ML15281A237: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 11/05/2015
| issue date = 11/05/2015
| title = Acknowledgement of License Renewal Regulatory Commitment Changes Regarding Torus Recoating
| title = Acknowledgement of License Renewal Regulatory Commitment Changes Regarding Torus Recoating
| author name = Wengert T J
| author name = Wengert T
| author affiliation = NRC/NRR/DORL/LPLIV-1, NRC/NRR/DORL/LPLIV-2
| author affiliation = NRC/NRR/DORL/LPLIV-1, NRC/NRR/DORL/LPLIV-2
| addressee name = Limpias O A
| addressee name = Limpias O
| addressee affiliation = Nebraska Public Power District (NPPD)
| addressee affiliation = Nebraska Public Power District (NPPD)
| docket = 05000298
| docket = 05000298
| license number = DPR-046
| license number = DPR-046
| contact person = Lingam S P
| contact person = Lingam S
| document type = Letter
| document type = Letter
| page count = 2
| page count = 2
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Oscar A. Limpias Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321 November 5, 2015
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 5, 2015 Mr. Oscar A. Limpias Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321


==SUBJECT:==
==SUBJECT:==
COOPER NUCLEAR STATION-ACKNOWLEDGEMENT OF REGULATORY COMMITMENT CHANGE REGARDING TORUS RECOATING  
COOPER NUCLEAR STATION-ACKNOWLEDGEMENT OF REGULATORY COMMITMENT CHANGE REGARDING TORUS RECOATING


==Dear Mr. Limpias:==
==Dear Mr. Limpias:==
By letter dated September 29, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15280A357), Nebraska Public Power District, the licensee for Cooper Nuclear Station, submitted a letter informing the U.S. Nuclear Regulatory Commission (NRC) of a revision to two license renewal commitments associated with inspection and coating of the torus. Instead of recoating the torus as originally committed, the licensee chose to perform an analysis following each torus inspection to ensure that the projected pitting of the torus up to the next inspection interval will not result in reduction of torus wall thickness below minimum acceptable values. The NRC staff acknowledges the change in commitments and has no objections.
 
By letter dated September 29, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15280A357), Nebraska Public Power District, the licensee for Cooper Nuclear Station, submitted a letter informing the U.S. Nuclear Regulatory Commission (NRC) of a revision to two license renewal commitments associated with inspection and coating of the torus. Instead of recoating the torus as originally committed, the licensee chose to perform an analysis following each torus inspection to ensure that the projected pitting of the torus up to the next inspection interval will not result in reduction of torus wall thickness below minimum acceptable values.
The NRC staff acknowledges the change in commitments and has no objections.
If you have any questions, please contact me at (301) 415-4037 or via e-mail at Thomas. Wengert@nrc.gov.
If you have any questions, please contact me at (301) 415-4037 or via e-mail at Thomas. Wengert@nrc.gov.
Docket No. 50-298 cc: Distribution via Listserv Sincerely, Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Mr. Oscar A Limpias Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321 November 5, 2015
Sincerely, r\:~~
Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298 cc: Distribution via Listserv


==SUBJECT:==
ML15281A237            *concurrence via email    **see previous concurrence OFFICE    NRR/DORL/LPLIV-1 /PM        NRR/DORL/LPLIV-1/LA        N RR/J LD/PPSD/JOM B/BC(A)
COOPER NUCLEAR STATION -ACKNOWLEDGEMENT OF REGULATORY COMMITMENT CHANGE REGARDING TORUS RECOATING
NAME          SLingam **                  J Burkhardt**                  MHalter
* DATE          11/02/2015                    10/13/2015                    11/03/2015 OFFICE      NRR/DLR/RSRG/BC          NRR/DORL/LPLIV-2/BC            NRR/DORL/LPLIV-2/PM NAME            SBloom
* MKhanna                      TWengert DATE          11/02/2015                    11/04/2015                    11/05/2015


