{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 December 10, 2015 10 CFR 50.90 U.S. Nuclear Regulatory Commission Serial No. 15-494 Attention:
{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 December 10, 2015 10 CFR 50.90 U.S. Nuclear Regulatory Commission                           Serial No.     15-494 Attention: Document Control Desk                             NLOS/DEA       R0 Washington, DC 20555                                         Docket Nos.:   50-338/339 License Nos.:   NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
Document Control Desk NLOS/DEA R0 Washington, DC 20555 Docket Nos.: 50-338/339 License Nos.: NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNITS 1 AND 2 LICENSE AMENDMENT REQUEST TO ADDRESS THE ISSUES IDENTIFIED IN WESTINGHOUSE DOCUMENTS NSAL-09-5. REV. 1 AND NSAL-1 5-I In accordance with the provisions of 10 CFR 50.90, Virginia Electric and Power Company (Dominion) is submitting a license amendment request to revise the North Anna Power Station Units 1 and 2 Technical Specifications (TS). The proposed changes would revise the TS to address the issues identified in two Westinghouse communication documents.
NORTH ANNA POWER STATION UNITS 1 AND 2 LICENSE AMENDMENT REQUEST TO ADDRESS THE ISSUES IDENTIFIED IN WESTINGHOUSE DOCUMENTS NSAL-09-5.
Specifically, the proposed changes will address the issues identified in:
REV. 1 AND NSAL-1 5-I In accordance with the provisions of 10 CFR 50.90, Virginia Electric and Power Company (Dominion) is submitting a license amendment request to revise the North Anna Power Station Units 1 and 2 Technical Specifications (TS). The proposed changes would revise the TS to address the issues identified in two Westinghouse communication documents.
* Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Rev. 1 (Reference
Specifically, the proposed changes will address the issues identified in:* Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Rev. 1 (Reference
: 1) by relocating required operating space reductions (power and AFD) to the Core Operating Limits Report, accompanied by verification for each reload cycle
: 1) by relocating required operating space reductions (power and AFD) to the Core Operating Limits Report, accompanied by verification for each reload cycle* Westinghouse Nuclear Safety Advisory Letter NSAL-1 5-1, Rev. 0 (Reference
* Westinghouse Nuclear Safety Advisory Letter NSAL-1 5-1, Rev. 0 (Reference
: 2) by defining TS surveillance requirements for steady-state and transient FQ(Z) and corresponding actions with which to apply an appropriate penalty factor to measured results Attachment 1 provides a discussion of the proposed change. The marked-up and proposed TS pages are included in Attachments 2 and 3, respectively.
: 2) by defining TS surveillance requirements for steady-state and transient FQ(Z) and corresponding actions with which to apply an appropriate penalty factor to measured results provides a discussion of the proposed change. The marked-up and proposed TS pages are included in Attachments 2 and 3, respectively. The marked-up and proposed TS Bases changes are provided for NRC information only in .
The marked-up and proposed TS Bases changes are provided for NRC information only in Attachment 4.We have evaluated the proposed amendment and have determined that it does not involve a significant hazards consideration as defined in 10 CFR 50.92. The basis for this determination is included in Attachment
We have evaluated the proposed amendment and have determined that it does not involve a significant hazards consideration as defined in 10 CFR 50.92. The basis for this determination is included in Attachment 1. We have also determined that operation with the proposed change will not result in any significant increase in the amount of effluents that may be released offsite or any significant increase in individual or cumulative occupational radiation exposure. Therefore, the proposed amendment is eligible for categorical exclusion from an environmental assessment as set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment is needed in connection with the approval of the proposed
: 1. We have also determined that operation with the proposed change will not result in any significant increase in the amount of effluents that may be released offsite or any significant increase in individual or cumulative occupational radiation exposure.
_A4u6)
Therefore, the proposed amendment is eligible for categorical exclusion from an environmental assessment as set forth in 10 CFR 51.22(c)(9).
 
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment is needed in connection with the approval of the proposed_A4u6)
Serial No: 15-494 Docket Nos.: 50-338/339 Page 2 of 3 change. The proposed TS change has been reviewed and approved by the Facility Safety Review Committee.
Serial No: 15-494 Docket Nos.: 50-338/339 Page 2 of 3 change. The proposed TS change has been reviewed and approved by the Facility Safety Review Committee.
Dominion requests approval of the proposed amendment by May 31, 2017 to enable implementation of the changes by the Unit 2 refueling outage in the fall of 2017.Should you have any questions in Ms. Diane E. Aitken at (804) 273-2694.Sincerely, Mark D. Sartain Vice President  
Dominion requests approval of the proposed amendment by May 31, 2017 to enable implementation of the changes by the Unit 2 refueling outage in the fall of 2017.
-Nuclear Engineering regard to this submittal, please contact COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO)))The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mark D. Sartain, who is Vice President  
Should you have any questions in regard                                  to    this    submittal,  please    contact Ms. Diane E. Aitken at (804) 273-2694.
-Nuclear Engineering of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.Acknowledged before me this ..L day of Lers' 2015.M y. ('.nm m ik F vn ir i .<4I 3)1 , "Z o LA r ivl3 Notary Public Z) ~bl~Commonwealth of Virginia Reg. # 7629412 1 My Commission Expires August 31, 20L2&
Sincerely, Mark D. Sartain Vice President - Nuclear Engineering COMMONWEALTH OF VIRGINIA                                   ))
COUNTY OF HENRICO                                           )
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mark D. Sartain, who is Vice President     - Nuclear Engineering of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this ..L             day of -).c.*    Lers' 2015.
M y.('.nm m ik*inn F vnir p.*'  i   *l .<4I 3)1 , "Zo LA *
* 1 r
                                                                                                          &
ivl3 v*,,,,,,,v*o Notary Public               Z)     ~bl~
Commonwealth of Virginia Reg. # 7629412 My Commission Expires August 31, 20L2


==References:==
==References:==
: 1. Westinghouse Nuclear Safety Advisory Letter, NSAL-09-5, Rev. 1, "Relaxed Axial Offset Control EQ Technical Specification Actions," September 23, 2009.2. Westinghouse Nuclear Safety Advisory Letter, NSAL-1 5-1, Rev. 0, "Heat Flux Hot Channel Factor Technical Specification Surveillance," February 6, 2015.Attachments:
: 1. Westinghouse Nuclear Safety Advisory Letter, NSAL-09-5, Rev. 1, "Relaxed Axial Offset Control EQ Technical Specification Actions," September 23, 2009.
: 1. Discussion of Change 2. Marked-up Technical Specifications Pages 3. Proposed Technical Specifications Pages 4. Marked-up Technical Specifications Bases Pages (for information only)Commitments made in this letter: None Serial No: 15-494 Docket Nos.: 50-338/339 Page 3 of 3 cc: U.S. Nuclear Regulatory Commission  
: 2. Westinghouse Nuclear Safety Advisory Letter, NSAL-1 5-1, Rev. 0, "Heat Flux Hot Channel Factor Technical Specification Surveillance," February 6, 2015.
-Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1 257 State Health Commissioner Virginia Department of Health James Madison Building -7 th floor 109 Governor Street Suite 730 Richmond, VA 23219 Dr. V. Sreenivas NRC Project Manager -North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Karen Cotton-Gross NRC Project Manager U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power Station Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 1 of 16 ATTACHMENT I DISCUSSION OF CHANGE Virginia Electric and Power Company (Dominion)
Attachments:
North Anna Power Station Units I and 2 Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and N SAL-i15-I, Rev. 0 Attachment 1, Page 2 of 16 Table of Contents  
: 1. Discussion of Change
: 2. Marked-up Technical Specifications Pages
: 3. Proposed Technical Specifications Pages
: 4. Marked-up Technical Specifications Bases Pages (for information only)
Commitments made in this letter: None
 
Serial No: 15-494 Docket Nos.: 50-338/339 Page 3 of 3 cc: U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1 257 State Health Commissioner Virginia Department of Health James Madison Building - 7 th floor 109 Governor Street Suite 730 Richmond, VA 23219 Dr. V. Sreenivas NRC Project Manager - North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Karen Cotton-Gross NRC Project Manager U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power Station
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 1 of 16 ATTACHMENT I DISCUSSION OF CHANGE Virginia Electric and Power Company (Dominion)
North Anna Power Station Units I and 2
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-i15-I, Rev. 0 Attachment 1, Page 2 of 16 Table of Contents


==1.0 DESCRIPTION==
==1.0 DESCRIPTION==
 
............................................................................................           3 2.0 PROPOSED TECHNICAL SPECIFICATIONS CHANGES ............................................ 4 3.0 TECHNICALANALYSIS ..................................................             :................................
............................................................................................
3 2.0 PROPOSED TECHNICAL SPECIFICATIONS CHANGES ............................................
4 3.0 TECHNICALANALYSIS  
..................................................
:................................


==4.0 REGULATORY EVALUATION==
==4.0 REGULATORY EVALUATION==
.........................................................................                    13


.........................................................................
==5.0 ENVIRONMENTAL CONSIDERATION==
13 5.0 ENVIRONMENTAL CONSIDERATIONS
S ..............................................................                       16
..............................................................
16  


==6.0 REFERENCES==
==6.0 REFERENCES==
...........................................................................................
...........................................................................................             16
16 Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. I and NSAL-15-1, Rev. 0 Attachment 1, Page 3 of 16  


==1.0 DESCRIPTION==
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. I and NSAL-15-1, Rev. 0 Attachment 1, Page 3 of 16
 
==1.0   DESCRIPTION==
 
In accordance with the provisions of 10 CFR 50.90, Virginia Electric and Power Company (Dominion) is submitting a request to amend the Technical Specifications (TS) for North Anna Power Station Units 1 and 2 (NAPS). The changes are intended to address the issues identified in Westinghouse communications NSAL-09-5, Rev. 1 (Reference 1) and NSAL-15-1 (Reference 2).
Reference 1 notified Westinghouse customers of an issue associated with the Required Actions for Condition B of TS 3.2.1B, "Heat Flux Hot Channel Factor (FQ(Z) (RAOC-W(Z)
Methodology)," in Reference 3 for plants that have implemented the relaxed axial offset control (RAOC) methodology. In certain situations where transient FQ, FQw(Z), is not within its limit, the existing Required Actions may be insufficient to restore FQw(Z) to within the limit. Revision 1 of Reference 1 provided clarification regarding the applicability of the recommended interim actions to address this issue and how they should be implemented, including potential inclusion in plant specific Technical Specification changes. Dominion's evaluation of Reference I determined that it was applicable to NAPS, based on the similarities between the RAOC and Dominion's Relaxed Power Distribution Control (RPDC) methodologies.
Reference 2 notified Westinghouse customers of an issue associated with Surveillance Requirement (SR) 3.2.1.2 in TS 3.2.1B of Reference 3. For certain trends in measured FQ(Z) and non-equilibrium factor W(Z), the existing SR may not ensure that the transient FQ, FQw(Z), limit will be met between the performance of the monthly flux map measurements, for those plants that use the W(Z) FQ surveillance methodology. Dominion's evaluation of Reference 2 determined that it was also applicable to NAPS, based on the similarities between the RAOC and Dominion's Relaxed Power Distribution Control (RPDC) methodologies.
Dominion is proposing to change TS 3.2.1, "Heat Flux Hot Channel Factor (FQ(Z))," to enhance the required actions to be taken in the event that transient Fo(Z) surveillance limits are not met. Changes are also proposed that define separate terms, action steps and surveillance requirements for steady-state and transient FQ(Z), denoted as FQE(Z) and FQT(Z), respectively. The use of separate surveillance requirements (SR) in this manner is consistent with Westinghouse Standard Technical Specifications, NUREG-1431, Rev. 4 (Reference 3). The revised surveillance requirements provide guidance for application of, and determining the magnitude of a penalty factor for the measured FQ(Z). The factor will be applied if the trend in measured values indicates decreasing margin to the applicable limit since performing the previous surveillance or if the trend in predicted values indicates decreasing margin to the applicable limit prior to the next required surveillance. The


In accordance with the provisions of 10 CFR 50.90, Virginia Electric and Power Company (Dominion) is submitting a request to amend the Technical Specifications (TS) for North Anna Power Station Units 1 and 2 (NAPS). The changes are intended to address the issues identified in Westinghouse communications NSAL-09-5, Rev. 1 (Reference
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 4 of 16 changes specify that this factor will be defined in the Core Operating Limits Report (COLR),
: 1) and NSAL-15-1 (Reference 2).Reference 1 notified Westinghouse customers of an issue associated with the Required Actions for Condition B of TS 3.2.1B, "Heat Flux Hot Channel Factor (FQ(Z) (RAOC-W(Z)
which allows specific numerical values of the factor to be evaluated for each reload core.
Methodology)," in Reference 3 for plants that have implemented the relaxed axial offset control (RAOC) methodology.
The Bases for TS 3.2.1 are being modified to address the proposed changes to TS 3.2.1.
In certain situations where transient FQ, FQw(Z), is not within its limit, the existing Required Actions may be insufficient to restore FQw(Z) to within the limit. Revision 1 of Reference 1 provided clarification regarding the applicability of the recommended interim actions to address this issue and how they should be implemented, including potential inclusion in plant specific Technical Specification changes. Dominion's evaluation of Reference I determined that it was applicable to NAPS, based on the similarities between the RAOC and Dominion's Relaxed Power Distribution Control (RPDC)methodologies.
The TS Bases changes are provided for information only. Changes to the TS Bases will be incorporated in accordance with the TS Bases Control Program (TS 5.5.13) upon approval of this amendment request.
Reference 2 notified Westinghouse customers of an issue associated with Surveillance Requirement (SR) 3.2.1.2 in TS 3.2.1B of Reference
2.0   PROPOSED TECHNICAL SPECIFICATIONS CHANGES The proposed TS and SR changes are detailed below. To aid review, deleted text is struck through and added text is italicized and bolded. For more extensive changes, reference is made to the TS markups in Attachment 2 and TS Bases markups in Attachment 4.
: 3. For certain trends in measured FQ(Z) and non-equilibrium factor W(Z), the existing SR may not ensure that the transient FQ, FQw(Z), limit will be met between the performance of the monthly flux map measurements, for those plants that use the W(Z) FQ surveillance methodology.
2.1   TS 3.2.1 - Heat Flux Hot Channel Factor (FQ(Z))
Dominion's evaluation of Reference 2 determined that it was also applicable to NAPS, based on the similarities between the RAOC and Dominion's Relaxed Power Distribution Control (RPDC)methodologies.
TS 3.2.1 currently reflects use of the Dominion Relaxed Power Distribution Control (RPDC) power distribution control methodology (Reference 4). The proposed changes detailed below revise certain specification terminology, including relocation of some equations to the TS Bases, and revision of appropriate TS Required Actions to address the issues in References 1 and 2.
Dominion is proposing to change TS 3.2.1, "Heat Flux Hot Channel Factor (FQ(Z))," to enhance the required actions to be taken in the event that transient Fo(Z) surveillance limits are not met. Changes are also proposed that define separate terms, action steps and surveillance requirements for steady-state and transient FQ(Z), denoted as FQE(Z) and FQT(Z), respectively.
The proposed changes follow:
The use of separate surveillance requirements (SR) in this manner is consistent with Westinghouse Standard Technical Specifications, NUREG-1431, Rev. 4 (Reference 3). The revised surveillance requirements provide guidance for application of, and determining the magnitude of a penalty factor for the measured FQ(Z). The factor will be applied if the trend in measured values indicates decreasing margin to the applicable limit since performing the previous surveillance or if the trend in predicted values indicates decreasing margin to the applicable limit prior to the next required surveillance.
LCO 3.2.1
The Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 4 of 16 changes specify that this factor will be defined in the Core Operating Limits Report (COLR), which allows specific numerical values of the factor to be evaluated for each reload core.The Bases for TS 3.2.1 are being modified to address the proposed changes to TS 3.2.1.The TS Bases changes are provided for information only. Changes to the TS Bases will be incorporated in accordance with the TS Bases Control Program (TS 5.5.13) upon approval of this amendment request.2.0 PROPOSED TECHNICAL SPECIFICATIONS CHANGES The proposed TS and SR changes are detailed below. To aid review, deleted text is struck through and added text is italicized and bolded. For more extensive changes, reference is made to the TS markups in Attachment 2 and TS Bases markups in Attachment 4.2.1 TS 3.2.1 -Heat Flux Hot Channel Factor (FQ(Z))TS 3.2.1 currently reflects use of the Dominion Relaxed Power Distribution Control (RPDC)power distribution control methodology (Reference 4). The proposed changes detailed below revise certain specification terminology, including relocation of some equations to the TS Bases, and revision of appropriate TS Required Actions to address the issues in References 1 and 2.The proposed changes follow: LCO 3.2.1*LCO 3.2.1 will be revised as follows: FQ(Z), as approximated by ,E{-- FQE(z) and FQT(Z), shall be within the limits specified in the COLR.TS 3.2.1 -CONDITION A. REQUIRED ACTIONS AND COMPLETION TIME* TS 3.2.1 CONDITION A will be revised as follows:-.......NOTE-------....
  *LCO 3.2.1 will be revised as follows:
FQ(Z), as approximated by ,E{-- FQE(z) and FQT(Z), shall be within the limits specified in the COLR.
TS 3.2.1 - CONDITION A. REQUIRED ACTIONS AND COMPLETION TIME
* TS 3.2.1 CONDITION A will be revised as follows:
              -.......
NOTE-------....
Required Action A.4 shall be completed whenever this Condition is entered. SR 3.2.1.2 is not required to be performed if this Condition is entered prior to THERMAL POWER exceeding 75% RTP after a refueling.
Required Action A.4 shall be completed whenever this Condition is entered. SR 3.2.1.2 is not required to be performed if this Condition is entered prior to THERMAL POWER exceeding 75% RTP after a refueling.
A. F-QM-Z-) FQE(Z) not within limit.
A. F-QM-Z-) FQE(Z) not within limit.
Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 5 of 16* Delete TS 3.2.1 REQUIRED ACTION A.1 and renumber remaining REQUIRED ACTIONS as REQUIRED ACTION A.1, A.2, A.3, and A.4* New TS 3.2.1 REQUIRED ACTION A.1 reads as follows: Reduce THERMAL POWER > 1% RTP for each 1% FQE(Z) exceeds limit.A.1 COMPLETION TIME 15 minutes after each FQM(-Z-) FQE(Z) determination
 
*New TS 3.2.1 REQUIRED ACTION A.2 reads as follows: Reduce Power Range Neutron Flux-High trip setpoints  
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 5 of 16
> 1% for each 1% .FQM(-Z--eee-litthat THERMAL POWER is limited below RTP by Required Action A. 1.A.2 COMPLETION TIME 72 hours after each .FQM(-Z-)
* Delete TS 3.2.1 REQUIRED ACTION A.1 and renumber remaining REQUIRED ACTIONS as REQUIRED ACTION A.1, A.2, A.3, and A.4
FQE(Z) determination
* New TS 3.2.1 REQUIRED ACTION A.1 reads as follows:
*New TS 3.2.1 REQUIRED ACTION A.3 reads as follows: Reduce Overpower AT trip setpoints  
Reduce THERMAL POWER > 1% RTP for each 1% $*M(Z) FQE(Z) exceeds limit.
> 1% for each 1 % = Z)-e ....ee-li,;ii that THERMAL POWER is limited below RTP by Required Action A. 1.A.3 COMPLETION TIME 72 hours after each .FQM(-Z-)
A.1 COMPLETION TIME 15 minutes after each FQM(-Z-) FQE(Z) determination
FQE(Z) determination
  *New TS 3.2.1 REQUIRED ACTION A.2 reads as follows:
*New TS 3.2.1 ACTION A.4 reads as follows: Perform SR 3.2.1.1 and SR 3.2.1.2 A.4 COMPLETION TIME Prior to increasing THERMAL POWER above the limit of Required Action A.21 Serial No: 15-494 Docket Nos.: 50-338/339 LAR- NSAL-09-5, Rev. 1 and NSAL-15-1, Rev. 0 Attachment 1, Page 6 of 16 TS 3.2.1 -CONDITION B. REQUIRED ACTIONS and COMPLETION TIME* New TS 3.2.1 CONDITION B will be added, to read as follows: ACTIONS CONDITION  
Reduce Power Range Neutron Flux-High trip setpoints > 1% for each 1% .FQM(-Z--
] REQUIRED ACTIONj COMPLETION TIME B.----NOTE-.....
eee-litthat           THERMAL POWER is limited below RTP by Required Action A. 1.
Required Action B.5 shall be completed whenever this Condition is entered.FQT (z) not within limit.8.1 Reduce AFD limits as specified in the COLR.AND B.2 Reduce THERMAL POWER as specified in the COLR.AND B.3 Reduce Power Range Neutron Flux-High trip setpoints  
A.2 COMPLETION TIME 72 hours after each .FQM(-Z-) FQE(Z) determination
> 1%for each 1% that THERMAL POWER is limited below RTP by Required Action 8.2.AND B.4 Reduce Overpower AT trip setpoints  
  *New TS 3.2.1 REQUIRED ACTION A.3 reads as follows:
> 1%for each 1% that THERMAL POWER is limited below RTP by Required Action 8.2.AND 8.5 Perform SR 3.2.1.1 and SR 3.2.1.2.4 hours after each FQT (Z) determination 4 hours after each FQT (Z) determination 72 hours after each FQT (z) determination 72 hours after each FQT (Z) determination Prior to increasing THERMAL POWER and AFD limits above the limits of Required Actions 8.1 and 8.2* Renumber existing TS 3.2.1 CONDITION B, REQUIRED ACTION, as follows: BC. Required Action and associated Completion Time not met.BC.1 Be in MODE 2.
Reduce Overpower AT trip setpoints > 1% for each 1% = Z)-e ....ee-li,;ii that THERMAL POWER is limited below RTP by Required Action A. 1.
Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 7 of 16 2.2 SR 3.2.1.1, SR 3.2.1.2 [new] -Heat Flux Hot Channel Factor (FQ(Z))The changes to SR 3.2.1.1 and the addition of SR 3.2.1.2 conform with the introduction of steady-state, FQE(Z), and transient, FQT(Z), in TS 3.2.1. These changes define separate surveillance requirements for the two representations of FQ(Z).The proposed changes follow: SR 3.2.1.1* The Note before SR 3.2.1 .1 is deleted since it pertains to transient limits.* SR 3.2.1.1 is revised to read as follows: Verify FQE(Z) is within limit.SR 3.2.1.1 [FREQUENCY] (the 2 nd clause): Once within 12 hours after achieving equilibrium conditions after exceeding, by -- 10%RTP, the THERMAL POWER at which FQM(-Z-) FQE(Z) was last verified Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Attachment 1, Page 8 of 16*New SR 3.2.1.2 will be added, to read as follows: S UR VEILLA NCE FREQUENCY SR 3.2.1.2----..............NOTE.........
A.3 COMPLETION TIME 72 hours after each .FQM(-Z-) FQE(Z) determination
If measurements indicate that either the[K(Z) I maximum over z OR K(z) ]maximum over z has increased since the previous evaluation of FQ(Z)or is expected to increase prior to the next evaluation:
  *New TS 3.2.1 ACTION A.4 reads as follows:
A. Increase FQT(Z) by the appropriate factor, as specified in the COLR, and verify FQT(Z) is still within limits or B. Repeat SR 3.2.1.2 once perT7 EFPD until a. Above (A) is met or b. Two successive flux maps indicate that the[~&#xb6;21 LKzJ maximum over z AND K(Z)].maximum over z Once after each refueling within 12 hours after achieving equilibrium conditions after THERMAL POWER exceeds 75% RTP AND Once within 12 hours after achieving equilibrium conditions after exceeding, by> 10% RTP, the THERMAL POWER at which FQT(Z) was last verified AND In accordance with the Surveillance Frequency Control Program has not increased.
Perform SR 3.2.1.1 and SR 3.2.1.2 A.4 COMPLETION TIME Prior to increasing THERMAL POWER above the limit of Required Action A.21
Verify FQT (Z) is within limit.
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 9 of 16 2.3 TS Bases 3.2.1 -Heat Flux Hot Channel Factor (FQ(Z))Several changes to the Bases will be required which reflect the terminology changes and relocation of items from the specific TS sections noted in the description above.Summary list of key changes (see markup in Attachment 4):* Revise terminology throughout to reflect use of FQ(Z), FQE(Z) and FQT(Z) as appropriate
Serial No: 15-494 Docket Nos.: 50-338/339 LAR- NSAL-09-5, Rev. 1 and NSAL-15-1, Rev. 0 Attachment 1, Page 6 of 16 TS 3.2.1 - CONDITION B. REQUIRED ACTIONS and COMPLETION TIME
* Changes to conform with deletion and renumbered Condition A REQUIRED ACTIONS in TS 3.2.1* Insert 4 describes the relation for FQT(Z), including the N(Z) factor* Insert 5 describes actions to reduce core power and AFD limits if FQE(Z) and FQT(Z)cannot be maintained within LCO limits* Insert 6 describes the Condition B REQUIRED ACTIONS added in TS 3.2.1 for FaT(Z)* Insert 7 describes the steady-state peaking factor, FQE(Z) for SR 3.2.1.1* Insert 8 describes the frequency conditions for the transient peaking factor, FQT(Z) for SR 3.2.1.2* Insert 9 describes expressions for both FQE (Z) and FQT(z) that are evaluated to determine whether to apply the appropriate penalty factor or increase the frequency of surveillance Based on Dominion's analytical assessment of internal and external operating experiences (e.g. Westinghouse Communication 06-IC-03, Reference 5), the magnitudes of the lower and upper core regions excluded from FQ surveillances had been proactively and conservatively reduced (in approximately 2006) from what was and is currently described in the North Anna Technical Specification Bases. An update to the Technical Specification Bases to expand the FQ axial surveillance regions is being tracked by Dominion's corrective action system.3.0 TECHNICAL ANALYSIS The proposed TS changes identified in Section 2.0 are evaluated for technical adequacy in the following sections.3.1 TS 3.2.1 -Heat Flux Hot Channel Factor (FQ(Z))The proposed changes involve additions, deletions and revisions to existing TS content that are associated with LCO 3.2.1. These changes provide resolution of issues documented in Westinghouse notification documents NSAL-09-5, Rev. 1 (Reference
* New TS 3.2.1 CONDITION B will be added, to read as follows:
: 1) and NSAL-15-1 (Reference 2). NAPS is currently operating with compensatory actions which address the issues identified in References 1 and 2. Evaluation of the specific proposed changes is provided below.
ACTIONS CONDITION       ]   REQUIRED ACTIONj             COMPLETION TIME B.----NOTE-.....             8.1 Reduce AFD limits 4 hours after each Required Action B.5         as specified in the FQT(Z) determination shall be completed           COLR.
Serial No: 15-494 Docket Nos.: 50-338/339 LAR,- NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Attachment 1, Page 10 of 16 LCO 3.2.1 The existing LCO 3.2.1 specifies that FQ(Z) is approximated by F 0 M(Z), which is described in the Bases as the steady-state measured value for FQ(Z). The COLR limit to which FQM(z) is compared is adjusted by the factor, N(Z), which accounts for the calculated worst case transient core conditions.
whenever this               AND Condition is entered.                                   4 hours after each B.2    Reduce THERMAL FQT(Z) determination FQT(z) not within           POWER as specified in limit.                      the COLR.
The N(Z) factor is calculated in accordance with the approved Dominion RPDC methodology (Reference 4). The proposed changes specify that Fo(Z) is approximated by F 0 E(z) and FQT(Z), denoted as the steady-state and transient quantities, respectively.
AND                         72 hours after each B.3     Reduce     Power FQT(z) determination Range Neutron Flux-High trip setpoints > 1%
Separate surveillance requirements are specified for FQE(Z) and FQT(Z), which is consistent with the comparable terms F 0 c(Z) and F 0 w(Z) in Standard Technical Specifications for Westinghouse plants (Reference 3).A Note is inserted before LCO 3.2.1 Condition A to explain that Action A.4 is always required to be performed unless SR 3.2.1.2 is performed prior to exceeding 75% RTP after a refueling outage. This note is consistent with language proposed for this LCO condition in response to an NRC Request for Additional Information during review of WCAP-1 7661-P (Reference 6).Required Action A.1 in existing LCO 3.2.1 is deleted, since the revised Condition A now applies to steady-state FQE(Z), for which this action does not apply, per the comparable Reference 3 actions for TS 3.2.IB. The remaining actions for LCO 3.2.1 Condition A are retained, with changes to each action that reflect use of FQE(Z) versus FQM(Z).A new Condition B with corresponding Required Actions is added to address the situation in which FQT(Z) is not within its limit. Proposed Required Actions B.1 through B.5 are a modified version of the interim actions identified in NSAL-09-5, Rev. 1 (Reference 1), for this situation.
for   each     1%   that THERMAL POWER is limited below RTP by Required Action 8.2.
These changes are proposed as the resolution for the issues identified in Reference 1.Westinghouse's proposal for the long term resolution of NSAL-09-5, Rev. 1 is to seek NRC approval for the methods described in WCAP-17661-P (Reference 6). WCAP-17661-P is intended to revise the existing RAOC and Constant Axial Offset Control (CAOC) F 0 Surveillance Technical Specifications to address several outstanding issues, one of which was NSAL-09-5.
AND                         72 hours after each FQT(Z) determination B.4 Reduce Overpower AT trip setpoints > 1%
Dominion has strategically chosen not to adopt WCAP-17661-P and its subsequent Technical Specification Task Force (TSTF) traveler for North Anna.This alternate approach was determined by Dominion evaluation to most appropriately address the issues in NSAL-09-5, Rev. 1 for NAPS. The Dominion approach has these desirable aspects: 1) it addresses directly the issues of NSAL-09-5, Rev. 1; 2) it retains the existing TS surveillance scheme and structure; and 3) it retains the existing axial control calculational methodology (RPDC). By relocating the numerical values to the COLR, Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 11 of 16 Dominion's proposed resolution of NSAL-09-5 allows the required RPDC operating space (THERMAL POWER and AFD) reductions to be evaluated and modified on a cycle-specific basis. This proposed resolution is supported by current Dominion RPDC methods.Specifically, the allowable operating space that applies to Required Action B.1 and 8.2 is relocated to the COLR. A new table, entitled "Required Operating Space Reductions for FQT(Z) Exceeding Its Limits," will be added to the COLR to quantify the required THERMAL POWER and AFD limits associated with different amounts of FQT(Z) margin improvement (1%, 2%, etc.). If LCO 3.2.1, Condition B is entered, the operating space as defined in the new COLR table will ensure that sufficient margin exists. COLR Table 3.2-3 below presents a sample of the proposed table to be included in the COLR.The values provided in the sample table below are only intended to provide a representative example of typical reload values. The determination and verification of the required FQT(Z)margin improvements and the corresponding required reductions in the THERMAL POWER Limit and AFD Bands will be performed on a reload specific basis in accordance with the approved methodology of VEP-NE-1-A listed in Technical Specification 5.6.5.b.COLR Table 3.2-3 Required Operating Space Reductions for FQT(Z) Exceeding Its Limits Required FQT(z) Margin THERMAL POWER Negative AFD Positive AFD Improvement Reduction Band Reduction Band Reduction (% RTP) (% AFD) (% AFD)< %>3% >2.0% > 2.0%> 1% and<2% >5% > 3.0% > 3.0%> 2% and <3% ___8% __.3.5% >3.5%> 3% _50% N/A N/A 3.2 SR 3.2.1.1, SR 3.2.1.2 [new] -Heat Flux Hot Channel Factor (FQ(Z))The proposed changes to SR 3.2.1.1 address surveillance for FQE(Z), and the addition of new SR 3.2.1.2 addresses surveillance for FQT(Z). Specifying separate requirements for FQE(Z) and FQT(Z), iS consistent with treatment of the comparable terms F 0 c(Z) and FQw(Z)in Standard Technical Specifications for Westinghouse plants (Reference 3).The Note preceding SR 3.2.1.1 is deleted since it is not applicable to surveillance for the steady-state parameter FQE(z). It relates to considerations that apply only to conducting surveillance for the transient FQ(Z) limits.
for   each     1%   that THERMAL POWER is limited below RTP by Required Action 8.2.       Priorto increasing AND                         THERMAL POWER and AFD limits above 8.5 Perform SR 3.2.1.1 the limits of Required and SR 3.2.1.2.             Actions 8.1 and 8.2
Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 12 of 16 Insert 3 describes proposed new SR 3.2.1.2 for FQT(Z), including a Note preceding SR 3.2.1.2 that describes the actions for the situation in which either FQE(Z) or FQT(Z) have increased since the last evaluation of FQ(Z) or are expected to increase prior to the next evaluation.
* Renumber existing TS 3.2.1 CONDITION B, REQUIRED ACTION, as follows:
Required Action A of the Note involves increasing FQT(Z) by the appropriate factor, as specified in the COLR, if the conditions concerning either FQE(Z) or FQT(Z) are met. This approach, although different in the details of application from that recommended in Reference 2, has been deemed to be more suitable for use with Dominion methods. The proposed SR 3.2.1 .2 has been confirmed by analysis with Dominion methods for representative NAPS reload cores to ensure that FQE(Z) and FQT(Z) will satisfy their respective limits and to resolve the issue -of undetected loss of margin identified in Reference 2.As applied by Dominion, SR 3.2.1.2 involves looking for increases in steady-state and transient, measured and predicted FQ(Z) to determine if the penalty factor should be applied. The application of the appropriate penalty factor will be required if any of the following conditions are met: 1. Increase in measured maximum FoE(Z,) I K(Z) from the previous surveillance, 2. Increase in measured maximum FQT(Z) I K(Z) from the previous surveillance, 3. Increase in predicted maximum FQE(Z) I K(Z) over the next surveillance period, or 4. Increase in predicted maximum FQT(Z) I K(Z) over the next surveillance period.Cycle-specific analyses will be performed to determine the appropriate penalty factor required to accommodate potential increases in FQ(Z) over the surveillance period. SR 3.2.1.2 notes that the 'appropriate factor' will be specified in the COLR. This allows for the details of the appropriate penalty factors to be evaluated and modified on a cycle-specific basis. This revised surveillance requirement will ensure an appropriate analytical penalty factor is applied during performance of SR 3.2.1.2, which addresses the issues identified in NSAL-15-1 (Reference 2).A new table, entitled "Penalty Factors for Flux Map Analysis," will be added to the COLR.Table 3.2-2 below presents a sample of the proposed table to be included in the COLR. The values provided in the sample table below are only intended to provide a representative example of typical reload values. The determination and verification of the appropriate penalty factor will be performed on a reload specific basis in accordance with the approved methodology of VEP-NE-1-A listed in Technical Specification 5.6.5.b.
BC. Required Action and associated Completion Time not met.
Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Attachment 1, Page 13 of 16 COLR Table 3.2-2 Penalty Factors for Flux Map Analysis Burnup Surveillance (MWD/MTU)
BC.1 Be in MODE 2.
Factor 0 -999 4.00%1000 -1999 3.50%2000 -2999 2.00%3000 -3999 2.00%4000 -4999 2.00%5000 -6999 2.00%7000 -8999 2.00%9000 -10999 2.00%11000 -12999 2.00%13000 -14999 2.00%15000 -16999 2.00%17000 -18999 2.00%19000 -EOR 2.00%Subsequent to approval of this LAR, Dominion intends to process appropriate conforming changes, in the form of a modification (denoted VEP-NE-1, Rev. 0.2-A) to the RPDC topical report. These changes will reflect the adjustments discussed herein to address the issues in References 1 and 2. This modification will be prepared in accordance with Dominion's topical modification process, as provided for in our reload methods topical report VEP-FRD-42-A (Reference 7).
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 7 of 16 2.2     SR 3.2.1.1, SR 3.2.1.2 [new]     - Heat Flux Hot Channel Factor (FQ(Z))
The changes to SR 3.2.1.1 and the addition of SR 3.2.1.2 conform with the introduction of steady-state, FQE(Z), and transient, FQT(Z), in TS 3.2.1. These changes define separate surveillance requirements for the two representations of FQ(Z).
The proposed changes follow:
SR 3.2.1.1
* The Note before SR 3.2.1 .1 is deleted since it pertains to transient limits.
* SR 3.2.1.1 is revised to read as follows:
Verify .F-*(-Z- FQE(Z) is within limit.
SR 3.2.1.1 [FREQUENCY] (the 2 nd clause):
Once within 12 hours after achieving equilibrium conditions after exceeding, by -- 10%
RTP, the THERMAL POWER at which FQM(-Z-) FQE(Z) was last verified
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR   - NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Attachment 1, Page 8 of 16
*New SR 3.2.1.2 will be added, to read as follows:
S UR VEILLA NCE                               FREQUENCY SR 3.2.1.2----..............NOTE.........
If measurements indicate that either the maximum over z
[K(Z) I OR K(z) ]
maximum over z has increasedsince the previous evaluation of FQ(Z)or is expected to increaseprior to the next evaluation:
A. Increase FQT(Z) by the appropriatefactor, as specified in the COLR, and verify FQT(Z) is still within limits or B. Repeat SR 3.2.1.2 once perT7 EFPD until               Once after each
: a. Above (A) is met or                               refueling within 12 hours
: b. Two successive flux maps indicate that the       after achieving equilibrium conditions after
[~&#xb6;21                     THERMAL POWER exceeds 75% RTP maximum over z         LKzJ AND                                               AND Once within 12 hours K(Z)].                   after achieving maximum over z equilibrium conditions has not increased.                                after exceeding, by
                                                          > 10% RTP, the Verify FQT(Z) is within limit.
THERMAL POWER at which FQT(Z) was last verified AND In accordancewith the Surveillance Frequency Control Program
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 9 of 16 2.3 TS Bases 3.2.1     - Heat Flux Hot Channel Factor (FQ(Z))
Several changes to the Bases will be required which reflect the terminology changes and relocation of items from the specific TS sections noted in the description above.
Summary list of key changes (see markup in Attachment 4):
* Revise terminology throughout to reflect use of FQ(Z), FQE(Z) and FQT(Z) as appropriate
* Changes to conform with deletion and renumbered Condition A REQUIRED ACTIONS in TS 3.2.1
* Insert 4 describes the relation for FQT(Z), including the N(Z) factor
* Insert 5 describes actions to reduce core power and AFD limits if FQE(Z) and FQT(Z) cannot be maintained within LCO limits
* Insert 6 describes the Condition B REQUIRED ACTIONS added in TS 3.2.1 for FaT(Z)
* Insert 7 describes the steady-state peaking factor, FQE(Z) for SR 3.2.1.1
* Insert 8 describes the frequency conditions for the transient peaking factor, FQT(Z) for SR 3.2.1.2
* Insert 9 describes expressions for both FQE (Z) and FQT(z) that are evaluated to determine whether to apply the appropriate penalty factor or increase the frequency of surveillance Based on Dominion's analytical assessment of internal and external operating experiences (e.g. Westinghouse Communication 06-IC-03, Reference 5), the magnitudes of the lower and upper core regions excluded from FQ surveillances had been proactively and conservatively reduced (in approximately 2006) from what was and is currently described in the North Anna Technical Specification Bases. An update to the Technical Specification Bases to expand the FQ axial surveillance regions is being tracked by Dominion's corrective action system.
 
