ML15217A236: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-301 Control Room/In
{{#Wiki_filter:ES-301                           Control Room/In-Plant Systems Outline                           Form ES-301-2 Facility: Clinton Power Station                                         Date of Examination: 8/18/2015 Exam Level: RO           SRO-I     SRO-U                               Operating Test No.: 2015-302 Control Room Systems: *8 for RO; 7 for SRO-I; 2 or 3 for SRO-U Safety System / JPM Title                                     Type Code*
-Plant Systems Outline Form ES-301-2 Facility: Clinton Power Station Date of Examination: 8/1 8/2015 Exam Level: RO SRO-I   SRO-U Operating Test No.: 2015-302   Control Room Systems
Function
: *8 for RO; 7 for SRO
: a. CRD / Control Rod Scram Time Testing Restoration                                         A,N,S           1
-I; 2 or 3 for SRO
: b. RHR / Initiate Low Pressure ECCS System and Maximize Injection                         A,D,EN,L,S         2
-U System / JPM Title Type Code*
: c. MTG / Turbine On Line Tests                                                             A,D,P,S           3
Safety Function a. CRD / Control Rod Scram Tim e Testing Restoration A,N,S 1 b. RHR / Initiate Low Pressure ECCS System and Maximize Injection A , D,EN,L,S 2 c. MTG / Turbine On Line Tests A , D,P,S 3 d. HPCS / Perform a HPCS Pump Operability Test A,D,EN,S 4 e. CRVICS / Manually Perform a Group 1 Isolation A,D,EN,L, S 5 f. RPS / Perform a Manual SCRAM Functional/SDV Hi Level Bypass Test D ,P,S 7 g. V C / Startup the Control Room Ventilation System (VC) in the Hi Radiation Mode D,EN,S 9 h. n/a n/a n/a In-Plant Systems
: d. HPCS / Perform a HPCS Pump Operability Test                                             A,D,EN,S           4
* (3 for RO); (3 for SRO
: e. CRVICS / Manually Perform a Group 1 Isolation                                         A,D,EN,L,S         5
-I); (3 or 2 for SRO
: f. RPS / Perform a Manual SCRAM Functional/SDV Hi Level Bypass Test                         D,P,S           7
-U) i. ELEC / Manual Transfer of Distribution Load P a n el Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter D ,P ,R 6 j. LPCI / RSP-Div 2 LPCI Operation E,L,N,R 7 k. IAS / Place an IA Ring Header Auto Isolation Valve into Service D , E, R 8
: g. VC / Startup the Control Room Ventilation System (VC) in the Hi                         D,EN,S           9 Radiation Mode
* All RO and SRO
: h. n/a                                                                                       n/a           n/a In-Plant Systems * (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
-I control room (and in
: i. ELEC / Manual Transfer of Distribution Load Panel Loads (NSPS                             D,P,R            6 Solenoid) (RPS) FROM Alternate Power TO the Inverter
-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in
: j. LPCI / RSP-Div 2 LPCI Operation                                                         E,L,N,R           7
-plant systems and functions may overlap those tested in the control room.
: k. IAS / Place an IA Ring Header Auto Isolation Valve into Service                           D,E,R           8
* Type Codes Criteria for RO / SRO
* All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
* Type Codes                                   Criteria for RO / SRO-I / SRO-U (A)lternate path                                                     4-6 /    4-6 / 2-3 (C)ontrol room (D)irect from bank                                                   <9 /    <8    / <4 (E)mergency or abnormal in-plant                                     >1 /    >1    / >1 (EN)gineered safety feature                                           >1/      >1  / > 1 (control room system)
-plant (EN)gineered safety feature
(L)ow-Power / Shutdown                                               >1 /    >1    / >1 (N)ew or (M)odified from bank including 1(A)                         >2 /     >2    / >1 (P)revious 2 exams                                                    <3/     <3   / < 2 (randomly selected)
 
(R)CA                                                                >1 /     >1   / >1 (S)imulator ES-301, Page 23 of 27}}
(L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 
< 9 / < 8 / < 4  > 1 / > 1 / > 1  > 1 /   > 1  /   > 1 (control room system
) > 1 / > 1 / > 1  > 2 / > 2 / > 1  < 3 / < 3 / < 2 (randomly selected)
  > 1 / > 1 / > 1   ES-301, Page 23 of 27}}

Latest revision as of 08:26, 31 October 2019

2015 Clinton Power Station Initial License Examination Form ES-301-2
ML15217A236
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/19/2015
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML15216A597 List:
References
Download: ML15217A236 (1)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Power Station Date of Examination: 8/18/2015 Exam Level: RO SRO-I SRO-U Operating Test No.: 2015-302 Control Room Systems: *8 for RO; 7 for SRO-I; 2 or 3 for SRO-U Safety System / JPM Title Type Code*

Function

a. CRD / Control Rod Scram Time Testing Restoration A,N,S 1
b. RHR / Initiate Low Pressure ECCS System and Maximize Injection A,D,EN,L,S 2
c. MTG / Turbine On Line Tests A,D,P,S 3
d. HPCS / Perform a HPCS Pump Operability Test A,D,EN,S 4
e. CRVICS / Manually Perform a Group 1 Isolation A,D,EN,L,S 5
f. RPS / Perform a Manual SCRAM Functional/SDV Hi Level Bypass Test D,P,S 7
g. VC / Startup the Control Room Ventilation System (VC) in the Hi D,EN,S 9 Radiation Mode
h. n/a n/a n/a In-Plant Systems * (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. ELEC / Manual Transfer of Distribution Load Panel Loads (NSPS D,P,R 6 Solenoid) (RPS) FROM Alternate Power TO the Inverter
j. LPCI / RSP-Div 2 LPCI Operation E,L,N,R 7
k. IAS / Place an IA Ring Header Auto Isolation Valve into Service D,E,R 8
  • All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature >1/ >1 / > 1 (control room system)

(L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)

(R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27