AK1.03 RO Tier 1 / EPE       Steam Generator Tube Rupture (SGTR): Reflux boiling: Reflux boiling is not Group 1    038EK1.04  used as a mitigation strategy for SGTR at PBNP: Reselected 038EK1.01 RO Tier 1 / APE       Loss of Main Feedwater (MFW): No K2.* K/A with an RO Importance Rating Group 1    054K2.*    2.5: Reselected 054G2.2.36 RO Tier 1 / EPE       Loss of Offsite and Onsite Power (Station Blackout): No K2.* K/A with an RO Group 1    055EK2.*  Importance Rating  2.5: Reselected 055G2.4.8 RO Tier 1 / W/E04EA2. LOCA Outside Containment: Facility conditions and selection of appropriate Group 1    1          procedures during abnormal and emergency operations: Determined to be an SRO level question due to selection of procedures while within the EOP network: Reselected W/E04EA2.2 RO Tier 1 / APE       Accidental Liquid Radioactive-Waste Release: The calculation of offsite Group 2    059AK1.05  doses due to a release from the power plant: This is not an RO responsibility/job at PBNP: Reselected 059AK1.01 RO Tier 1 / W/E13EA2. Steam Generator Overpressure: Facility conditions and selection of Group 2    1          appropriate procedures during abnormal and emergency operations: This is not an RO responsibility at PBNP due to being a Yellow Critical Safety Function Path: Reselected W/E13EA2.2 RO Tier 2 / SYS       Pressurizer Pressure Control System (PZR PCS): PRT temperature and Group 1    010A3.01  pressure during PORV testing: No PORV testing is performed at PBNP which causes a temperature change in the PRT: Reselected 010A3.02 RO Tier 2 / SYS       Instrument Air System (IAS): No K5.* K/A with an RO Importance Rating Group 1    078K5.*    2.5: Reselected 078K1.04, see explanation below (061K1.*)
RO Tier 2 / SYS       Auxiliary / Emergency Feedwater (AFW) System: Was not used due to no Group 1    061K1.*    078K5.* K/A with an RO Importance Rating  2.5, randomly selected the available K/As within 078 (Instrument Air) which had a K/A  2.5, and then randomly exchanged it with an already selected K/A (i.e., 061K1.*):
Reselected 061K5.05 RO Tier 2 / SYS103K5.* Containment System: No K5.* K/A with an RO Importance Rating  2.5:
Group 1                Reselected 103K3.01, see explanation below (073K3.*)
RO Tier 2 / SYS       Process Radiation (PRM) System: Was not used due to no 103K5.* K/A with Group 1    073K3.*    an RO Importance Rating 2.5, randomly selected the available K/As within 103 (Containment) which had a K/A 2.5, and then exchanged it with an already selected K/A (i.e., 073K3.*): Reselected 073K5.01 RO Tier 2 / SYS        Service Water System (SWS): Conditions initiating automatic closure of Group 1    076K4.01  closed cooling water auxiliary building header supply and return valves: The Auxiliary Building at PBNP does not have header supply and return valves with an automatic closure: Reselected 076K4.06
 
Randomly Tier /
Selected                              Reason for Rejection Group K/A RO Tier 2 / SYS       Service Water System (SWS): Service water train separation: Train Group 1    076K4.06  separation is only achieved by Service Water Pump power supplies at PBNP:
Reselected 076K4.02 RO Tier 2 / SYS       Containment Purge System (CPS): Containment evacuation signal: Unable Group 2    029A4.04  to construct a question with the required level of difficulty: Reselected 029A4.01 RO Tier 2 / SYS        Containment Purge System (CPS): Containment purge flow rate: Purge flow Group 2    029A4.01  rate of the Containment Purge System is not monitored: No further A4.* K/A exist with an RO Importance Rating 2.5, selected 029A3.01 due to A3 not being sampled within Tier 2/Group2 RO Tier 2 / SYS        Steam Dump System (SDS) and Turbine Bypass Control: S/G level: Unable Group 2     041K1.02  to construct a question with the required level of difficulty: Reselected 041K1.05 SRO Tier   APE        Loss of Component Cooling Water (CCW): (multi-unit license) Ability to 1/         026G2.2.4  explain the variations in control board/control room layouts, systems, Group 1                instrumentation, and procedural actions between units at a facility: No differences between the units which leveraged as a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 026G2.2.38 SRO Tier   APE        Steam Line Rupture: Conditions requiring a reactor trip: Unable to write a 1/         040AA2.02 question to the requirements of an SRO level question (meeting the Group 1                requirements of 10CFR55.43(b)): Reselected 040AA2.04 SRO Tier   APE        Fuel Handling Incidents: Ability to interpret reference materials, such as 1/         036G2.1.25 graphs, curves, tables, etc: Unable to write a question to the requirements of Group 2                an SRO level question (meeting the requirements of 10CFR55.43(b)):
Reselected 036G2.1.31 SRO Tier   APE        Fuel Handling Incidents: Ability to locate control room switches, controls, and 1/          036G2.1.31 indications, and to determine that they correctly reflect the desired plant Group 2                lineup.: Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 036G2.1.23 SRO Tier   SYS        Pressurizer Relief Tank/Quench Tank System (PRTS): Bubble formation in 2/         007A2.06  PZR: Unable to write a question to the requirements of an SRO level Group 1                question (meeting the requirements of 10CFR55.43(b)): Reselected 007A2.07 SRO Tier   SYS        Pressurizer Relief Tank/Quench Tank System (PRTS): Recirculating quench 2/          007A2.07  tank: There are no procedures at PBNP which accomplish this task. Unable Group 1                to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 007A2.01 SRO Tier    SYS        Pressurizer Level Control System (PZR LCS): Ability to locate control room 2/          011G2.1.31 switches, controls, and indications, and to determine that they correctly reflect Group 2                the desired plant lineup: Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)):
Reselected 011G2.1.32
 