==3.0   TECHNICAL ANALYSIS==
 
The proposed TS changes identified in Section 2.0 are evaluated for technical adequacy in the following sections.
3.1   TS 3.2.1 - Heat Flux Hot Channel Factor (FQ(Z))
The proposed changes involve additions, deletions and revisions to existing TS content that are associated with LCO 3.2.1. These changes provide resolution of issues documented in Westinghouse notification documents NSAL-09-5, Rev. 1 (Reference 1) and NSAL-15-1 (Reference 2). NAPS is currently operating with compensatory actions which address the issues identified in References 1 and 2. Evaluation of the specific proposed changes is provided below.
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR,- NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Attachment 1, Page 10 of 16 LCO 3.2.1 The existing LCO 3.2.1 specifies that FQ(Z) is approximated by F0 M(Z), which is described in the Bases as the steady-state measured value for FQ(Z). The COLR limit to which FQM(z) is compared is adjusted by the factor, N(Z), which accounts for the calculated worst case transient core conditions. The N(Z) factor is calculated in accordance with the approved Dominion RPDC methodology (Reference 4). The proposed changes specify that Fo(Z) is approximated by F0 E(z) and FQT(Z), denoted as the steady-state and transient quantities, respectively. Separate surveillance requirements are specified for FQE(Z) and FQT(Z), which is consistent with the comparable terms F0 c(Z) and F0 w(Z) in Standard Technical Specifications for Westinghouse plants (Reference 3).
A Note is inserted before LCO 3.2.1 Condition A to explain that Action A.4 is always required to be performed unless SR 3.2.1.2 is performed prior to exceeding 75% RTP after a refueling outage. This note is consistent with language proposed for this LCO condition in response to an NRC Request for Additional Information during review of WCAP-1 7661-P (Reference 6).
Required Action A.1 in existing LCO 3.2.1 is deleted, since the revised Condition A now applies to steady-state FQE(Z), for which this action does not apply, per the comparable Reference 3 actions for TS 3.2.IB. The remaining actions for LCO 3.2.1 Condition A are retained, with changes to each action that reflect use of FQE(Z) versus FQM(Z).
A new Condition B with corresponding Required Actions is added to address the situation in which FQT(Z) is not within its limit. Proposed Required Actions B.1 through B.5 are a modified version of the interim actions identified in NSAL-09-5, Rev. 1 (Reference 1), for this situation. These changes are proposed as the resolution for the issues identified in Reference 1.
Westinghouse's proposal for the long term resolution of NSAL-09-5, Rev. 1 is to seek NRC approval for the methods described in WCAP-17661-P (Reference 6). WCAP-17661-P is intended to revise the existing RAOC and Constant Axial Offset Control (CAOC) F0 Surveillance Technical Specifications to address several outstanding issues, one of which was NSAL-09-5. Dominion has strategically chosen not to adopt WCAP-17661-P and its subsequent Technical Specification Task Force (TSTF) traveler for North Anna.
This alternate approach was determined by Dominion evaluation to most appropriately address the issues in NSAL-09-5, Rev. 1 for NAPS. The Dominion approach has these desirable aspects: 1) it addresses directly the issues of NSAL-09-5, Rev. 1; 2) it retains the existing TS surveillance scheme and structure; and 3) it retains the existing axial control calculational methodology (RPDC). By relocating the numerical values to the COLR,
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 11 of 16 Dominion's proposed resolution of NSAL-09-5 allows the required RPDC operating space (THERMAL POWER and AFD) reductions to be evaluated and modified on a cycle-specific basis. This proposed resolution is supported by current Dominion RPDC methods.
Specifically, the allowable operating space that applies to Required Action B.1 and 8.2 is relocated to the COLR. A new table, entitled "Required Operating Space Reductions for FQT(Z) Exceeding Its Limits," will be added to the COLR to quantify the required THERMAL POWER and AFD limits associated with different amounts of FQT(Z) margin improvement (1%, 2%, etc.). If LCO 3.2.1, Condition B is entered, the operating space as defined in the new COLR table will ensure that sufficient margin exists. COLR Table 3.2-3 below presents a sample of the proposed table to be included in the COLR.
The values provided in the sample table below are only intended to provide a representative example of typical reload values. The determination and verification of the required FQT(Z) margin improvements and the corresponding required reductions in the THERMAL POWER Limit and AFD Bands will be performed on a reload specific basis in accordance with the approved methodology of VEP-NE-1-A listed in Technical Specification 5.6.5.b.
COLR Table 3.2-3 Required Operating Space Reductions for FQT(Z) Exceeding Its Limits Required FQT(z) Margin     THERMAL POWER           Negative AFD             Positive AFD Improvement               Reduction           Band Reduction         Band Reduction
(%RTP)               (%AFD)                   (%AFD)
                    < %>3%                               >&#x17d;2.0%                   > 2.0%
      > 1% and*<2%                 >&#x17d;5%                 > 3.0%                   > 3.0%
      > 2% and <3%                   ___8%               __.3.5%                 >&#x17d;3.5%
            > 3%                   _&#x17d;50%                 N/A                       N/A 3.2 SR 3.2.1.1, SR 3.2.1.2 [new]     - Heat Flux Hot Channel Factor (FQ(Z))
The proposed changes to SR 3.2.1.1 address surveillance for FQE(Z), and the addition of new SR 3.2.1.2 addresses surveillance for FQT(Z). Specifying separate requirements for FQE(Z) and FQT(Z), iS consistent with treatment of the comparable terms F0 c(Z) and FQw(Z) in Standard Technical Specifications for Westinghouse plants (Reference 3).
The Note preceding SR 3.2.1.1 is deleted since it is not applicable to surveillance for the steady-state parameter FQE(z). It relates to considerations that apply only to conducting surveillance for the transient FQ(Z) limits.
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 12 of 16 Insert 3 describes proposed new SR 3.2.1.2 for FQT(Z), including a Note preceding SR 3.2.1.2 that describes the actions for the situation in which either FQE(Z) or FQT(Z) have increased since the last evaluation of FQ(Z) or are expected to increase prior to the next evaluation. Required Action A of the Note involves increasing FQT(Z) by the appropriate factor, as specified in the COLR, if the conditions concerning either FQE(Z) or FQT(Z) are met. This approach, although different in the details of application   from that recommended in Reference 2, has been deemed to be more suitable for use with       Dominion methods. The proposed SR 3.2.1 .2 has been confirmed by analysis with               Dominion methods for representative NAPS reload cores to ensure that FQE(Z) and             FQT(Z) will satisfy their respective limits and to resolve the issue -of undetected loss         of margin identified in Reference 2.
As applied by Dominion, SR 3.2.1.2 involves looking for increases in steady-state and transient, measured and predicted FQ(Z) to determine if the penalty factor should be applied. The application of the appropriate penalty factor will be required if any of the following conditions are met:
: 1. Increase in measured maximum FoE(Z,) I K(Z) from the previous surveillance,
: 2. Increase in measured maximum FQT(Z) I K(Z) from the previous surveillance,
: 3. Increase in predicted maximum FQE(Z) I K(Z) over the next surveillance period, or
: 4. Increase in predicted maximum FQT(Z) I K(Z) over the next surveillance period.
Cycle-specific analyses will be performed to determine the appropriate penalty factor required to accommodate potential increases in FQ(Z) over the surveillance period. SR 3.2.1.2 notes that the 'appropriate factor' will be specified in the COLR. This allows for the details of the appropriate penalty factors to be evaluated and modified on a cycle-specific basis. This revised surveillance requirement will ensure an appropriate analytical penalty factor is applied during performance of SR 3.2.1.2, which addresses the issues identified in NSAL-15-1 (Reference 2).
A new table, entitled "Penalty Factors for Flux Map Analysis," will be added to the COLR.
Table 3.2-2 below presents a sample of the proposed table to be included in the COLR. The values provided in the sample table below are only intended to provide a representative example of typical reload values. The determination and verification of the appropriate penalty factor will be performed on a reload specific basis in accordance with the approved methodology of VEP-NE-1-A listed in Technical Specification 5.6.5.b.
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5,   Rev. I and NSAL-1 5-1, Rev. 0 Attachment 1, Page 13 of 16 COLR Table 3.2-2 Penalty Factors for Flux Map Analysis Burnup         Surveillance (MWD/MTU)         Factor 0 -999           4.00%
1000 -1999         3.50%
2000 -2999         2.00%
3000 -3999         2.00%
4000 -4999         2.00%
5000 -6999         2.00%
7000 -8999         2.00%
9000 -10999         2.00%
11000 -12999         2.00%
13000 -14999         2.00%
15000 -16999         2.00%
17000 -18999         2.00%
19000 - EOR         2.00%
Subsequent to approval of this LAR, Dominion intends to process appropriate conforming changes, in the form of a modification (denoted VEP-NE-1, Rev. 0.2-A) to the RPDC topical report. These changes will reflect the adjustments discussed herein to address the issues in References 1 and 2. This modification will be prepared in accordance with Dominion's topical modification process, as provided for in our reload methods topical report VEP-FRD-42-A (Reference 7).


==4.0 REGULATORY EVALUATION==
==4.0 REGULATORY EVALUATION==


4.1 Applicable Regulatory Requirements and Criteria 10 CFR 50, Appendix B, General Design Criterion 10, which states: The reactor core and associated coolant, control, and protection systems shall be designed with appropriate margin to assure that specified acceptable fuel design limits are not exceeded during any condition of normal operation, including the effects of anticipated operational occurrences.
4.1   Applicable Regulatory Requirements and Criteria 10 CFR 50, Appendix B, General Design Criterion 10, which states:
10 CFR 50.36, Technical Specifications, paragraph (c)(2) states that technical specifications will include limiting conditions for operation.
The reactor core and associated coolant, control, and protection systems shall be designed with appropriate margin to assure that specified acceptable fuel design limits are not exceeded during any condition of normal operation, including the effects of anticipated operational occurrences.
Paragraph (c)(3) states that technical specifications will include surveillance requirements.
10 CFR 50.36, Technical Specifications, paragraph (c)(2) states that technical specifications will include limiting conditions for operation. Paragraph (c)(3) states that technical specifications will include surveillance requirements. Both of these paragraphs are applicable to the proposed change.
Both of these paragraphs are applicable to the proposed change.
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and NSAL-15-1, Rev. 0 Attachment 1, Page 14 of 16 Section (c)(2)(ii)(B) provides that LCOs must be established for each item meeting one or more criteria.
Serial No: 15-494 Docket Nos.: 50-338/339 LAR   - NSAL-09-5, Rev. 1 and NSAL-15-1, Rev. 0 Attachment 1, Page 14 of 16 Section (c)(2)(ii)(B) provides that LCOs must be established for each item meeting one or more criteria. For the power distribution items affected by the proposed change, the following criterion applies:
For the power distribution items affected by the proposed change, the following criterion applies: (B) Criterion
(B) Criterion 2. A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. The association with the relevant design basis accident analysis is described below.
: 2. A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. The association with the relevant design basis accident analysis is described below.10 CFR 50.46, Acceptance Criteria For Emergency Core Cooling Systems For Light-Water Nuclear Power Reactors, establishes acceptable limits for the performance of emergency core cooling systems (ECCS), and requirements for the analytical models used to validate the performance.
10 CFR 50.46, Acceptance Criteria For Emergency Core Cooling Systems For Light-Water Nuclear Power Reactors, establishes acceptable limits for the performance of emergency core cooling systems (ECCS), and requirements for the analytical models used to validate the performance. The analyses of ECOS performance use various inputs and assumptions that reflect the conditions and features of a given plant. In accordance with North Anna TS 5.6.5.b, Core Operating Limits Report, the ECCS analysis establishes limits for FQ(Z), Heat Flux Hot Channel Factor, which is the subject of the proposed TS changes.
The analyses of ECOS performance use various inputs and assumptions that reflect the conditions and features of a given plant. In accordance with North Anna TS 5.6.5.b, Core Operating Limits Report, the ECCS analysis establishes limits for FQ(Z), Heat Flux Hot Channel Factor, which is the subject of the proposed TS changes.The proposed change maintains compliance with these requirements.
The proposed change maintains compliance with these requirements.
4.2 No Significant Hazards Consideration Dominion has evaluated whether a significant hazards consideration is involved with the proposed amendment by addressing the three standards set forth in 10 CFR 50.92,"Issuance of Amendment," as discussed below: 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
4.2   No Significant Hazards Consideration Dominion has evaluated whether a significant hazards consideration is involved with the proposed amendment by addressing the three standards set forth in 10 CFR 50.92, "Issuance of Amendment," as discussed below:
Response:
: 1. Does the proposed change involve a significant increase               in the probability or consequences of an accident previously evaluated?
No.The proposed change for resolution of Westinghouse notification documents NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 is intended to address deficiencies identified within the existing NAPS Technical Specifications and to return them to their as-designed function.Operation in accordance with the revised TS ensures that the assumptions for initial conditions of key parameter values in the safety analyses remain valid and does not result in actions that would increase the probability or consequences of any accident previously evaluated.
Response: No.
The proposed change for resolution of Westinghouse notification documents NSAL     5, Rev. 1 and NSAL-1 5-1, Rev. 0 is intended to address deficiencies identified within the existing NAPS Technical Specifications and to return them to their as-designed function.
Operation in accordance with the revised TS ensures that the assumptions for initial conditions of key parameter values in the safety analyses remain valid and does not result in actions that would increase the probability or consequences of any accident previously evaluated.
Therefore, the proposed amendment does not involve a significant increase in the probability or the consequences of any accident previously evaluated.
Therefore, the proposed amendment does not involve a significant increase in the probability or the consequences of any accident previously evaluated.
Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 15 of 16 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response:
No.Operation in accordance with the revised TS and its limits precludes new challenges to SSCs that might introduce a new type of accident.
All design and performance criteria will continue to be met and no new single failure mechanisms will be created. The proposed change for resolution of Westinghouse notification documents NSAL-09-5, Rev. 1 and NSAL-15-1, Rev. 0 does not involve the alteration of plant equipment or introduce unique operational modes or accident precursors.
It thus does not create the potential for a different kind of accident.Therefore, the proposed amendment does not create a new or different kind of accident from any accident previously evaluated.
: 3. Does the proposed change involve a significant reduction in a margin of safety?Response:
No.Operation in accordance with the revised TS and its limits preserves the margins assumed in the initial conditions for key parameters assumed in the safety analysis.
This ensures that all design and performance criteria associated with the safety analysis will continue to be met and that the margin of safety is not affected.Therefore, the proposed amendment does not involve a significant reduction in a margin of safety.Based on the above information, Dominion concludes that the proposed license amendment involves no significant hazards consideration under the criteria set forth in 10 CFR 50.92(c)and, accordingly, a finding of no significant hazards consideration is justified.
4.3 Precedents The proposed changes to the North Anna Units 1 and 2 TS are fundamentally the same as those in the following submittal associated with previous application of Dominion methods: 1. Letter from Mark D. Sartain (Dominion) to USNRC, "Millstone Power Station Unit 3 License Amendment Request to Adopt Dominion Core Design and Safety Analysis Methods and to Address the Issues Identified in Westinghouse Documents NSAL-09-5, Rev. 1, NSAL-1 5-1 and 06-1C-03," May 8, 2015 (ADAMS Accession No. ML15134A244).Precedent 1 included proposed TS changes that address each of the issues identified in References 1 and 2 in a comparable manner to those enclosed in this LAR. For both Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 16 of 16 Precedent 1 and this LAR, the proposed TS changes are compatible with Dominion reload core design methods.5.0 ENVIRONMENTAL CONSIDERATIONS Dominion has reviewed the proposed license amendment for environmental considerations.
The proposed license amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.
Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion from an environmental assessment as set forth in 10 CFR 51.22(c)(9).
Therefore, pursuant to 10 CFR 51 .22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.


==6.0 REFERENCES==
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 15 of 16
: 1. Westinghouse Nuclear Safety Advisory Letter, NSAL-09-5, Rev. 1, "Relaxed Axial Offset Control EQ Technical Specification Actions," September 23, 2009.2. Westinghouse Nuclear Safety Advisory Letter, NSAL-15-1, Rev. 0, "Heat Flux Hot Channel Factor Technical Specification Surveillance," February 3, 2015.3. NUREG-1431, Revision 4, Vol. 1 and 2, "Standard Technical Specifications
: 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
-Westinghouse Plants." 4. Topical Report, VEP-NE-1, Rev. 0.1-A, "VEPCO Relaxed Power Distribution Control Methodology and Associated FQ Surveillance Technical Specifications," August 2003.5. Westinghouse Notice 06-1C-03, "FQ and Fxy, Surveillance Zone Issue," February 21, 2006.6. WCAP-17661-P, Revision 1, "Improved RAOC and CAOC FQ Surveillance Technical Specifications," November 2013.7. Topical Report, VEP-FRD-42, Rev. 2.1-A, "Reload Nuclear Design Methodology," August 2003.
Response: No.
Serial No. 15-494 LAR -NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Docket Nos. 50-338/339 ATTACHMENT 2 MARKED-UP TECHNICAL SPECIFICATIONS PAGES Virginia Electric and Power Company (Dominion)
Operation in accordance with the revised TS and its limits precludes new challenges to SSCs that might introduce a new type of accident. All design and performance criteria will continue to be met and no new single failure mechanisms will be created. The proposed change for resolution of Westinghouse notification documents NSAL-09-5, Rev. 1 and NSAL-15-1, Rev. 0 does not involve the alteration of plant equipment or introduce unique operational modes or accident precursors. It thus does not create the potential for a different kind of accident.
North Anna Power Station Units 1 and 2 FQ(Z)3.2.1 3.2 POWER DISTRIBUTION LIMITS 3.2.1 Heat Flux Hot Channel Factor (FQ(Z)) ,,- FQE(Z)and FQ'(Z)1k LCO 3.2.1 FQ(Z), as approximated by , shall be within the limits specified in the COLR.APPLICABILITY:
Therefore, the proposed amendment does not create a new or different kind of accident from any accident previously evaluated.
MODE 1.ACTIONS CONDITIONNSRT"1']A. not within limit.REQUIRED ACTION COMPLETION TIME A1eADlimits
: 3. Does the proposed change involve a significant reduction in a margin of safety?
_> 1% 15 mi er" foreac-M(Z)FQ(Z) exeesliidetermi nat ionReduce THERMAL POWER1% RTP for each 1%AND A.-2-.2 Reduce Power Range Neutron Flux-High trip setpoints 1% for each 1% M AND A.f-..3 Reduce Overpower AT trip setpoints 1%for each 1%-F/-,,,-
Response: No.
cxcd limit.AND A.-2-.4 Perform SR 3.2.1.1 land SR 3.2.1.2 15 minutes after each -F~-+Z 4-determi nation IFQE(Z)72 hours after each -F --~----determi nation 72 hours after each 4-determination that THERMAL POWER is limited below RTP by Required Action A.1 Prior to increasing THERMAL POWER above the limit of Required Action A.f-..I North Anna Units 1 and 2 3211Aedet 3/1 3.2.1-I FQ(Z)3.2.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME---Required Action and -B-.I Be in MODE 2. 6 hoursassociated Completions SURVEILLANCE REQUIREMENTS
Operation in accordance with the revised TS and its limits preserves the margins assumed in the initial conditions for key parameters assumed in the safety analysis. This ensures that all design and performance criteria associated with the safety analysis will continue to be met and that the margin of safety is not affected.
------------------
Therefore, the proposed amendment does not involve a significant reduction in a margin of safety.
NOTE- ---------During power escalation, THERMAL POWER may be increased until a power level for extended operation has been achieved, at which a power distribution map is obtai ned.North Anna Units 1 and 2 3212Aedet 3/1 3.2.1-2 FQ(Z)3.2.1 SURVEILLANCE REQUIREMENTS SURVE IL LANCE FREQUENCY SR 3.2.1.1 IFoE(Z)-...NOTE---- --I F(Z) measurements indicate maximu over z LK-(Z)has increas ,d since the p iu eval uation o Z a. Increase by he appropriate factor and-verf F(Z) is still within limits;b. Repeat SR .21. ce per 7 EFPD until two cesv lux maps indicate maxium verz [ K~(Z)j]__as not Veri fy> --(ji s within limit.Once after each refueling prior to THERMAL POWER exceeding 75% RTP AND Once within 12 hours after achieving equilibrium conditions after exceeding, by10% RTP, the THERMAL POWER at waslat erifed~AND In accordance with the Surveil11ance Frequency Control Program North Anna Units 1 and 2 3.2.1-3 Aedet 6/4 INSERT "1"-~NOTE---Required Action A.4 shall be completed whenever this Condition is entered. SR 3.2.1.2 is not required to be performed if this Condition is entered prior to THERMAL POWER exceeding 75%RTP after a refueling.
Based on the above information, Dominion concludes that the proposed license amendment involves no significant hazards consideration under the criteria set forth in 10 CFR 50.92(c) and, accordingly, a finding of no significant hazards consideration is justified.
INSERT "2" ACTIONS CONDITION
4.3  Precedents The proposed changes to the North Anna Units 1 and 2 TS are fundamentally the same as those in the following submittal associated with previous application of Dominion methods:
[REQUIRED ACTION ]COMPLETION TIME B.----NOTE----...
: 1. Letter from Mark D. Sartain (Dominion) to USNRC, "Millstone Power Station Unit 3 License Amendment Request to Adopt Dominion Core Design and Safety Analysis Methods and to Address the Issues Identified in Westinghouse Documents NSAL-09-5, Rev. 1, NSAL-1 5-1 and 06-1C-03," May 8, 2015 (ADAMS Accession No. ML15134A244).
Required Action B.5 shall be completed whenever this Condition is entered.FQT(Z) not within limit.B.1 AND B.2 AND B.3 AND B.4 AND B.5 Reduce AFD limits as specified in the COLR.Reduce THERMAL POWER as specified in the COLR.Reduce Power Range Neutron Flux-High trip setpoints
Precedent 1 included proposed TS changes that address each of the issues identified in References 1 and 2 in a comparable manner to those enclosed in this LAR. For both
> 1 % for each 1 % that THERMAL POWER is limited below RTP by Required Action B.2.Reduce Overpower AT trip setpoints
 
> 1 % for each 1 % that THERMAL POWER is limited below RTP by Required Action B.2.Perform SR 3.2.1.1 and SR 3.2.1.2.4 hours after each FaT(Z) determination 4 hours after each FaT(Z) determination 72 hours after each FaT(Z) determination 72 hours after each FQT(z) determination Prior to increasing THERMAL POWER and AFD limits above the limits of Required Actions B.1 and B.2 INSERT "3" SURVEILLANCE FREQUENCY SR 3.2.1.2-~~~NOTE-----------
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 16 of 16 Precedent 1 and this LAR, the proposed TS changes are compatible with Dominion reload core design methods.
If measurements indicate that either the maximum over z [n()]1 OR maximum over z [ K(z)].has increased since the previous evaluation of FQ(Z)or is expected to increase prior to the next evaluation:
 
A. Increase FQT(Z) by the appropriate factor, as specified in the COLR, and verify FQT(z) is still within limits or B. Repeat SR 3.2.1.2 once per 7 EFPD until a. Above (A) is met or b. Two successive flux maps indicate that the maximum over z [FK(Z)]J AND maximum over z [nK~)has not increased.
==5.0    ENVIRONMENTAL CONSIDERATION==
Verify FQT(Z) is within limit.Once after each refueling within 12 hours after achieving equilibrium conditions after THERMAL POWER exceeds 75% RTP AND Once within 12 hours after achieving equilibrium conditions after exceeding, by> 10% RTP, the THERMAL POWER at which FoT(z)was last verified AND In accordance with the Surveillance Frequency Control Program Serial No. 15-494 LAR -NSAL-09-5, Rev. 1 and NSAL-15-1 Docket Nos. 50-338/339 ATTACHMENT 3 PROPOSED TECHNICAL SPECIFICATIONS PAGES Virginia Electric and Power Company (Dominion)
S Dominion has reviewed the proposed license amendment for environmental considerations.
North Anna Power Station Units 1 and 2 FQ(Z)3.2.1 3.2 POWER DISTRIBUTION LIMITS 3.2.1 Heat Flux Hot Channel Factor (FQ(Z))LCO 3.2.1 APPLICABILITY:
The proposed license amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.          Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion from an environmental assessment as set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51 .22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
FQ(Z) , as approximated by FQE (Z) and FQT (Z), shall be within the limits specified in the COLR.MODE 1.ACTIONS CONDITION
 
] REQUIRED ACTION TCOMPLETION TIME A.------NOTE---
==6.0    REFERENCES==
--Required Action A.4 shall be completed whenever this Condition is entered. SR 3.2.1.2 is not required to be performed if this Condition is entered prior to THERMAL POWER exceeding 75% RTP after a refueling.
: 1. Westinghouse Nuclear Safety Advisory Letter, NSAL-09-5, Rev. 1, "Relaxed Axial Offset Control EQ Technical Specification Actions," September 23, 2009.
FQE (7) not within limit.A.I Reduce THERMAL POWER1% RTP for each 1%FQE (Z) exceeds limit.15 minutes after each FeE (7)determi nati on AND A.2 Reduce Power Range Neutron Flux-High trip setpoints 1%for each 1% that THERMAL POWER is limited below RTP by Required Action A.I.AND A.3 Reduce Overpower AT trip setpoints 1%for each 1% that THERMAL POWER is limited below RTP by Required Action A.1.AND A.4 Perform SR 3.2.1.1 and SR 3.2.1.2.72 hours afteY FQE (Z)determi nati on r each 72 hours after each FQE (Z)determi nati on Prior to increasing THERMAL POWER above the limit of Required Action A.I I North Anna Units 1 and 2 3211Aedet 3.2.1-1 Amendments FQ(Z)3.2.1 ACTIONS CONDITION
: 2. Westinghouse Nuclear Safety Advisory Letter, NSAL-15-1, Rev. 0, "Heat Flux Hot Channel Factor Technical Specification Surveillance," February 3, 2015.
]R EQUIRED ACTION COMPLETION TIME B.------NOTE-  
: 3. NUREG-1431, Revision 4, Vol. 1 and 2, "Standard Technical Specifications                -
---Required Action B.5 shall be completed whenever this Condition is entered.B.I Reduce AFD limits as specified in the COLR, FQT (Z) not within limit.AND B,2 Reduce THERMAL POWER as specified in the COLR.AND B.3 Reduce Power Range Neutron Flux-High trip setpoints  
Westinghouse Plants."
> 1%for each 1% that THERMAL POWER is limited below RTP by Required Action B.2 AND B,4 Reduce Overpower AT trip setpoints  
: 4. Topical Report, VEP-NE-1, Rev. 0.1-A, "VEPCO Relaxed Power Distribution Control Methodology and Associated FQ Surveillance Technical Specifications," August 2003.
> 1%for each 1% that THERMAL POWER is limited below RTP by Required Action B.2.AND B.5 Perform SR 3.2.1.1 and SR 3.2.1.2.4 hours after each FQT (7)determi nati on 4 hours after each FQT (Z)determi nati on 72 hours after each FQT (Z)determi nati on 72 hours after each FQT (Z)determi nati on Prior to increasing THERMAL POWER and AFD limits above the limits of Required Actions B.I and B.2.C. Required Action and }C.1 Be in MODE 2. 6 hours associated Completion Time not met.,______________
: 5. Westinghouse Notice 06-1C-03, "FQ and Fxy, Surveillance Zone Issue," February 21, 2006.
_________North Anna Units 1 and 2 3212Aedet 3,2.1-2 Amendments FQ(Z)3.2.1 SURVEILLANCE REQUIREMENTS
: 6. WCAP-17661-P, Revision 1, "Improved RAOC and CAOC FQ Surveillance Technical Specifications," November 2013.
-- ------------------ NOTE ----------During power escalation, THERMAL POWER may be increased until a power level for extended operation has been achieved, at which a power distribution map is obtained.SURVEILLANCE REQUIREMENTS
: 7. Topical Report, VEP-FRD-42, Rev. 2.1-A, "Reload Nuclear Design Methodology,"
_____________
August 2003.
SURVEILLANCE FREQUENCY SR 3.2.1.1 Verify FQ (Z) is within limit. Once after each refueling prior to THERMAL POWER exceeding 75% RTP AND Once within 12 hours after achieving equilibrium conditions after exceeding, by10% RTP, the THERMAL POWER at which FQE (Z)was last verified AND In accordance with the Surveillance Frequency Control Program North Anna Units 1 and 2 3213Aedet 3.2.1-3 Amendments FQ(Z)3.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY+SR 3.2.1.2-NOTE-If measurements indicate that either the maximum over z OR maximum over z1 LK(Z) j1 has increased since the previous evaluation of FQ (7) or is expected to increase prior to the next evaluation:
 
A. Increase FQT (7) by the appropriate factor, as specified in the COLR, and verify FQT (7)is still within limits or B. Repeat SR 3.2.1.2 once per 7 EFPD until1 a. Above (A) is met or b. Two successive flux maps indicate that the maximum over z AND maximum over z SFQ(Z)]K(Z) j has not increased.(conti nued)North Anna Units 1 and 2 3214Aedet 3.2.1-4 Amendments FQ(Z)3.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.1.2 (conti nued)Verify FQT (Z) is within limit.Once after each refueling within 12 hours after achieving equilibrium conditions after THERMAL POWER exceeds 75% RTP AND Once within 12 hours after achieving equilibrium conditions after exceeding, by10% RTP, the THERMAL POWER at which FQT (Z)was last verified AND In accordance with the Surveillance Frequency Control Program North Anna Units 1 and 2 3215Aedet 3.2.1-5 Amendments Intentionally Blank Serial No. 15-494 LAR -NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Docket Nos. 50-338/339 ATTACHMENT 4 MARKED-UP AND PROPOSED TECHNICAL SPECIFICATIONS BASES PAGES (for information only)Virginia Electric and Power Company (Dominion)
Serial No. 15-494 LAR - NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Docket Nos. 50-338/339 ATTACHMENT 2 MARKED-UP TECHNICAL SPECIFICATIONS PAGES Virginia Electric and Power Company (Dominion)
North Anna Power Station Units 1 and 2 FQ(Z)B 3.2.1 B 3.2 POWER DISTRIBUTION LIMITS B 3.2.1 Heat Flux Hot Channel Factor (FQ(Z))BASES BACKGROUND FQ(Z) is approximated by FQE(Z) and FaT(Z). FQE(Z)is defined as the measured value of FQ(Z), incorporating manufacturing tolerances and measurement uncertainties.
North Anna Power Station Units 1 and 2
FaT(Z) is defined as the FQE(Z)incorporating a non-equilibrium factor that accounts for possible power distribution transients during normal operation.
 
The purpose of the limits on the values of FQ(Z) is to limit the local (i.e., pellet) peak power density. The value of FQ(Z) varies along the axial height (Z) of the core.FQ(Z) is defined as the maximum local fuel rod linear power density divided by the average fuel rod linear power density, assuming nominal fuel pellet and fuel rod dimensions.
FQ(Z) 3.2.1 3.2  POWER DISTRIBUTION LIMITS 3.2.1      Heat Flux Hot Channel Factor (FQ(Z))          ,,- FQE(Z)and FQ'(Z) 1k LCO  3.2.1         FQ(Z), as approximated by specified in the COLR.
Therefore, FQ(Z) is a measure of the peak fuel pellet power within the reactor core.During power operation, the global power distribution is limited by LCO 3.2.3, "AXIAL FLUX DIFFERENCE (AFD)," and LCO 3.2.4, "QUADRANT POWER TILT RATIO (QPTR)," which are directly and continuously measured process variables.
                                                    -f*-~ ,  shall be within the limits APPLICABILITY:      MODE 1.
These LCOs, along with LCO 3.1.6, "Control Bank Insertion Limits," maintain the core limits on power distributions on a continuous basis.FQ(Z) varies with fuel loading patterns, control bank insertion, fuel burnup, and changes in axial power distribution.
ACTIONS CONDITION                      REQUIRED ACTION            COMPLETION TIME
FQ(Z) is measured periodically using the incore detector system. These measurements are generally taken with the core at or near steady state conditions.
        /*I NSRT"1']
Using the measured three dimensional power distributions, it Isteady-state F 0 (Z),I is possible to derive a measure val1 foFQ)rt\IFQE(Z)I However, because this value represents a steady state condition, it does not encompass the variations in the value of FQ(Z) that are present during nonequilibrium situations, such as load changes.To account for these possible variations, the steady state.........e\ is" adjusted by an elevation dependent factor-.that accounts for the calculated worst case transient conditions itO derive FaT(Z) Ii Core monitoring and control under nonsteady state conditions are accomplished by operating the core within the limits of the appropriate LC~s, including the limits on AFD, QPTR, and control rod insertion.
A.  -F-.Z* not within          A1eADlimits                      _>1% 15 mi              er" limit.                          foreac-M(Z)FQ(Z) exeesliidetermi                      nation A.-Z*. Reduce THERMAL POWER      15 minutes after
North Anna Units 1 and 2 B3211Rvso B 3.2.1-1 Revision 0 FQ(Z)B 3.2.1 BASES APPLICABLE This LCO precludes core power distributions that violate the SAFETY ANALYSES following fuel design criteria: a. During a loss of coolant accident (LOCA), the peak cladding temperature during a small break LOCA must not exceed 2200&deg;F, and there must be a high level of probability that the peak cladding temperature does not exceed 2200 0 F for the large breaks (Ref. 1);b. During a loss of forced reactor coolant flow accident, there must be at least 95% probability at the 95%confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a departure from nucleate boiling (DNB) condition;
                                            &#x17d;1% RTP for each 1%        each -F~-+Z 4-        IFQE(Z) determi nation AND A.-2-.2    Reduce Power Range        72 hours after Neutron Flux-High trip    each -F -- ~----
: c. During an ejected rod accident, the energy deposition to unirradiated fuel is limited to 225 cal/gm and irradiated fuel is limited to 200 cal/gm (Ref. 2); and d. The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest worth control rod stuck fully withdrawn (Ref. 3).Limits on Fo(7) ensure that the value of the initial total peaking factor assumed in the accident analyses remains valid. Other criteria must also be met (e.g., maximum cladding oxidation, maximum hydrogen generation, coolable geometry, and long term cooling).
setpoints &#x17d; 1% for        determi nation each 1% M AND A.f-..3    Reduce Overpower AT        72 hours after trip setpoints &#x17d; 1%       each f*()        4-for each 1%-F/-,,,- determination cxcd limit.                    that THERMAL POWER AND                                is limited below RTP by Required Action A.1 A.-2-.4   Perform SR 3.2.1.1        Prior to increasing land SR 3.2.1.2            THERMAL POWER above the limit of Required Action A.f-..I North Anna Units 1 and 2                  3.2.1-I 3211Aedet                                  3/1
However, the peak cladding temperature is typically most limiting.Fo (Z) limits assumed in the LOCA analysis are typically limiting relative to (i.e., lower than) the FQ(Z) limit assumed in safety analyses for other postulated accidents.
 