==Dear Mr. Limpias:==
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 5, 2015 Mr. Oscar A. Limpias Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321
By letter dated September 29, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15280A357), Nebraska Public Power District, the licensee for Cooper Nuclear Station, submitted a letter informing the U.S. Nuclear Regulatory Commission (NRC) of a revision to two license renewal commitments associated with inspection and coating of the torus. Instead of recoating the torus as originally committed, the licensee chose to perform an analysis following each torus inspection to ensure that the projected pitting of the torus up to the next inspection interval will not result in reduction of torus wall thickness below minimum acceptable values. The NRC staff acknowledges the change in commitments and has no objections.
If you have any questions, please contact me at (301) 415-4037 or via e-mail at Thomas.Wengert@nrc.gov.
Docket No. 50-298 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL4-2 R/F RidsAcrsAcnw
_MailCTR Resource RidsNrrDorllpl4-2 Resource RidsNrrLAPBlechman Resource Sincerely, IRA/ Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrPMCooper Resource RidsNrrLAJBurkhardt Resource RidsRgn4MailCenter Resource RidsNrrJLD Resource RidsNrrDlrRsrg Resource JBoska, NRR/JLD/PPSD/JOMB HJones, NRR/DLR/RSRG MYoder, NRR/DE/ESGB ADAMS Accession No. ML 152 81A23 7
* concurrence via email **see previous concurrence OFFICE NRR/DORL/LPLIV-1
/PM NRR/DORL/LPLIV-1/LA N RR/J LD/PPSD/JOM B/BC(A) NAME SLingam ** J Burkhardt**
MHalter
* DATE 11/02/2015 10/13/2015 11/03/2015 OFFICE NRR/DLR/RSRG/BC NRR/DORL/LPLIV-2/BC NRR/DORL/LPLIV-2/PM NAME SBloom
* MKhanna TWengert DATE 11/02/2015 11/04/2015 11/05/2015 OFFICIAL RECORD COPY UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Oscar A. Limpias Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321 November 5, 2015


==SUBJECT:==
==SUBJECT:==
COOPER NUCLEAR STATION-ACKNOWLEDGEMENT OF REGULATORY COMMITMENT CHANGE REGARDING TORUS RECOATING  
COOPER NUCLEAR STATION-ACKNOWLEDGEMENT OF REGULATORY COMMITMENT CHANGE REGARDING TORUS RECOATING


==Dear Mr. Limpias:==
==Dear Mr. Limpias:==
By letter dated September 29, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15280A357), Nebraska Public Power District, the licensee for Cooper Nuclear Station, submitted a letter informing the U.S. Nuclear Regulatory Commission (NRC) of a revision to two license renewal commitments associated with inspection and coating of the torus. Instead of recoating the torus as originally committed, the licensee chose to perform an analysis following each torus inspection to ensure that the projected pitting of the torus up to the next inspection interval will not result in reduction of torus wall thickness below minimum acceptable values. The NRC staff acknowledges the change in commitments and has no objections.
 
By letter dated September 29, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15280A357), Nebraska Public Power District, the licensee for Cooper Nuclear Station, submitted a letter informing the U.S. Nuclear Regulatory Commission (NRC) of a revision to two license renewal commitments associated with inspection and coating of the torus. Instead of recoating the torus as originally committed, the licensee chose to perform an analysis following each torus inspection to ensure that the projected pitting of the torus up to the next inspection interval will not result in reduction of torus wall thickness below minimum acceptable values.
The NRC staff acknowledges the change in commitments and has no objections.
If you have any questions, please contact me at (301) 415-4037 or via e-mail at Thomas. Wengert@nrc.gov.
If you have any questions, please contact me at (301) 415-4037 or via e-mail at Thomas. Wengert@nrc.gov.
Docket No. 50-298 cc: Distribution via Listserv Sincerely, Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Mr. Oscar A Limpias Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321 November 5, 2015
Sincerely, r\:~~
Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298 cc: Distribution via Listserv


==SUBJECT:==
ML15281A237            *concurrence via email     **see previous concurrence OFFICE     NRR/DORL/LPLIV-1 /PM         NRR/DORL/LPLIV-1/LA         N RR/J LD/PPSD/JOM B/BC(A)
COOPER NUCLEAR STATION -ACKNOWLEDGEMENT OF REGULATORY COMMITMENT CHANGE REGARDING TORUS RECOATING
NAME           SLingam **                   J Burkhardt**                   MHalter
 
* DATE           11/02/2015                   10/13/2015                   11/03/2015 OFFICE       NRR/DLR/RSRG/BC           NRR/DORL/LPLIV-2/BC             NRR/DORL/LPLIV-2/PM NAME           SBloom
==Dear Mr. Limpias:==
* MKhanna                       TWengert DATE           11/02/2015                   11/04/2015                   11/05/2015}}
By letter dated September 29, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15280A357), Nebraska Public Power District, the licensee for Cooper Nuclear Station, submitted a letter informing the U.S. Nuclear Regulatory Commission (NRC) of a revision to two license renewal commitments associated with inspection and coating of the torus. Instead of recoating the torus as originally committed, the licensee chose to perform an analysis following each torus inspection to ensure that the projected pitting of the torus up to the next inspection interval will not result in reduction of torus wall thickness below minimum acceptable values. The NRC staff acknowledges the change in commitments and has no objections.
If you have any questions, please contact me at (301) 415-4037 or via e-mail at Thomas.Wengert@nrc.gov.
Docket No. 50-298 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL4-2 R/F RidsAcrsAcnw
_MailCTR Resource RidsNrrDorllpl4-2 Resource RidsNrrLAPBlechman Resource Sincerely, IRA/ Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrPMCooper Resource RidsNrrLAJBurkhardt Resource RidsRgn4MailCenter Resource RidsNrrJLD Resource RidsNrrDlrRsrg Resource JBoska, NRR/JLD/PPSD/JOMB HJones, NRR/DLR/RSRG MYoder, NRR/DE/ESGB ADAMS Accession No. ML 152 81A23 7
* concurrence via email **see previous concurrence OFFICE NRR/DORL/LPLIV-1  
/PM NRR/DORL/LPLIV-1/LA N RR/J LD/PPSD/JOM B/BC(A) NAME SLingam ** J Burkhardt**
MHalter
* DATE 11/02/2015 10/13/2015 11/03/2015 OFFICE NRR/DLR/RSRG/BC NRR/DORL/LPLIV-2/BC NRR/DORL/LPLIV-2/PM NAME SBloom
* MKhanna TWengert DATE 11/02/2015 11/04/2015 11/05/2015 OFFICIAL RECORD COPY}}

