ML15217A236: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/19/2015
| issue date = 08/19/2015
| title = 2015 Clinton Power Station Initial License Examination Form ES-301-2
| title = 2015 Clinton Power Station Initial License Examination Form ES-301-2
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 1
| page count = 1
}}
}}
=Text=
{{#Wiki_filter:ES-301                            Control Room/In-Plant Systems Outline                            Form ES-301-2 Facility: Clinton Power Station                                          Date of Examination: 8/18/2015 Exam Level: RO            SRO-I      SRO-U                              Operating Test No.: 2015-302 Control Room Systems: *8 for RO; 7 for SRO-I; 2 or 3 for SRO-U Safety System / JPM Title                                      Type Code*
Function
: a. CRD / Control Rod Scram Time Testing Restoration                                          A,N,S            1
: b. RHR / Initiate Low Pressure ECCS System and Maximize Injection                        A,D,EN,L,S          2
: c. MTG / Turbine On Line Tests                                                              A,D,P,S          3
: d. HPCS / Perform a HPCS Pump Operability Test                                            A,D,EN,S          4
: e. CRVICS / Manually Perform a Group 1 Isolation                                          A,D,EN,L,S          5
: f. RPS / Perform a Manual SCRAM Functional/SDV Hi Level Bypass Test                          D,P,S            7
: g. VC / Startup the Control Room Ventilation System (VC) in the Hi                          D,EN,S            9 Radiation Mode
: h. n/a                                                                                        n/a            n/a In-Plant Systems * (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. ELEC / Manual Transfer of Distribution Load Panel Loads (NSPS                            D,P,R            6 Solenoid) (RPS) FROM Alternate Power TO the Inverter
: j. LPCI / RSP-Div 2 LPCI Operation                                                          E,L,N,R          7
: k. IAS / Place an IA Ring Header Auto Isolation Valve into Service                          D,E,R            8
* All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes                                    Criteria for RO / SRO-I / SRO-U (A)lternate path                                                      4-6 /    4-6 / 2-3 (C)ontrol room (D)irect from bank                                                    <9 /    <8    / <4 (E)mergency or abnormal in-plant                                      >1 /    >1    / >1 (EN)gineered safety feature                                          >1/      >1  / > 1 (control room system)
(L)ow-Power / Shutdown                                                >1 /    >1    / >1 (N)ew or (M)odified from bank including 1(A)                          >2 /    >2    / >1 (P)revious 2 exams                                                    <3/      <3    / < 2 (randomly selected)
(R)CA                                                                >1 /    >1    / >1 (S)imulator ES-301, Page 23 of 27}}

Latest revision as of 08:26, 31 October 2019

2015 Clinton Power Station Initial License Examination Form ES-301-2
ML15217A236
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/19/2015
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML15216A597 List:
References
Download: ML15217A236 (1)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Power Station Date of Examination: 8/18/2015 Exam Level: RO SRO-I SRO-U Operating Test No.: 2015-302 Control Room Systems: *8 for RO; 7 for SRO-I; 2 or 3 for SRO-U Safety System / JPM Title Type Code*

Function

a. CRD / Control Rod Scram Time Testing Restoration A,N,S 1
b. RHR / Initiate Low Pressure ECCS System and Maximize Injection A,D,EN,L,S 2
c. MTG / Turbine On Line Tests A,D,P,S 3
d. HPCS / Perform a HPCS Pump Operability Test A,D,EN,S 4
e. CRVICS / Manually Perform a Group 1 Isolation A,D,EN,L,S 5
f. RPS / Perform a Manual SCRAM Functional/SDV Hi Level Bypass Test D,P,S 7
g. VC / Startup the Control Room Ventilation System (VC) in the Hi D,EN,S 9 Radiation Mode
h. n/a n/a n/a In-Plant Systems * (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. ELEC / Manual Transfer of Distribution Load Panel Loads (NSPS D,P,R 6 Solenoid) (RPS) FROM Alternate Power TO the Inverter
j. LPCI / RSP-Div 2 LPCI Operation E,L,N,R 7
k. IAS / Place an IA Ring Header Auto Isolation Valve into Service D,E,R 8
  • All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature >1/ >1 / > 1 (control room system)

(L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)

(R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27