FQ(Z) 3.2.1 ACTIONS CONDITION                 REQUIRED ACTION         COMPLETION TIME
---   Required Action and    -B-.I  Be in MODE 2.          6 hours I* associated Completions SURVEILLANCE REQUIREMENTS
          ------------------          NOTE-   -   - -  -    -  -  -  --
During power escalation, THERMAL POWER may be increased until a power level for extended operation has been achieved, at which a power distribution map is obtai ned.
North Anna Units 1 and 2            3212Aedet 3.2.1-2                              3/1
 
FQ(Z) 3.2.1 SURVEILLANCE REQUIREMENTS SURVE ILLANCE                            FREQUENCY SR  3.2.1.1 I F(Z) measurements indicate
                                            -...
NOTE----      --
maximu    over z LK-(Z) has increas ,d since the p        iu eval uation o        Z
: a. Increase F*(    by he appropriate factor and-verf F(Z) is still within limits;
: b. Repeat SR     .21.     ce per 7 EFPD until two    cesv        lux maps indicate maxium verz  [
__as not increased'.*
K~(Z)j]
IFoE(Z)   Veri fy>-- (ji s within limit.            Once after each refueling prior to THERMAL POWER exceeding 75% RTP AND Once within 12 hours after achieving equilibrium conditions after exceeding, by
                                                          &#x17d;10% RTP, the THERMAL POWER at whicl+W(+*
waslat erifed~
AND In accordance with the Surveil11ance Frequency Control Program North Anna Units 1 and 2               3.2.1-3                Aedet        6/4
 
INSERT "1"
                                                            -~NOTE---
Required Action A.4 shall be completed whenever this Condition is entered. SR 3.2.1.2 is not required to be performed if this Condition is entered prior to THERMAL POWER exceeding 75%
RTP after a refueling.
INSERT "2" ACTIONS CONDITION          [REQUIRED                ACTION            ]COMPLETION TIME B.----NOTE----...        B.1    Reduce AFD limits as specified in 4 hours after each Required Action B.5          the COLR.                            FaT(Z) determination shall be completed    AND whenever this          B.2     Reduce THERMAL POWER as            4 hours after each Condition is entered.         specified in the COLR.               FaT(Z) determination AND FQT(Z) not within      B.3    Reduce Power Range Neutron          72 hours after each limit.                         Flux-High trip setpoints > 1 % for  FaT(Z) determination each 1 % that THERMAL POWER is limited below RTP by Required Action B.2.
AND B.4    Reduce Overpower AT trip            72 hours after each setpoints > 1% for each 1% that      FQT(z) determination THERMAL POWER is limited below RTP by Required Action B.2.
AND B.5   Perform SR 3.2.1.1 and SR            Prior to increasing 3.2.1.2.                            THERMAL POWER and AFD limits above the limits of Required Actions B.1 and B.2
 
INSERT "3" SURVEILLANCE                                      FREQUENCY SR 3.2.1.2                           -~~~NOTE-----------
If measurements indicate that either the maximum over z      [n()]1 OR maximum over z [ K(z)].
has increased since the previous evaluation of FQ(Z) or is expected to increase prior to the next evaluation:
A. Increase FQT(Z) by the appropriate factor, as specified in the COLR, and verify FQT(z) is still within limits or B. Repeat SR 3.2.1.2 once per 7 EFPD until
: a. Above (A) is met or
: b. Two successive flux maps indicate that the    Once after each refueling within 12 hours maximum over z [FK(Z)]J                      after achieving equilibrium conditions after
[nK~)
AND                                          THERMAL POWER exceeds 75% RTP maximum over z has not increased.                           AND Once within 12 hours after achieving Verify FQT(Z) is within limit.                         equilibrium conditions after exceeding, by
                                                                  > 10% RTP, the THERMAL POWER at which FoT(z) was last verified AND In accordance with the Surveillance Frequency Control Program
 
Serial No. 15-494 LAR - NSAL-09-5, Rev. 1 and NSAL-15-1 Docket Nos. 50-338/339 ATTACHMENT 3 PROPOSED TECHNICAL SPECIFICATIONS PAGES Virginia Electric and Power Company (Dominion)
North Anna Power Station Units 1 and 2
 
FQ(Z) 3.2.1 3.2  POWER DISTRIBUTION LIMITS 3.2.1     Heat Flux Hot Channel Factor (FQ(Z))
LCO  3.2.1       FQ(Z) , as approximated the limits  specified in bytheFQECOLR.
(Z) and FQT (Z),  shall be within APPLICABILITY:    MODE 1.
ACTIONS CONDITION        ]          REQUIRED ACTION          TCOMPLE          TIME A.------NOTE---           --     A.I    Reduce THERMAL POWER      15 minutes after Required Action A.4                &#x17d;1% RTP for each 1%      each FeE (7) shall be completed                   FQE (Z) exceeds limit. determi nati on whenever this Condition is entered. SR 3.2.1.2 is not required to be          AND performed if this A.2     Reduce Power Range        72 hours afteYr each Condition is entered Neutron Flux-High         FQE (Z) prior to THERMAL POWER exceeding 75% RTP after            trip setpoints &#x17d; 1%       determi nati on a refueling.                        for each 1% that THERMAL POWER is limited below RTP by FQE (7) not within Required Action A.I.
limit.
AND A.3      Reduce Overpower AT       72 hours after each trip setpoints &#x17d; 1%       FQE (Z) for each 1% that         determi nati on THERMAL POWER is limited below RTP by Required Action A.1.
AND A.4      Perform SR 3.2.1.1       Prior to increasing and SR 3.2.1.2.           THERMAL POWER above the limit of Required Action A.I I
North Anna Units 1 and 2              3.2.1-1 3211Aedet                    Amendments
 
FQ(Z) 3.2.1 ACTIONS CONDITION          ]R    EQUIRED ACTION              COMPLETION TIME B.------NOTE-        ---    B.I    Reduce AFD limits as 4 hours after each Required Action B.5              specified in the    FQT (7) shall be completed              COLR,                determi nati on whenever this Condition is entered.
AND B,2     Reduce THERMAL POWER 4 hours after each FQT (Z) not within              as specified in the  FQT (Z) limit.
COLR.               determi nati on AND B.3    Reduce Power Range  72 hours after each Neutron Flux-High    FQT (Z) trip setpoints > 1%  determi nati on for each 1% that THERMAL POWER is limited below RTP by Required Action B.2 AND B,4    Reduce Overpower AT  72 hours after each trip setpoints > 1%  FQT (Z) for each 1% that    determi nati on THERMAL POWER is limited below RTP by Required Action B.2.
AND B.5    Perform SR 3.2.1.1 Prior to increasing and SR 3.2.1.2.     THERMAL POWER and AFD limits above the limits of Required Actions B.I and B.2.
C. Required Action and associated Completion
                            }C.1    Be in MODE 2.        6 hours Time not met.,______________                            _________
North Anna Units 1 and 2            3,2.1-2 3212Aedet              Amendments
 
FQ(Z) 3.2.1 SURVEILLANCE REQUIREMENTS
          -- - - - - - - - - -  - - -  - - - --  NOTE  -  -    -  -        -      -  -    - -    -
During power escalation, THERMAL POWER may be increased until a power level for extended operation has been achieved,               at which a power distribution map is obtained.
SURVEILLANCE REQUIREMENTS                                            _____________
SURVEILLANCE                                        FREQUENCY SR 3.2.1.1            Verify FQ (Z) is within limit.               Once after each refueling prior to THERMAL POWER exceeding 75% RTP AND Once within 12 hours after achieving equilibrium conditions after exceeding, by
                                                                      &#x17d;10% RTP, the THERMAL POWER at which FQE (Z) was last verified AND In accordance with the Surveillance Frequency Control Program North Anna Units 1 and 2                       3213Aedet 3.2.1-3                          Amendments
 
FQ(Z) 3.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                 FREQUENCY
                                                          +
SR 3.2.1.2                               -NOTE-If measurements indicate that either the maximum over z    LK(Z)
SFQ*Z) 1 j
OR FQ*Z) 1 maximum over z has increased of since FQ (7) the   previous evaluation                or is  expected to increase prior to the next evaluation:
A. Increase FQT (7) by the appropriate factor, as specified in the COLR, and verify FQT (7) is  still within limits or B. Repeat SR 3.2.1.2 once per 7 EFPD until1
: a. Above (A) is met or
: b. Two successive flux maps indicate that the maximum over z SFQ(Z)]
AND maximum over z      K(Z)   j has not increased.
(conti nued)
North Anna Units 1 and 2               3.2.1-4 3214Aedet                  Amendments
 
FQ(Z) 3.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                      FREQUENCY SR  3.2.1.2    (conti nued)
Verify FQT (Z) is within limit.
Once after each refueling within 12 hours after achieving equilibrium conditions after THERMAL POWER exceeds 75% RTP AND Once within 12 hours after achieving equilibrium conditions after exceeding, by
                                                &#x17d;10% RTP, the THERMAL POWER at which FQT (Z) was last verified AND In accordance with the Surveillance Frequency Control Program North Anna Units 1 and 2            3.2.1-5 3215Aedet        Amendments
 
Intentionally Blank Serial No. 15-494 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Docket Nos. 50-338/339 ATTACHMENT 4 MARKED-UP AND PROPOSED TECHNICAL SPECIFICATIONS BASES PAGES (for information only)
Virginia Electric and Power Company (Dominion)
North Anna Power Station Units 1 and 2
 
FQ(Z)
B 3.2.1 B 3.2  POWER DISTRIBUTION LIMITS B 3.2.1    Heat Flux Hot Channel Factor (FQ(Z))
BASES BACKGROUND          The the purpose          of thepellet) limits on the values of FQ(Z) is to limit local (i.e.,                  peak power density. The value of FQ(Z) is approximated by       FQ(Z) varies along the axial height (Z) of the core.
FQE(Z) and FaT(Z). FQE(Z) is defined as the             FQ(Z) is defined as the maximum local fuel rod linear power measured value of FQ(Z),      density divided by the average fuel rod linear power density, assuming nominal fuel pellet and fuel rod incorporating                  dimensions. Therefore, FQ(Z) is a measure of the peak fuel manufacturing tolerances      pellet power within the reactor core.
and measurement uncertainties. FaT(Z) is      During power operation, the global power distribution is limited by LCO 3.2.3, "AXIAL FLUX DIFFERENCE (AFD)," and defined as the FQE(Z)          LCO 3.2.4, "QUADRANT POWER TILT RATIO (QPTR)," which are incorporating a non-           directly and continuously measured process variables. These equilibrium factor that       LCOs, along with LCO 3.1.6, "Control Bank Insertion Limits,"
maintain the core limits on power distributions on a accounts for possible          continuous basis.
power distribution transients during normal      FQ(Z) varies with fuel loading patterns, control bank operation.                    insertion, fuel burnup, and changes in axial power distribution.
FQ(Z) system.is These  measured  periodically  using the incore detector measurements  are generally  taken with the core at or near steady state conditions.
Isteady-state F0 (Z),I        Using is        the measured possible                three to derive    dimensional a measure  val1 power distributions, it foFQ)rt\
IFQE(Z)I              However, because this value represents a steady state condition, it does not encompass the variations in the value of FQ(Z) that are present during nonequilibrium situations, such as load changes.
To account for these possible variations, the steady state
                                      ......... e\    is"adjusted by an elevation dependent factor
                  *-.
* that accounts for the calculated worst case transient conditions itO derive FaT(Z)    Ii    Core monitoring and control under nonsteady state conditions are accomplished by operating the core within the limits of the appropriate LC~s, including the limits on AFD, QPTR, and control rod insertion.
North Anna Units 1 and 2                      B 3.2.1-1 B3211Rvso                              Revision 0
 
FQ(Z)
B 3.2.1 BASES APPLICABLE        This LCO precludes core power distributions that violate the SAFETY ANALYSES    following fuel design criteria:
: a. During a loss of coolant accident (LOCA), the peak cladding temperature during a small break LOCA must not exceed 2200&deg;F, and there must be a high level of probability that the peak cladding temperature does not exceed 2200 0 F for the large breaks (Ref. 1);
: b. During a loss of forced reactor coolant flow accident, there must be at least 95% probability at the 95%
confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a departure from nucleate boiling (DNB) condition;
: c. During an ejected rod accident, the energy deposition to unirradiated fuel is limited to 225 cal/gm and irradiated fuel is limited to 200 cal/gm (Ref. 2); and
: d. The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest worth control rod stuck fully withdrawn (Ref. 3).
Limits on Fo(7) ensure that the value of the initial total peaking factor assumed in the accident analyses remains valid. Other criteria must also be met (e.g., maximum cladding oxidation, maximum hydrogen generation, coolable geometry, and long term cooling). However, the peak cladding temperature is typically most limiting.
Fo (Z) limits assumed in the LOCA analysis are typically limiting relative to (i.e., lower than) the FQ(Z) limit assumed in safety analyses for other postulated accidents.
Therefore, this LCO provides conservative limits for other postulated accidents.
Therefore, this LCO provides conservative limits for other postulated accidents.
FQ(Z) satisfies Criterion 2 of 10 CFR 50.36(c) (2) (ii).North Anna Units 1 and 2B321-Reion 3 B 3.2.1-2 Revision 13 FQ(Z)B 3.2.1 BASES NE[CO Heat Flux Hot Channel Factor, f-Ft), shall be limited by the following relationships, asu=, dec ....bad Ifor where: CFQ is the FQ(Z) limit at RTP provided in the COLR, K(Z) is the normalized F (Z) as a function of core height provided in the CObLR, cedependent function tha s ra " nontered I o " included in the FQ(Z) is approximated by FQE(Z) and FQT(Z). Thus, both FQE(Z) and FQT(Z) must meet the preceding limits on FQ(Z).P is the fraction of RATED THERMAL POWER defined as=THERMAL POWER--The actual values of CF, K(Z), an ()aegven in the\COLR; however, CFQ is normally approximately
FQ(Z) satisfies Criterion 2 of 10 CFR 50.36(c) (2) (ii).
: 2. (Z) s ar-\ function that looks like the one provided in I FQ(Z) evluaionrequires obtaining an incore flux map in MEI.From the incore flux map results we obtain the au measured value of FQ(Z). Then, the measured increased by 1.03 which is a factor that accounts for fuel manufacturing tolerances and 1.05 which accounts for flux I NER 4" measurement unetit o banFEZ The FQ(Z) limits define limiting values for core power peaking that precludes peak cladding temperatures above 2200&deg;F during a small break LOCA and assures with a high level of probability that the peak cladding temperature does not exceed 2200&deg;F for large breaks (Ref. 1).This LCO requires operation within the bounds assumed in the safety analyses.
North Anna Units 1 and 2B321-Reion   B 3.2.1-2                       Revision 13 3
Calculations are performed in the core design process to confirm that the core can be controlled in (conti nued)North Anna Units 1 and 2B321-Reion3 B 3.2.1-3 Revision 13 FQ(Z)B 3.2.1 BASES LCO (conti nued)such a manner during operation that it can stay within the LOCA "Ft'cQ/(''
 
limits.. .= If FQ(Z ......~ i^ ma-inta-.^d  
FQ(Z)
,.,ih-n th..r::::r:r7
B 3.2.1 BASES NE
:III~2r'i~ rcguir~u.Violating the LCO limits for FQ(Z) produces unacceptable consequences if a design basis event occurs while FQ(Z) is outside its specified limits.APPLICABILITY The FQ(Z) limits must be maintained in MODE 1 to prevent core power distributions from exceeding the limits assumed in the safety analyses.
[CO                   The*-*M-~ued- Heat Flux Hot Channel Factor, f-Ft), shall be limited by the following relationships, asu=,     .... bad dec Ifor where:     CFQ is the FQ(Z) limit at RTP provided in the COLR, K(Z) is the normalized F (Z) as a function of core height provided in the CObLR, s cedependentra function
Applicability in other MODES is not required because there is either insufficient stored energy in the fuel or insufficient energy being transferred to the reactor coolant to require a limit on the distribution of core power.ACTIONS occurred, oepain r r texceeded.
                                                                                  "        tha nontered I o"             included in the P is the fraction of RATED THERMAL POWER defined as
The maximum AFD limits initil by Req d Action A.1 may be affce euntdtriains o MZ)and would require rdcin ih1 iue fteF-~i. AP--1 R~ducing THERMAL POWER by  1% RTP for each 1% by which 4r,-fZ-)-exceeds its limit, maintains an acceptable absolute power density. The percent the limit can-l1.O}x 100 for P > 0.5 100 for P  0.5 (conti nued)North Anna Units 1 and 2B3.1-Reion 3 B 3.2.1-4 Revision 13 FQ(Z)B3.2.1 BASES ACTIONS A.-1. (continued)
                                                          =THERMAL  POWER FQ(Z) is approximated by FQE(Z) and FQT(Z). Thus, both     -- *The actual values of CF, K(Z), an          ()aegven in the FQE(Z) and FQT(Z) must meet       \COLR; however, CFQ is normally approximately 2. (Z) s ar-the preceding limits on FQ(Z).     \ function that looks like the one provided in I FQ(Z)
QE(ZI- -......->-F~-*)is the measured FQ(Z) multiplied by factors accounting for manufacturing tolerances and measurement uncertainties.
An_*      evluaionrequires MEI.From  the incore flux  obtaining map resultsan we incore obtainflux themap in au measured value of FQ(Z). Then, the measured *-}r-Z-Y.-..s increased by 1.03 which is a factor that accounts for fuel manufacturing tolerances and 1.05 which accounts for flux I NER 4"
FM(Z) t,,e ,,=ou= ,ahe u, ,(Z). The Completion Time of 15 minutes provides an acceptable time to reduce power in an orderly manner and without allowing the unit to remain in an unacceptable condition for an extended period of time. The maximum allowable power level initially determined by Required Action A.-t.I may be affected by subsequent determinations would require power reductions within 15 minutegof if necessary to comply with the decr~ased maximum allowable power level.Decreases iricF-(*)would allow increasing the maximum allowable po~ler level and increasing power up to this revised limit.Ithat THERMAL POWER is limited A.--f.2 Ibelow RTP by Required Action A.1 A reduction of the Power Range Neutron Flux-High trip setpoints by > 1% for each 1% by ,which .....d liz _.--im-it, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions.
* measurement unetit                           o banFEZ The FQ(Z) limits define limiting values for core power peaking that precludes peak cladding temperatures above 2200&deg;F during a small break LOCA and assures with a high level of probability that the peak cladding temperature does not exceed 2200&deg;F for large breaks (Ref. 1).
The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER in accordance with Required Action The maximum allowable Power Range Neutron Flux-High trip setpoints initially determined by Required Action A.-2-,2 may be affected by subsequent determinations of-.zF-~-and would require Power Range Neutron Flux-High trip setpoint reductions within 72 hours of if necessary to comply with the decr'6ased maximum allowable Power Range Neutron Flux-High trip setpoints.
This LCO requires operation within the bounds assumed in the safety analyses. Calculations are performed in the core design process to confirm that the core can be controlled in (conti nued)
Decreases in>_-FZ-(-_4 would allow increasing the maximum allowable Power Range Neutron Flux-High trip setpoints.
North Anna Units 1 and 2B321-Reion3     B 3.2.1-3                             Revision 13
A .-4-. 3 Reduction in the Overpower AT trip setpoints (value of K 4) by1% (in AT span) for each 1% by which exceeds itz<-++w+t, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions.
 
The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period, and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.-2..1. The (conti nued)North Anna Units 1 and 2B3.1-Reion 3 B 3.2.1-5 FQ(Z)B 3.2.1 BASES ACTIONS[FoE(Z)I A.-2-.3 (continued) maximum allowable Overpower AT trip setpoints initially determined by Required Action may be affected by subsequent determinations o~f~ftand would require Overpower AT trip setpoint r~ductions within 72 hours of thedetermination, if necessary to comply with the decreased maximum allowable Overpower AT trip setpoints.
FQ(Z)
Decreases i -.{)would allow increasing the maximum Overpower AT trip setpoints.
B 3.2.1 BASES LCO               such LOCA a"Ft'cQ/(''
A f.A i-tA/-and SR 3.2121 Verification thatl.F-,)-has bee rerestored, to within, its limit, by perforrifng SR 3.2.1.1 prior to increasing THERMAL POWER above the limit imposed by Required Action A."Z1., ensures that core conditions during operation at higher power levels are consistent with safety analyses assumptions.
manner      during operation           that it can stay within the (conti nued)                      limits.. .=If FQ(Z       ......   ~i^ ma-inta-.^d ,.,ih-n th..
-_--1 I--A. 1 through A.4 and B. 1 through B.5I If Required Actions A.I, A.2.1, A.2.2, A.2.3, or A.2.1 are not met within their associated Completion Times, the unit must be placed in a MODE or condition in which the LCO requirements are not applicable.
r::::r:r7       :III~2r' i~ rcguir~u.
This is done by placing the unit in at least MODE 2 within 6 hours.This allowed Completion Time is reasonable based on SURVEILLANCE SR 3.2.1.1 4-modified by a Note. It states that THERMAL REQUIREMENTS POWER may be increased until a power level for extended operation has been achieved at which a power distribution map can be obtained.
Violating consequences    the ifLCOa limits design for basisFQ(Z)   eventproduces occurs unacceptable while FQ(Z) is outside its specified limits.
This allowance is modified, however, by one of the Frequency conditions that requires verification FQZ tha f+-is within its specified limit after a power rise IFQ~z I I of ore than 10% RTP over the THERMAL POWER at which it was I last verified to be within specified limits. In the absence I of this Frequency condition, it is possible to increase I power to RTP and operate for 31 days without verification of 44..*. The Frequency condition is not intended to require"verification of these parameters after every 10% increase in power level above the last verification.
APPLICABILITY     The FQ(Z) limits must be maintained in MODE 1 to prevent core power distributions from exceeding the limits assumed in the safety analyses. Applicability in other MODES is not required because there is either insufficient stored energy in the fuel or insufficient energy being transferred to the reactor coolant to require a limit on the distribution of core power.
It only requires (continued)
ACTIONS occurred, oepain                         r r             texceeded. The maximum AFD limits initilaL.-*etermined by Req                           d Action A.1 may be affce                     euntdtriains o                         MZ)and       would require           rdcin           ih1             iue         fteF
North Anna Units 1 and 2B321-Reion3 B 3.2.1-6 Revision 13 FQ(Z)B 3.2.1 BASES SURVEILLANCE verification after a power level is achieved for extended REQUIREMENTS operation that is 10% higher than that power at which FQ was (continued) last measured.SR 3.2.1.1 I INSR~i111I The nuclear design process includes calculations performed to determine that the core can be operated within the FQ(Z) limits. Because flux maps are taken in steady state conditions, the variations in power distribution resulting from normal operational maneuvers are not present in the flux map data. These variations are, however, conservatively calculated by considering a wide range of unit maneuvers in normal operation.
        -~i.     AP--1 R~ducing THERMAL 4r,-fZ-)-exceeds       its POWER limit,by maintains
The maximum peaking factor increase over steady state values, calculated as a function of core elevation, Z, is called N(Z).The limit with which-~-~
                                                        &#x17d; 1% RTP for each 1% by which an acceptable absolute power density. The percent that.*-~f~-exceeds the limit can 100 for P > 0.5
is compared varies inversely with power above 50% RTP~and N(Z) and directly with a function called K(Z) provided in the COLR. IINSERT,"8", If THERMAL POWER has been increased by 10% RTP since the last determination o0 , another evaluation of this factor is required 12hours after achieving equilibrium conditions at this higher power level (to ensure thakc-F~()-
                                                        -l1.O}x 100 for P
values are being reduced sufficiently with power increase to stay within the LCO limits).The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.Flux map data are taken for multiple core elevations  
* 0.5 (conti nued)
..A+evaluations are not applicable for the following core regions, measured in percent of core height: a. Lower core region, from 0 to 15% inclusive; and b. Upper core region, from 85 to 100% inclusive.
North Anna Units 1 and 2B3.1-Reion         B 3.2.1-4                                         Revision 13 3
North Anna Units 1 and 2B321-Reion4 B 3.2.1-7 Revision 46 FQ(Z)B 3.2.1 BASES SR -3.2.1. (continued)
 
SURVE ILLANCE REQUIREMENTS The top and bottom 15% of the core are excluded from the evaluation because of the low probability that these regions would be more limiting in the safety analyses and because of the difficulty of making a precise measurement in these This Surveillce has been modified by a Note that may require that mor requent surveillances be performed.
FQ(Z)
An FQ()evaluation of the eG 3required to account IFTZ or any increase t )that may occur and__cause th ~r~limit to be exceeded before the next require(e evaluation.
B3.2.1 BASES ACTIONS           A.-1. (continued)
a two most recent evaluations show an incri it is required to m e l im ith the last increased by apepropriate factor, or to uate more fr~pm lly, each 7 EFPD. These alternative r rementsFQ(Z) from exceeding its limit without detectli REFERENCES
QE(ZI- -......- >-F~-*)is the measured FQ(Z) multiplied by factors accounting for manufacturing tolerances and measurement uncertainties.
: 1. 10 CFR 50.46.2. VEP-NFE-2-A, "VEPCO Evaluation of the Control Rod Ejection Transient." 3. UFSAR, Section 3.1.22.4. VEP-NE-I-A, "VEPCO Relaxed Power Distribution Control Methodology and Associated FQ Surveillance Technical Specifications." North Anna Units 1 and 2B321-Reion3 B 3.2.1-8 Revision 13 INSERT "4" FQE(Z) is an excellent approximation for FQ(Z) when the reactor is at the steady-state power at which the incore flux map was taken.The expression for FQT(Z) is: FQT(Z) "- FQE(Z) N(Z)Where: N(Z) is a cycle dependent function that accounts for power distribution transients encountered during normal operation.
FM(Z) ,.* t,,e ,,=ou= ,ahe u, ,(Z).     The Completion Time of 15 minutes provides an acceptable time to reduce power in an orderly manner and without allowing the unit to remain in an unacceptable condition for an extended period of time. The maximum allowable power level initially determined by Required Action A.-t.I may be affected by subsequent determinations okf*-F~)-and would require power reductions within 15 minutegof the.*FfZ-determination,      if necessary to comply with the decr~ased maximum allowable power level.
N(Z) is included in the COLR. The FQT(Z) is calculated as described in Reference 4.INSERT "5" If FQE(Z) cannot be maintained within the LCO limits, reduction of core power is required and if FQT(Z) cannot be maintained within the LCO limits, reduction of the AFD limits is also required.INSERT "6" B.1 If it is found that the maximum calculated value of FQ(Z) that can occur during normal maneuvers, FQT(Z) , exceeds its specified limits, there exists a potential for FQE(Z) to become excessively high if a normal operational transient occurs. Reducing the AFD Limit by the amount specified in the COLR within the allowed Completion Time of 4 hours, restricts the axial flux distribution such that even if a transient occurred, core peaking factors are not exceeded.
Decreases iricF-(*)would allow increasing the maximum allowable po~ler level and increasing power up to this revised limit.
Ithat THERMAL POWER is limited A.--f.2                             Ibelow RTP by Required Action A.1 A reduction of the Power Range Neutron Flux-High trip setpoints by > 1% for each 1% by ,which F*(Z) ..... d liz         _.
                  --im-it, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.-*-.I. The maximum allowable Power Range Neutron Flux-High trip setpoints initially determined by Required Action A.-2-,2 may be affected by subsequent determinations of-.zF-~-and would require Power Range Neutron Flux-High trip setpoint reductions within 72 hours of thecF,*)-determination, if necessary to comply with the decr'6ased maximum allowable Power Range Neutron Flux-High trip setpoints. Decreases in
                >_-FZ-(-_4 would allow increasing the maximum allowable Power Range Neutron Flux-High trip setpoints.
A.-4-. 3 Reduction in the Overpower AT trip setpoints (value of K4) by
                  &#x17d;1% (in AT span) for each 1% by which F*(Z) exceeds itz<-
                  ++w+t, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period, and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.-2..1. The (conti nued)
North Anna Units 1 and 2B3.1-Reion   B 3.2.1-5                                     3
 
FQ(Z)
B 3.2.1 BASES ACTIONS               A.-2-.3 (continued) maximum allowable Overpower AT trip setpoints initially determined by Required Action A.*Z-.3 may be affected by
[FoE(Z)I              subsequent determinations o~f~ftand would require Overpower AT trip setpoint r~ductions within 72 hours of the
                    -*** determination, if necessary to comply with the decreased maximum allowable Overpower AT trip setpoints.
Decreases i -. {)would allow increasing the maximum Overpower AT trip setpoints.
A   f.Ai-tA
                                  "*-*"*                /-and Verification thatl.F-,)-has bee rerestored,SRto3.2121 within, its limit, by perforrifng SR 3.2.1.1 prior to increasing THERMAL POWER above the limit imposed by Required Action A."Z1.,
ensures that core conditions during operation at higher power levels are consistent with safety analyses assumptions.
                    -_--1                         I--A.1 through A.4 and B.1 through B.5I If Required Actions A.I, A.2.1, A.2.2, A.2.3, or A.2.1 are not met within their associated Completion Times, the unit must be placed in a MODE or condition in which the LCO requirements are not applicable. This is done by placing the unit in at least MODE 2 within 6 hours.
This allowed Completion Time is reasonable based on SURVEILLANCE         SR 3.2.1.1 4-modified by a Note. It states that THERMAL REQUIREMENTS         POWER may be increased until a power level for extended operation has been achieved at which a power distribution map can be obtained. This allowance is modified, however, by one of the Frequency conditions that requires verification FQZ         tha -*f+-is within its specified limit after a power rise IFQ~z I I   of ore than 10% RTP over the THERMAL POWER at which       it was I last verified to be within specified limits. In the absence I of this Frequency condition, it is possible to increase I power to RTP and operate for 31 days without verification of 44..*. The Frequency condition is not intended to require "verification of these parameters after every 10% increase in power level above the last verification. It only requires (continued)
North Anna Units 1 and 2B321-Reion3     B 3.2.1-6                       Revision 13
 
FQ(Z)
B 3.2.1 BASES SURVEILLANCE     verification after a power level is achieved for extended REQUIREMENTS     operation that is 10% higher than that power at which FQ was (continued)     last measured.
SR 3.2.1.1 I INSR~i111I The nuclear design process includes calculations performed to determine that the core can be operated within the FQ(Z) limits. Because flux maps are taken in steady state conditions, the variations in power distribution resulting from normal operational maneuvers are not present in the flux map data. These variations are, however, conservatively calculated by considering a wide range of unit maneuvers in normal operation. The maximum peaking factor increase over steady state values, calculated as a function of core elevation, Z, is called N(Z).
The limit with which-~-~   is compared varies inversely with power above 50% RTP~and N(Z) and directly with a function called K(Z) provided in the COLR.                       IINSERT,"8",
If THERMAL POWER has been increased by &#x17d; 10% RTP since the last determination o0 *4~ , another evaluation of this factor is required 12hours after achieving equilibrium conditions at this higher power level (to ensure thakc-F~()-
values are being reduced sufficiently with power increase to stay within the LCO limits).
The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.
Flux map data are taken for multiple core elevations ..A+
evaluations are not applicable for the following axi*1 core regions, measured in percent of core height:
: a. Lower core region, from 0 to 15% inclusive; and
: b. Upper core region, from 85 to 100% inclusive.
North Anna Units 1 and 2B321-Reion4B 3.2.1-7                       Revision 46
 
FQ(Z)
B 3.2.1 BASES SURVE ILLANCE        SR   -3.2.1.   (continued)
REQUIREMENTS The   top and because evaluation      bottom of    of the core are excluded from the 15%the low probability that these regions would be more limiting in the safety analyses and because of the difficulty of making a precise measurement in these This Surveillce has been modified by a Note that may require that mor         requent surveillances be performed. An FQ()evaluation               of the *x,~o            eG     3required to account IFTZ             or any increase t       F*(* )that may occur and__cause th ~r~
limit to be exceeded before the next require(e evaluation.
a two most recent F*(Z)      evaluations show an incri it is required increased  by    to apepropriate m       e F*(Z)  l im or to factor,      ith the uate last F*(Z)
F*(Z) more fr~pm lly,       each 7 EFPD. These alternative r         rements pr*      FQ(Z) from exceeding its limit without detectli REFERENCES           1. 10 CFR 50.46.
: 2. VEP-NFE-2-A, "VEPCO Evaluation of the Control Rod Ejection Transient."
: 3. UFSAR, Section 3.1.22.
: 4. VEP-NE-I-A, "VEPCO Relaxed Power Distribution Control Methodology and Associated FQ Surveillance Technical Specifications."
North Anna Units 1 and 2B321-Reion3       B 3.2.1-8                               Revision 13
 
INSERT "4" FQE(Z) is an excellent approximation for FQ(Z) when the reactor is at the steady-state power at which the incore flux map was taken.
The expression for FQT(Z) is:
FQT(Z) "- FQE(Z) N(Z)
Where:       N(Z) is a cycle dependent function that accounts for power distribution transients encountered during normal operation. N(Z) is included in the COLR. The FQT(Z) is calculated as described in Reference 4.
INSERT "5" If FQE(Z) cannot be maintained within the LCO limits, reduction of core power is required and if FQT(Z) cannot be maintained within the LCO limits, reduction of the AFD limits is also required.
INSERT "6" B.1 If it is found that the maximum calculated value of FQ(Z) that can occur during normal maneuvers, FQT(Z) , exceeds its specified limits, there exists a potential for FQE(Z) to become excessively high if a normal operational transient occurs. Reducing the AFD Limit by the amount specified in the COLR within the allowed Completion Time of 4 hours, restricts the axial flux distribution such that even if a transient occurred, core peaking factors are not exceeded.
 