Latest revision as of 05:51, 31 October 2019

Acknowledgement of License Renewal Regulatory Commitment Changes Regarding Torus Recoating
ML15281A237
Person / Time
Site: Cooper Entergy icon.png
Issue date: 11/05/2015
From: Thomas Wengert
Plant Licensing Branch IV, Plant Licensing Branch IV
To: Limpias O
Nebraska Public Power District (NPPD)
Lingam S
References
Download: ML15281A237 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 5, 2015 Mr. Oscar A. Limpias Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321

SUBJECT:

COOPER NUCLEAR STATION-ACKNOWLEDGEMENT OF REGULATORY COMMITMENT CHANGE REGARDING TORUS RECOATING

Dear Mr. Limpias:

By letter dated September 29, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15280A357), Nebraska Public Power District, the licensee for Cooper Nuclear Station, submitted a letter informing the U.S. Nuclear Regulatory Commission (NRC) of a revision to two license renewal commitments associated with inspection and coating of the torus. Instead of recoating the torus as originally committed, the licensee chose to perform an analysis following each torus inspection to ensure that the projected pitting of the torus up to the next inspection interval will not result in reduction of torus wall thickness below minimum acceptable values.

The NRC staff acknowledges the change in commitments and has no objections.

If you have any questions, please contact me at (301) 415-4037 or via e-mail at Thomas. Wengert@nrc.gov.

Sincerely, r\:~~

Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298 cc: Distribution via Listserv

ML15281A237 *concurrence via email **see previous concurrence OFFICE NRR/DORL/LPLIV-1 /PM NRR/DORL/LPLIV-1/LA N RR/J LD/PPSD/JOM B/BC(A)

NAME SLingam ** J Burkhardt** MHalter

  • DATE 11/02/2015 10/13/2015 11/03/2015 OFFICE NRR/DLR/RSRG/BC NRR/DORL/LPLIV-2/BC NRR/DORL/LPLIV-2/PM NAME SBloom
  • MKhanna TWengert DATE 11/02/2015 11/04/2015 11/05/2015

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 5, 2015 Mr. Oscar A. Limpias Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321

SUBJECT:

COOPER NUCLEAR STATION-ACKNOWLEDGEMENT OF REGULATORY COMMITMENT CHANGE REGARDING TORUS RECOATING

Dear Mr. Limpias:

By letter dated September 29, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15280A357), Nebraska Public Power District, the licensee for Cooper Nuclear Station, submitted a letter informing the U.S. Nuclear Regulatory Commission (NRC) of a revision to two license renewal commitments associated with inspection and coating of the torus. Instead of recoating the torus as originally committed, the licensee chose to perform an analysis following each torus inspection to ensure that the projected pitting of the torus up to the next inspection interval will not result in reduction of torus wall thickness below minimum acceptable values.

The NRC staff acknowledges the change in commitments and has no objections.

If you have any questions, please contact me at (301) 415-4037 or via e-mail at Thomas. Wengert@nrc.gov.

Sincerely, r\:~~

Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298 cc: Distribution via Listserv

ML15281A237 *concurrence via email **see previous concurrence OFFICE NRR/DORL/LPLIV-1 /PM NRR/DORL/LPLIV-1/LA N RR/J LD/PPSD/JOM B/BC(A)

NAME SLingam ** J Burkhardt** MHalter

  • DATE 11/02/2015 10/13/2015 11/03/2015 OFFICE NRR/DLR/RSRG/BC NRR/DORL/LPLIV-2/BC NRR/DORL/LPLIV-2/PM NAME SBloom
  • MKhanna TWengert DATE 11/02/2015 11/04/2015 11/05/2015