Randomly Tier /
Selected                              Reason for Rejection Group K/A RO Tier 2 / SYS        Containment Spray System (CSS): (multi-unit license) Ability to explain the Group 2    022G2.2.4  variations in control board/control room layouts, systems, instrumentation, and procedural actions between units at a facility: Unable to write a question to meet this K/A due to no major differences between units for this system:
Reselected 022G2.2.39 RO Tier 2 / SYS        Instrument Air System (IAS): Cooling water to compressor: Unable to write a Group 1    078K1.04  question to meet this K/A due only one station air compressor has cooling water supplied to it, and there is a question focused on this in the test already (SRO Tier 1/Group 1, 065A204 - Typical conditions which could cause a compressor trip (e.g., high temperature): Reselected 078K1.05 Loss of Intermediate Range Nuclear Instrumentation: Ability to determine RO Tier 1 / APE        and interpret the following as they apply to the Loss of Intermediate Range Group 2    033AA2.12 Nuclear Instrumentation: Maximum allowable channel disagreement.:
Submitted question was determined to not be discriminatorily valid. Unable to write a replacement question that meets this KA and that has discrimination validity. Discussed with Chief Examiner and obtained approval to redraw:
Reselected 033AA2.01}}

Latest revision as of 14:02, 31 October 2019

2015 Point Beach Nuclear Plant Initial License Examination Form ES-401-4
ML15083A062
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/06/2015
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Florida Power & Light Energy Point Beach
References
Download: ML15083A062 (3)


Text

ES-401 Record of Rejected K/As Form ES-401-4 Randomly Tier /

Selected Reason for Rejection Group K/A RO Tier 1 / APE Loss of Reactor Coolant Makeup Group 1 022AK1.04 Reason for changing from manual to automatic control of charging flow valve controller: PBNP does not have a Charging Flow Valve Controller which has an automatic feature. Reselected 022AK1.03 RO Tier 1 / EPE Steam Generator Tube Rupture (SGTR): Reflux boiling: Reflux boiling is not Group 1 038EK1.04 used as a mitigation strategy for SGTR at PBNP: Reselected 038EK1.01 RO Tier 1 / APE Loss of Main Feedwater (MFW): No K2.* K/A with an RO Importance Rating Group 1 054K2.* 2.5: Reselected 054G2.2.36 RO Tier 1 / EPE Loss of Offsite and Onsite Power (Station Blackout): No K2.* K/A with an RO Group 1 055EK2.* Importance Rating 2.5: Reselected 055G2.4.8 RO Tier 1 / W/E04EA2. LOCA Outside Containment: Facility conditions and selection of appropriate Group 1 1 procedures during abnormal and emergency operations: Determined to be an SRO level question due to selection of procedures while within the EOP network: Reselected W/E04EA2.2 RO Tier 1 / APE Accidental Liquid Radioactive-Waste Release: The calculation of offsite Group 2 059AK1.05 doses due to a release from the power plant: This is not an RO responsibility/job at PBNP: Reselected 059AK1.01 RO Tier 1 / W/E13EA2. Steam Generator Overpressure: Facility conditions and selection of Group 2 1 appropriate procedures during abnormal and emergency operations: This is not an RO responsibility at PBNP due to being a Yellow Critical Safety Function Path: Reselected W/E13EA2.2 RO Tier 2 / SYS Pressurizer Pressure Control System (PZR PCS): PRT temperature and Group 1 010A3.01 pressure during PORV testing: No PORV testing is performed at PBNP which causes a temperature change in the PRT: Reselected 010A3.02 RO Tier 2 / SYS Instrument Air System (IAS): No K5.* K/A with an RO Importance Rating Group 1 078K5.* 2.5: Reselected 078K1.04, see explanation below (061K1.*)

RO Tier 2 / SYS Auxiliary / Emergency Feedwater (AFW) System: Was not used due to no Group 1 061K1.* 078K5.* K/A with an RO Importance Rating 2.5, randomly selected the available K/As within 078 (Instrument Air) which had a K/A 2.5, and then randomly exchanged it with an already selected K/A (i.e., 061K1.*):