INSERT "6" (Continued)
INSERT "6" (Continued)
B.2 If it is found that the maximum calculated value of FQ(Z) that can occur during normal maneuvers, FQT(Z) , exceeds its specified limits, there exists a potential for FQE(Z) to become excessively high if a normal operational transient occurs. Reducing THERMAL POWER by the amount specified in the COLR within the allowed Completion Time of 4 hours, restricts the absolute power density such that even if a transient occurred, core peaking factors are not exceeded.
B.2 If it is found that the maximum calculated value of FQ(Z) that can occur during normal maneuvers, FQT(Z) , exceeds its specified limits, there exists a potential for FQE(Z) to become excessively high if a normal operational transient occurs. Reducing THERMAL POWER by the amount specified in the COLR within the allowed Completion Time of 4 hours, restricts the absolute power density such that even if a transient occurred, core peaking factors are not exceeded. The percent that FQT(Z) exceeds the limit can be determined from:
The percent that FQT(Z) exceeds the limit can be determined from:{maximum over Z ('C;-Q(-Z))!
{maximum over     Z ('C;-Q(-Z))!     1 xl00forP>0.5 tmaximum overZ       CFQKZ~)'     1} x100 for P*<O.5 B.3 A reduction of the Power Range Neutron Flux-High trip setpoints by > 1% for each 1%
1 xl00forP>0.5 tmaximum overZ CFQKZ~)' 1} x100 for P<O.5 B.3 A reduction of the Power Range Neutron Flux-High trip setpoints by > 1 % for each 1 %by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions.
by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.
The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.B.4 Reduction in the Overpower AT trip setpoints (value of K 4) by > 1 % for each 1% by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions.
B.4 Reduction in the Overpower AT trip setpoints (value of K4 ) by > 1 % for each 1% by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period, and the preceding prompt reduction in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.
The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period, and the preceding prompt reduction in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.
 
INSERT "6" (Continued)
INSERT "6" (Continued)
B.5 Verification that FQT(z) has been restored to within its limit, by performing SR 3.2.1.1 and SR 3.2.1.2 prior to increasing THERMAL POWER and AFD limits above the maximum allowable power and AFD limits imposed by Required Actions B.1 and B.2 ensures that core conditions during operation at higher power levels and future operation are consistent with safety analyses assumptions.
B.5 Verification that FQT(z) has been restored to within its limit, by performing SR 3.2.1.1 and SR 3.2.1.2 prior to increasing THERMAL POWER and AFD limits above the maximum allowable power and AFD limits imposed by Required Actions B.1 and B.2 ensures that core conditions during operation at higher power levels and future operation are consistent with safety analyses assumptions.
C.1 INSERT "7" Verification that FQE(Z) is within its specified limits involves increasing FQ(Z) to allow for manufacturing tolerance and measurement uncertainties in order to obtain FQE(z).Specifically, FQE(Z) is the measured value of FQ(Z) obtained from incore flux map results multiplied by manufacturing and measurement uncertainties (1.05 x 1.03 = 1.0815).FQE(Z) is then compared to its specified limits.The limit with which FQE(z) is compared varies inversely with power above 50% RTP and directly with a function called K(Z) provided in the COLR.Performing this Surveillance in MODE 1 prior to exceeding 75% RTP ensures that the FQE(Z) limit is met when RTP is achieved, because peaking factors generally decrease as power level is increased.
C.1 INSERT "7" Verification that FQE(Z) is within its specified limits involves increasing FQ(Z) to allow for manufacturing tolerance and measurement uncertainties in order to obtain FQE(z).
If THERMAL POWER has been increased by > 10% RTP since the last determination of FQE(Z), another evaluation of this factor is required 12 hours after achieving equilibrium conditions at this higher power level (to ensure that FQE(Z) values are being reduced sufficiently with power increase to stay within the LCO limits).SR 3.2.1.2 INSERT "8" SR 3.2.1.2 requires a Surveillance of FQT(Z) during the initial startup following each refueling within 12 hours after achieving equilibrium conditions after exceeding 75%RTP. THERMAL POWER levels below 75% are typically non-limiting with respect to the limit for FQT(Z). Also, initial startups following a refueling are slow and well controlled due to startup ramp rate limitations and fuel conditioning requirements.
Specifically, FQE(Z) is the measured value of FQ(Z) obtained from incore flux map results multiplied by manufacturing and measurement uncertainties (1.05 x 1.03 = 1.0815).
Furthermore, startup physics testing and flux symmetry measurements, also performed at low power, provide confirmation that the core is operating as expected.
FQE(Z) is then compared to its specified limits.
Consequently, the initial startup following a refueling will not result in non-equilibrium power shapes that could challenge the FQT(Z) limit. This Frequency ensures that verification of FaT(Z) is performed prior to extended operation at high power levels where the maximum permitted peak LHR could be challenged by non-equilibrium operation.
The limit with which FQE(z) is compared varies inversely with power above 50% RTP and directly with a function called K(Z) provided in the COLR.
If a previous Surveillance of FQT(Z) was performed at part power conditions (below RTP), SR 3.2.1.2 also requires that FoT(Z) be verified at power levels -> 10% RTP above the THERMAL POWER of its last verification within 12 hours after achieving equilibrium conditions.
Performing this Surveillance in MODE 1 prior to exceeding 75% RTP ensures that the FQE(Z) limit is met when RTP is achieved, because peaking factors generally decrease as power level is increased.
This ensures that FQT(Z) is within its limit using radial peaking factors measured at the higher power level.INSERT "9" If the two most recent FQ(Z) evaluations show that either the maximum over Z [ K()]OR maximum over Z/ ()J has increased or is expected to increase prior to the next evaluation then it is required to increase the FQT(Z) by the appropriate factor, as specified in the COLR, and verify FQT(z) is still within limits or evaluate FQ(Z) every 7 EFPD until SR 3.2.1 .2 is satisfied.
If THERMAL POWER has been increased by > 10% RTP since the last determination of FQE(Z), another evaluation of this factor is required 12 hours after achieving equilibrium conditions at this higher power level (to ensure that FQE(Z) values are being reduced sufficiently with power increase to stay within the LCO limits).
SR 3.2.1.2
 
INSERT "8" SR 3.2.1.2 requires a Surveillance of FQT(Z) during the initial startup following each refueling within 12 hours after achieving equilibrium conditions after exceeding 75%
RTP. THERMAL POWER levels below 75% are typically non-limiting with respect to the limit for FQT(Z). Also, initial startups following a refueling are slow and well controlled due to startup ramp rate limitations and fuel conditioning requirements. Furthermore, startup physics testing and flux symmetry measurements, also performed at low power, provide confirmation that the core is operating as expected. Consequently, the initial startup following a refueling will not result in non-equilibrium power shapes that could challenge the FQT(Z) limit. This Frequency ensures that verification of FaT(Z) is performed prior to extended operation at high power levels where the maximum permitted peak LHR could be challenged by non-equilibrium operation.
If a previous Surveillance of FQT(Z) was performed at part power conditions (below RTP), SR 3.2.1.2 also requires that FoT(Z) be verified at power levels ->10% RTP above the THERMAL POWER of its last verification within 12 hours after achieving equilibrium conditions. This ensures that FQT(Z) is within its limit using radial peaking factors measured at the higher power level.
INSERT "9" If the two most recent FQ(Z) evaluations show that either the maximum over Z         [ K()]
OR maximum over Z/           ()J has increased or is expected to increase prior to the next evaluation then it is required to increase the FQT(Z) by the appropriate factor, as specified in the COLR, and verify FQT(z) is still within limits or evaluate FQ(Z) every 7 EFPD until SR 3.2.1 .2 is satisfied.
These alternate requirements prevent FQ(Z) from exceeding its limit without detection.
These alternate requirements prevent FQ(Z) from exceeding its limit without detection.
FQ(Z)B 3.2.1 B 3.2 POWER DISTRIBUTION LIMITS B 3.2.1 Heat Flux Hot Channel Factor (FQ(Z))BASES BACKGROUND The purpose of the limits on the values of FQ(Z) is to limit the local (i.e., pellet) peak power density. The value of FQ(Z) varies along the axial height (Z) of the core.FQ(Z) is defined as the maximum local fuel rod linear power density divided by the average fuel rod linear power density, assuming nominal fuel pellet and fuel rod dimensions.
 
Therefore, FQ(Z) is a measure of the peak fuel pellet power within the reactor core.FQ(Z) is approximated by FQE (Z) and FQT (Z). FeE (7) is defined as the measured value of FQ(Z), incorporating manufacturing tolerances and measurement uncertainties.
FQ(Z)
B 3.2.1 B 3.2   POWER DISTRIBUTION LIMITS B 3.2.1   Heat Flux Hot Channel Factor (FQ(Z))
BASES BACKGROUND         The purpose of the limits on the values of FQ(Z) is to limit the local (i.e., pellet) peak power density. The value of FQ(Z) varies along the axial height (Z) of the core.
FQ(Z) is defined as the maximum local fuel rod linear power density divided by the average fuel rod linear power density, assuming nominal fuel pellet and fuel rod dimensions. Therefore, FQ(Z) is a measure of the peak fuel pellet power within the reactor core.
FQ(Z) is approximated by FQE (Z) and FQT (Z). FeE (7) is defined as the measured value of FQ(Z), incorporating manufacturing tolerances and measurement uncertainties.
FQT (Z) i s defined as the FQE (Z) incorporating a non-equilibrium factor that accounts for possible power distribution transients during normal operation.
FQT (Z) i s defined as the FQE (Z) incorporating a non-equilibrium factor that accounts for possible power distribution transients during normal operation.
During power operation, the global power distribution is limited by LCO 3.2.3, "AXIAL FLUX DIFFERENCE (AFD)," and LCO 3.2.4, "QUADRANT POWER TILT RATIO (QPTR)," which are directly and continuously measured process variables.
During power operation, the global power distribution is limited by LCO 3.2.3, "AXIAL FLUX DIFFERENCE (AFD)," and LCO 3.2.4, "QUADRANT POWER TILT RATIO (QPTR)," which are directly and continuously measured process variables. These LCOs, along with LCO 3.1.6, "Control Bank Insertion Limits,"
These LCOs, along with LCO 3.1.6, "Control Bank Insertion Limits," maintain the core limits on power distributions on a continuous basis.FQ(Z) varies with fuel loading patterns, control bank insertion, fuel burnup, and changes in axial power distribution.
maintain the core limits on power distributions on a continuous basis.
FQ(Z) varies with fuel loading patterns, control bank insertion, fuel burnup, and changes in axial power distribution.
FQ(Z) is measured periodically using the incore detector system. These measurements are generally taken with the core at or near steady state conditions.
FQ(Z) is measured periodically using the incore detector system. These measurements are generally taken with the core at or near steady state conditions.
Using the measured three dimensional power distributions, it is possible to derive a measured value for steady state FQ(Z), FQE (Z). However, because this val ue represents a steady state condition, it does not encompass the variations in the value of FQ(Z) that are present during nonequilibrium situations, such as load changes.(conti nued)North Anna Units 1 and 2B32.-Reionx B 3.2.1-i Revision xx FQ(Z)B 3.2.1 BASES BACKGROUND To account for these possible variations, the steady state (continued)
Using the measured three dimensional power distributions, it is possible to derive a measured value for steady state FQ(Z), FQE (Z). However, because this val ue represents a steady state condition, it does not encompass the variations in the value of FQ(Z) that are present during nonequilibrium situations, such as load changes.
FeE (Z) is adjusted by an elevation dependent factor that accounts for the calculated worst case transient conditions to derive FQT (Z).Core monitoring and control under nonsteady state conditions are accomplished by operating the core within the limits of the appropriate LCOs, including the limits on AFD, QPTR, and control rod insertion.
(conti nued)
l I APPLICABLE SAFETY ANALYSES This LCO precludes core power distributions that violate the following fuel design criteria: a. During a loss of coolant accident (LOCA), the peak cladding temperature during a small break LOCA must not exceed 2200 0 F, and there must be a high level of probability that the peak cladding temperature does not exceed 2200&deg;F for the large breaks (Ref. 1);b. During a loss of forced reactor coolant flow accident, there must be at least 95% probability at the 95%confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a departure from nucleate boiling (DNB) condition;
North Anna Units 1 and 2B32.-Reionx   B 3.2.1-i                       Revision xx
: c. During an ejected rod accident, the energy deposition to unirradiated fuel is limited to 225 cal/gm and irradiated fuel is limited to 200 cal/gm (Ref. 2); and d. The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest worth control rod stuck fully withdrawn (Ref. 3).Limits on F (Z) ensure that the value of the initial total peaking factor assumed in the accident analyses remains valid. Other criteria must also be met (e.g., maximum cladding oxidation, maximum hydrogen generation, coolable geometry, and long term cooling).
 
However, the peak cladding temperature is typically most limiting.FQ(Z) limits assumed in the LOCA analysis are typically limiting relative to (i.e., lower than) the FQ(Z) limit assumed in safety analyses for other postulated accidents.
FQ(Z)
B 3.2.1 BASES BACKGROUND       To account for these possible variations, the steady state (continued)     FeE (Z) is adjusted by an elevation dependent factor that accounts for the calculated worst case transient conditions     l to derive FQT (Z).                                               I Core monitoring and control under nonsteady state conditions are accomplished by operating the core within the limits of the appropriate LCOs, including the limits on AFD, QPTR, and control rod insertion.
APPLICABLE       This LCO precludes core power distributions that violate the SAFETY ANALYSES  following fuel design criteria:
: a. During a loss of coolant accident (LOCA), the peak cladding temperature during a small break LOCA must not exceed 22000 F, and there must be a high level of probability that the peak cladding temperature does not exceed 2200&deg;F for the large breaks (Ref. 1);
: b. During a loss of forced reactor coolant flow accident, there must be at least 95% probability at the 95%
confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a departure from nucleate boiling (DNB) condition;
: c. During an ejected rod accident, the energy deposition to unirradiated fuel is limited to 225 cal/gm and irradiated fuel is limited to 200 cal/gm (Ref. 2); and
: d. The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest worth control rod stuck fully withdrawn (Ref. 3).
Limits on F (Z) ensure that the value of the initial total peaking factor assumed in the accident analyses remains valid. Other criteria must also be met (e.g., maximum cladding oxidation, maximum hydrogen generation, coolable geometry, and long term cooling). However, the peak cladding temperature is typically most limiting.
FQ(Z) limits assumed in the LOCA analysis are typically limiting relative to (i.e., lower than) the FQ(Z) limit assumed in safety analyses for other postulated accidents.
Therefore, this LCO provides conservative limits for other postulated accidents.
Therefore, this LCO provides conservative limits for other postulated accidents.
FQ(Z) satisfies Criterion 2 of 10 CFR 50.36(c) (2) (ii).North Anna Units 1 and 2B3212Reionx B 3.2.1-2 FQ(Z)B 3.2.1 BASES LCO The Heat Flux Hot Channel Factor, FQ(Z), shall be limited by the following relationships:
FQ(Z) satisfies Criterion 2 of 10 CFR 50.36(c) (2) (ii).
FQ(Z) < CFQ K(Z) for P > 0.5 FQ(Z) < CFQ K(Z) for P 0.5 where: CFQ is the FQ(Z) limit at RTP provided in the COLR, K(Z) is the normalized F (Z) as a function of core height provided in the COLR and P is the fraction of RATED THERMAL POWER defined as THERMAL POWER RTP The actual values of CFQ and K(Z) are given in the COLR;however, CFQ is normally approximately 2 and K(Z) is aI function that looks like the one provided in Figure B 3.2.1-1.is approximated by FeE (Z) and FQT (Z). Thus, both FQ (z) and FQT (Z) must meet the preceding limits on FQ(Z).An FQE (Z) evaluation requires obtaining an incore flux map in MODE 1. From the incore flux map results we obtain the measured value of FQ(Z). Then, the measured value is increased by 1.03 which is a factor that accounts for fuel manufacturing tolerances and 1.05 which accounts for flux map measurement uncertainty to obtain FQE (Z) (Ref. 4).FeE (Z) is an excellent approximation for FQ(Z) when the reactor is at the steady state power at which the i ncore flux map was taken.The expression for FQT (Z) is: FQT (Z)= =FQE (Z) N(Z)Where: N(Z) is a cycle dependent function that accounts for power distribution transients encountered during normal operation.
North Anna Units 1 and 2B3212ReionxB 3.2.1-2
N(Z) is included in the COLR. The FQT (Z) is calculated as described in Reference 4.(conti nued)North Anna Units 1 and 2B32.-Reionx B3.2.1-3 Revision xx FQ(Z)B 3.2.1 BASES LCO (conti nued)The FQ(Z) limits define limiting values for core power peaking that precludes peak cladding temperatures above 2200&deg;F during a small break LOCA and assures with a high level of probability that the peak cladding temperature does not exceed 2200&deg;F for large breaks (Ref. 1).This LCO requires operation within the bounds assumed in the safety analyses.
 
Calculations are performed in the core design process to confirm that the core can be controlled in such a manner during operation that it can stay within the LOCA FQ(Z) limits. If FQE (Z) cannot be maintained within the LCO limits, reduction of core power is required and if FQT (Z) cannot be maintained within the LCO limits, reduction of the AFD limits is also required.Violating the LCO limits for FQ(Z) produces unacceptable consequences if a design basis event occurs while FQ(Z) is outside its specified limits.APPLICABILITY The FQ(Z) limits must be maintained in MODE 1 to prevent core power distributions from exceeding the limits assumed in the safety analyses.
FQ(Z)
Applicability in other MODES is not required because there is either insufficient stored energy in the fuel or insufficient energy being transferred to the reactor coolant to require a limit on the distribution of core power.ACTIONS A.I RedJucing THERMAL POWER by _> 1%0 RTP for each 1%o by FQ (Z) exceeds its limit, maintaips an acceptable power density. The percent that FQ (Z) exceeds the be determined from:{maximum over z C.Q_ Z)J-i.0 xlO0 for P > 0.5{maximum over z x1i00 for P <0.5 0.which absol ute limit can (conti nued)North Anna Units 1 and 2B321-Reionx B 3.2.1-4 Revision xx FQ(Z)B 3.2.1 BASES ACTIONS (conti nued)A.1 (continued)
B 3.2.1 BASES LCO               The Heat Flux Hot Channel Factor, FQ(Z),   shall be limited by the following relationships:
FQE (Z) is the measured FQ(Z) multiplied by factors accounting for manufacturing tolerances and measurement uncertainties.
FQ(Z) < CFQ K(Z)     for P > 0.5 FQ(Z) < CFQ K(Z)     for P
The Completion Time of 15 minutes provides an acceptable time to reduce power in an orderly manner and without allowing the unit to remain in an unacceptable condition for an extended period of time. The maximum allowable power level initially determined by Required Action A.1 may be affected by subsequent determinations of FQE (Z) and would require power reductions within .15 minutes of the FQE (Z) determination, if necessary to comply with the decreased maximum allowable power level. Decreases in FeE (Z)would allow increasing the maximum allowable power level and increasing power up to this revised limit.A.2 A reduction of the Power Range Neutron Flux-High trip setpoints by >_ 1% for each 1%o that THERMAL POWER is limited below RTP by Required Action A.I, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions.
* 0.5 where:     CFQ is the FQ(Z) limit at RTP provided in the COLR, K(Z) is the normalized F (Z) as a function of core height provided in the COLR and P is the fraction of RATED THERMAL POWER defined as THERMAL POWER RTP The actual values of CFQ and K(Z) are given in the COLR; however, CFQ is normally approximately 2 and K(Z) is aI function that looks like the one provided in Figure B 3.2.1-1.
The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.1. The maximum allowable Power Range Neutron Flux-High trip setpoints initially determined by Required Action A.2 may be affected by subsequent determinations of FQE (Z) and would require Power Range Neutron Flux-High trip setpoint reductions within 72 hours of the FeE (Z) determination, if necessary to comply with the decreased maximum allowable Power Range Neutron Flux-High trip setpoints.
FQ*Z)  is approximated by FeE (Z) and FQT (Z). Thus, both FQ (z) and FQT (Z) must meet the preceding limits on FQ(Z).
Decreases in FeE (Z) would allow increasing the maximum allowable Power Range Neutron Flux-High trip setpoi nts.A.3 Reduction i n the Overpower AT trip setpoints (value of K 4) by>_ 1% (in AT span) for each 1% that THERMAL POWER is limited below RTP by Required Action A.1, is a conservative action (conti nued)North Anna Units 1 and 2B321-Reionx B 3.2.1-5 Revision xx FQ(Z)B 3.2.1 BASES ACTIONS A.3 (continued)(contnued) for protection against the consequences of severe transients with unanalyzed power distributions.
An FQE (Z) evaluation requires obtaining an incore flux map in MODE 1. From the incore flux map results we obtain the measured value of FQ(Z). Then, the measured value is increased by 1.03 which is a factor that accounts for fuel manufacturing tolerances and 1.05 which accounts for flux map measurement uncertainty to obtain FQE (Z) (Ref. 4).
The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period, and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.I. The maximum allowable Overpower AT trip setpoints initially determined by Required Action A.3 may be affected by subsequent determinations of FQE (Z) and would require Overpower AT trip setpoint reductions within 72 hours of the FQE (Z) determination, if necessary to comply with the decreased maximum allowable Overpower AT trip setpoints.
FeE (Z) is an excellent approximation for FQ(Z) when the reactor is at the steady state power at which the i ncore flux map was taken.
Decreases in FQE (Z) would allow increasing the maximum Overpower AT trip setpoints.
The expression for FQT (Z) is:
FQT (Z)= =FQE (Z) N(Z)
Where: N(Z) is a cycle dependent function that accounts for power distribution transients encountered during normal operation. N(Z) is included in the COLR. The FQT (Z) is calculated as described in Reference 4.
(conti nued)
North Anna Units 1 and 2B32.-ReionxB3.2.1-3                           Revision xx
 
FQ(Z)
B 3.2.1 BASES LCO(conti nued)   The FQ(Z) limits define limiting values for core power peaking that precludes peak cladding temperatures above 2200&deg;F during a small break LOCA and assures with a high level of probability that the peak cladding temperature does not exceed 2200&deg;F for large breaks (Ref. 1).
This LCO requires operation within the bounds assumed in the safety analyses. Calculations are performed in the core design process to confirm that the core can be controlled in such a manner during operation that it can stay within the LOCA FQ(Z) limits. If FQE (Z) cannot be maintained within the LCO limits, reduction of core power is required and if FQT (Z) cannot be maintained within the LCO limits, reduction of the AFD limits is also required.
Violating the LCO limits for FQ(Z) produces unacceptable consequences if a design basis event occurs while FQ(Z) is outside its specified limits.
APPLICABILITY     The FQ(Z) limits must be maintained in MODE 1 to prevent core power distributions from exceeding the limits assumed in the safety analyses. Applicability in other MODES is not required because there is either insufficient stored energy in the fuel or insufficient energy being transferred to the reactor coolant to require a limit on the distribution of core power.
ACTIONS           A.I RedJucing THERMAL POWER by _>1%0 RTP for each 1%o by FQ (Z) exceeds its limit, maintaips an acceptable which absol ute power density. The percent that FQ (Z) exceeds the limit can be determined from:
{maximum over z C.Q_   Z)J-i.0 xlO0 for P > 0.5
{maximum over z CF-O-*Z)J-1.0    x1i00 for P *<0.5 0.
(conti nued)
North Anna Units 1 and 2B321-ReionxB 3.2.1-4                           Revision xx
 
FQ(Z)
B 3.2.1 BASES ACTIONS           A.1 (continued)
(conti nued)    FQE (Z) is the measured FQ(Z) multiplied by factors accounting for manufacturing tolerances and measurement uncertainties. The Completion Time of 15 minutes provides an acceptable time to reduce power in an orderly manner and without allowing the unit to remain in an unacceptable condition for an extended period of time. The maximum allowable power level initially determined by Required Action A.1 may be affected by subsequent determinations of FQE (Z) and would require power reductions within .15 minutes of the FQE (Z) determination, if necessary to comply with the decreased maximum allowable power level. Decreases in FeE (Z) would allow increasing the maximum allowable power level and increasing power up to this revised limit.
A.2 A reduction of the Power Range Neutron Flux-High trip setpoints by >_ 1% for each 1%o that THERMAL POWER is limited below RTP by Required Action A.I, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.1. The maximum allowable Power Range Neutron Flux-High trip setpoints initially determined by Required Action A.2 may be affected by subsequent determinations of FQE (Z) and would require Power Range Neutron Flux-High trip setpoint reductions within 72 hours of the FeE (Z) determination, if necessary to comply with the decreased maximum allowable Power Range Neutron Flux-High trip setpoints. Decreases in FeE (Z) would allow increasing the maximum allowable Power Range Neutron Flux-High trip setpoi nts.
A.3 Reduction i n the Overpower AT trip setpoints (value of K4 ) by
                  >_ 1% (in AT span) for each 1% that THERMAL POWER is limited below RTP by Required Action A.1, is a conservative action (conti nued)
North Anna Units 1 and 2B321-Reionx B 3.2.1-5                         Revision xx
 
FQ(Z)
B 3.2.1 BASES ACTIONS           A.3 (continued)
(contnued) for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period, and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.I. The maximum allowable Overpower AT trip setpoints initially determined by Required Action A.3 may be affected by subsequent determinations of FQE (Z) and would require Overpower AT trip setpoint reductions within 72 hours of the FQE (Z) determination, if necessary to comply with the decreased maximum allowable Overpower AT trip setpoints. Decreases in FQE (Z) would allow increasing the maximum Overpower AT trip setpoints.
A.4 Verification that FQE(Z) has been restored to within its limit, by performing SR 3.2.1.1 and SR 3.2.1.2 prior to increasing THERMAL POWER above the limit imposed by Required Action A.1, ensures.that core conditions during operation at higher power levels are consistent with safety analyses assumptions.
A.4 Verification that FQE(Z) has been restored to within its limit, by performing SR 3.2.1.1 and SR 3.2.1.2 prior to increasing THERMAL POWER above the limit imposed by Required Action A.1, ensures.that core conditions during operation at higher power levels are consistent with safety analyses assumptions.
B.1 If it is found that the maximum calculated value of FQ(Z)that can occur during normal maneuvers, FQT (Z), exceeds its specified limits, there exists a potential for FQE (Z) to become excessively high if a normal operational transient occurs. Reducing the AFD Limit by the amount specified in the COLR within the allowed Completion Time of 4 hours, restricts the axial flux distribution such that even if a transient occurred, core peaking factors are not exceeded.B.2 If it is found that the maximum calculated value of FQ(Z)that can occur during normal maneuvers, FQT (Z), exceeds its specified limits, there exists a potential for FQE (Z) to become excessively high if a normal operational transient occurs. Reducing THERMAL POWER by the amount specified in the COLR within the allowed Completion Time of 4 hours, (conti nued)North Anna Units 1 and 2B321-Reionx B 3.2.1-6 FQ(Z)B 3.2.1 BASES ACTIONS B.2 (continued)(conti nued)restricts the absolute power density such that even if a transient occurred, core peaking factors are not exceeded.The percent that FQT (Z) exceeds the limits can be determined from: F r FQIZ)1 maximum over Z 1 FQK(Z)J-1}
B.1 If it is found that the maximum calculated value of FQ(Z) that can occur during normal maneuvers, FQT (Z), exceeds its specified limits, there exists a potential for FQE (Z) to become excessively high if a normal operational transient occurs. Reducing the AFD Limit by the amount specified in the COLR within the allowed Completion Time of 4 hours, restricts the axial flux distribution such that even if a transient occurred, core peaking factors are not exceeded.
xlO0 for P > 0.5 maximum over Z -1xli00 for P 0.5 0.5 B.3 A reduction of the Power Range Neutron Flux-High trip setpoints by >1% for each 1% by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions.
B.2 If it is found that the maximum calculated value of FQ(Z) that can occur during normal maneuvers, FQT (Z), exceeds its specified limits, there exists a potential for FQE (Z) to become excessively high if a normal operational transient occurs. Reducing THERMAL POWER by the amount specified in the COLR within the allowed Completion Time of 4 hours, (conti nued)
The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.B.4 Reduction in the Overpower AT trip setpoints (value of K 4) by>1% for each 1% by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions.
North Anna Units 1 and 2B321-ReionxB 3.2.1-6
The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period, and preceding prompt reduction.in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.(conti nued)North Anna Units 1 and 2B321-Reionx B 3.2.1-7 FQ(Z)B 3.2.1 BASES ACTIONS (conti nued)B.5 Verification that FQT (Z) has been restored to within its limit, by performing SR 3.2.1.1 and SR 3.2.1.2 prior to increasing THERMAL POWER and AFD limits above the maximum allowable power and AFD limits imposed by Required Actions B.1 and B.2 ensures that core conditions during operation at higher power levels and future operation are consistent with safety analyses assumptions.
 
C.'If Required Actions A.I through A.4 and B.I through B.5 are not met within their associated Completion Times, the unit must be placed in a MODE or condition in which the LCO requirements are not applicable.
FQ(Z)
This is done by placing the unit in at least MODE 2 within 6 hours.This allowed Completion Time is reasonable based on operating experience regarding the amount of time it takes to reach MODE 2 from full power operation in an orderly manner and without challenging unit systems.SURVEILLANCE REQU IREMENTS SR 3.2.1.1 and SR 3.2.1.2 are modified by a Note. It states that during power escalation, THERMAL POWER may be increased until a power level for extended operation has been achieved at which a power distribution map can be obtained.
B 3.2.1 BASES ACTIONS           B.2 (continued)
This allowance is modified, however, by one of the Frequency conditions that requires verification that FQ(Z) is within its specified limit after a power rise of more than 10% RTP over the THERMAL POWER at which it was last verified to be within specified limits. In the absence of this Frequency condition, it is possible to increase power to RTP and operate for 31 days without verification of FQ(Z). The Frequency condition is not intended to require verification of these parameters after every 10% increase in power level above the last verification.
(conti nued) restricts the absolute power density such that even if a transient occurred, core peaking factors are not exceeded.
It only requires verification after a power level is achieved for extended operation that is 10% higher than that power at which FQ was last measured.(continued)
The percent that FQT (Z) exceeds the limits can be determined from:
I I North Anna Units 1 and 2B321-Reionx B 3.2.1-8 Revision xx FQ(Z)B 3.2.1 BASES SURVEILLANCE REQU IREMENTS (continued)
F 1maximum over Z 1 rFQIZ)
SR 3.2.1.1 Verification that FQE (Z) is within its specified limits involves increasing FQ(Z) to allow for manufacturing tolerance and uncertainties in order to obtain FQ (Z). Specifically, FQ (Z) is the measured value of FQ(Z)obtained from incore flux map results multiplied by manufacturing and measurement uncertainties (1.05 x 1.03 = 1.0815). FQ (Z) is then compared to its specified limits.The limit with which FQE (Z) is compared varies inversely with power above 50%0 RTP and directly with a function called K(Z) provided in the COLR.Performing this in MODE 1 prior to exceeding 75% RTP ensures that the FQ (Z) limit is met when RTP is achieved, because peaking factors generally decrease as power level is increased.
FQK(Z)J-1} xlO0   for P > 0.5 maximum over Z   F-*    -1xli00   for P
If THERMAL POWER has beep increased by > 10% RTP since the last determination of FQ (Z) , another evaluation of this factor is required 12 hours after achieving equilibrium conditions at this higher power level (to ensure that FeE (Z)values are being reduced sufficiently with power increase to stay within the LCO limits).SR 3.2.1.2 The nuclear design process includes calculations performed to determine that the core can be operated within the FQ(Z) limits. Because flux maps are taken in steady state conditions, the variations in power distribution resulting from normal operational maneuvers are not present in the flux map data. These variations are, however, conservatively calculated by considering a wide range of unit maneuvers in normal operation.
* 0.5 0.5 B.3 A reduction of the Power Range Neutron Flux-High trip setpoints by >1% for each 1% by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.
The maximum peaking factor increase over steady state values, calculated as a function of core elevation, Z, is called N(Z).The limit with which with power above 50%function called K(Z)FQT (Z) is compared varies inversely RTP and N(Z) and directly with a provided in the COLR.SR 3.2.1.2 requires a Surveillance of FQT (Z) during the initial startup following each refueling within 12 hours after achieving equilibrium conditions after exceeding 75%(continued)
B.4 Reduction in the Overpower AT trip setpoints (value of K4 ) by
North Anna Units 1 and 2B321-Reionx B 3.2.1-9 Revision xx FQ(Z)B 3.2.1 BASES SURVEILLANCE REQUIREMENTS (conti nued)SR 3.2.1.2 (continued)
                  >1% for each 1% by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period, and preceding prompt reduction.in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.
RTP. THERMAL POWER levels below 75% are typically non-limiting with respect to the limit for FQT (Z) .Also, initial startups following a refueling are slow and well controlled due to startup ramp rate limitations and fuel conditioning requirements.
(conti nued)
Furthermore, startup physics testing and flux symmetry measurements, also performed at low power, provide confirmation that the core is operating as expected.
North Anna Units 1 and 2B321-ReionxB 3.2.1-7
Consequently, the initial startup following a refueling will not result in non-equilibrium power shapes that could challenge the FQT (Z)T limit. This Frequency ensures that verification of FQT (Z) is performed prior to extended operation at high power levels where the maximum permitted peak LHR could be challenged by non-equilibrium operation.
 
If a previous Surveillance of FqT (Z) was performed at part power conditions (below RTP), SR 3.2.1.2 also requires that FQT (Z) be yenifi ed at power level s_> 10% RTP above the THERMAL POWER of its last verification within 12 hours after achieving equilibrium conditions.
FQ(Z)
This ensures that FQT (7)is within its limit using radial peaking factors measured at the higher power level.If THERMAL POWER has been increased by 10% RTP since the last determination of FQT (Z), another evaluation of this factor is required 12 hours after achieving equilibrium conditions at this higher power level (to ensure that FQT (Z)values are being reduced sufficiently with power increase to stay within the LCO limits).The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.Flux map data are taken for multiple core elevations.
B 3.2.1 BASES ACTIONS           B.5 (conti nued)
FQT (Z)evaluations are not applicable for the following axial core regions, measured in percent of core height: a. Lower core region, from 0 to 15% inclusive; and b. Upper core region, from 85 to 100% inclusive.(conti nued)North Anna Units 1 and 2 B3211 eiinx B 3.2.1-10 Revision xx FQ(z)B 3.2.1 BASES SURVEILLANCE REQUIREMENTS (conti nued)SR 3.2.1.2 (continued)
Verification that FQT (Z) has been restored to within its limit, by performing SR 3.2.1.1 and SR 3.2.1.2 prior to increasing THERMAL POWER and AFD limits above the maximum allowable power and AFD limits imposed by Required Actions B.1 and B.2 ensures that core conditions during operation at higher power levels and future operation are consistent with safety analyses assumptions.
The top and bottom 15% of the core are excluded from the evaluation because of the low probability that these regions would be more limiting in the safety analyses and because of the difficulty of making a precise measurement in these regions.This Surveillance has been modified by a Note that may require that more frequent surveillances be performed.
C.'
An evaluation of the expressions below are required to account for any increase to FqT (Z) that may occur and cause the FQT (Z) limit to be exceeded before the next required FQT (Z)eval uati on.If the two most recent FQ(Z) evaluations show that either the maximum over z OR L 1 FQ(Z)K(Z)-maximum over z has increased or is expected to increase prior to the next evaluation then it is required to increase the Fe T (Z) by the appropriate factor, as specified in the COLR, and verify(Z) is still within limits or evaluate FQ(Z) every 7 EFPD until SR 3.2.1.2 is satisfied.
If Required Actions A.I through A.4 and B.I through B.5 are not met within their associated Completion Times, the unit must be placed in a MODE or condition in which the LCO requirements are not applicable. This is done by placing the unit in at least MODE 2 within 6 hours.
These alternate requirements prevent FQ(Z) from exceeding its limit without detection.
This allowed Completion Time is reasonable based on operating experience regarding the amount of time it takes to reach MODE 2 from full power operation in an orderly manner and without challenging unit systems.
REFERENCES
SURVEILLANCE     SR 3.2.1.1 and SR 3.2.1.2 are modified by a Note. It states REQU IREMENTS    that during power escalation, THERMAL POWER may be increased until a power level for extended operation has been achieved at which a power distribution map can be obtained. This allowance is modified, however, by one of the Frequency conditions that requires verification that FQ(Z) is within its specified limit after a power rise of more than 10% RTP   I over the THERMAL POWER at which it was last verified to be within specified limits. In the absence of this Frequency condition, it is possible to increase power to RTP and operate for 31 days without verification of FQ(Z). The         I Frequency condition is not intended to require verification of these parameters after every 10% increase in power level above the last verification. It only requires verification after a power level is achieved for extended operation that is 10% higher than that power at which FQ was last measured.
: 1. 10 CFR 50.46.2. VEP-NFE-2-A, "VEPCO Evaluation of the Control Rod Ejection Transient." 3. UFSAR, Section 3.1.22.4. VEP-NE-1-A, "VEPCO Relaxed Power Distribution Control Methodology and Associated FQ Surveillance Technical Specifications." North Anna Units 1 and 2 B3211 eiinx FQ(Z)B3.2.1 1.2 1.1 1.0 0.9 0.8 0.7._. 0.6 0.5 0.4 0.3 0.2 0.1 0.0 DO NO IPRT IN TIS AREA DONO OPRT NHSAE (6, 1.0)(12, .925)THIS FIGURE FOR-ILLUSTRATION ONLY. DO NOT USE FOR OPERATION FT. 0 1 2 3 4 5 6 7 8 9 10 11 12 16.6 33.3 50.0 66.7 83.3 100 CORE HEIGHT* FOR CORE HEIGHT OF 12 FEET Figure B 3.2.1-1 (page 1 of 1)K(Z)-Normalized FQ(Z) as a Function of Core Height North Anna Units 1 and 2 B3211 eiinx B 3,2.1-12 Revision xx VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 December 10, 2015 10 CFR 50.90 U.S. Nuclear Regulatory Commission Serial No. 15-494 Attention:
(continued)
Document Control Desk NLOS/DEA R0 Washington, DC 20555 Docket Nos.: 50-338/339 License Nos.: NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
North Anna Units 1 and 2B321-ReionxB 3.2.1-8                       Revision xx
NORTH ANNA POWER STATION UNITS 1 AND 2 LICENSE AMENDMENT REQUEST TO ADDRESS THE ISSUES IDENTIFIED IN WESTINGHOUSE DOCUMENTS NSAL-09-5.
 
