ML15217A236: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 08/19/2015 | | issue date = 08/19/2015 | ||
| title = 2015 Clinton Power Station Initial License Examination Form ES-301-2 | | title = 2015 Clinton Power Station Initial License Examination Form ES-301-2 | ||
| author name = | | author name = Mcneil D | ||
| author affiliation = NRC/RGN-III/DRS/OLB | | author affiliation = NRC/RGN-III/DRS/OLB | ||
| addressee name = | | addressee name = | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ES-301 Control Room/In | {{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Power Station Date of Examination: 8/18/2015 Exam Level: RO SRO-I SRO-U Operating Test No.: 2015-302 Control Room Systems: *8 for RO; 7 for SRO-I; 2 or 3 for SRO-U Safety System / JPM Title Type Code* | ||
-Plant Systems Outline Form ES-301-2 | Function | ||
: *8 for RO; 7 for SRO | : a. CRD / Control Rod Scram Time Testing Restoration A,N,S 1 | ||
-I; 2 or 3 for SRO | : b. RHR / Initiate Low Pressure ECCS System and Maximize Injection A,D,EN,L,S 2 | ||
-U System / JPM Title Type Code* | : c. MTG / Turbine On Line Tests A,D,P,S 3 | ||
: d. HPCS / Perform a HPCS Pump Operability Test A,D,EN,S 4 | |||
VC) in the Hi | : e. CRVICS / Manually Perform a Group 1 Isolation A,D,EN,L,S 5 | ||
: f. RPS / Perform a Manual SCRAM Functional/SDV Hi Level Bypass Test D,P,S 7 | |||
-I); (3 or 2 for SRO | : g. VC / Startup the Control Room Ventilation System (VC) in the Hi D,EN,S 9 Radiation Mode | ||
-U) i. ELEC / Manual Transfer of Distribution Load Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter | : h. n/a n/a n/a In-Plant Systems * (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | ||
* All RO and SRO | : i. ELEC / Manual Transfer of Distribution Load Panel Loads (NSPS D,P,R 6 Solenoid) (RPS) FROM Alternate Power TO the Inverter | ||
-I control room (and in | : j. LPCI / RSP-Div 2 LPCI Operation E,L,N,R 7 | ||
-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in | : k. IAS / Place an IA Ring Header Auto Isolation Valve into Service D,E,R 8 | ||
-plant systems and functions may overlap those tested in the control room. | * All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. | ||
* Type Codes Criteria for RO / SRO | * Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature >1/ >1 / > 1 (control room system) | ||
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in | (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected) | ||
-plant (EN)gineered safety feature | (R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27}} | ||
(L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) | |||
) | |||
Latest revision as of 08:26, 31 October 2019
ML15217A236 | |
Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 08/19/2015 |
From: | Mcneil D NRC/RGN-III/DRS/OLB |
To: | Exelon Generation Co |
Shared Package | |
ML15216A597 | List: |
References | |
Download: ML15217A236 (1) | |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Power Station Date of Examination: 8/18/2015 Exam Level: RO SRO-I SRO-U Operating Test No.: 2015-302 Control Room Systems: *8 for RO; 7 for SRO-I; 2 or 3 for SRO-U Safety System / JPM Title Type Code*
Function
- a. CRD / Control Rod Scram Time Testing Restoration A,N,S 1
- c. MTG / Turbine On Line Tests A,D,P,S 3
- e. CRVICS / Manually Perform a Group 1 Isolation A,D,EN,L,S 5
- f. RPS / Perform a Manual SCRAM Functional/SDV Hi Level Bypass Test D,P,S 7
- h. n/a n/a n/a In-Plant Systems * (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. ELEC / Manual Transfer of Distribution Load Panel Loads (NSPS D,P,R 6 Solenoid) (RPS) FROM Alternate Power TO the Inverter
- All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature >1/ >1 / > 1 (control room system)
(L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)
(R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27