ML15257A191: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15257A191
| number = ML15257A191
| issue date = 09/04/2015
| issue date = 09/04/2015
| title = Calvert Cliffs, Units 1 and 2 - Technical Specification Bases, Revisions 49 Through 55
| title = Technical Specification Bases, Revisions 49 Through 55
| author name = Smith L D
| author name = Smith L
| author affiliation = Exelon Generation Co, LLC
| author affiliation = Exelon Generation Co, LLC
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 1
| page count = 1
}}
}}
=Text=
{{#Wiki_filter:Exe~n
            ~Larry Ge eraton,,Regulatory                                  D. Smith Assurance Manager Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 410 495-5219 Office www.exeloncorp.corn larry.smith2@exeloncorp.com 10 CFR 50.71 September 4, 2015 U. S. Nuclear Regulatory Commission
*ATTN: Document Control Desk Washington, DC 20555 Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318
==Subject:==
Technical Specification Bases, Revisions 49 througih 55
*Enclosed for your use is one copy (CD) of the Calvert Cliffs Technical Specifications Bases, Revisions 49 through 55. These revisions were performed under the Technical Specification Bases Control Program (Technical Specification 5.5.14). This program states, "Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71 (e)."
The List of Effective pages is included. This electronic copy contains all of the revisions.
There are no regulatory commitments contained in this correspondence.
Should you have questions regarding this matter, please contact me at (410) 495-5219.
Respectfully, Regulatory Assurance Manager LDS/PSF/bjd                                        .
==Enclosure:==
Technical Specification Bases, Revisions 49 through 55 (CD) cc:    NRC Project Manager, Calvert Cliffs (Without Enclosure)
NRC Regional Administrator, Region I sNRCryResidentMD RInspector, Calvert Cliffs                                                    -* (,(_}}

Latest revision as of 07:46, 31 October 2019

Technical Specification Bases, Revisions 49 Through 55
ML15257A191
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/04/2015
From: Laura Smith
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML15257A190 List:
References
Download: ML15257A191 (1)


Text

Exe~n

~Larry Ge eraton,,Regulatory D. Smith Assurance Manager Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 410 495-5219 Office www.exeloncorp.corn larry.smith2@exeloncorp.com 10 CFR 50.71 September 4, 2015 U. S. Nuclear Regulatory Commission

  • ATTN: Document Control Desk Washington, DC 20555 Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318

Subject:

Technical Specification Bases, Revisions 49 througih 55

  • Enclosed for your use is one copy (CD) of the Calvert Cliffs Technical Specifications Bases, Revisions 49 through 55. These revisions were performed under the Technical Specification Bases Control Program (Technical Specification 5.5.14). This program states, "Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71 (e)."

The List of Effective pages is included. This electronic copy contains all of the revisions.

There are no regulatory commitments contained in this correspondence.

Should you have questions regarding this matter, please contact me at (410) 495-5219.

Respectfully, Regulatory Assurance Manager LDS/PSF/bjd .

Enclosure:

Technical Specification Bases, Revisions 49 through 55 (CD) cc: NRC Project Manager, Calvert Cliffs (Without Enclosure)

NRC Regional Administrator, Region I sNRCryResidentMD RInspector, Calvert Cliffs -* (,(_