REV. 1 AND NSAL-1 5-I In accordance with the provisions of 10 CFR 50.90, Virginia Electric and Power Company (Dominion) is submitting a license amendment request to revise the North Anna Power Station Units 1 and 2 Technical Specifications (TS). The proposed changes would revise the TS to address the issues identified in two Westinghouse communication documents.
FQ(Z)
Specifically, the proposed changes will address the issues identified in:* Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Rev. 1 (Reference
B 3.2.1 BASES SURVEILLANCE     SR 3.2.1.1 REQU IREMENTS (continued)    Verification that FQE (Z) is within its specified limits involves increasing FQ(Z) to allow for manufacturing tolerance and measuremleni* uncertainties in order to obtain FQ (Z). Specifically, FQ (Z) is the measured value of FQ(Z) obtained from incore flux map results multiplied by manufacturing and measurement uncertainties (1.05 x 1.03 = 1.0815). FQ (Z) is then compared to its specified limits.
: 1) by relocating required operating space reductions (power and AFD) to the Core Operating Limits Report, accompanied by verification for each reload cycle* Westinghouse Nuclear Safety Advisory Letter NSAL-1 5-1, Rev. 0 (Reference
The limit with which FQE (Z) is compared varies inversely with power above 50%0 RTP and directly with a function called K(Z) provided in the COLR.
: 2) by defining TS surveillance requirements for steady-state and transient FQ(Z) and corresponding actions with which to apply an appropriate penalty factor to measured results Attachment 1 provides a discussion of the proposed change. The marked-up and proposed TS pages are included in Attachments 2 and 3, respectively.
Performing this Surveillanc* in MODE 1 prior to exceeding 75% RTP ensures that the FQ (Z) limit is met when RTP is achieved, because peaking factors generally decrease as power level is increased.
The marked-up and proposed TS Bases changes are provided for NRC information only in Attachment 4.We have evaluated the proposed amendment and have determined that it does not involve a significant hazards consideration as defined in 10 CFR 50.92. The basis for this determination is included in Attachment
If THERMAL POWER has beep increased by > 10% RTP since the last determination of FQ (Z) , another evaluation of this factor is required 12 hours after achieving equilibrium conditions at this higher power level (to ensure that FeE (Z) values are being reduced sufficiently with power increase to stay within the LCO limits).
: 1. We have also determined that operation with the proposed change will not result in any significant increase in the amount of effluents that may be released offsite or any significant increase in individual or cumulative occupational radiation exposure.
SR 3.2.1.2 The nuclear design process includes calculations performed to determine that the core can be operated within the FQ(Z) limits. Because flux maps are taken in steady state conditions, the variations in power distribution resulting from normal operational maneuvers are not present in the flux map data. These variations are, however, conservatively calculated by considering a wide range of unit maneuvers in normal operation. The maximum peaking factor increase over steady state values, calculated as a function of core elevation, Z, is called N(Z).
Therefore, the proposed amendment is eligible for categorical exclusion from an environmental assessment as set forth in 10 CFR 51.22(c)(9).
The limit with which FQT (Z) is compared varies inversely with power above 50% RTP and N(Z) and directly with a function called K(Z) provided in the COLR.
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment is needed in connection with the approval of the proposed_A4u6)
SR 3.2.1.2 requires a Surveillance of FQT (Z) during the initial startup following each refueling within 12 hours after achieving equilibrium conditions after exceeding 75%
(continued)
North Anna Units 1 and 2B321-ReionxB 3.2.1-9                         Revision xx
 
FQ(Z)
B 3.2.1 BASES SURVEILLANCE     SR 3.2.1.2 (continued)
REQUIREMENTS (conti nued)    RTP. THERMAL POWER levels below 75% are typically non-limiting with respect to the limit for FQT (Z) . Also, initial startups following a refueling are slow and well controlled due to startup ramp rate limitations and fuel conditioning requirements. Furthermore, startup physics testing and flux symmetry measurements, also performed at low power, provide confirmation that the core is operating as expected. Consequently, the initial startup following a refueling will not result in non-equilibrium power shapes that could challenge the FQT (Z)T limit. This Frequency ensures that verification of FQT (Z) is performed prior to extended operation at high power levels where the maximum permitted peak LHR could be challenged by non-equilibrium operation.
If a previous Surveillance of FqT (Z) was performed at part power conditions (below RTP), SR 3.2.1.2 also requires that FQT (Z) be yenifi ed at power level s_> 10% RTP above the THERMAL POWER of its last verification within 12 hours after achieving equilibrium conditions. This ensures that FQT (7) is within its limit using radial peaking factors measured at the higher power level.
If THERMAL POWER has been increased by &#x17d; 10% RTP since the last determination of FQT (Z), another evaluation of this factor is required 12 hours after achieving equilibrium conditions at this higher power level (to ensure that FQT (Z) values are being reduced sufficiently with power increase to stay within the LCO limits).
The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.
Flux map data are taken for multiple core elevations. FQT (Z) evaluations are not applicable for the following axial core regions, measured in percent of core height:
: a. Lower core region, from 0 to 15% inclusive; and
: b. Upper core region, from 85 to 100% inclusive.
(conti nued)
North Anna Units 1 and 2           B 3.2.1-10 B3211                              Revision eiinxxx
 
FQ(z)
B 3.2.1 BASES SURVEILLANCE     SR 3.2.1.2 (continued)
REQUIREMENTS (conti nued)    The top and bottom 15% of the core are excluded from the evaluation because of the low probability that these regions would be more limiting in the safety analyses and because of the difficulty of making a precise measurement in these regions.
This Surveillance has been modified by a Note that may require that more frequent surveillances be performed. An evaluation of the expressions below are required to account for any increase to FqT (Z) that may occur and cause the FQT (Z) limit to be exceeded before the next required FQT (Z) eval uati on.
If the two most recent FQ(Z) evaluations show that either the maximum over z L1 FQ*Z)
OR FQ(Z) maximum over z                  K(Z)-
has increased evaluation    thenorit is isexpected requiredtotoincrease increase prior toT (Z) the Fe    the by next the appropriate factor, as specified in the COLR, and verify FQ* (Z) is still within limits or evaluate FQ(Z) every 7 EFPD until SR 3.2.1.2 is satisfied. These alternate requirements prevent FQ(Z) from exceeding its limit without detection.
REFERENCES       1. 10 CFR 50.46.
: 2. VEP-NFE-2-A, "VEPCO Evaluation of the Control Rod Ejection Transient."
: 3. UFSAR,   Section 3.1.22.
: 4. VEP-NE-1-A, "VEPCO Relaxed Power Distribution Control Methodology and Associated FQ Surveillance Technical Specifications."
North Anna Units 1 and 2             B3211                                       eiinx
 
FQ(Z)
B3.2.1 1.2 DONO    IPRT INTIS AREA 1.1 DONOOPRT      NHSAE (6, 1.0) 1.0 0.9 (12, .925) 0.8 0.7
          ._. 0.6 0.5 0.4 0.3 0.2             THIS FIGURE FOR-ILLUSTRATION ONLY. DO NOT USE FOR OPERATION 0.1 0.0 FT.      0   1   2     3     4     5     6     7   8 9   10     11     12 16.6       33.3       50.0       66.7   83.3           100 CORE HEIGHT
* FOR CORE HEIGHT OF 12 FEET Figure B 3.2.1-1 (page 1 of 1)
K(Z)-Normalized FQ(Z) as a Function of Core Height North Anna Units 1 and 2                 B3211 B 3,2.1-12                               Revision eiinxxx
 
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 December 10, 2015 10 CFR 50.90 U.S. Nuclear Regulatory Commission                           Serial No.     15-494 Attention: Document Control Desk                             NLOS/DEA       R0 Washington, DC 20555                                         Docket Nos.:   50-338/339 License Nos.:   NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNITS 1 AND 2 LICENSE AMENDMENT REQUEST TO ADDRESS THE ISSUES IDENTIFIED IN WESTINGHOUSE DOCUMENTS NSAL-09-5. REV. 1 AND NSAL-1 5-I In accordance with the provisions of 10 CFR 50.90, Virginia Electric and Power Company (Dominion) is submitting a license amendment request to revise the North Anna Power Station Units 1 and 2 Technical Specifications (TS). The proposed changes would revise the TS to address the issues identified in two Westinghouse communication documents.
Specifically, the proposed changes will address the issues identified in:
* Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Rev. 1 (Reference
: 1) by relocating required operating space reductions (power and AFD) to the Core Operating Limits Report, accompanied by verification for each reload cycle
* Westinghouse Nuclear Safety Advisory Letter NSAL-1 5-1, Rev. 0 (Reference
: 2) by defining TS surveillance requirements for steady-state and transient FQ(Z) and corresponding actions with which to apply an appropriate penalty factor to measured results provides a discussion of the proposed change. The marked-up and proposed TS pages are included in Attachments 2 and 3, respectively. The marked-up and proposed TS Bases changes are provided for NRC information only in .
We have evaluated the proposed amendment and have determined that it does not involve a significant hazards consideration as defined in 10 CFR 50.92. The basis for this determination is included in Attachment 1. We have also determined that operation with the proposed change will not result in any significant increase in the amount of effluents that may be released offsite or any significant increase in individual or cumulative occupational radiation exposure. Therefore, the proposed amendment is eligible for categorical exclusion from an environmental assessment as set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment is needed in connection with the approval of the proposed
_A4u6)
 
Serial No: 15-494 Docket Nos.: 50-338/339 Page 2 of 3 change. The proposed TS change has been reviewed and approved by the Facility Safety Review Committee.
Serial No: 15-494 Docket Nos.: 50-338/339 Page 2 of 3 change. The proposed TS change has been reviewed and approved by the Facility Safety Review Committee.
Dominion requests approval of the proposed amendment by May 31, 2017 to enable implementation of the changes by the Unit 2 refueling outage in the fall of 2017.Should you have any questions in Ms. Diane E. Aitken at (804) 273-2694.Sincerely, Mark D. Sartain Vice President  
Dominion requests approval of the proposed amendment by May 31, 2017 to enable implementation of the changes by the Unit 2 refueling outage in the fall of 2017.
-Nuclear Engineering regard to this submittal, please contact COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO)))The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mark D. Sartain, who is Vice President  
Should you have any questions in regard                                  to    this    submittal,  please    contact Ms. Diane E. Aitken at (804) 273-2694.
-Nuclear Engineering of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.Acknowledged before me this ..L day of Lers' 2015.M y. ('.nm m ik F vn ir i .<4I 3)1 , "Z o LA r ivl3 Notary Public Z) ~bl~Commonwealth of Virginia Reg. # 7629412 1 My Commission Expires August 31, 20L2&
Sincerely, Mark D. Sartain Vice President - Nuclear Engineering COMMONWEALTH OF VIRGINIA                                   ))
COUNTY OF HENRICO                                           )
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mark D. Sartain, who is Vice President     - Nuclear Engineering of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this ..L             day of -).c.*    Lers' 2015.
M y.('.nm m ik*inn F vnir p.*'  i   *l .<4I 3)1 , "Zo LA *
* 1 r
                                                                                                          &
ivl3 v*,,,,,,,v*o Notary Public               Z)     ~bl~
Commonwealth of Virginia Reg. # 7629412 My Commission Expires August 31, 20L2


==References:==
==References:==
: 1. Westinghouse Nuclear Safety Advisory Letter, NSAL-09-5, Rev. 1, "Relaxed Axial Offset Control EQ Technical Specification Actions," September 23, 2009.2. Westinghouse Nuclear Safety Advisory Letter, NSAL-1 5-1, Rev. 0, "Heat Flux Hot Channel Factor Technical Specification Surveillance," February 6, 2015.Attachments:
: 1. Westinghouse Nuclear Safety Advisory Letter, NSAL-09-5, Rev. 1, "Relaxed Axial Offset Control EQ Technical Specification Actions," September 23, 2009.
: 1. Discussion of Change 2. Marked-up Technical Specifications Pages 3. Proposed Technical Specifications Pages 4. Marked-up Technical Specifications Bases Pages (for information only)Commitments made in this letter: None Serial No: 15-494 Docket Nos.: 50-338/339 Page 3 of 3 cc: U.S. Nuclear Regulatory Commission  
: 2. Westinghouse Nuclear Safety Advisory Letter, NSAL-1 5-1, Rev. 0, "Heat Flux Hot Channel Factor Technical Specification Surveillance," February 6, 2015.
-Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1 257 State Health Commissioner Virginia Department of Health James Madison Building -7 th floor 109 Governor Street Suite 730 Richmond, VA 23219 Dr. V. Sreenivas NRC Project Manager -North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Karen Cotton-Gross NRC Project Manager U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power Station Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 1 of 16 ATTACHMENT I DISCUSSION OF CHANGE Virginia Electric and Power Company (Dominion)
Attachments:
North Anna Power Station Units I and 2 Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and N SAL-i15-I, Rev. 0 Attachment 1, Page 2 of 16 Table of Contents  
: 1. Discussion of Change
: 2. Marked-up Technical Specifications Pages
: 3. Proposed Technical Specifications Pages
: 4. Marked-up Technical Specifications Bases Pages (for information only)
Commitments made in this letter: None
 
Serial No: 15-494 Docket Nos.: 50-338/339 Page 3 of 3 cc: U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1 257 State Health Commissioner Virginia Department of Health James Madison Building - 7 th floor 109 Governor Street Suite 730 Richmond, VA 23219 Dr. V. Sreenivas NRC Project Manager - North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Karen Cotton-Gross NRC Project Manager U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power Station
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 1 of 16 ATTACHMENT I DISCUSSION OF CHANGE Virginia Electric and Power Company (Dominion)
North Anna Power Station Units I and 2
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-i15-I, Rev. 0 Attachment 1, Page 2 of 16 Table of Contents


==1.0 DESCRIPTION==
==1.0 DESCRIPTION==
 
............................................................................................           3 2.0 PROPOSED TECHNICAL SPECIFICATIONS CHANGES ............................................ 4 3.0 TECHNICALANALYSIS ..................................................             :................................
............................................................................................
3 2.0 PROPOSED TECHNICAL SPECIFICATIONS CHANGES ............................................
4 3.0 TECHNICALANALYSIS  
..................................................
:................................


==4.0 REGULATORY EVALUATION==
==4.0 REGULATORY EVALUATION==
.........................................................................                    13


.........................................................................
==5.0 ENVIRONMENTAL CONSIDERATION==
13 5.0 ENVIRONMENTAL CONSIDERATIONS
S ..............................................................                       16
..............................................................
16  


==6.0 REFERENCES==
==6.0 REFERENCES==
...........................................................................................
...........................................................................................             16
16 Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. I and NSAL-15-1, Rev. 0 Attachment 1, Page 3 of 16  


==1.0 DESCRIPTION==
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. I and NSAL-15-1, Rev. 0 Attachment 1, Page 3 of 16
 
==1.0   DESCRIPTION==
 
In accordance with the provisions of 10 CFR 50.90, Virginia Electric and Power Company (Dominion) is submitting a request to amend the Technical Specifications (TS) for North Anna Power Station Units 1 and 2 (NAPS). The changes are intended to address the issues identified in Westinghouse communications NSAL-09-5, Rev. 1 (Reference 1) and NSAL-15-1 (Reference 2).
Reference 1 notified Westinghouse customers of an issue associated with the Required Actions for Condition B of TS 3.2.1B, "Heat Flux Hot Channel Factor (FQ(Z) (RAOC-W(Z)
Methodology)," in Reference 3 for plants that have implemented the relaxed axial offset control (RAOC) methodology. In certain situations where transient FQ, FQw(Z), is not within its limit, the existing Required Actions may be insufficient to restore FQw(Z) to within the limit. Revision 1 of Reference 1 provided clarification regarding the applicability of the recommended interim actions to address this issue and how they should be implemented, including potential inclusion in plant specific Technical Specification changes. Dominion's evaluation of Reference I determined that it was applicable to NAPS, based on the similarities between the RAOC and Dominion's Relaxed Power Distribution Control (RPDC) methodologies.
Reference 2 notified Westinghouse customers of an issue associated with Surveillance Requirement (SR) 3.2.1.2 in TS 3.2.1B of Reference 3. For certain trends in measured FQ(Z) and non-equilibrium factor W(Z), the existing SR may not ensure that the transient FQ, FQw(Z), limit will be met between the performance of the monthly flux map measurements, for those plants that use the W(Z) FQ surveillance methodology. Dominion's evaluation of Reference 2 determined that it was also applicable to NAPS, based on the similarities between the RAOC and Dominion's Relaxed Power Distribution Control (RPDC) methodologies.
Dominion is proposing to change TS 3.2.1, "Heat Flux Hot Channel Factor (FQ(Z))," to enhance the required actions to be taken in the event that transient Fo(Z) surveillance limits are not met. Changes are also proposed that define separate terms, action steps and surveillance requirements for steady-state and transient FQ(Z), denoted as FQE(Z) and FQT(Z), respectively. The use of separate surveillance requirements (SR) in this manner is consistent with Westinghouse Standard Technical Specifications, NUREG-1431, Rev. 4 (Reference 3). The revised surveillance requirements provide guidance for application of, and determining the magnitude of a penalty factor for the measured FQ(Z). The factor will be applied if the trend in measured values indicates decreasing margin to the applicable limit since performing the previous surveillance or if the trend in predicted values indicates decreasing margin to the applicable limit prior to the next required surveillance. The


In accordance with the provisions of 10 CFR 50.90, Virginia Electric and Power Company (Dominion) is submitting a request to amend the Technical Specifications (TS) for North Anna Power Station Units 1 and 2 (NAPS). The changes are intended to address the issues identified in Westinghouse communications NSAL-09-5, Rev. 1 (Reference
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 4 of 16 changes specify that this factor will be defined in the Core Operating Limits Report (COLR),
: 1) and NSAL-15-1 (Reference 2).Reference 1 notified Westinghouse customers of an issue associated with the Required Actions for Condition B of TS 3.2.1B, "Heat Flux Hot Channel Factor (FQ(Z) (RAOC-W(Z)
which allows specific numerical values of the factor to be evaluated for each reload core.
Methodology)," in Reference 3 for plants that have implemented the relaxed axial offset control (RAOC) methodology.
The Bases for TS 3.2.1 are being modified to address the proposed changes to TS 3.2.1.
In certain situations where transient FQ, FQw(Z), is not within its limit, the existing Required Actions may be insufficient to restore FQw(Z) to within the limit. Revision 1 of Reference 1 provided clarification regarding the applicability of the recommended interim actions to address this issue and how they should be implemented, including potential inclusion in plant specific Technical Specification changes. Dominion's evaluation of Reference I determined that it was applicable to NAPS, based on the similarities between the RAOC and Dominion's Relaxed Power Distribution Control (RPDC)methodologies.
The TS Bases changes are provided for information only. Changes to the TS Bases will be incorporated in accordance with the TS Bases Control Program (TS 5.5.13) upon approval of this amendment request.
Reference 2 notified Westinghouse customers of an issue associated with Surveillance Requirement (SR) 3.2.1.2 in TS 3.2.1B of Reference
2.0   PROPOSED TECHNICAL SPECIFICATIONS CHANGES The proposed TS and SR changes are detailed below. To aid review, deleted text is struck through and added text is italicized and bolded. For more extensive changes, reference is made to the TS markups in Attachment 2 and TS Bases markups in Attachment 4.
: 3. For certain trends in measured FQ(Z) and non-equilibrium factor W(Z), the existing SR may not ensure that the transient FQ, FQw(Z), limit will be met between the performance of the monthly flux map measurements, for those plants that use the W(Z) FQ surveillance methodology.
2.1   TS 3.2.1 - Heat Flux Hot Channel Factor (FQ(Z))
Dominion's evaluation of Reference 2 determined that it was also applicable to NAPS, based on the similarities between the RAOC and Dominion's Relaxed Power Distribution Control (RPDC)methodologies.
TS 3.2.1 currently reflects use of the Dominion Relaxed Power Distribution Control (RPDC) power distribution control methodology (Reference 4). The proposed changes detailed below revise certain specification terminology, including relocation of some equations to the TS Bases, and revision of appropriate TS Required Actions to address the issues in References 1 and 2.
Dominion is proposing to change TS 3.2.1, "Heat Flux Hot Channel Factor (FQ(Z))," to enhance the required actions to be taken in the event that transient Fo(Z) surveillance limits are not met. Changes are also proposed that define separate terms, action steps and surveillance requirements for steady-state and transient FQ(Z), denoted as FQE(Z) and FQT(Z), respectively.
The proposed changes follow:
The use of separate surveillance requirements (SR) in this manner is consistent with Westinghouse Standard Technical Specifications, NUREG-1431, Rev. 4 (Reference 3). The revised surveillance requirements provide guidance for application of, and determining the magnitude of a penalty factor for the measured FQ(Z). The factor will be applied if the trend in measured values indicates decreasing margin to the applicable limit since performing the previous surveillance or if the trend in predicted values indicates decreasing margin to the applicable limit prior to the next required surveillance.
LCO 3.2.1
The Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 4 of 16 changes specify that this factor will be defined in the Core Operating Limits Report (COLR), which allows specific numerical values of the factor to be evaluated for each reload core.The Bases for TS 3.2.1 are being modified to address the proposed changes to TS 3.2.1.The TS Bases changes are provided for information only. Changes to the TS Bases will be incorporated in accordance with the TS Bases Control Program (TS 5.5.13) upon approval of this amendment request.2.0 PROPOSED TECHNICAL SPECIFICATIONS CHANGES The proposed TS and SR changes are detailed below. To aid review, deleted text is struck through and added text is italicized and bolded. For more extensive changes, reference is made to the TS markups in Attachment 2 and TS Bases markups in Attachment 4.2.1 TS 3.2.1 -Heat Flux Hot Channel Factor (FQ(Z))TS 3.2.1 currently reflects use of the Dominion Relaxed Power Distribution Control (RPDC)power distribution control methodology (Reference 4). The proposed changes detailed below revise certain specification terminology, including relocation of some equations to the TS Bases, and revision of appropriate TS Required Actions to address the issues in References 1 and 2.The proposed changes follow: LCO 3.2.1*LCO 3.2.1 will be revised as follows: FQ(Z), as approximated by ,E{-- FQE(z) and FQT(Z), shall be within the limits specified in the COLR.TS 3.2.1 -CONDITION A. REQUIRED ACTIONS AND COMPLETION TIME* TS 3.2.1 CONDITION A will be revised as follows:-.......NOTE-------....
  *LCO 3.2.1 will be revised as follows:
FQ(Z), as approximated by ,E{-- FQE(z) and FQT(Z), shall be within the limits specified in the COLR.
TS 3.2.1 - CONDITION A. REQUIRED ACTIONS AND COMPLETION TIME
* TS 3.2.1 CONDITION A will be revised as follows:
              -.......
NOTE-------....
Required Action A.4 shall be completed whenever this Condition is entered. SR 3.2.1.2 is not required to be performed if this Condition is entered prior to THERMAL POWER exceeding 75% RTP after a refueling.
Required Action A.4 shall be completed whenever this Condition is entered. SR 3.2.1.2 is not required to be performed if this Condition is entered prior to THERMAL POWER exceeding 75% RTP after a refueling.
A. F-QM-Z-) FQE(Z) not within limit.
A. F-QM-Z-) FQE(Z) not within limit.
Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 5 of 16* Delete TS 3.2.1 REQUIRED ACTION A.1 and renumber remaining REQUIRED ACTIONS as REQUIRED ACTION A.1, A.2, A.3, and A.4* New TS 3.2.1 REQUIRED ACTION A.1 reads as follows: Reduce THERMAL POWER > 1% RTP for each 1% FQE(Z) exceeds limit.A.1 COMPLETION TIME 15 minutes after each FQM(-Z-) FQE(Z) determination
 
