ML15281A237: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML15281A237 | | number = ML15281A237 | ||
| issue date = 11/05/2015 | | issue date = 11/05/2015 | ||
| title = | | title = Acknowledgement of License Renewal Regulatory Commitment Changes Regarding Torus Recoating | ||
| author name = Wengert T | | author name = Wengert T | ||
| author affiliation = NRC/NRR/DORL/LPLIV-1, NRC/NRR/DORL/LPLIV-2 | | author affiliation = NRC/NRR/DORL/LPLIV-1, NRC/NRR/DORL/LPLIV-2 | ||
| addressee name = Limpias O | | addressee name = Limpias O | ||
| addressee affiliation = Nebraska Public Power District (NPPD) | | addressee affiliation = Nebraska Public Power District (NPPD) | ||
| docket = 05000298 | | docket = 05000298 | ||
| license number = DPR-046 | | license number = DPR-046 | ||
| contact person = Lingam S | | contact person = Lingam S | ||
| document type = Letter | | document type = Letter | ||
| page count = 2 | | page count = 2 | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Oscar A. Limpias Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 5, 2015 Mr. Oscar A. Limpias Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321 | ||
==SUBJECT:== | ==SUBJECT:== | ||
COOPER NUCLEAR STATION-ACKNOWLEDGEMENT OF REGULATORY COMMITMENT CHANGE REGARDING TORUS RECOATING | COOPER NUCLEAR STATION-ACKNOWLEDGEMENT OF REGULATORY COMMITMENT CHANGE REGARDING TORUS RECOATING | ||
==Dear Mr. Limpias:== | ==Dear Mr. Limpias:== | ||
By letter dated September 29, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15280A357), Nebraska Public Power District, the licensee for Cooper Nuclear Station, submitted a letter informing the U.S. Nuclear Regulatory Commission (NRC) of a revision to two license renewal commitments associated with inspection and coating of the torus. Instead of recoating the torus as originally committed, the licensee chose to perform an analysis following each torus inspection to ensure that the projected pitting of the torus up to the next inspection interval will not result in reduction of torus wall thickness below minimum acceptable values. | |||
* concurrence via email **see previous concurrence OFFICE NRR/DORL/LPLIV-1 /PM NRR/DORL/LPLIV-1/LA N RR/J LD/PPSD/JOM B/BC(A) NAME SLingam ** J Burkhardt** MHalter | The NRC staff acknowledges the change in commitments and has no objections. | ||
* DATE 11/02/2015 10/13/2015 11/03/2015 OFFICE NRR/DLR/RSRG/BC NRR/DORL/LPLIV-2/BC NRR/DORL/LPLIV-2/PM NAME SBloom | If you have any questions, please contact me at (301) 415-4037 or via e-mail at Thomas. Wengert@nrc.gov. | ||
* MKhanna TWengert DATE 11/02/2015 11/04/2015 11/05/2015 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Oscar A. Limpias Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321 | Sincerely, r\:~~ | ||
Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298 cc: Distribution via Listserv | |||
ML15281A237 *concurrence via email **see previous concurrence OFFICE NRR/DORL/LPLIV-1 /PM NRR/DORL/LPLIV-1/LA N RR/J LD/PPSD/JOM B/BC(A) | |||
NAME SLingam ** J Burkhardt** MHalter | |||
* DATE 11/02/2015 10/13/2015 11/03/2015 OFFICE NRR/DLR/RSRG/BC NRR/DORL/LPLIV-2/BC NRR/DORL/LPLIV-2/PM NAME SBloom | |||
* MKhanna TWengert DATE 11/02/2015 11/04/2015 11/05/2015 | |||
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 5, 2015 Mr. Oscar A. Limpias Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321 | |||
==SUBJECT:== | ==SUBJECT:== | ||
COOPER NUCLEAR STATION-ACKNOWLEDGEMENT OF REGULATORY COMMITMENT CHANGE REGARDING TORUS RECOATING | COOPER NUCLEAR STATION-ACKNOWLEDGEMENT OF REGULATORY COMMITMENT CHANGE REGARDING TORUS RECOATING | ||
==Dear Mr. Limpias:== | ==Dear Mr. Limpias:== | ||
By letter dated September 29, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15280A357), Nebraska Public Power District, the licensee for Cooper Nuclear Station, submitted a letter informing the U.S. Nuclear Regulatory Commission (NRC) of a revision to two license renewal commitments associated with inspection and coating of the torus. Instead of recoating the torus as originally committed, the licensee chose to perform an analysis following each torus inspection to ensure that the projected pitting of the torus up to the next inspection interval will not result in reduction of torus wall thickness below minimum acceptable values. | |||