Reselected 061K5.05 RO Tier 2 / SYS103K5.* Containment System: No K5.* K/A with an RO Importance Rating 2.5:

Group 1 Reselected 103K3.01, see explanation below (073K3.*)

RO Tier 2 / SYS Process Radiation (PRM) System: Was not used due to no 103K5.* K/A with Group 1 073K3.* an RO Importance Rating 2.5, randomly selected the available K/As within 103 (Containment) which had a K/A 2.5, and then exchanged it with an already selected K/A (i.e., 073K3.*): Reselected 073K5.01 RO Tier 2 / SYS Service Water System (SWS): Conditions initiating automatic closure of Group 1 076K4.01 closed cooling water auxiliary building header supply and return valves: The Auxiliary Building at PBNP does not have header supply and return valves with an automatic closure: Reselected 076K4.06

Randomly Tier /

Selected Reason for Rejection Group K/A RO Tier 2 / SYS Service Water System (SWS): Service water train separation: Train Group 1 076K4.06 separation is only achieved by Service Water Pump power supplies at PBNP:

Reselected 076K4.02 RO Tier 2 / SYS Containment Purge System (CPS): Containment evacuation signal: Unable Group 2 029A4.04 to construct a question with the required level of difficulty: Reselected 029A4.01 RO Tier 2 / SYS Containment Purge System (CPS): Containment purge flow rate: Purge flow Group 2 029A4.01 rate of the Containment Purge System is not monitored: No further A4.* K/A exist with an RO Importance Rating 2.5, selected 029A3.01 due to A3 not being sampled within Tier 2/Group2 RO Tier 2 / SYS Steam Dump System (SDS) and Turbine Bypass Control: S/G level: Unable Group 2 041K1.02 to construct a question with the required level of difficulty: Reselected 041K1.05 SRO Tier APE Loss of Component Cooling Water (CCW): (multi-unit license) Ability to 1/ 026G2.2.4 explain the variations in control board/control room layouts, systems, Group 1 instrumentation, and procedural actions between units at a facility: No differences between the units which leveraged as a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 026G2.2.38 SRO Tier APE Steam Line Rupture: Conditions requiring a reactor trip: Unable to write a 1/ 040AA2.02 question to the requirements of an SRO level question (meeting the Group 1 requirements of 10CFR55.43(b)): Reselected 040AA2.04 SRO Tier APE Fuel Handling Incidents: Ability to interpret reference materials, such as 1/ 036G2.1.25 graphs, curves, tables, etc: Unable to write a question to the requirements of Group 2 an SRO level question (meeting the requirements of 10CFR55.43(b)):

Reselected 036G2.1.31 SRO Tier APE Fuel Handling Incidents: Ability to locate control room switches, controls, and 1/ 036G2.1.31 indications, and to determine that they correctly reflect the desired plant Group 2 lineup.: Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 036G2.1.23 SRO Tier SYS Pressurizer Relief Tank/Quench Tank System (PRTS): Bubble formation in 2/ 007A2.06 PZR: Unable to write a question to the requirements of an SRO level Group 1 question (meeting the requirements of 10CFR55.43(b)): Reselected 007A2.07 SRO Tier SYS Pressurizer Relief Tank/Quench Tank System (PRTS): Recirculating quench 2/ 007A2.07 tank: There are no procedures at PBNP which accomplish this task. Unable Group 1 to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)): Reselected 007A2.01 SRO Tier SYS Pressurizer Level Control System (PZR LCS): Ability to locate control room 2/ 011G2.1.31 switches, controls, and indications, and to determine that they correctly reflect Group 2 the desired plant lineup: Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b)):

Reselected 011G2.1.32

Randomly Tier /

Selected Reason for Rejection Group K/A RO Tier 2 / SYS Containment Spray System (CSS): (multi-unit license) Ability to explain the Group 2 022G2.2.4 variations in control board/control room layouts, systems, instrumentation, and procedural actions between units at a facility: Unable to write a question to meet this K/A due to no major differences between units for this system:

Reselected 022G2.2.39 RO Tier 2 / SYS Instrument Air System (IAS): Cooling water to compressor: Unable to write a Group 1 078K1.04 question to meet this K/A due only one station air compressor has cooling water supplied to it, and there is a question focused on this in the test already (SRO Tier 1/Group 1, 065A204 - Typical conditions which could cause a compressor trip (e.g., high temperature): Reselected 078K1.05 Loss of Intermediate Range Nuclear Instrumentation: Ability to determine RO Tier 1 / APE and interpret the following as they apply to the Loss of Intermediate Range Group 2 033AA2.12 Nuclear Instrumentation: Maximum allowable channel disagreement.:

Submitted question was determined to not be discriminatorily valid. Unable to write a replacement question that meets this KA and that has discrimination validity. Discussed with Chief Examiner and obtained approval to redraw:

Reselected 033AA2.01