*New TS 3.2.1 REQUIRED ACTION A.2 reads as follows: Reduce Power Range Neutron Flux-High trip setpoints  
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 5 of 16
> 1% for each 1% .FQM(-Z--eee-litthat THERMAL POWER is limited below RTP by Required Action A. 1.A.2 COMPLETION TIME 72 hours after each .FQM(-Z-)
* Delete TS 3.2.1 REQUIRED ACTION A.1 and renumber remaining REQUIRED ACTIONS as REQUIRED ACTION A.1, A.2, A.3, and A.4
FQE(Z) determination
* New TS 3.2.1 REQUIRED ACTION A.1 reads as follows:
*New TS 3.2.1 REQUIRED ACTION A.3 reads as follows: Reduce Overpower AT trip setpoints  
Reduce THERMAL POWER > 1% RTP for each 1% $*M(Z) FQE(Z) exceeds limit.
> 1% for each 1 % = Z)-e ....ee-li,;ii that THERMAL POWER is limited below RTP by Required Action A. 1.A.3 COMPLETION TIME 72 hours after each .FQM(-Z-)
A.1 COMPLETION TIME 15 minutes after each FQM(-Z-) FQE(Z) determination
FQE(Z) determination
  *New TS 3.2.1 REQUIRED ACTION A.2 reads as follows:
*New TS 3.2.1 ACTION A.4 reads as follows: Perform SR 3.2.1.1 and SR 3.2.1.2 A.4 COMPLETION TIME Prior to increasing THERMAL POWER above the limit of Required Action A.21 Serial No: 15-494 Docket Nos.: 50-338/339 LAR- NSAL-09-5, Rev. 1 and NSAL-15-1, Rev. 0 Attachment 1, Page 6 of 16 TS 3.2.1 -CONDITION B. REQUIRED ACTIONS and COMPLETION TIME* New TS 3.2.1 CONDITION B will be added, to read as follows: ACTIONS CONDITION  
Reduce Power Range Neutron Flux-High trip setpoints > 1% for each 1% .FQM(-Z--
] REQUIRED ACTIONj COMPLETION TIME B.----NOTE-.....
eee-litthat           THERMAL POWER is limited below RTP by Required Action A. 1.
Required Action B.5 shall be completed whenever this Condition is entered.FQT (z) not within limit.8.1 Reduce AFD limits as specified in the COLR.AND B.2 Reduce THERMAL POWER as specified in the COLR.AND B.3 Reduce Power Range Neutron Flux-High trip setpoints  
A.2 COMPLETION TIME 72 hours after each .FQM(-Z-) FQE(Z) determination
> 1%for each 1% that THERMAL POWER is limited below RTP by Required Action 8.2.AND B.4 Reduce Overpower AT trip setpoints  
  *New TS 3.2.1 REQUIRED ACTION A.3 reads as follows:
> 1%for each 1% that THERMAL POWER is limited below RTP by Required Action 8.2.AND 8.5 Perform SR 3.2.1.1 and SR 3.2.1.2.4 hours after each FQT (Z) determination 4 hours after each FQT (Z) determination 72 hours after each FQT (z) determination 72 hours after each FQT (Z) determination Prior to increasing THERMAL POWER and AFD limits above the limits of Required Actions 8.1 and 8.2* Renumber existing TS 3.2.1 CONDITION B, REQUIRED ACTION, as follows: BC. Required Action and associated Completion Time not met.BC.1 Be in MODE 2.
Reduce Overpower AT trip setpoints > 1% for each 1% = Z)-e ....ee-li,;ii that THERMAL POWER is limited below RTP by Required Action A. 1.
Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 7 of 16 2.2 SR 3.2.1.1, SR 3.2.1.2 [new] -Heat Flux Hot Channel Factor (FQ(Z))The changes to SR 3.2.1.1 and the addition of SR 3.2.1.2 conform with the introduction of steady-state, FQE(Z), and transient, FQT(Z), in TS 3.2.1. These changes define separate surveillance requirements for the two representations of FQ(Z).The proposed changes follow: SR 3.2.1.1* The Note before SR 3.2.1 .1 is deleted since it pertains to transient limits.* SR 3.2.1.1 is revised to read as follows: Verify FQE(Z) is within limit.SR 3.2.1.1 [FREQUENCY] (the 2 nd clause): Once within 12 hours after achieving equilibrium conditions after exceeding, by -- 10%RTP, the THERMAL POWER at which FQM(-Z-) FQE(Z) was last verified Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Attachment 1, Page 8 of 16*New SR 3.2.1.2 will be added, to read as follows: S UR VEILLA NCE FREQUENCY SR 3.2.1.2----..............NOTE.........
A.3 COMPLETION TIME 72 hours after each .FQM(-Z-) FQE(Z) determination
If measurements indicate that either the[K(Z) I maximum over z OR K(z) ]maximum over z has increased since the previous evaluation of FQ(Z)or is expected to increase prior to the next evaluation:
  *New TS 3.2.1 ACTION A.4 reads as follows:
A. Increase FQT(Z) by the appropriate factor, as specified in the COLR, and verify FQT(Z) is still within limits or B. Repeat SR 3.2.1.2 once perT7 EFPD until a. Above (A) is met or b. Two successive flux maps indicate that the[~&#xb6;21 LKzJ maximum over z AND K(Z)].maximum over z Once after each refueling within 12 hours after achieving equilibrium conditions after THERMAL POWER exceeds 75% RTP AND Once within 12 hours after achieving equilibrium conditions after exceeding, by> 10% RTP, the THERMAL POWER at which FQT(Z) was last verified AND In accordance with the Surveillance Frequency Control Program has not increased.
Perform SR 3.2.1.1 and SR 3.2.1.2 A.4 COMPLETION TIME Prior to increasing THERMAL POWER above the limit of Required Action A.21
Verify FQT (Z) is within limit.
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 9 of 16 2.3 TS Bases 3.2.1 -Heat Flux Hot Channel Factor (FQ(Z))Several changes to the Bases will be required which reflect the terminology changes and relocation of items from the specific TS sections noted in the description above.Summary list of key changes (see markup in Attachment 4):* Revise terminology throughout to reflect use of FQ(Z), FQE(Z) and FQT(Z) as appropriate
Serial No: 15-494 Docket Nos.: 50-338/339 LAR- NSAL-09-5, Rev. 1 and NSAL-15-1, Rev. 0 Attachment 1, Page 6 of 16 TS 3.2.1 - CONDITION B. REQUIRED ACTIONS and COMPLETION TIME
* Changes to conform with deletion and renumbered Condition A REQUIRED ACTIONS in TS 3.2.1* Insert 4 describes the relation for FQT(Z), including the N(Z) factor* Insert 5 describes actions to reduce core power and AFD limits if FQE(Z) and FQT(Z)cannot be maintained within LCO limits* Insert 6 describes the Condition B REQUIRED ACTIONS added in TS 3.2.1 for FaT(Z)* Insert 7 describes the steady-state peaking factor, FQE(Z) for SR 3.2.1.1* Insert 8 describes the frequency conditions for the transient peaking factor, FQT(Z) for SR 3.2.1.2* Insert 9 describes expressions for both FQE (Z) and FQT(z) that are evaluated to determine whether to apply the appropriate penalty factor or increase the frequency of surveillance Based on Dominion's analytical assessment of internal and external operating experiences (e.g. Westinghouse Communication 06-IC-03, Reference 5), the magnitudes of the lower and upper core regions excluded from FQ surveillances had been proactively and conservatively reduced (in approximately 2006) from what was and is currently described in the North Anna Technical Specification Bases. An update to the Technical Specification Bases to expand the FQ axial surveillance regions is being tracked by Dominion's corrective action system.3.0 TECHNICAL ANALYSIS The proposed TS changes identified in Section 2.0 are evaluated for technical adequacy in the following sections.3.1 TS 3.2.1 -Heat Flux Hot Channel Factor (FQ(Z))The proposed changes involve additions, deletions and revisions to existing TS content that are associated with LCO 3.2.1. These changes provide resolution of issues documented in Westinghouse notification documents NSAL-09-5, Rev. 1 (Reference
* New TS 3.2.1 CONDITION B will be added, to read as follows:
: 1) and NSAL-15-1 (Reference 2). NAPS is currently operating with compensatory actions which address the issues identified in References 1 and 2. Evaluation of the specific proposed changes is provided below.
ACTIONS CONDITION       ]   REQUIRED ACTIONj             COMPLETION TIME B.----NOTE-.....             8.1 Reduce AFD limits 4 hours after each Required Action B.5         as specified in the FQT(Z) determination shall be completed           COLR.
Serial No: 15-494 Docket Nos.: 50-338/339 LAR,- NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Attachment 1, Page 10 of 16 LCO 3.2.1 The existing LCO 3.2.1 specifies that FQ(Z) is approximated by F 0 M(Z), which is described in the Bases as the steady-state measured value for FQ(Z). The COLR limit to which FQM(z) is compared is adjusted by the factor, N(Z), which accounts for the calculated worst case transient core conditions.
whenever this               AND Condition is entered.                                   4 hours after each B.2    Reduce THERMAL FQT(Z) determination FQT(z) not within           POWER as specified in limit.                      the COLR.
The N(Z) factor is calculated in accordance with the approved Dominion RPDC methodology (Reference 4). The proposed changes specify that Fo(Z) is approximated by F 0 E(z) and FQT(Z), denoted as the steady-state and transient quantities, respectively.
AND                         72 hours after each B.3     Reduce     Power FQT(z) determination Range Neutron Flux-High trip setpoints > 1%
Separate surveillance requirements are specified for FQE(Z) and FQT(Z), which is consistent with the comparable terms F 0 c(Z) and F 0 w(Z) in Standard Technical Specifications for Westinghouse plants (Reference 3).A Note is inserted before LCO 3.2.1 Condition A to explain that Action A.4 is always required to be performed unless SR 3.2.1.2 is performed prior to exceeding 75% RTP after a refueling outage. This note is consistent with language proposed for this LCO condition in response to an NRC Request for Additional Information during review of WCAP-1 7661-P (Reference 6).Required Action A.1 in existing LCO 3.2.1 is deleted, since the revised Condition A now applies to steady-state FQE(Z), for which this action does not apply, per the comparable Reference 3 actions for TS 3.2.IB. The remaining actions for LCO 3.2.1 Condition A are retained, with changes to each action that reflect use of FQE(Z) versus FQM(Z).A new Condition B with corresponding Required Actions is added to address the situation in which FQT(Z) is not within its limit. Proposed Required Actions B.1 through B.5 are a modified version of the interim actions identified in NSAL-09-5, Rev. 1 (Reference 1), for this situation.
for   each     1%   that THERMAL POWER is limited below RTP by Required Action 8.2.
These changes are proposed as the resolution for the issues identified in Reference 1.Westinghouse's proposal for the long term resolution of NSAL-09-5, Rev. 1 is to seek NRC approval for the methods described in WCAP-17661-P (Reference 6). WCAP-17661-P is intended to revise the existing RAOC and Constant Axial Offset Control (CAOC) F 0 Surveillance Technical Specifications to address several outstanding issues, one of which was NSAL-09-5.
AND                         72 hours after each FQT(Z) determination B.4 Reduce Overpower AT trip setpoints > 1%
Dominion has strategically chosen not to adopt WCAP-17661-P and its subsequent Technical Specification Task Force (TSTF) traveler for North Anna.This alternate approach was determined by Dominion evaluation to most appropriately address the issues in NSAL-09-5, Rev. 1 for NAPS. The Dominion approach has these desirable aspects: 1) it addresses directly the issues of NSAL-09-5, Rev. 1; 2) it retains the existing TS surveillance scheme and structure; and 3) it retains the existing axial control calculational methodology (RPDC). By relocating the numerical values to the COLR, Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 11 of 16 Dominion's proposed resolution of NSAL-09-5 allows the required RPDC operating space (THERMAL POWER and AFD) reductions to be evaluated and modified on a cycle-specific basis. This proposed resolution is supported by current Dominion RPDC methods.Specifically, the allowable operating space that applies to Required Action B.1 and 8.2 is relocated to the COLR. A new table, entitled "Required Operating Space Reductions for FQT(Z) Exceeding Its Limits," will be added to the COLR to quantify the required THERMAL POWER and AFD limits associated with different amounts of FQT(Z) margin improvement (1%, 2%, etc.). If LCO 3.2.1, Condition B is entered, the operating space as defined in the new COLR table will ensure that sufficient margin exists. COLR Table 3.2-3 below presents a sample of the proposed table to be included in the COLR.The values provided in the sample table below are only intended to provide a representative example of typical reload values. The determination and verification of the required FQT(Z)margin improvements and the corresponding required reductions in the THERMAL POWER Limit and AFD Bands will be performed on a reload specific basis in accordance with the approved methodology of VEP-NE-1-A listed in Technical Specification 5.6.5.b.COLR Table 3.2-3 Required Operating Space Reductions for FQT(Z) Exceeding Its Limits Required FQT(z) Margin THERMAL POWER Negative AFD Positive AFD Improvement Reduction Band Reduction Band Reduction (% RTP) (% AFD) (% AFD)< %>3% >2.0% > 2.0%> 1% and<2% >5% > 3.0% > 3.0%> 2% and <3% ___8% __.3.5% >3.5%> 3% _50% N/A N/A 3.2 SR 3.2.1.1, SR 3.2.1.2 [new] -Heat Flux Hot Channel Factor (FQ(Z))The proposed changes to SR 3.2.1.1 address surveillance for FQE(Z), and the addition of new SR 3.2.1.2 addresses surveillance for FQT(Z). Specifying separate requirements for FQE(Z) and FQT(Z), iS consistent with treatment of the comparable terms F 0 c(Z) and FQw(Z)in Standard Technical Specifications for Westinghouse plants (Reference 3).The Note preceding SR 3.2.1.1 is deleted since it is not applicable to surveillance for the steady-state parameter FQE(z). It relates to considerations that apply only to conducting surveillance for the transient FQ(Z) limits.
for   each     1%   that THERMAL POWER is limited below RTP by Required Action 8.2.       Priorto increasing AND                         THERMAL POWER and AFD limits above 8.5 Perform SR 3.2.1.1 the limits of Required and SR 3.2.1.2.             Actions 8.1 and 8.2
Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 12 of 16 Insert 3 describes proposed new SR 3.2.1.2 for FQT(Z), including a Note preceding SR 3.2.1.2 that describes the actions for the situation in which either FQE(Z) or FQT(Z) have increased since the last evaluation of FQ(Z) or are expected to increase prior to the next evaluation.
* Renumber existing TS 3.2.1 CONDITION B, REQUIRED ACTION, as follows:
Required Action A of the Note involves increasing FQT(Z) by the appropriate factor, as specified in the COLR, if the conditions concerning either FQE(Z) or FQT(Z) are met. This approach, although different in the details of application from that recommended in Reference 2, has been deemed to be more suitable for use with Dominion methods. The proposed SR 3.2.1 .2 has been confirmed by analysis with Dominion methods for representative NAPS reload cores to ensure that FQE(Z) and FQT(Z) will satisfy their respective limits and to resolve the issue -of undetected loss of margin identified in Reference 2.As applied by Dominion, SR 3.2.1.2 involves looking for increases in steady-state and transient, measured and predicted FQ(Z) to determine if the penalty factor should be applied. The application of the appropriate penalty factor will be required if any of the following conditions are met: 1. Increase in measured maximum FoE(Z,) I K(Z) from the previous surveillance, 2. Increase in measured maximum FQT(Z) I K(Z) from the previous surveillance, 3. Increase in predicted maximum FQE(Z) I K(Z) over the next surveillance period, or 4. Increase in predicted maximum FQT(Z) I K(Z) over the next surveillance period.Cycle-specific analyses will be performed to determine the appropriate penalty factor required to accommodate potential increases in FQ(Z) over the surveillance period. SR 3.2.1.2 notes that the 'appropriate factor' will be specified in the COLR. This allows for the details of the appropriate penalty factors to be evaluated and modified on a cycle-specific basis. This revised surveillance requirement will ensure an appropriate analytical penalty factor is applied during performance of SR 3.2.1.2, which addresses the issues identified in NSAL-15-1 (Reference 2).A new table, entitled "Penalty Factors for Flux Map Analysis," will be added to the COLR.Table 3.2-2 below presents a sample of the proposed table to be included in the COLR. The values provided in the sample table below are only intended to provide a representative example of typical reload values. The determination and verification of the appropriate penalty factor will be performed on a reload specific basis in accordance with the approved methodology of VEP-NE-1-A listed in Technical Specification 5.6.5.b.
BC. Required Action and associated Completion Time not met.
Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Attachment 1, Page 13 of 16 COLR Table 3.2-2 Penalty Factors for Flux Map Analysis Burnup Surveillance (MWD/MTU)
BC.1 Be in MODE 2.
Factor 0 -999 4.00%1000 -1999 3.50%2000 -2999 2.00%3000 -3999 2.00%4000 -4999 2.00%5000 -6999 2.00%7000 -8999 2.00%9000 -10999 2.00%11000 -12999 2.00%13000 -14999 2.00%15000 -16999 2.00%17000 -18999 2.00%19000 -EOR 2.00%Subsequent to approval of this LAR, Dominion intends to process appropriate conforming changes, in the form of a modification (denoted VEP-NE-1, Rev. 0.2-A) to the RPDC topical report. These changes will reflect the adjustments discussed herein to address the issues in References 1 and 2. This modification will be prepared in accordance with Dominion's topical modification process, as provided for in our reload methods topical report VEP-FRD-42-A (Reference 7).
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 7 of 16 2.2     SR 3.2.1.1, SR 3.2.1.2 [new]     - Heat Flux Hot Channel Factor (FQ(Z))
The changes to SR 3.2.1.1 and the addition of SR 3.2.1.2 conform with the introduction of steady-state, FQE(Z), and transient, FQT(Z), in TS 3.2.1. These changes define separate surveillance requirements for the two representations of FQ(Z).
The proposed changes follow:
SR 3.2.1.1
* The Note before SR 3.2.1 .1 is deleted since it pertains to transient limits.
* SR 3.2.1.1 is revised to read as follows:
Verify .F-*(-Z- FQE(Z) is within limit.
SR 3.2.1.1 [FREQUENCY] (the 2 nd clause):
Once within 12 hours after achieving equilibrium conditions after exceeding, by -- 10%
RTP, the THERMAL POWER at which FQM(-Z-) FQE(Z) was last verified
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR   - NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Attachment 1, Page 8 of 16
*New SR 3.2.1.2 will be added, to read as follows:
S UR VEILLA NCE                               FREQUENCY SR 3.2.1.2----..............NOTE.........
If measurements indicate that either the maximum over z
[K(Z) I OR K(z) ]
maximum over z has increasedsince the previous evaluation of FQ(Z)or is expected to increaseprior to the next evaluation:
A. Increase FQT(Z) by the appropriatefactor, as specified in the COLR, and verify FQT(Z) is still within limits or B. Repeat SR 3.2.1.2 once perT7 EFPD until               Once after each
: a. Above (A) is met or                               refueling within 12 hours
: b. Two successive flux maps indicate that the       after achieving equilibrium conditions after
[~&#xb6;21                     THERMAL POWER exceeds 75% RTP maximum over z         LKzJ AND                                               AND Once within 12 hours K(Z)].                   after achieving maximum over z equilibrium conditions has not increased.                                after exceeding, by
                                                          > 10% RTP, the Verify FQT(Z) is within limit.
THERMAL POWER at which FQT(Z) was last verified AND In accordancewith the Surveillance Frequency Control Program
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 9 of 16 2.3 TS Bases 3.2.1     - Heat Flux Hot Channel Factor (FQ(Z))
Several changes to the Bases will be required which reflect the terminology changes and relocation of items from the specific TS sections noted in the description above.
Summary list of key changes (see markup in Attachment 4):
* Revise terminology throughout to reflect use of FQ(Z), FQE(Z) and FQT(Z) as appropriate
* Changes to conform with deletion and renumbered Condition A REQUIRED ACTIONS in TS 3.2.1
* Insert 4 describes the relation for FQT(Z), including the N(Z) factor
* Insert 5 describes actions to reduce core power and AFD limits if FQE(Z) and FQT(Z) cannot be maintained within LCO limits
* Insert 6 describes the Condition B REQUIRED ACTIONS added in TS 3.2.1 for FaT(Z)
* Insert 7 describes the steady-state peaking factor, FQE(Z) for SR 3.2.1.1
* Insert 8 describes the frequency conditions for the transient peaking factor, FQT(Z) for SR 3.2.1.2
* Insert 9 describes expressions for both FQE (Z) and FQT(z) that are evaluated to determine whether to apply the appropriate penalty factor or increase the frequency of surveillance Based on Dominion's analytical assessment of internal and external operating experiences (e.g. Westinghouse Communication 06-IC-03, Reference 5), the magnitudes of the lower and upper core regions excluded from FQ surveillances had been proactively and conservatively reduced (in approximately 2006) from what was and is currently described in the North Anna Technical Specification Bases. An update to the Technical Specification Bases to expand the FQ axial surveillance regions is being tracked by Dominion's corrective action system.
 
==3.0   TECHNICAL ANALYSIS==
 
The proposed TS changes identified in Section 2.0 are evaluated for technical adequacy in the following sections.
3.1   TS 3.2.1 - Heat Flux Hot Channel Factor (FQ(Z))
The proposed changes involve additions, deletions and revisions to existing TS content that are associated with LCO 3.2.1. These changes provide resolution of issues documented in Westinghouse notification documents NSAL-09-5, Rev. 1 (Reference 1) and NSAL-15-1 (Reference 2). NAPS is currently operating with compensatory actions which address the issues identified in References 1 and 2. Evaluation of the specific proposed changes is provided below.
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR,- NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Attachment 1, Page 10 of 16 LCO 3.2.1 The existing LCO 3.2.1 specifies that FQ(Z) is approximated by F0 M(Z), which is described in the Bases as the steady-state measured value for FQ(Z). The COLR limit to which FQM(z) is compared is adjusted by the factor, N(Z), which accounts for the calculated worst case transient core conditions. The N(Z) factor is calculated in accordance with the approved Dominion RPDC methodology (Reference 4). The proposed changes specify that Fo(Z) is approximated by F0 E(z) and FQT(Z), denoted as the steady-state and transient quantities, respectively. Separate surveillance requirements are specified for FQE(Z) and FQT(Z), which is consistent with the comparable terms F0 c(Z) and F0 w(Z) in Standard Technical Specifications for Westinghouse plants (Reference 3).
A Note is inserted before LCO 3.2.1 Condition A to explain that Action A.4 is always required to be performed unless SR 3.2.1.2 is performed prior to exceeding 75% RTP after a refueling outage. This note is consistent with language proposed for this LCO condition in response to an NRC Request for Additional Information during review of WCAP-1 7661-P (Reference 6).
Required Action A.1 in existing LCO 3.2.1 is deleted, since the revised Condition A now applies to steady-state FQE(Z), for which this action does not apply, per the comparable Reference 3 actions for TS 3.2.IB. The remaining actions for LCO 3.2.1 Condition A are retained, with changes to each action that reflect use of FQE(Z) versus FQM(Z).
A new Condition B with corresponding Required Actions is added to address the situation in which FQT(Z) is not within its limit. Proposed Required Actions B.1 through B.5 are a modified version of the interim actions identified in NSAL-09-5, Rev. 1 (Reference 1), for this situation. These changes are proposed as the resolution for the issues identified in Reference 1.
Westinghouse's proposal for the long term resolution of NSAL-09-5, Rev. 1 is to seek NRC approval for the methods described in WCAP-17661-P (Reference 6). WCAP-17661-P is intended to revise the existing RAOC and Constant Axial Offset Control (CAOC) F0 Surveillance Technical Specifications to address several outstanding issues, one of which was NSAL-09-5. Dominion has strategically chosen not to adopt WCAP-17661-P and its subsequent Technical Specification Task Force (TSTF) traveler for North Anna.
This alternate approach was determined by Dominion evaluation to most appropriately address the issues in NSAL-09-5, Rev. 1 for NAPS. The Dominion approach has these desirable aspects: 1) it addresses directly the issues of NSAL-09-5, Rev. 1; 2) it retains the existing TS surveillance scheme and structure; and 3) it retains the existing axial control calculational methodology (RPDC). By relocating the numerical values to the COLR,
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 11 of 16 Dominion's proposed resolution of NSAL-09-5 allows the required RPDC operating space (THERMAL POWER and AFD) reductions to be evaluated and modified on a cycle-specific basis. This proposed resolution is supported by current Dominion RPDC methods.
Specifically, the allowable operating space that applies to Required Action B.1 and 8.2 is relocated to the COLR. A new table, entitled "Required Operating Space Reductions for FQT(Z) Exceeding Its Limits," will be added to the COLR to quantify the required THERMAL POWER and AFD limits associated with different amounts of FQT(Z) margin improvement (1%, 2%, etc.). If LCO 3.2.1, Condition B is entered, the operating space as defined in the new COLR table will ensure that sufficient margin exists. COLR Table 3.2-3 below presents a sample of the proposed table to be included in the COLR.
The values provided in the sample table below are only intended to provide a representative example of typical reload values. The determination and verification of the required FQT(Z) margin improvements and the corresponding required reductions in the THERMAL POWER Limit and AFD Bands will be performed on a reload specific basis in accordance with the approved methodology of VEP-NE-1-A listed in Technical Specification 5.6.5.b.
COLR Table 3.2-3 Required Operating Space Reductions for FQT(Z) Exceeding Its Limits Required FQT(z) Margin     THERMAL POWER           Negative AFD             Positive AFD Improvement               Reduction           Band Reduction         Band Reduction
(%RTP)               (%AFD)                   (%AFD)
                    < %>3%                               >&#x17d;2.0%                   > 2.0%
      > 1% and*<2%                 >&#x17d;5%                 > 3.0%                   > 3.0%
      > 2% and <3%                   ___8%               __.3.5%                 >&#x17d;3.5%
            > 3%                   _&#x17d;50%                 N/A                       N/A 3.2 SR 3.2.1.1, SR 3.2.1.2 [new]     - Heat Flux Hot Channel Factor (FQ(Z))
The proposed changes to SR 3.2.1.1 address surveillance for FQE(Z), and the addition of new SR 3.2.1.2 addresses surveillance for FQT(Z). Specifying separate requirements for FQE(Z) and FQT(Z), iS consistent with treatment of the comparable terms F0 c(Z) and FQw(Z) in Standard Technical Specifications for Westinghouse plants (Reference 3).
The Note preceding SR 3.2.1.1 is deleted since it is not applicable to surveillance for the steady-state parameter FQE(z). It relates to considerations that apply only to conducting surveillance for the transient FQ(Z) limits.
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 12 of 16 Insert 3 describes proposed new SR 3.2.1.2 for FQT(Z), including a Note preceding SR 3.2.1.2 that describes the actions for the situation in which either FQE(Z) or FQT(Z) have increased since the last evaluation of FQ(Z) or are expected to increase prior to the next evaluation. Required Action A of the Note involves increasing FQT(Z) by the appropriate factor, as specified in the COLR, if the conditions concerning either FQE(Z) or FQT(Z) are met. This approach, although different in the details of application   from that recommended in Reference 2, has been deemed to be more suitable for use with       Dominion methods. The proposed SR 3.2.1 .2 has been confirmed by analysis with               Dominion methods for representative NAPS reload cores to ensure that FQE(Z) and             FQT(Z) will satisfy their respective limits and to resolve the issue -of undetected loss         of margin identified in Reference 2.
As applied by Dominion, SR 3.2.1.2 involves looking for increases in steady-state and transient, measured and predicted FQ(Z) to determine if the penalty factor should be applied. The application of the appropriate penalty factor will be required if any of the following conditions are met:
: 1. Increase in measured maximum FoE(Z,) I K(Z) from the previous surveillance,
: 2. Increase in measured maximum FQT(Z) I K(Z) from the previous surveillance,
: 3. Increase in predicted maximum FQE(Z) I K(Z) over the next surveillance period, or
: 4. Increase in predicted maximum FQT(Z) I K(Z) over the next surveillance period.
Cycle-specific analyses will be performed to determine the appropriate penalty factor required to accommodate potential increases in FQ(Z) over the surveillance period. SR 3.2.1.2 notes that the 'appropriate factor' will be specified in the COLR. This allows for the details of the appropriate penalty factors to be evaluated and modified on a cycle-specific basis. This revised surveillance requirement will ensure an appropriate analytical penalty factor is applied during performance of SR 3.2.1.2, which addresses the issues identified in NSAL-15-1 (Reference 2).
A new table, entitled "Penalty Factors for Flux Map Analysis," will be added to the COLR.
Table 3.2-2 below presents a sample of the proposed table to be included in the COLR. The values provided in the sample table below are only intended to provide a representative example of typical reload values. The determination and verification of the appropriate penalty factor will be performed on a reload specific basis in accordance with the approved methodology of VEP-NE-1-A listed in Technical Specification 5.6.5.b.
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5,   Rev. I and NSAL-1 5-1, Rev. 0 Attachment 1, Page 13 of 16 COLR Table 3.2-2 Penalty Factors for Flux Map Analysis Burnup         Surveillance (MWD/MTU)         Factor 0 -999           4.00%
1000 -1999         3.50%
2000 -2999         2.00%
3000 -3999         2.00%
4000 -4999         2.00%
5000 -6999         2.00%
7000 -8999         2.00%
9000 -10999         2.00%
11000 -12999         2.00%
13000 -14999         2.00%
15000 -16999         2.00%
17000 -18999         2.00%
19000 - EOR         2.00%
Subsequent to approval of this LAR, Dominion intends to process appropriate conforming changes, in the form of a modification (denoted VEP-NE-1, Rev. 0.2-A) to the RPDC topical report. These changes will reflect the adjustments discussed herein to address the issues in References 1 and 2. This modification will be prepared in accordance with Dominion's topical modification process, as provided for in our reload methods topical report VEP-FRD-42-A (Reference 7).


==4.0 REGULATORY EVALUATION==
==4.0 REGULATORY EVALUATION==


4.1 Applicable Regulatory Requirements and Criteria 10 CFR 50, Appendix B, General Design Criterion 10, which states: The reactor core and associated coolant, control, and protection systems shall be designed with appropriate margin to assure that specified acceptable fuel design limits are not exceeded during any condition of normal operation, including the effects of anticipated operational occurrences.
4.1   Applicable Regulatory Requirements and Criteria 10 CFR 50, Appendix B, General Design Criterion 10, which states:
10 CFR 50.36, Technical Specifications, paragraph (c)(2) states that technical specifications will include limiting conditions for operation.
The reactor core and associated coolant, control, and protection systems shall be designed with appropriate margin to assure that specified acceptable fuel design limits are not exceeded during any condition of normal operation, including the effects of anticipated operational occurrences.
Paragraph (c)(3) states that technical specifications will include surveillance requirements.
10 CFR 50.36, Technical Specifications, paragraph (c)(2) states that technical specifications will include limiting conditions for operation. Paragraph (c)(3) states that technical specifications will include surveillance requirements. Both of these paragraphs are applicable to the proposed change.
Both of these paragraphs are applicable to the proposed change.
 
Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and NSAL-15-1, Rev. 0 Attachment 1, Page 14 of 16 Section (c)(2)(ii)(B) provides that LCOs must be established for each item meeting one or more criteria.
Serial No: 15-494 Docket Nos.: 50-338/339 LAR   - NSAL-09-5, Rev. 1 and NSAL-15-1, Rev. 0 Attachment 1, Page 14 of 16 Section (c)(2)(ii)(B) provides that LCOs must be established for each item meeting one or more criteria. For the power distribution items affected by the proposed change, the following criterion applies:
For the power distribution items affected by the proposed change, the following criterion applies: (B) Criterion
(B) Criterion 2. A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. The association with the relevant design basis accident analysis is described below.
: 2. A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. The association with the relevant design basis accident analysis is described below.10 CFR 50.46, Acceptance Criteria For Emergency Core Cooling Systems For Light-Water Nuclear Power Reactors, establishes acceptable limits for the performance of emergency core cooling systems (ECCS), and requirements for the analytical models used to validate the performance.
10 CFR 50.46, Acceptance Criteria For Emergency Core Cooling Systems For Light-Water Nuclear Power Reactors, establishes acceptable limits for the performance of emergency core cooling systems (ECCS), and requirements for the analytical models used to validate the performance. The analyses of ECOS performance use various inputs and assumptions that reflect the conditions and features of a given plant. In accordance with North Anna TS 5.6.5.b, Core Operating Limits Report, the ECCS analysis establishes limits for FQ(Z), Heat Flux Hot Channel Factor, which is the subject of the proposed TS changes.
The analyses of ECOS performance use various inputs and assumptions that reflect the conditions and features of a given plant. In accordance with North Anna TS 5.6.5.b, Core Operating Limits Report, the ECCS analysis establishes limits for FQ(Z), Heat Flux Hot Channel Factor, which is the subject of the proposed TS changes.The proposed change maintains compliance with these requirements.
The proposed change maintains compliance with these requirements.
4.2 No Significant Hazards Consideration Dominion has evaluated whether a significant hazards consideration is involved with the proposed amendment by addressing the three standards set forth in 10 CFR 50.92,"Issuance of Amendment," as discussed below: 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
4.2   No Significant Hazards Consideration Dominion has evaluated whether a significant hazards consideration is involved with the proposed amendment by addressing the three standards set forth in 10 CFR 50.92, "Issuance of Amendment," as discussed below:
Response:
: 1. Does the proposed change involve a significant increase               in the probability or consequences of an accident previously evaluated?
No.The proposed change for resolution of Westinghouse notification documents NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 is intended to address deficiencies identified within the existing NAPS Technical Specifications and to return them to their as-designed function.Operation in accordance with the revised TS ensures that the assumptions for initial conditions of key parameter values in the safety analyses remain valid and does not result in actions that would increase the probability or consequences of any accident previously evaluated.
Response: No.
The proposed change for resolution of Westinghouse notification documents NSAL     5, Rev. 1 and NSAL-1 5-1, Rev. 0 is intended to address deficiencies identified within the existing NAPS Technical Specifications and to return them to their as-designed function.
Operation in accordance with the revised TS ensures that the assumptions for initial conditions of key parameter values in the safety analyses remain valid and does not result in actions that would increase the probability or consequences of any accident previously evaluated.
Therefore, the proposed amendment does not involve a significant increase in the probability or the consequences of any accident previously evaluated.
Therefore, the proposed amendment does not involve a significant increase in the probability or the consequences of any accident previously evaluated.
Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 15 of 16 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response:
No.Operation in accordance with the revised TS and its limits precludes new challenges to SSCs that might introduce a new type of accident.
All design and performance criteria will continue to be met and no new single failure mechanisms will be created. The proposed change for resolution of Westinghouse notification documents NSAL-09-5, Rev. 1 and NSAL-15-1, Rev. 0 does not involve the alteration of plant equipment or introduce unique operational modes or accident precursors.
It thus does not create the potential for a different kind of accident.Therefore, the proposed amendment does not create a new or different kind of accident from any accident previously evaluated.
: 3. Does the proposed change involve a significant reduction in a margin of safety?Response:
No.Operation in accordance with the revised TS and its limits preserves the margins assumed in the initial conditions for key parameters assumed in the safety analysis.
This ensures that all design and performance criteria associated with the safety analysis will continue to be met and that the margin of safety is not affected.Therefore, the proposed amendment does not involve a significant reduction in a margin of safety.Based on the above information, Dominion concludes that the proposed license amendment involves no significant hazards consideration under the criteria set forth in 10 CFR 50.92(c)and, accordingly, a finding of no significant hazards consideration is justified.
4.3 Precedents The proposed changes to the North Anna Units 1 and 2 TS are fundamentally the same as those in the following submittal associated with previous application of Dominion methods: 1. Letter from Mark D. Sartain (Dominion) to USNRC, "Millstone Power Station Unit 3 License Amendment Request to Adopt Dominion Core Design and Safety Analysis Methods and to Address the Issues Identified in Westinghouse Documents NSAL-09-5, Rev. 1, NSAL-1 5-1 and 06-1C-03," May 8, 2015 (ADAMS Accession No. ML15134A244).Precedent 1 included proposed TS changes that address each of the issues identified in References 1 and 2 in a comparable manner to those enclosed in this LAR. For both Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 16 of 16 Precedent 1 and this LAR, the proposed TS changes are compatible with Dominion reload core design methods.5.0 ENVIRONMENTAL CONSIDERATIONS Dominion has reviewed the proposed license amendment for environmental considerations.
The proposed license amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.
Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion from an environmental assessment as set forth in 10 CFR 51.22(c)(9).
Therefore, pursuant to 10 CFR 51 .22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.


==6.0 REFERENCES==
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 15 of 16
: 1. Westinghouse Nuclear Safety Advisory Letter, NSAL-09-5, Rev. 1, "Relaxed Axial Offset Control EQ Technical Specification Actions," September 23, 2009.2. Westinghouse Nuclear Safety Advisory Letter, NSAL-15-1, Rev. 0, "Heat Flux Hot Channel Factor Technical Specification Surveillance," February 3, 2015.3. NUREG-1431, Revision 4, Vol. 1 and 2, "Standard Technical Specifications
: 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
-Westinghouse Plants." 4. Topical Report, VEP-NE-1, Rev. 0.1-A, "VEPCO Relaxed Power Distribution Control Methodology and Associated FQ Surveillance Technical Specifications," August 2003.5. Westinghouse Notice 06-1C-03, "FQ and Fxy, Surveillance Zone Issue," February 21, 2006.6. WCAP-17661-P, Revision 1, "Improved RAOC and CAOC FQ Surveillance Technical Specifications," November 2013.7. Topical Report, VEP-FRD-42, Rev. 2.1-A, "Reload Nuclear Design Methodology," August 2003.
Response: No.
Serial No. 15-494 LAR -NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Docket Nos. 50-338/339 ATTACHMENT 2 MARKED-UP TECHNICAL SPECIFICATIONS PAGES Virginia Electric and Power Company (Dominion)
Operation in accordance with the revised TS and its limits precludes new challenges to SSCs that might introduce a new type of accident. All design and performance criteria will continue to be met and no new single failure mechanisms will be created. The proposed change for resolution of Westinghouse notification documents NSAL-09-5, Rev. 1 and NSAL-15-1, Rev. 0 does not involve the alteration of plant equipment or introduce unique operational modes or accident precursors. It thus does not create the potential for a different kind of accident.
North Anna Power Station Units 1 and 2 FQ(Z)3.2.1 3.2 POWER DISTRIBUTION LIMITS 3.2.1 Heat Flux Hot Channel Factor (FQ(Z)) ,,- FQE(Z)and FQ'(Z)1k LCO 3.2.1 FQ(Z), as approximated by , shall be within the limits specified in the COLR.APPLICABILITY:
Therefore, the proposed amendment does not create a new or different kind of accident from any accident previously evaluated.
MODE 1.ACTIONS CONDITIONNSRT"1']A. not within limit.REQUIRED ACTION COMPLETION TIME A1eADlimits
: 3. Does the proposed change involve a significant reduction in a margin of safety?
_> 1% 15 mi er" foreac-M(Z)FQ(Z) exeesliidetermi nat ionReduce THERMAL POWER1% RTP for each 1%AND A.-2-.2 Reduce Power Range Neutron Flux-High trip setpoints 1% for each 1% M AND A.f-..3 Reduce Overpower AT trip setpoints 1%for each 1%-F/-,,,-
Response: No.
cxcd limit.AND A.-2-.4 Perform SR 3.2.1.1 land SR 3.2.1.2 15 minutes after each -F~-+Z 4-determi nation IFQE(Z)72 hours after each -F --~----determi nation 72 hours after each 4-determination that THERMAL POWER is limited below RTP by Required Action A.1 Prior to increasing THERMAL POWER above the limit of Required Action A.f-..I North Anna Units 1 and 2 3211Aedet 3/1 3.2.1-I FQ(Z)3.2.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME---Required Action and -B-.I Be in MODE 2. 6 hoursassociated Completions SURVEILLANCE REQUIREMENTS
Operation in accordance with the revised TS and its limits preserves the margins assumed in the initial conditions for key parameters assumed in the safety analysis. This ensures that all design and performance criteria associated with the safety analysis will continue to be met and that the margin of safety is not affected.
------------------
Therefore, the proposed amendment does not involve a significant reduction in a margin of safety.
NOTE- ---------During power escalation, THERMAL POWER may be increased until a power level for extended operation has been achieved, at which a power distribution map is obtai ned.North Anna Units 1 and 2 3212Aedet 3/1 3.2.1-2 FQ(Z)3.2.1 SURVEILLANCE REQUIREMENTS SURVE IL LANCE FREQUENCY SR 3.2.1.1 IFoE(Z)-...NOTE---- --I F(Z) measurements indicate maximu over z LK-(Z)has increas ,d since the p iu eval uation o Z a. Increase by he appropriate factor and-verf F(Z) is still within limits;b. Repeat SR .21. ce per 7 EFPD until two cesv lux maps indicate maxium verz [ K~(Z)j]__as not Veri fy> --(ji s within limit.Once after each refueling prior to THERMAL POWER exceeding 75% RTP AND Once within 12 hours after achieving equilibrium conditions after exceeding, by10% RTP, the THERMAL POWER at waslat erifed~AND In accordance with the Surveil11ance Frequency Control Program North Anna Units 1 and 2 3.2.1-3 Aedet 6/4 INSERT "1"-~NOTE---Required Action A.4 shall be completed whenever this Condition is entered. SR 3.2.1.2 is not required to be performed if this Condition is entered prior to THERMAL POWER exceeding 75%RTP after a refueling.
Based on the above information, Dominion concludes that the proposed license amendment involves no significant hazards consideration under the criteria set forth in 10 CFR 50.92(c) and, accordingly, a finding of no significant hazards consideration is justified.
INSERT "2" ACTIONS CONDITION
4.3  Precedents The proposed changes to the North Anna Units 1 and 2 TS are fundamentally the same as those in the following submittal associated with previous application of Dominion methods:
[REQUIRED ACTION ]COMPLETION TIME B.----NOTE----...
: 1. Letter from Mark D. Sartain (Dominion) to USNRC, "Millstone Power Station Unit 3 License Amendment Request to Adopt Dominion Core Design and Safety Analysis Methods and to Address the Issues Identified in Westinghouse Documents NSAL-09-5, Rev. 1, NSAL-1 5-1 and 06-1C-03," May 8, 2015 (ADAMS Accession No. ML15134A244).
Required Action B.5 shall be completed whenever this Condition is entered.FQT(Z) not within limit.B.1 AND B.2 AND B.3 AND B.4 AND B.5 Reduce AFD limits as specified in the COLR.Reduce THERMAL POWER as specified in the COLR.Reduce Power Range Neutron Flux-High trip setpoints
Precedent 1 included proposed TS changes that address each of the issues identified in References 1 and 2 in a comparable manner to those enclosed in this LAR. For both
> 1 % for each 1 % that THERMAL POWER is limited below RTP by Required Action B.2.Reduce Overpower AT trip setpoints
 
> 1 % for each 1 % that THERMAL POWER is limited below RTP by Required Action B.2.Perform SR 3.2.1.1 and SR 3.2.1.2.4 hours after each FaT(Z) determination 4 hours after each FaT(Z) determination 72 hours after each FaT(Z) determination 72 hours after each FQT(z) determination Prior to increasing THERMAL POWER and AFD limits above the limits of Required Actions B.1 and B.2 INSERT "3" SURVEILLANCE FREQUENCY SR 3.2.1.2-~~~NOTE-----------
Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 16 of 16 Precedent 1 and this LAR, the proposed TS changes are compatible with Dominion reload core design methods.
If measurements indicate that either the maximum over z [n()]1 OR maximum over z [ K(z)].has increased since the previous evaluation of FQ(Z)or is expected to increase prior to the next evaluation:
 
A. Increase FQT(Z) by the appropriate factor, as specified in the COLR, and verify FQT(z) is still within limits or B. Repeat SR 3.2.1.2 once per 7 EFPD until a. Above (A) is met or b. Two successive flux maps indicate that the maximum over z [FK(Z)]J AND maximum over z [nK~)has not increased.
==5.0    ENVIRONMENTAL CONSIDERATION==
Verify FQT(Z) is within limit.Once after each refueling within 12 hours after achieving equilibrium conditions after THERMAL POWER exceeds 75% RTP AND Once within 12 hours after achieving equilibrium conditions after exceeding, by> 10% RTP, the THERMAL POWER at which FoT(z)was last verified AND In accordance with the Surveillance Frequency Control Program Serial No. 15-494 LAR -NSAL-09-5, Rev. 1 and NSAL-15-1 Docket Nos. 50-338/339 ATTACHMENT 3 PROPOSED TECHNICAL SPECIFICATIONS PAGES Virginia Electric and Power Company (Dominion)
S Dominion has reviewed the proposed license amendment for environmental considerations.
North Anna Power Station Units 1 and 2 FQ(Z)3.2.1 3.2 POWER DISTRIBUTION LIMITS 3.2.1 Heat Flux Hot Channel Factor (FQ(Z))LCO 3.2.1 APPLICABILITY:
The proposed license amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.          Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion from an environmental assessment as set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51 .22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
FQ(Z) , as approximated by FQE (Z) and FQT (Z), shall be within the limits specified in the COLR.MODE 1.ACTIONS CONDITION
 
] REQUIRED ACTION TCOMPLETION TIME A.------NOTE---
==6.0    REFERENCES==
--Required Action A.4 shall be completed whenever this Condition is entered. SR 3.2.1.2 is not required to be performed if this Condition is entered prior to THERMAL POWER exceeding 75% RTP after a refueling.
: 1. Westinghouse Nuclear Safety Advisory Letter, NSAL-09-5, Rev. 1, "Relaxed Axial Offset Control EQ Technical Specification Actions," September 23, 2009.
FQE (7) not within limit.A.I Reduce THERMAL POWER1% RTP for each 1%FQE (Z) exceeds limit.15 minutes after each FeE (7)determi nati on AND A.2 Reduce Power Range Neutron Flux-High trip setpoints 1%for each 1% that THERMAL POWER is limited below RTP by Required Action A.I.AND A.3 Reduce Overpower AT trip setpoints 1%for each 1% that THERMAL POWER is limited below RTP by Required Action A.1.AND A.4 Perform SR 3.2.1.1 and SR 3.2.1.2.72 hours afteY FQE (Z)determi nati on r each 72 hours after each FQE (Z)determi nati on Prior to increasing THERMAL POWER above the limit of Required Action A.I I North Anna Units 1 and 2 3211Aedet 3.2.1-1 Amendments FQ(Z)3.2.1 ACTIONS CONDITION
: 2. Westinghouse Nuclear Safety Advisory Letter, NSAL-15-1, Rev. 0, "Heat Flux Hot Channel Factor Technical Specification Surveillance," February 3, 2015.
]R EQUIRED ACTION COMPLETION TIME B.------NOTE-  
: 3. NUREG-1431, Revision 4, Vol. 1 and 2, "Standard Technical Specifications                -
---Required Action B.5 shall be completed whenever this Condition is entered.B.I Reduce AFD limits as specified in the COLR, FQT (Z) not within limit.AND B,2 Reduce THERMAL POWER as specified in the COLR.AND B.3 Reduce Power Range Neutron Flux-High trip setpoints  
Westinghouse Plants."
> 1%for each 1% that THERMAL POWER is limited below RTP by Required Action B.2 AND B,4 Reduce Overpower AT trip setpoints  
: 4. Topical Report, VEP-NE-1, Rev. 0.1-A, "VEPCO Relaxed Power Distribution Control Methodology and Associated FQ Surveillance Technical Specifications," August 2003.
> 1%for each 1% that THERMAL POWER is limited below RTP by Required Action B.2.AND B.5 Perform SR 3.2.1.1 and SR 3.2.1.2.4 hours after each FQT (7)determi nati on 4 hours after each FQT (Z)determi nati on 72 hours after each FQT (Z)determi nati on 72 hours after each FQT (Z)determi nati on Prior to increasing THERMAL POWER and AFD limits above the limits of Required Actions B.I and B.2.C. Required Action and }C.1 Be in MODE 2. 6 hours associated Completion Time not met.,______________
: 5. Westinghouse Notice 06-1C-03, "FQ and Fxy, Surveillance Zone Issue," February 21, 2006.
_________North Anna Units 1 and 2 3212Aedet 3,2.1-2 Amendments FQ(Z)3.2.1 SURVEILLANCE REQUIREMENTS
: 6. WCAP-17661-P, Revision 1, "Improved RAOC and CAOC FQ Surveillance Technical Specifications," November 2013.
-- ------------------ NOTE ----------During power escalation, THERMAL POWER may be increased until a power level for extended operation has been achieved, at which a power distribution map is obtained.SURVEILLANCE REQUIREMENTS
: 7. Topical Report, VEP-FRD-42, Rev. 2.1-A, "Reload Nuclear Design Methodology,"
_____________
August 2003.
SURVEILLANCE FREQUENCY SR 3.2.1.1 Verify FQ (Z) is within limit. Once after each refueling prior to THERMAL POWER exceeding 75% RTP AND Once within 12 hours after achieving equilibrium conditions after exceeding, by10% RTP, the THERMAL POWER at which FQE (Z)was last verified AND In accordance with the Surveillance Frequency Control Program North Anna Units 1 and 2 3213Aedet 3.2.1-3 Amendments FQ(Z)3.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY+SR 3.2.1.2-NOTE-If measurements indicate that either the maximum over z OR maximum over z1 LK(Z) j1 has increased since the previous evaluation of FQ (7) or is expected to increase prior to the next evaluation:
 
A. Increase FQT (7) by the appropriate factor, as specified in the COLR, and verify FQT (7)is still within limits or B. Repeat SR 3.2.1.2 once per 7 EFPD until1 a. Above (A) is met or b. Two successive flux maps indicate that the maximum over z AND maximum over z SFQ(Z)]K(Z) j has not increased.(conti nued)North Anna Units 1 and 2 3214Aedet 3.2.1-4 Amendments FQ(Z)3.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.1.2 (conti nued)Verify FQT (Z) is within limit.Once after each refueling within 12 hours after achieving equilibrium conditions after THERMAL POWER exceeds 75% RTP AND Once within 12 hours after achieving equilibrium conditions after exceeding, by10% RTP, the THERMAL POWER at which FQT (Z)was last verified AND In accordance with the Surveillance Frequency Control Program North Anna Units 1 and 2 3215Aedet 3.2.1-5 Amendments Intentionally Blank Serial No. 15-494 LAR -NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Docket Nos. 50-338/339 ATTACHMENT 4 MARKED-UP AND PROPOSED TECHNICAL SPECIFICATIONS BASES PAGES (for information only)Virginia Electric and Power Company (Dominion)
Serial No. 15-494 LAR - NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Docket Nos. 50-338/339 ATTACHMENT 2 MARKED-UP TECHNICAL SPECIFICATIONS PAGES Virginia Electric and Power Company (Dominion)
North Anna Power Station Units 1 and 2 FQ(Z)B 3.2.1 B 3.2 POWER DISTRIBUTION LIMITS B 3.2.1 Heat Flux Hot Channel Factor (FQ(Z))BASES BACKGROUND FQ(Z) is approximated by FQE(Z) and FaT(Z). FQE(Z)is defined as the measured value of FQ(Z), incorporating manufacturing tolerances and measurement uncertainties.
North Anna Power Station Units 1 and 2
FaT(Z) is defined as the FQE(Z)incorporating a non-equilibrium factor that accounts for possible power distribution transients during normal operation.
 