* concurrence via email **see previous concurrence OFFICE NRR/DORL/LPLIV-1 /PM NRR/DORL/LPLIV-1/LA N RR/J LD/PPSD/JOM B/BC(A) NAME SLingam ** J Burkhardt** MHalter | The NRC staff acknowledges the change in commitments and has no objections. | ||
* DATE 11/02/2015 10/13/2015 11/03/2015 OFFICE NRR/DLR/RSRG/BC NRR/DORL/LPLIV-2/BC NRR/DORL/LPLIV-2/PM NAME SBloom | If you have any questions, please contact me at (301) 415-4037 or via e-mail at Thomas. Wengert@nrc.gov. | ||
* MKhanna TWengert DATE 11/02/2015 11/04/2015 11/05/2015}} | Sincerely, r\:~~ | ||
Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298 cc: Distribution via Listserv | |||
ML15281A237 *concurrence via email **see previous concurrence OFFICE NRR/DORL/LPLIV-1 /PM NRR/DORL/LPLIV-1/LA N RR/J LD/PPSD/JOM B/BC(A) | |||
NAME SLingam ** J Burkhardt** MHalter | |||
* DATE 11/02/2015 10/13/2015 11/03/2015 OFFICE NRR/DLR/RSRG/BC NRR/DORL/LPLIV-2/BC NRR/DORL/LPLIV-2/PM NAME SBloom | |||
* MKhanna TWengert DATE 11/02/2015 11/04/2015 11/05/2015}} |
Latest revision as of 05:51, 31 October 2019
ML15281A237 | |
Person / Time | |
---|---|
Site: | Cooper |
Issue date: | 11/05/2015 |
From: | Thomas Wengert Plant Licensing Branch IV, Plant Licensing Branch IV |
To: | Limpias O Nebraska Public Power District (NPPD) |
Lingam S | |
References | |
Download: ML15281A237 (2) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 5, 2015 Mr. Oscar A. Limpias Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321
SUBJECT:
COOPER NUCLEAR STATION-ACKNOWLEDGEMENT OF REGULATORY COMMITMENT CHANGE REGARDING TORUS RECOATING
Dear Mr. Limpias:
By letter dated September 29, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15280A357), Nebraska Public Power District, the licensee for Cooper Nuclear Station, submitted a letter informing the U.S. Nuclear Regulatory Commission (NRC) of a revision to two license renewal commitments associated with inspection and coating of the torus. Instead of recoating the torus as originally committed, the licensee chose to perform an analysis following each torus inspection to ensure that the projected pitting of the torus up to the next inspection interval will not result in reduction of torus wall thickness below minimum acceptable values.
The NRC staff acknowledges the change in commitments and has no objections.
If you have any questions, please contact me at (301) 415-4037 or via e-mail at Thomas. Wengert@nrc.gov.
Sincerely, r\:~~
Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298 cc: Distribution via Listserv
ML15281A237 *concurrence via email **see previous concurrence OFFICE NRR/DORL/LPLIV-1 /PM NRR/DORL/LPLIV-1/LA N RR/J LD/PPSD/JOM B/BC(A)
NAME SLingam ** J Burkhardt** MHalter
- DATE 11/02/2015 10/13/2015 11/03/2015 OFFICE NRR/DLR/RSRG/BC NRR/DORL/LPLIV-2/BC NRR/DORL/LPLIV-2/PM NAME SBloom
- MKhanna TWengert DATE 11/02/2015 11/04/2015 11/05/2015
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 5, 2015 Mr. Oscar A. Limpias Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321
SUBJECT:
COOPER NUCLEAR STATION-ACKNOWLEDGEMENT OF REGULATORY COMMITMENT CHANGE REGARDING TORUS RECOATING
Dear Mr. Limpias:
By letter dated September 29, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15280A357), Nebraska Public Power District, the licensee for Cooper Nuclear Station, submitted a letter informing the U.S. Nuclear Regulatory Commission (NRC) of a revision to two license renewal commitments associated with inspection and coating of the torus. Instead of recoating the torus as originally committed, the licensee chose to perform an analysis following each torus inspection to ensure that the projected pitting of the torus up to the next inspection interval will not result in reduction of torus wall thickness below minimum acceptable values.
The NRC staff acknowledges the change in commitments and has no objections.
If you have any questions, please contact me at (301) 415-4037 or via e-mail at Thomas. Wengert@nrc.gov.
Sincerely, r\:~~
Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298 cc: Distribution via Listserv
ML15281A237 *concurrence via email **see previous concurrence OFFICE NRR/DORL/LPLIV-1 /PM NRR/DORL/LPLIV-1/LA N RR/J LD/PPSD/JOM B/BC(A)
NAME SLingam ** J Burkhardt** MHalter
- DATE 11/02/2015 10/13/2015 11/03/2015 OFFICE NRR/DLR/RSRG/BC NRR/DORL/LPLIV-2/BC NRR/DORL/LPLIV-2/PM NAME SBloom
- MKhanna TWengert DATE 11/02/2015 11/04/2015 11/05/2015