The purpose of the limits on the values of FQ(Z) is to limit the local (i.e., pellet) peak power density. The value of FQ(Z) varies along the axial height (Z) of the core.FQ(Z) is defined as the maximum local fuel rod linear power density divided by the average fuel rod linear power density, assuming nominal fuel pellet and fuel rod dimensions.
FQ(Z) 3.2.1 3.2  POWER DISTRIBUTION LIMITS 3.2.1      Heat Flux Hot Channel Factor (FQ(Z))          ,,- FQE(Z)and FQ'(Z) 1k LCO  3.2.1         FQ(Z), as approximated by specified in the COLR.
Therefore, FQ(Z) is a measure of the peak fuel pellet power within the reactor core.During power operation, the global power distribution is limited by LCO 3.2.3, "AXIAL FLUX DIFFERENCE (AFD)," and LCO 3.2.4, "QUADRANT POWER TILT RATIO (QPTR)," which are directly and continuously measured process variables.
                                                    -f*-~ ,  shall be within the limits APPLICABILITY:      MODE 1.
These LCOs, along with LCO 3.1.6, "Control Bank Insertion Limits," maintain the core limits on power distributions on a continuous basis.FQ(Z) varies with fuel loading patterns, control bank insertion, fuel burnup, and changes in axial power distribution.
ACTIONS CONDITION                      REQUIRED ACTION            COMPLETION TIME
FQ(Z) is measured periodically using the incore detector system. These measurements are generally taken with the core at or near steady state conditions.
        /*I NSRT"1']
Using the measured three dimensional power distributions, it Isteady-state F 0 (Z),I is possible to derive a measure val1 foFQ)rt\IFQE(Z)I However, because this value represents a steady state condition, it does not encompass the variations in the value of FQ(Z) that are present during nonequilibrium situations, such as load changes.To account for these possible variations, the steady state.........e\ is" adjusted by an elevation dependent factor-.that accounts for the calculated worst case transient conditions itO derive FaT(Z) Ii Core monitoring and control under nonsteady state conditions are accomplished by operating the core within the limits of the appropriate LC~s, including the limits on AFD, QPTR, and control rod insertion.
A.  -F-.Z* not within          A1eADlimits                      _>1% 15 mi              er" limit.                          foreac-M(Z)FQ(Z) exeesliidetermi                      nation A.-Z*. Reduce THERMAL POWER      15 minutes after
North Anna Units 1 and 2 B3211Rvso B 3.2.1-1 Revision 0 FQ(Z)B 3.2.1 BASES APPLICABLE This LCO precludes core power distributions that violate the SAFETY ANALYSES following fuel design criteria: a. During a loss of coolant accident (LOCA), the peak cladding temperature during a small break LOCA must not exceed 2200&deg;F, and there must be a high level of probability that the peak cladding temperature does not exceed 2200 0 F for the large breaks (Ref. 1);b. During a loss of forced reactor coolant flow accident, there must be at least 95% probability at the 95%confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a departure from nucleate boiling (DNB) condition;
                                            &#x17d;1% RTP for each 1%        each -F~-+Z 4-        IFQE(Z) determi nation AND A.-2-.2    Reduce Power Range        72 hours after Neutron Flux-High trip    each -F -- ~----
: c. During an ejected rod accident, the energy deposition to unirradiated fuel is limited to 225 cal/gm and irradiated fuel is limited to 200 cal/gm (Ref. 2); and d. The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest worth control rod stuck fully withdrawn (Ref. 3).Limits on Fo(7) ensure that the value of the initial total peaking factor assumed in the accident analyses remains valid. Other criteria must also be met (e.g., maximum cladding oxidation, maximum hydrogen generation, coolable geometry, and long term cooling).
setpoints &#x17d; 1% for        determi nation each 1% M AND A.f-..3    Reduce Overpower AT        72 hours after trip setpoints &#x17d; 1%       each f*()        4-for each 1%-F/-,,,- determination cxcd limit.                    that THERMAL POWER AND                                is limited below RTP by Required Action A.1 A.-2-.4   Perform SR 3.2.1.1        Prior to increasing land SR 3.2.1.2            THERMAL POWER above the limit of Required Action A.f-..I North Anna Units 1 and 2                  3.2.1-I 3211Aedet                                  3/1
However, the peak cladding temperature is typically most limiting.Fo (Z) limits assumed in the LOCA analysis are typically limiting relative to (i.e., lower than) the FQ(Z) limit assumed in safety analyses for other postulated accidents.
 
FQ(Z) 3.2.1 ACTIONS CONDITION                 REQUIRED ACTION         COMPLETION TIME
---   Required Action and    -B-.I  Be in MODE 2.          6 hours I* associated Completions SURVEILLANCE REQUIREMENTS
          ------------------          NOTE-   -   - -  -    -  -  -  --
During power escalation, THERMAL POWER may be increased until a power level for extended operation has been achieved, at which a power distribution map is obtai ned.
North Anna Units 1 and 2            3212Aedet 3.2.1-2                              3/1
 
FQ(Z) 3.2.1 SURVEILLANCE REQUIREMENTS SURVE ILLANCE                            FREQUENCY SR  3.2.1.1 I F(Z) measurements indicate
                                            -...
NOTE----      --
maximu    over z LK-(Z) has increas ,d since the p        iu eval uation o        Z
: a. Increase F*(    by he appropriate factor and-verf F(Z) is still within limits;
: b. Repeat SR     .21.     ce per 7 EFPD until two    cesv        lux maps indicate maxium verz  [
__as not increased'.*
K~(Z)j]
IFoE(Z)   Veri fy>-- (ji s within limit.            Once after each refueling prior to THERMAL POWER exceeding 75% RTP AND Once within 12 hours after achieving equilibrium conditions after exceeding, by
                                                          &#x17d;10% RTP, the THERMAL POWER at whicl+W(+*
waslat erifed~
AND In accordance with the Surveil11ance Frequency Control Program North Anna Units 1 and 2               3.2.1-3                Aedet        6/4
 
INSERT "1"
                                                            -~NOTE---
Required Action A.4 shall be completed whenever this Condition is entered. SR 3.2.1.2 is not required to be performed if this Condition is entered prior to THERMAL POWER exceeding 75%
RTP after a refueling.
INSERT "2" ACTIONS CONDITION          [REQUIRED                ACTION            ]COMPLETION TIME B.----NOTE----...        B.1    Reduce AFD limits as specified in 4 hours after each Required Action B.5          the COLR.                            FaT(Z) determination shall be completed    AND whenever this          B.2     Reduce THERMAL POWER as            4 hours after each Condition is entered.         specified in the COLR.               FaT(Z) determination AND FQT(Z) not within      B.3    Reduce Power Range Neutron          72 hours after each limit.                         Flux-High trip setpoints > 1 % for  FaT(Z) determination each 1 % that THERMAL POWER is limited below RTP by Required Action B.2.
AND B.4    Reduce Overpower AT trip            72 hours after each setpoints > 1% for each 1% that      FQT(z) determination THERMAL POWER is limited below RTP by Required Action B.2.
AND B.5   Perform SR 3.2.1.1 and SR            Prior to increasing 3.2.1.2.                            THERMAL POWER and AFD limits above the limits of Required Actions B.1 and B.2
 
INSERT "3" SURVEILLANCE                                      FREQUENCY SR 3.2.1.2                           -~~~NOTE-----------
If measurements indicate that either the maximum over z      [n()]1 OR maximum over z [ K(z)].
has increased since the previous evaluation of FQ(Z) or is expected to increase prior to the next evaluation:
A. Increase FQT(Z) by the appropriate factor, as specified in the COLR, and verify FQT(z) is still within limits or B. Repeat SR 3.2.1.2 once per 7 EFPD until
: a. Above (A) is met or
: b. Two successive flux maps indicate that the    Once after each refueling within 12 hours maximum over z [FK(Z)]J                      after achieving equilibrium conditions after
[nK~)
AND                                          THERMAL POWER exceeds 75% RTP maximum over z has not increased.                           AND Once within 12 hours after achieving Verify FQT(Z) is within limit.                         equilibrium conditions after exceeding, by
                                                                  > 10% RTP, the THERMAL POWER at which FoT(z) was last verified AND In accordance with the Surveillance Frequency Control Program
 
Serial No. 15-494 LAR - NSAL-09-5, Rev. 1 and NSAL-15-1 Docket Nos. 50-338/339 ATTACHMENT 3 PROPOSED TECHNICAL SPECIFICATIONS PAGES Virginia Electric and Power Company (Dominion)
North Anna Power Station Units 1 and 2
 
FQ(Z) 3.2.1 3.2  POWER DISTRIBUTION LIMITS 3.2.1     Heat Flux Hot Channel Factor (FQ(Z))
LCO  3.2.1       FQ(Z) , as approximated the limits  specified in bytheFQECOLR.
(Z) and FQT (Z),  shall be within APPLICABILITY:    MODE 1.
ACTIONS CONDITION        ]          REQUIRED ACTION          TCOMPLE          TIME A.------NOTE---           --     A.I    Reduce THERMAL POWER      15 minutes after Required Action A.4                &#x17d;1% RTP for each 1%      each FeE (7) shall be completed                   FQE (Z) exceeds limit. determi nati on whenever this Condition is entered. SR 3.2.1.2 is not required to be          AND performed if this A.2     Reduce Power Range        72 hours afteYr each Condition is entered Neutron Flux-High         FQE (Z) prior to THERMAL POWER exceeding 75% RTP after            trip setpoints &#x17d; 1%       determi nati on a refueling.                        for each 1% that THERMAL POWER is limited below RTP by FQE (7) not within Required Action A.I.
limit.
AND A.3      Reduce Overpower AT       72 hours after each trip setpoints &#x17d; 1%       FQE (Z) for each 1% that         determi nati on THERMAL POWER is limited below RTP by Required Action A.1.
AND A.4      Perform SR 3.2.1.1       Prior to increasing and SR 3.2.1.2.           THERMAL POWER above the limit of Required Action A.I I
North Anna Units 1 and 2              3.2.1-1 3211Aedet                    Amendments
 
FQ(Z) 3.2.1 ACTIONS CONDITION          ]R    EQUIRED ACTION              COMPLETION TIME B.------NOTE-        ---    B.I    Reduce AFD limits as 4 hours after each Required Action B.5              specified in the    FQT (7) shall be completed              COLR,                determi nati on whenever this Condition is entered.
AND B,2     Reduce THERMAL POWER 4 hours after each FQT (Z) not within              as specified in the  FQT (Z) limit.
COLR.               determi nati on AND B.3    Reduce Power Range  72 hours after each Neutron Flux-High    FQT (Z) trip setpoints > 1%  determi nati on for each 1% that THERMAL POWER is limited below RTP by Required Action B.2 AND B,4    Reduce Overpower AT  72 hours after each trip setpoints > 1%  FQT (Z) for each 1% that    determi nati on THERMAL POWER is limited below RTP by Required Action B.2.
AND B.5    Perform SR 3.2.1.1 Prior to increasing and SR 3.2.1.2.     THERMAL POWER and AFD limits above the limits of Required Actions B.I and B.2.
C. Required Action and associated Completion
                            }C.1    Be in MODE 2.        6 hours Time not met.,______________                            _________
North Anna Units 1 and 2            3,2.1-2 3212Aedet              Amendments
 
FQ(Z) 3.2.1 SURVEILLANCE REQUIREMENTS
          -- - - - - - - - - -  - - -  - - - --  NOTE  -  -    -  -        -      -  -    - -    -
During power escalation, THERMAL POWER may be increased until a power level for extended operation has been achieved,               at which a power distribution map is obtained.
SURVEILLANCE REQUIREMENTS                                            _____________
SURVEILLANCE                                        FREQUENCY SR 3.2.1.1            Verify FQ (Z) is within limit.               Once after each refueling prior to THERMAL POWER exceeding 75% RTP AND Once within 12 hours after achieving equilibrium conditions after exceeding, by
                                                                      &#x17d;10% RTP, the THERMAL POWER at which FQE (Z) was last verified AND In accordance with the Surveillance Frequency Control Program North Anna Units 1 and 2                       3213Aedet 3.2.1-3                          Amendments
 
FQ(Z) 3.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                 FREQUENCY
                                                          +
SR 3.2.1.2                               -NOTE-If measurements indicate that either the maximum over z    LK(Z)
SFQ*Z) 1 j
OR FQ*Z) 1 maximum over z has increased of since FQ (7) the   previous evaluation                or is  expected to increase prior to the next evaluation:
A. Increase FQT (7) by the appropriate factor, as specified in the COLR, and verify FQT (7) is  still within limits or B. Repeat SR 3.2.1.2 once per 7 EFPD until1
: a. Above (A) is met or
: b. Two successive flux maps indicate that the maximum over z SFQ(Z)]
AND maximum over z      K(Z)   j has not increased.
(conti nued)
North Anna Units 1 and 2               3.2.1-4 3214Aedet                  Amendments
 
FQ(Z) 3.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                      FREQUENCY SR  3.2.1.2    (conti nued)
Verify FQT (Z) is within limit.
Once after each refueling within 12 hours after achieving equilibrium conditions after THERMAL POWER exceeds 75% RTP AND Once within 12 hours after achieving equilibrium conditions after exceeding, by
                                                &#x17d;10% RTP, the THERMAL POWER at which FQT (Z) was last verified AND In accordance with the Surveillance Frequency Control Program North Anna Units 1 and 2            3.2.1-5 3215Aedet        Amendments
 
Intentionally Blank Serial No. 15-494 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Docket Nos. 50-338/339 ATTACHMENT 4 MARKED-UP AND PROPOSED TECHNICAL SPECIFICATIONS BASES PAGES (for information only)
Virginia Electric and Power Company (Dominion)
North Anna Power Station Units 1 and 2
 
FQ(Z)
B 3.2.1 B 3.2  POWER DISTRIBUTION LIMITS B 3.2.1    Heat Flux Hot Channel Factor (FQ(Z))
BASES BACKGROUND          The the purpose          of thepellet) limits on the values of FQ(Z) is to limit local (i.e.,                  peak power density. The value of FQ(Z) is approximated by       FQ(Z) varies along the axial height (Z) of the core.
FQE(Z) and FaT(Z). FQE(Z) is defined as the             FQ(Z) is defined as the maximum local fuel rod linear power measured value of FQ(Z),      density divided by the average fuel rod linear power density, assuming nominal fuel pellet and fuel rod incorporating                  dimensions. Therefore, FQ(Z) is a measure of the peak fuel manufacturing tolerances      pellet power within the reactor core.
and measurement uncertainties. FaT(Z) is      During power operation, the global power distribution is limited by LCO 3.2.3, "AXIAL FLUX DIFFERENCE (AFD)," and defined as the FQE(Z)          LCO 3.2.4, "QUADRANT POWER TILT RATIO (QPTR)," which are incorporating a non-           directly and continuously measured process variables. These equilibrium factor that       LCOs, along with LCO 3.1.6, "Control Bank Insertion Limits,"
maintain the core limits on power distributions on a accounts for possible          continuous basis.
power distribution transients during normal      FQ(Z) varies with fuel loading patterns, control bank operation.                    insertion, fuel burnup, and changes in axial power distribution.
FQ(Z) system.is These  measured  periodically  using the incore detector measurements  are generally  taken with the core at or near steady state conditions.
Isteady-state F0 (Z),I        Using is        the measured possible                three to derive    dimensional a measure  val1 power distributions, it foFQ)rt\
IFQE(Z)I              However, because this value represents a steady state condition, it does not encompass the variations in the value of FQ(Z) that are present during nonequilibrium situations, such as load changes.
To account for these possible variations, the steady state
                                      ......... e\    is"adjusted by an elevation dependent factor
                  *-.
* that accounts for the calculated worst case transient conditions itO derive FaT(Z)    Ii    Core monitoring and control under nonsteady state conditions are accomplished by operating the core within the limits of the appropriate LC~s, including the limits on AFD, QPTR, and control rod insertion.
North Anna Units 1 and 2                      B 3.2.1-1 B3211Rvso                              Revision 0
 
FQ(Z)
B 3.2.1 BASES APPLICABLE        This LCO precludes core power distributions that violate the SAFETY ANALYSES    following fuel design criteria:
: a. During a loss of coolant accident (LOCA), the peak cladding temperature during a small break LOCA must not exceed 2200&deg;F, and there must be a high level of probability that the peak cladding temperature does not exceed 2200 0 F for the large breaks (Ref. 1);
: b. During a loss of forced reactor coolant flow accident, there must be at least 95% probability at the 95%
confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a departure from nucleate boiling (DNB) condition;
: c. During an ejected rod accident, the energy deposition to unirradiated fuel is limited to 225 cal/gm and irradiated fuel is limited to 200 cal/gm (Ref. 2); and
: d. The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest worth control rod stuck fully withdrawn (Ref. 3).
Limits on Fo(7) ensure that the value of the initial total peaking factor assumed in the accident analyses remains valid. Other criteria must also be met (e.g., maximum cladding oxidation, maximum hydrogen generation, coolable geometry, and long term cooling). However, the peak cladding temperature is typically most limiting.
Fo (Z) limits assumed in the LOCA analysis are typically limiting relative to (i.e., lower than) the FQ(Z) limit assumed in safety analyses for other postulated accidents.
Therefore, this LCO provides conservative limits for other postulated accidents.
Therefore, this LCO provides conservative limits for other postulated accidents.
FQ(Z) satisfies Criterion 2 of 10 CFR 50.36(c) (2) (ii).North Anna Units 1 and 2B321-Reion 3 B 3.2.1-2 Revision 13 FQ(Z)B 3.2.1 BASES NE[CO Heat Flux Hot Channel Factor, f-Ft), shall be limited by the following relationships, asu=, dec ....bad Ifor where: CFQ is the FQ(Z) limit at RTP provided in the COLR, K(Z) is the normalized F (Z) as a function of core height provided in the CObLR, cedependent function tha s ra " nontered I o " included in the FQ(Z) is approximated by FQE(Z) and FQT(Z). Thus, both FQE(Z) and FQT(Z) must meet the preceding limits on FQ(Z).P is the fraction of RATED THERMAL POWER defined as=THERMAL POWER--The actual values of CF, K(Z), an ()aegven in the\COLR; however, CFQ is normally approximately
FQ(Z) satisfies Criterion 2 of 10 CFR 50.36(c) (2) (ii).
: 2. (Z) s ar-\ function that looks like the one provided in I FQ(Z) evluaionrequires obtaining an incore flux map in MEI.From the incore flux map results we obtain the au measured value of FQ(Z). Then, the measured increased by 1.03 which is a factor that accounts for fuel manufacturing tolerances and 1.05 which accounts for flux I NER 4" measurement unetit o banFEZ The FQ(Z) limits define limiting values for core power peaking that precludes peak cladding temperatures above 2200&deg;F during a small break LOCA and assures with a high level of probability that the peak cladding temperature does not exceed 2200&deg;F for large breaks (Ref. 1).This LCO requires operation within the bounds assumed in the safety analyses.
North Anna Units 1 and 2B321-Reion   B 3.2.1-2                       Revision 13 3
Calculations are performed in the core design process to confirm that the core can be controlled in (conti nued)North Anna Units 1 and 2B321-Reion3 B 3.2.1-3 Revision 13 FQ(Z)B 3.2.1 BASES LCO (conti nued)such a manner during operation that it can stay within the LOCA "Ft'cQ/(''
 
limits.. .= If FQ(Z ......~ i^ ma-inta-.^d  
FQ(Z)
,.,ih-n th..r::::r:r7
B 3.2.1 BASES NE
:III~2r'i~ rcguir~u.Violating the LCO limits for FQ(Z) produces unacceptable consequences if a design basis event occurs while FQ(Z) is outside its specified limits.APPLICABILITY The FQ(Z) limits must be maintained in MODE 1 to prevent core power distributions from exceeding the limits assumed in the safety analyses.
[CO                   The*-*M-~ued- Heat Flux Hot Channel Factor, f-Ft), shall be limited by the following relationships, asu=,     .... bad dec Ifor where:     CFQ is the FQ(Z) limit at RTP provided in the COLR, K(Z) is the normalized F (Z) as a function of core height provided in the CObLR, s cedependentra function
Applicability in other MODES is not required because there is either insufficient stored energy in the fuel or insufficient energy being transferred to the reactor coolant to require a limit on the distribution of core power.ACTIONS occurred, oepain r r texceeded.
                                                                                  "        tha nontered I o"             included in the P is the fraction of RATED THERMAL POWER defined as
The maximum AFD limits initil by Req d Action A.1 may be affce euntdtriains o MZ)and would require rdcin ih1 iue fteF-~i. AP--1 R~ducing THERMAL POWER by  1% RTP for each 1% by which 4r,-fZ-)-exceeds its limit, maintains an acceptable absolute power density. The percent the limit can-l1.O}x 100 for P > 0.5 100 for P  0.5 (conti nued)North Anna Units 1 and 2B3.1-Reion 3 B 3.2.1-4 Revision 13 FQ(Z)B3.2.1 BASES ACTIONS A.-1. (continued)
                                                          =THERMAL  POWER FQ(Z) is approximated by FQE(Z) and FQT(Z). Thus, both     -- *The actual values of CF, K(Z), an          ()aegven in the FQE(Z) and FQT(Z) must meet       \COLR; however, CFQ is normally approximately 2. (Z) s ar-the preceding limits on FQ(Z).     \ function that looks like the one provided in I FQ(Z)
QE(ZI- -......->-F~-*)is the measured FQ(Z) multiplied by factors accounting for manufacturing tolerances and measurement uncertainties.
An_*      evluaionrequires MEI.From  the incore flux  obtaining map resultsan we incore obtainflux themap in au measured value of FQ(Z). Then, the measured *-}r-Z-Y.-..s increased by 1.03 which is a factor that accounts for fuel manufacturing tolerances and 1.05 which accounts for flux I NER 4"
FM(Z) t,,e ,,=ou= ,ahe u, ,(Z). The Completion Time of 15 minutes provides an acceptable time to reduce power in an orderly manner and without allowing the unit to remain in an unacceptable condition for an extended period of time. The maximum allowable power level initially determined by Required Action A.-t.I may be affected by subsequent determinations would require power reductions within 15 minutegof if necessary to comply with the decr~ased maximum allowable power level.Decreases iricF-(*)would allow increasing the maximum allowable po~ler level and increasing power up to this revised limit.Ithat THERMAL POWER is limited A.--f.2 Ibelow RTP by Required Action A.1 A reduction of the Power Range Neutron Flux-High trip setpoints by > 1% for each 1% by ,which .....d liz _.--im-it, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions.
* measurement unetit                           o banFEZ The FQ(Z) limits define limiting values for core power peaking that precludes peak cladding temperatures above 2200&deg;F during a small break LOCA and assures with a high level of probability that the peak cladding temperature does not exceed 2200&deg;F for large breaks (Ref. 1).
The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER in accordance with Required Action The maximum allowable Power Range Neutron Flux-High trip setpoints initially determined by Required Action A.-2-,2 may be affected by subsequent determinations of-.zF-~-and would require Power Range Neutron Flux-High trip setpoint reductions within 72 hours of if necessary to comply with the decr'6ased maximum allowable Power Range Neutron Flux-High trip setpoints.
This LCO requires operation within the bounds assumed in the safety analyses. Calculations are performed in the core design process to confirm that the core can be controlled in (conti nued)
Decreases in>_-FZ-(-_4 would allow increasing the maximum allowable Power Range Neutron Flux-High trip setpoints.
North Anna Units 1 and 2B321-Reion3     B 3.2.1-3                             Revision 13
A .-4-. 3 Reduction in the Overpower AT trip setpoints (value of K 4) by1% (in AT span) for each 1% by which exceeds itz<-++w+t, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions.
 
The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period, and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.-2..1. The (conti nued)North Anna Units 1 and 2B3.1-Reion 3 B 3.2.1-5 FQ(Z)B 3.2.1 BASES ACTIONS[FoE(Z)I A.-2-.3 (continued) maximum allowable Overpower AT trip setpoints initially determined by Required Action may be affected by subsequent determinations o~f~ftand would require Overpower AT trip setpoint r~ductions within 72 hours of thedetermination, if necessary to comply with the decreased maximum allowable Overpower AT trip setpoints.
FQ(Z)
Decreases i -.{)would allow increasing the maximum Overpower AT trip setpoints.
B 3.2.1 BASES LCO               such LOCA a"Ft'cQ/(''
A f.A i-tA/-and SR 3.2121 Verification thatl.F-,)-has bee rerestored, to within, its limit, by perforrifng SR 3.2.1.1 prior to increasing THERMAL POWER above the limit imposed by Required Action A."Z1., ensures that core conditions during operation at higher power levels are consistent with safety analyses assumptions.
manner      during operation           that it can stay within the (conti nued)                      limits.. .=If FQ(Z       ......   ~i^ ma-inta-.^d ,.,ih-n th..
-_--1 I--A. 1 through A.4 and B. 1 through B.5I If Required Actions A.I, A.2.1, A.2.2, A.2.3, or A.2.1 are not met within their associated Completion Times, the unit must be placed in a MODE or condition in which the LCO requirements are not applicable.
r::::r:r7       :III~2r' i~ rcguir~u.
This is done by placing the unit in at least MODE 2 within 6 hours.This allowed Completion Time is reasonable based on SURVEILLANCE SR 3.2.1.1 4-modified by a Note. It states that THERMAL REQUIREMENTS POWER may be increased until a power level for extended operation has been achieved at which a power distribution map can be obtained.
Violating consequences    the ifLCOa limits design for basisFQ(Z)   eventproduces occurs unacceptable while FQ(Z) is outside its specified limits.
This allowance is modified, however, by one of the Frequency conditions that requires verification FQZ tha f+-is within its specified limit after a power rise IFQ~z I I of ore than 10% RTP over the THERMAL POWER at which it was I last verified to be within specified limits. In the absence I of this Frequency condition, it is possible to increase I power to RTP and operate for 31 days without verification of 44..*. The Frequency condition is not intended to require"verification of these parameters after every 10% increase in power level above the last verification.
APPLICABILITY     The FQ(Z) limits must be maintained in MODE 1 to prevent core power distributions from exceeding the limits assumed in the safety analyses. Applicability in other MODES is not required because there is either insufficient stored energy in the fuel or insufficient energy being transferred to the reactor coolant to require a limit on the distribution of core power.
It only requires (continued)
ACTIONS occurred, oepain                         r r             texceeded. The maximum AFD limits initilaL.-*etermined by Req                           d Action A.1 may be affce                     euntdtriains o                         MZ)and       would require           rdcin           ih1             iue         fteF
North Anna Units 1 and 2B321-Reion3 B 3.2.1-6 Revision 13 FQ(Z)B 3.2.1 BASES SURVEILLANCE verification after a power level is achieved for extended REQUIREMENTS operation that is 10% higher than that power at which FQ was (continued) last measured.SR 3.2.1.1 I INSR~i111I The nuclear design process includes calculations performed to determine that the core can be operated within the FQ(Z) limits. Because flux maps are taken in steady state conditions, the variations in power distribution resulting from normal operational maneuvers are not present in the flux map data. These variations are, however, conservatively calculated by considering a wide range of unit maneuvers in normal operation.
        -~i.     AP--1 R~ducing THERMAL 4r,-fZ-)-exceeds       its POWER limit,by maintains
The maximum peaking factor increase over steady state values, calculated as a function of core elevation, Z, is called N(Z).The limit with which-~-~
                                                        &#x17d; 1% RTP for each 1% by which an acceptable absolute power density. The percent that.*-~f~-exceeds the limit can 100 for P > 0.5
is compared varies inversely with power above 50% RTP~and N(Z) and directly with a function called K(Z) provided in the COLR. IINSERT,"8", If THERMAL POWER has been increased by 10% RTP since the last determination o0 , another evaluation of this factor is required 12hours after achieving equilibrium conditions at this higher power level (to ensure thakc-F~()-
                                                        -l1.O}x 100 for P
values are being reduced sufficiently with power increase to stay within the LCO limits).The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.Flux map data are taken for multiple core elevations  
* 0.5 (conti nued)
..A+evaluations are not applicable for the following core regions, measured in percent of core height: a. Lower core region, from 0 to 15% inclusive; and b. Upper core region, from 85 to 100% inclusive.
North Anna Units 1 and 2B3.1-Reion         B 3.2.1-4                                         Revision 13 3
North Anna Units 1 and 2B321-Reion4 B 3.2.1-7 Revision 46 FQ(Z)B 3.2.1 BASES SR -3.2.1. (continued)
 
SURVE ILLANCE REQUIREMENTS The top and bottom 15% of the core are excluded from the evaluation because of the low probability that these regions would be more limiting in the safety analyses and because of the difficulty of making a precise measurement in these This Surveillce has been modified by a Note that may require that mor requent surveillances be performed.
FQ(Z)
An FQ()evaluation of the eG 3required to account IFTZ or any increase t )that may occur and__cause th ~r~limit to be exceeded before the next require(e evaluation.
B3.2.1 BASES ACTIONS           A.-1. (continued)
a two most recent evaluations show an incri it is required to m e l im ith the last increased by apepropriate factor, or to uate more fr~pm lly, each 7 EFPD. These alternative r rementsFQ(Z) from exceeding its limit without detectli REFERENCES
QE(ZI- -......- >-F~-*)is the measured FQ(Z) multiplied by factors accounting for manufacturing tolerances and measurement uncertainties.
: 1. 10 CFR 50.46.2. VEP-NFE-2-A, "VEPCO Evaluation of the Control Rod Ejection Transient." 3. UFSAR, Section 3.1.22.4. VEP-NE-I-A, "VEPCO Relaxed Power Distribution Control Methodology and Associated FQ Surveillance Technical Specifications." North Anna Units 1 and 2B321-Reion3 B 3.2.1-8 Revision 13 INSERT "4" FQE(Z) is an excellent approximation for FQ(Z) when the reactor is at the steady-state power at which the incore flux map was taken.The expression for FQT(Z) is: FQT(Z) "- FQE(Z) N(Z)Where: N(Z) is a cycle dependent function that accounts for power distribution transients encountered during normal operation.
FM(Z) ,.* t,,e ,,=ou= ,ahe u, ,(Z).     The Completion Time of 15 minutes provides an acceptable time to reduce power in an orderly manner and without allowing the unit to remain in an unacceptable condition for an extended period of time. The maximum allowable power level initially determined by Required Action A.-t.I may be affected by subsequent determinations okf*-F~)-and would require power reductions within 15 minutegof the.*FfZ-determination,      if necessary to comply with the decr~ased maximum allowable power level.
N(Z) is included in the COLR. The FQT(Z) is calculated as described in Reference 4.INSERT "5" If FQE(Z) cannot be maintained within the LCO limits, reduction of core power is required and if FQT(Z) cannot be maintained within the LCO limits, reduction of the AFD limits is also required.INSERT "6" B.1 If it is found that the maximum calculated value of FQ(Z) that can occur during normal maneuvers, FQT(Z) , exceeds its specified limits, there exists a potential for FQE(Z) to become excessively high if a normal operational transient occurs. Reducing the AFD Limit by the amount specified in the COLR within the allowed Completion Time of 4 hours, restricts the axial flux distribution such that even if a transient occurred, core peaking factors are not exceeded.
Decreases iricF-(*)would allow increasing the maximum allowable po~ler level and increasing power up to this revised limit.
Ithat THERMAL POWER is limited A.--f.2                             Ibelow RTP by Required Action A.1 A reduction of the Power Range Neutron Flux-High trip setpoints by > 1% for each 1% by ,which F*(Z) ..... d liz         _.
                  --im-it, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.-*-.I. The maximum allowable Power Range Neutron Flux-High trip setpoints initially determined by Required Action A.-2-,2 may be affected by subsequent determinations of-.zF-~-and would require Power Range Neutron Flux-High trip setpoint reductions within 72 hours of thecF,*)-determination, if necessary to comply with the decr'6ased maximum allowable Power Range Neutron Flux-High trip setpoints. Decreases in
                >_-FZ-(-_4 would allow increasing the maximum allowable Power Range Neutron Flux-High trip setpoints.
A.-4-. 3 Reduction in the Overpower AT trip setpoints (value of K4) by
                  &#x17d;1% (in AT span) for each 1% by which F*(Z) exceeds itz<-
                  ++w+t, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period, and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.-2..1. The (conti nued)
North Anna Units 1 and 2B3.1-Reion   B 3.2.1-5                                     3
 
FQ(Z)
B 3.2.1 BASES ACTIONS               A.-2-.3 (continued) maximum allowable Overpower AT trip setpoints initially determined by Required Action A.*Z-.3 may be affected by
[FoE(Z)I              subsequent determinations o~f~ftand would require Overpower AT trip setpoint r~ductions within 72 hours of the
                    -*** determination, if necessary to comply with the decreased maximum allowable Overpower AT trip setpoints.
Decreases i -. {)would allow increasing the maximum Overpower AT trip setpoints.
A   f.Ai-tA
                                  "*-*"*                /-and Verification thatl.F-,)-has bee rerestored,SRto3.2121 within, its limit, by perforrifng SR 3.2.1.1 prior to increasing THERMAL POWER above the limit imposed by Required Action A."Z1.,
ensures that core conditions during operation at higher power levels are consistent with safety analyses assumptions.
                    -_--1                         I--A.1 through A.4 and B.1 through B.5I If Required Actions A.I, A.2.1, A.2.2, A.2.3, or A.2.1 are not met within their associated Completion Times, the unit must be placed in a MODE or condition in which the LCO requirements are not applicable. This is done by placing the unit in at least MODE 2 within 6 hours.
This allowed Completion Time is reasonable based on SURVEILLANCE         SR 3.2.1.1 4-modified by a Note. It states that THERMAL REQUIREMENTS         POWER may be increased until a power level for extended operation has been achieved at which a power distribution map can be obtained. This allowance is modified, however, by one of the Frequency conditions that requires verification FQZ         tha -*f+-is within its specified limit after a power rise IFQ~z I I   of ore than 10% RTP over the THERMAL POWER at which       it was I last verified to be within specified limits. In the absence I of this Frequency condition, it is possible to increase I power to RTP and operate for 31 days without verification of 44..*. The Frequency condition is not intended to require "verification of these parameters after every 10% increase in power level above the last verification. It only requires (continued)
North Anna Units 1 and 2B321-Reion3     B 3.2.1-6                       Revision 13
 
FQ(Z)
B 3.2.1 BASES SURVEILLANCE     verification after a power level is achieved for extended REQUIREMENTS     operation that is 10% higher than that power at which FQ was (continued)     last measured.
SR 3.2.1.1 I INSR~i111I The nuclear design process includes calculations performed to determine that the core can be operated within the FQ(Z) limits. Because flux maps are taken in steady state conditions, the variations in power distribution resulting from normal operational maneuvers are not present in the flux map data. These variations are, however, conservatively calculated by considering a wide range of unit maneuvers in normal operation. The maximum peaking factor increase over steady state values, calculated as a function of core elevation, Z, is called N(Z).
The limit with which-~-~   is compared varies inversely with power above 50% RTP~and N(Z) and directly with a function called K(Z) provided in the COLR.                       IINSERT,"8",
If THERMAL POWER has been increased by &#x17d; 10% RTP since the last determination o0 *4~ , another evaluation of this factor is required 12hours after achieving equilibrium conditions at this higher power level (to ensure thakc-F~()-
values are being reduced sufficiently with power increase to stay within the LCO limits).
The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.
Flux map data are taken for multiple core elevations ..A+
evaluations are not applicable for the following axi*1 core regions, measured in percent of core height:
: a. Lower core region, from 0 to 15% inclusive; and
: b. Upper core region, from 85 to 100% inclusive.
North Anna Units 1 and 2B321-Reion4B 3.2.1-7                       Revision 46
 
FQ(Z)
B 3.2.1 BASES SURVE ILLANCE        SR   -3.2.1.   (continued)
REQUIREMENTS The   top and because evaluation      bottom of    of the core are excluded from the 15%the low probability that these regions would be more limiting in the safety analyses and because of the difficulty of making a precise measurement in these This Surveillce has been modified by a Note that may require that mor         requent surveillances be performed. An FQ()evaluation               of the *x,~o            eG     3required to account IFTZ             or any increase t       F*(* )that may occur and__cause th ~r~
limit to be exceeded before the next require(e evaluation.
a two most recent F*(Z)      evaluations show an incri it is required increased  by    to apepropriate m       e F*(Z)  l im or to factor,      ith the uate last F*(Z)
F*(Z) more fr~pm lly,       each 7 EFPD. These alternative r         rements pr*      FQ(Z) from exceeding its limit without detectli REFERENCES           1. 10 CFR 50.46.
: 2. VEP-NFE-2-A, "VEPCO Evaluation of the Control Rod Ejection Transient."
: 3. UFSAR, Section 3.1.22.
: 4. VEP-NE-I-A, "VEPCO Relaxed Power Distribution Control Methodology and Associated FQ Surveillance Technical Specifications."
North Anna Units 1 and 2B321-Reion3       B 3.2.1-8                               Revision 13
 
INSERT "4" FQE(Z) is an excellent approximation for FQ(Z) when the reactor is at the steady-state power at which the incore flux map was taken.
The expression for FQT(Z) is:
FQT(Z) "- FQE(Z) N(Z)
Where:       N(Z) is a cycle dependent function that accounts for power distribution transients encountered during normal operation. N(Z) is included in the COLR. The FQT(Z) is calculated as described in Reference 4.
INSERT "5" If FQE(Z) cannot be maintained within the LCO limits, reduction of core power is required and if FQT(Z) cannot be maintained within the LCO limits, reduction of the AFD limits is also required.
INSERT "6" B.1 If it is found that the maximum calculated value of FQ(Z) that can occur during normal maneuvers, FQT(Z) , exceeds its specified limits, there exists a potential for FQE(Z) to become excessively high if a normal operational transient occurs. Reducing the AFD Limit by the amount specified in the COLR within the allowed Completion Time of 4 hours, restricts the axial flux distribution such that even if a transient occurred, core peaking factors are not exceeded.
 
INSERT "6" (Continued)
INSERT "6" (Continued)
B.2 If it is found that the maximum calculated value of FQ(Z) that can occur during normal maneuvers, FQT(Z) , exceeds its specified limits, there exists a potential for FQE(Z) to become excessively high if a normal operational transient occurs. Reducing THERMAL POWER by the amount specified in the COLR within the allowed Completion Time of 4 hours, restricts the absolute power density such that even if a transient occurred, core peaking factors are not exceeded.
B.2 If it is found that the maximum calculated value of FQ(Z) that can occur during normal maneuvers, FQT(Z) , exceeds its specified limits, there exists a potential for FQE(Z) to become excessively high if a normal operational transient occurs. Reducing THERMAL POWER by the amount specified in the COLR within the allowed Completion Time of 4 hours, restricts the absolute power density such that even if a transient occurred, core peaking factors are not exceeded. The percent that FQT(Z) exceeds the limit can be determined from:
The percent that FQT(Z) exceeds the limit can be determined from:{maximum over Z ('C;-Q(-Z))!
{maximum over     Z ('C;-Q(-Z))!     1 xl00forP>0.5 tmaximum overZ       CFQKZ~)'     1} x100 for P*<O.5 B.3 A reduction of the Power Range Neutron Flux-High trip setpoints by > 1% for each 1%
1 xl00forP>0.5 tmaximum overZ CFQKZ~)' 1} x100 for P<O.5 B.3 A reduction of the Power Range Neutron Flux-High trip setpoints by > 1 % for each 1 %by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions.
by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.
The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.B.4 Reduction in the Overpower AT trip setpoints (value of K 4) by > 1 % for each 1% by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions.
B.4 Reduction in the Overpower AT trip setpoints (value of K4 ) by > 1 % for each 1% by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period, and the preceding prompt reduction in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.
The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period, and the preceding prompt reduction in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.
 
INSERT "6" (Continued)
INSERT "6" (Continued)
B.5 Verification that FQT(z) has been restored to within its limit, by performing SR 3.2.1.1 and SR 3.2.1.2 prior to increasing THERMAL POWER and AFD limits above the maximum allowable power and AFD limits imposed by Required Actions B.1 and B.2 ensures that core conditions during operation at higher power levels and future operation are consistent with safety analyses assumptions.
B.5 Verification that FQT(z) has been restored to within its limit, by performing SR 3.2.1.1 and SR 3.2.1.2 prior to increasing THERMAL POWER and AFD limits above the maximum allowable power and AFD limits imposed by Required Actions B.1 and B.2 ensures that core conditions during operation at higher power levels and future operation are consistent with safety analyses assumptions.
C.1 INSERT "7" Verification that FQE(Z) is within its specified limits involves increasing FQ(Z) to allow for manufacturing tolerance and measurement uncertainties in order to obtain FQE(z).Specifically, FQE(Z) is the measured value of FQ(Z) obtained from incore flux map results multiplied by manufacturing and measurement uncertainties (1.05 x 1.03 = 1.0815).FQE(Z) is then compared to its specified limits.The limit with which FQE(z) is compared varies inversely with power above 50% RTP and directly with a function called K(Z) provided in the COLR.Performing this Surveillance in MODE 1 prior to exceeding 75% RTP ensures that the FQE(Z) limit is met when RTP is achieved, because peaking factors generally decrease as power level is increased.
C.1 INSERT "7" Verification that FQE(Z) is within its specified limits involves increasing FQ(Z) to allow for manufacturing tolerance and measurement uncertainties in order to obtain FQE(z).
If THERMAL POWER has been increased by > 10% RTP since the last determination of FQE(Z), another evaluation of this factor is required 12 hours after achieving equilibrium conditions at this higher power level (to ensure that FQE(Z) values are being reduced sufficiently with power increase to stay within the LCO limits).SR 3.2.1.2 INSERT "8" SR 3.2.1.2 requires a Surveillance of FQT(Z) during the initial startup following each refueling within 12 hours after achieving equilibrium conditions after exceeding 75%RTP. THERMAL POWER levels below 75% are typically non-limiting with respect to the limit for FQT(Z). Also, initial startups following a refueling are slow and well controlled due to startup ramp rate limitations and fuel conditioning requirements.
Specifically, FQE(Z) is the measured value of FQ(Z) obtained from incore flux map results multiplied by manufacturing and measurement uncertainties (1.05 x 1.03 = 1.0815).
Furthermore, startup physics testing and flux symmetry measurements, also performed at low power, provide confirmation that the core is operating as expected.
FQE(Z) is then compared to its specified limits.
Consequently, the initial startup following a refueling will not result in non-equilibrium power shapes that could challenge the FQT(Z) limit. This Frequency ensures that verification of FaT(Z) is performed prior to extended operation at high power levels where the maximum permitted peak LHR could be challenged by non-equilibrium operation.
The limit with which FQE(z) is compared varies inversely with power above 50% RTP and directly with a function called K(Z) provided in the COLR.
If a previous Surveillance of FQT(Z) was performed at part power conditions (below RTP), SR 3.2.1.2 also requires that FoT(Z) be verified at power levels -> 10% RTP above the THERMAL POWER of its last verification within 12 hours after achieving equilibrium conditions.
Performing this Surveillance in MODE 1 prior to exceeding 75% RTP ensures that the FQE(Z) limit is met when RTP is achieved, because peaking factors generally decrease as power level is increased.
This ensures that FQT(Z) is within its limit using radial peaking factors measured at the higher power level.INSERT "9" If the two most recent FQ(Z) evaluations show that either the maximum over Z [ K()]OR maximum over Z/ ()J has increased or is expected to increase prior to the next evaluation then it is required to increase the FQT(Z) by the appropriate factor, as specified in the COLR, and verify FQT(z) is still within limits or evaluate FQ(Z) every 7 EFPD until SR 3.2.1 .2 is satisfied.
If THERMAL POWER has been increased by > 10% RTP since the last determination of FQE(Z), another evaluation of this factor is required 12 hours after achieving equilibrium conditions at this higher power level (to ensure that FQE(Z) values are being reduced sufficiently with power increase to stay within the LCO limits).
SR 3.2.1.2
 
INSERT "8" SR 3.2.1.2 requires a Surveillance of FQT(Z) during the initial startup following each refueling within 12 hours after achieving equilibrium conditions after exceeding 75%
RTP. THERMAL POWER levels below 75% are typically non-limiting with respect to the limit for FQT(Z). Also, initial startups following a refueling are slow and well controlled due to startup ramp rate limitations and fuel conditioning requirements. Furthermore, startup physics testing and flux symmetry measurements, also performed at low power, provide confirmation that the core is operating as expected. Consequently, the initial startup following a refueling will not result in non-equilibrium power shapes that could challenge the FQT(Z) limit. This Frequency ensures that verification of FaT(Z) is performed prior to extended operation at high power levels where the maximum permitted peak LHR could be challenged by non-equilibrium operation.
If a previous Surveillance of FQT(Z) was performed at part power conditions (below RTP), SR 3.2.1.2 also requires that FoT(Z) be verified at power levels ->10% RTP above the THERMAL POWER of its last verification within 12 hours after achieving equilibrium conditions. This ensures that FQT(Z) is within its limit using radial peaking factors measured at the higher power level.
INSERT "9" If the two most recent FQ(Z) evaluations show that either the maximum over Z         [ K()]
OR maximum over Z/           ()J has increased or is expected to increase prior to the next evaluation then it is required to increase the FQT(Z) by the appropriate factor, as specified in the COLR, and verify FQT(z) is still within limits or evaluate FQ(Z) every 7 EFPD until SR 3.2.1 .2 is satisfied.
These alternate requirements prevent FQ(Z) from exceeding its limit without detection.
These alternate requirements prevent FQ(Z) from exceeding its limit without detection.
FQ(Z)B 3.2.1 B 3.2 POWER DISTRIBUTION LIMITS B 3.2.1 Heat Flux Hot Channel Factor (FQ(Z))BASES BACKGROUND The purpose of the limits on the values of FQ(Z) is to limit the local (i.e., pellet) peak power density. The value of FQ(Z) varies along the axial height (Z) of the core.FQ(Z) is defined as the maximum local fuel rod linear power density divided by the average fuel rod linear power density, assuming nominal fuel pellet and fuel rod dimensions.
 
Therefore, FQ(Z) is a measure of the peak fuel pellet power within the reactor core.FQ(Z) is approximated by FQE (Z) and FQT (Z). FeE (7) is defined as the measured value of FQ(Z), incorporating manufacturing tolerances and measurement uncertainties.
FQ(Z)
B 3.2.1 B 3.2   POWER DISTRIBUTION LIMITS B 3.2.1   Heat Flux Hot Channel Factor (FQ(Z))
BASES BACKGROUND         The purpose of the limits on the values of FQ(Z) is to limit the local (i.e., pellet) peak power density. The value of FQ(Z) varies along the axial height (Z) of the core.
FQ(Z) is defined as the maximum local fuel rod linear power density divided by the average fuel rod linear power density, assuming nominal fuel pellet and fuel rod dimensions. Therefore, FQ(Z) is a measure of the peak fuel pellet power within the reactor core.
FQ(Z) is approximated by FQE (Z) and FQT (Z). FeE (7) is defined as the measured value of FQ(Z), incorporating manufacturing tolerances and measurement uncertainties.
FQT (Z) i s defined as the FQE (Z) incorporating a non-equilibrium factor that accounts for possible power distribution transients during normal operation.
FQT (Z) i s defined as the FQE (Z) incorporating a non-equilibrium factor that accounts for possible power distribution transients during normal operation.
During power operation, the global power distribution is limited by LCO 3.2.3, "AXIAL FLUX DIFFERENCE (AFD)," and LCO 3.2.4, "QUADRANT POWER TILT RATIO (QPTR)," which are directly and continuously measured process variables.
During power operation, the global power distribution is limited by LCO 3.2.3, "AXIAL FLUX DIFFERENCE (AFD)," and LCO 3.2.4, "QUADRANT POWER TILT RATIO (QPTR)," which are directly and continuously measured process variables. These LCOs, along with LCO 3.1.6, "Control Bank Insertion Limits,"
These LCOs, along with LCO 3.1.6, "Control Bank Insertion Limits," maintain the core limits on power distributions on a continuous basis.FQ(Z) varies with fuel loading patterns, control bank insertion, fuel burnup, and changes in axial power distribution.
maintain the core limits on power distributions on a continuous basis.
FQ(Z) varies with fuel loading patterns, control bank insertion, fuel burnup, and changes in axial power distribution.
FQ(Z) is measured periodically using the incore detector system. These measurements are generally taken with the core at or near steady state conditions.
FQ(Z) is measured periodically using the incore detector system. These measurements are generally taken with the core at or near steady state conditions.
Using the measured three dimensional power distributions, it is possible to derive a measured value for steady state FQ(Z), FQE (Z). However, because this val ue represents a steady state condition, it does not encompass the variations in the value of FQ(Z) that are present during nonequilibrium situations, such as load changes.(conti nued)North Anna Units 1 and 2B32.-Reionx B 3.2.1-i Revision xx FQ(Z)B 3.2.1 BASES BACKGROUND To account for these possible variations, the steady state (continued)
Using the measured three dimensional power distributions, it is possible to derive a measured value for steady state FQ(Z), FQE (Z). However, because this val ue represents a steady state condition, it does not encompass the variations in the value of FQ(Z) that are present during nonequilibrium situations, such as load changes.
FeE (Z) is adjusted by an elevation dependent factor that accounts for the calculated worst case transient conditions to derive FQT (Z).Core monitoring and control under nonsteady state conditions are accomplished by operating the core within the limits of the appropriate LCOs, including the limits on AFD, QPTR, and control rod insertion.
(conti nued)
l I APPLICABLE SAFETY ANALYSES This LCO precludes core power distributions that violate the following fuel design criteria: a. During a loss of coolant accident (LOCA), the peak cladding temperature during a small break LOCA must not exceed 2200 0 F, and there must be a high level of probability that the peak cladding temperature does not exceed 2200&deg;F for the large breaks (Ref. 1);b. During a loss of forced reactor coolant flow accident, there must be at least 95% probability at the 95%confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a departure from nucleate boiling (DNB) condition;
North Anna Units 1 and 2B32.-Reionx   B 3.2.1-i                       Revision xx
: c. During an ejected rod accident, the energy deposition to unirradiated fuel is limited to 225 cal/gm and irradiated fuel is limited to 200 cal/gm (Ref. 2); and d. The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest worth control rod stuck fully withdrawn (Ref. 3).Limits on F (Z) ensure that the value of the initial total peaking factor assumed in the accident analyses remains valid. Other criteria must also be met (e.g., maximum cladding oxidation, maximum hydrogen generation, coolable geometry, and long term cooling).
 
However, the peak cladding temperature is typically most limiting.FQ(Z) limits assumed in the LOCA analysis are typically limiting relative to (i.e., lower than) the FQ(Z) limit assumed in safety analyses for other postulated accidents.
FQ(Z)
B 3.2.1 BASES BACKGROUND       To account for these possible variations, the steady state (continued)     FeE (Z) is adjusted by an elevation dependent factor that accounts for the calculated worst case transient conditions     l to derive FQT (Z).                                               I Core monitoring and control under nonsteady state conditions are accomplished by operating the core within the limits of the appropriate LCOs, including the limits on AFD, QPTR, and control rod insertion.
APPLICABLE       This LCO precludes core power distributions that violate the SAFETY ANALYSES  following fuel design criteria:
: a. During a loss of coolant accident (LOCA), the peak cladding temperature during a small break LOCA must not exceed 22000 F, and there must be a high level of probability that the peak cladding temperature does not exceed 2200&deg;F for the large breaks (Ref. 1);
: b. During a loss of forced reactor coolant flow accident, there must be at least 95% probability at the 95%
confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a departure from nucleate boiling (DNB) condition;
: c. During an ejected rod accident, the energy deposition to unirradiated fuel is limited to 225 cal/gm and irradiated fuel is limited to 200 cal/gm (Ref. 2); and
: d. The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest worth control rod stuck fully withdrawn (Ref. 3).
Limits on F (Z) ensure that the value of the initial total peaking factor assumed in the accident analyses remains valid. Other criteria must also be met (e.g., maximum cladding oxidation, maximum hydrogen generation, coolable geometry, and long term cooling). However, the peak cladding temperature is typically most limiting.
FQ(Z) limits assumed in the LOCA analysis are typically limiting relative to (i.e., lower than) the FQ(Z) limit assumed in safety analyses for other postulated accidents.
Therefore, this LCO provides conservative limits for other postulated accidents.
Therefore, this LCO provides conservative limits for other postulated accidents.
FQ(Z) satisfies Criterion 2 of 10 CFR 50.36(c) (2) (ii).North Anna Units 1 and 2B3212Reionx B 3.2.1-2 FQ(Z)B 3.2.1 BASES LCO The Heat Flux Hot Channel Factor, FQ(Z), shall be limited by the following relationships:
FQ(Z) satisfies Criterion 2 of 10 CFR 50.36(c) (2) (ii).
FQ(Z) < CFQ K(Z) for P > 0.5 FQ(Z) < CFQ K(Z) for P 0.5 where: CFQ is the FQ(Z) limit at RTP provided in the COLR, K(Z) is the normalized F (Z) as a function of core height provided in the COLR and P is the fraction of RATED THERMAL POWER defined as THERMAL POWER RTP The actual values of CFQ and K(Z) are given in the COLR;however, CFQ is normally approximately 2 and K(Z) is aI function that looks like the one provided in Figure B 3.2.1-1.is approximated by FeE (Z) and FQT (Z). Thus, both FQ (z) and FQT (Z) must meet the preceding limits on FQ(Z).An FQE (Z) evaluation requires obtaining an incore flux map in MODE 1. From the incore flux map results we obtain the measured value of FQ(Z). Then, the measured value is increased by 1.03 which is a factor that accounts for fuel manufacturing tolerances and 1.05 which accounts for flux map measurement uncertainty to obtain FQE (Z) (Ref. 4).FeE (Z) is an excellent approximation for FQ(Z) when the reactor is at the steady state power at which the i ncore flux map was taken.The expression for FQT (Z) is: FQT (Z)= =FQE (Z) N(Z)Where: N(Z) is a cycle dependent function that accounts for power distribution transients encountered during normal operation.
North Anna Units 1 and 2B3212ReionxB 3.2.1-2
N(Z) is included in the COLR. The FQT (Z) is calculated as described in Reference 4.(conti nued)North Anna Units 1 and 2B32.-Reionx B3.2.1-3 Revision xx FQ(Z)B 3.2.1 BASES LCO (conti nued)The FQ(Z) limits define limiting values for core power peaking that precludes peak cladding temperatures above 2200&deg;F during a small break LOCA and assures with a high level of probability that the peak cladding temperature does not exceed 2200&deg;F for large breaks (Ref. 1).This LCO requires operation within the bounds assumed in the safety analyses.
 
Calculations are performed in the core design process to confirm that the core can be controlled in such a manner during operation that it can stay within the LOCA FQ(Z) limits. If FQE (Z) cannot be maintained within the LCO limits, reduction of core power is required and if FQT (Z) cannot be maintained within the LCO limits, reduction of the AFD limits is also required.Violating the LCO limits for FQ(Z) produces unacceptable consequences if a design basis event occurs while FQ(Z) is outside its specified limits.APPLICABILITY The FQ(Z) limits must be maintained in MODE 1 to prevent core power distributions from exceeding the limits assumed in the safety analyses.
FQ(Z)
Applicability in other MODES is not required because there is either insufficient stored energy in the fuel or insufficient energy being transferred to the reactor coolant to require a limit on the distribution of core power.ACTIONS A.I RedJucing THERMAL POWER by _> 1%0 RTP for each 1%o by FQ (Z) exceeds its limit, maintaips an acceptable power density. The percent that FQ (Z) exceeds the be determined from:{maximum over z C.Q_ Z)J-i.0 xlO0 for P > 0.5{maximum over z x1i00 for P <0.5 0.which absol ute limit can (conti nued)North Anna Units 1 and 2B321-Reionx B 3.2.1-4 Revision xx FQ(Z)B 3.2.1 BASES ACTIONS (conti nued)A.1 (continued)
B 3.2.1 BASES LCO               The Heat Flux Hot Channel Factor, FQ(Z),   shall be limited by the following relationships:
FQE (Z) is the measured FQ(Z) multiplied by factors accounting for manufacturing tolerances and measurement uncertainties.
FQ(Z) < CFQ K(Z)     for P > 0.5 FQ(Z) < CFQ K(Z)     for P
The Completion Time of 15 minutes provides an acceptable time to reduce power in an orderly manner and without allowing the unit to remain in an unacceptable condition for an extended period of time. The maximum allowable power level initially determined by Required Action A.1 may be affected by subsequent determinations of FQE (Z) and would require power reductions within .15 minutes of the FQE (Z) determination, if necessary to comply with the decreased maximum allowable power level. Decreases in FeE (Z)would allow increasing the maximum allowable power level and increasing power up to this revised limit.A.2 A reduction of the Power Range Neutron Flux-High trip setpoints by >_ 1% for each 1%o that THERMAL POWER is limited below RTP by Required Action A.I, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions.
* 0.5 where:     CFQ is the FQ(Z) limit at RTP provided in the COLR, K(Z) is the normalized F (Z) as a function of core height provided in the COLR and P is the fraction of RATED THERMAL POWER defined as THERMAL POWER RTP The actual values of CFQ and K(Z) are given in the COLR; however, CFQ is normally approximately 2 and K(Z) is aI function that looks like the one provided in Figure B 3.2.1-1.
The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.1. The maximum allowable Power Range Neutron Flux-High trip setpoints initially determined by Required Action A.2 may be affected by subsequent determinations of FQE (Z) and would require Power Range Neutron Flux-High trip setpoint reductions within 72 hours of the FeE (Z) determination, if necessary to comply with the decreased maximum allowable Power Range Neutron Flux-High trip setpoints.
FQ*Z)  is approximated by FeE (Z) and FQT (Z). Thus, both FQ (z) and FQT (Z) must meet the preceding limits on FQ(Z).
Decreases in FeE (Z) would allow increasing the maximum allowable Power Range Neutron Flux-High trip setpoi nts.A.3 Reduction i n the Overpower AT trip setpoints (value of K 4) by>_ 1% (in AT span) for each 1% that THERMAL POWER is limited below RTP by Required Action A.1, is a conservative action (conti nued)North Anna Units 1 and 2B321-Reionx B 3.2.1-5 Revision xx FQ(Z)B 3.2.1 BASES ACTIONS A.3 (continued)(contnued) for protection against the consequences of severe transients with unanalyzed power distributions.
An FQE (Z) evaluation requires obtaining an incore flux map in MODE 1. From the incore flux map results we obtain the measured value of FQ(Z). Then, the measured value is increased by 1.03 which is a factor that accounts for fuel manufacturing tolerances and 1.05 which accounts for flux map measurement uncertainty to obtain FQE (Z) (Ref. 4).
The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period, and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.I. The maximum allowable Overpower AT trip setpoints initially determined by Required Action A.3 may be affected by subsequent determinations of FQE (Z) and would require Overpower AT trip setpoint reductions within 72 hours of the FQE (Z) determination, if necessary to comply with the decreased maximum allowable Overpower AT trip setpoints.
FeE (Z) is an excellent approximation for FQ(Z) when the reactor is at the steady state power at which the i ncore flux map was taken.
Decreases in FQE (Z) would allow increasing the maximum Overpower AT trip setpoints.
The expression for FQT (Z) is:
FQT (Z)= =FQE (Z) N(Z)
Where: N(Z) is a cycle dependent function that accounts for power distribution transients encountered during normal operation. N(Z) is included in the COLR. The FQT (Z) is calculated as described in Reference 4.
(conti nued)
North Anna Units 1 and 2B32.-ReionxB3.2.1-3                           Revision xx
 
FQ(Z)
B 3.2.1 BASES LCO(conti nued)   The FQ(Z) limits define limiting values for core power peaking that precludes peak cladding temperatures above 2200&deg;F during a small break LOCA and assures with a high level of probability that the peak cladding temperature does not exceed 2200&deg;F for large breaks (Ref. 1).
This LCO requires operation within the bounds assumed in the safety analyses. Calculations are performed in the core design process to confirm that the core can be controlled in such a manner during operation that it can stay within the LOCA FQ(Z) limits. If FQE (Z) cannot be maintained within the LCO limits, reduction of core power is required and if FQT (Z) cannot be maintained within the LCO limits, reduction of the AFD limits is also required.
Violating the LCO limits for FQ(Z) produces unacceptable consequences if a design basis event occurs while FQ(Z) is outside its specified limits.
APPLICABILITY     The FQ(Z) limits must be maintained in MODE 1 to prevent core power distributions from exceeding the limits assumed in the safety analyses. Applicability in other MODES is not required because there is either insufficient stored energy in the fuel or insufficient energy being transferred to the reactor coolant to require a limit on the distribution of core power.
ACTIONS           A.I RedJucing THERMAL POWER by _>1%0 RTP for each 1%o by FQ (Z) exceeds its limit, maintaips an acceptable which absol ute power density. The percent that FQ (Z) exceeds the limit can be determined from:
{maximum over z C.Q_   Z)J-i.0 xlO0 for P > 0.5
{maximum over z CF-O-*Z)J-1.0    x1i00 for P *<0.5 0.
(conti nued)
North Anna Units 1 and 2B321-ReionxB 3.2.1-4                           Revision xx
 
FQ(Z)
B 3.2.1 BASES ACTIONS           A.1 (continued)
(conti nued)    FQE (Z) is the measured FQ(Z) multiplied by factors accounting for manufacturing tolerances and measurement uncertainties. The Completion Time of 15 minutes provides an acceptable time to reduce power in an orderly manner and without allowing the unit to remain in an unacceptable condition for an extended period of time. The maximum allowable power level initially determined by Required Action A.1 may be affected by subsequent determinations of FQE (Z) and would require power reductions within .15 minutes of the FQE (Z) determination, if necessary to comply with the decreased maximum allowable power level. Decreases in FeE (Z) would allow increasing the maximum allowable power level and increasing power up to this revised limit.
A.2 A reduction of the Power Range Neutron Flux-High trip setpoints by >_ 1% for each 1%o that THERMAL POWER is limited below RTP by Required Action A.I, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.1. The maximum allowable Power Range Neutron Flux-High trip setpoints initially determined by Required Action A.2 may be affected by subsequent determinations of FQE (Z) and would require Power Range Neutron Flux-High trip setpoint reductions within 72 hours of the FeE (Z) determination, if necessary to comply with the decreased maximum allowable Power Range Neutron Flux-High trip setpoints. Decreases in FeE (Z) would allow increasing the maximum allowable Power Range Neutron Flux-High trip setpoi nts.
A.3 Reduction i n the Overpower AT trip setpoints (value of K4 ) by
                  >_ 1% (in AT span) for each 1% that THERMAL POWER is limited below RTP by Required Action A.1, is a conservative action (conti nued)
North Anna Units 1 and 2B321-Reionx B 3.2.1-5                         Revision xx
 
FQ(Z)
B 3.2.1 BASES ACTIONS           A.3 (continued)
(contnued) for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period, and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.I. The maximum allowable Overpower AT trip setpoints initially determined by Required Action A.3 may be affected by subsequent determinations of FQE (Z) and would require Overpower AT trip setpoint reductions within 72 hours of the FQE (Z) determination, if necessary to comply with the decreased maximum allowable Overpower AT trip setpoints. Decreases in FQE (Z) would allow increasing the maximum Overpower AT trip setpoints.
A.4 Verification that FQE(Z) has been restored to within its limit, by performing SR 3.2.1.1 and SR 3.2.1.2 prior to increasing THERMAL POWER above the limit imposed by Required Action A.1, ensures.that core conditions during operation at higher power levels are consistent with safety analyses assumptions.
A.4 Verification that FQE(Z) has been restored to within its limit, by performing SR 3.2.1.1 and SR 3.2.1.2 prior to increasing THERMAL POWER above the limit imposed by Required Action A.1, ensures.that core conditions during operation at higher power levels are consistent with safety analyses assumptions.
B.1 If it is found that the maximum calculated value of FQ(Z)that can occur during normal maneuvers, FQT (Z), exceeds its specified limits, there exists a potential for FQE (Z) to become excessively high if a normal operational transient occurs. Reducing the AFD Limit by the amount specified in the COLR within the allowed Completion Time of 4 hours, restricts the axial flux distribution such that even if a transient occurred, core peaking factors are not exceeded.B.2 If it is found that the maximum calculated value of FQ(Z)that can occur during normal maneuvers, FQT (Z), exceeds its specified limits, there exists a potential for FQE (Z) to become excessively high if a normal operational transient occurs. Reducing THERMAL POWER by the amount specified in the COLR within the allowed Completion Time of 4 hours, (conti nued)North Anna Units 1 and 2B321-Reionx B 3.2.1-6 FQ(Z)B 3.2.1 BASES ACTIONS B.2 (continued)(conti nued)restricts the absolute power density such that even if a transient occurred, core peaking factors are not exceeded.The percent that FQT (Z) exceeds the limits can be determined from: F r FQIZ)1 maximum over Z 1 FQK(Z)J-1}
B.1 If it is found that the maximum calculated value of FQ(Z) that can occur during normal maneuvers, FQT (Z), exceeds its specified limits, there exists a potential for FQE (Z) to become excessively high if a normal operational transient occurs. Reducing the AFD Limit by the amount specified in the COLR within the allowed Completion Time of 4 hours, restricts the axial flux distribution such that even if a transient occurred, core peaking factors are not exceeded.
xlO0 for P > 0.5 maximum over Z -1xli00 for P 0.5 0.5 B.3 A reduction of the Power Range Neutron Flux-High trip setpoints by >1% for each 1% by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions.
B.2 If it is found that the maximum calculated value of FQ(Z) that can occur during normal maneuvers, FQT (Z), exceeds its specified limits, there exists a potential for FQE (Z) to become excessively high if a normal operational transient occurs. Reducing THERMAL POWER by the amount specified in the COLR within the allowed Completion Time of 4 hours, (conti nued)
The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.B.4 Reduction in the Overpower AT trip setpoints (value of K 4) by>1% for each 1% by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions.
North Anna Units 1 and 2B321-ReionxB 3.2.1-6
The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period, and preceding prompt reduction.in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.(conti nued)North Anna Units 1 and 2B321-Reionx B 3.2.1-7 FQ(Z)B 3.2.1 BASES ACTIONS (conti nued)B.5 Verification that FQT (Z) has been restored to within its limit, by performing SR 3.2.1.1 and SR 3.2.1.2 prior to increasing THERMAL POWER and AFD limits above the maximum allowable power and AFD limits imposed by Required Actions B.1 and B.2 ensures that core conditions during operation at higher power levels and future operation are consistent with safety analyses assumptions.
 
C.'If Required Actions A.I through A.4 and B.I through B.5 are not met within their associated Completion Times, the unit must be placed in a MODE or condition in which the LCO requirements are not applicable.
FQ(Z)
This is done by placing the unit in at least MODE 2 within 6 hours.This allowed Completion Time is reasonable based on operating experience regarding the amount of time it takes to reach MODE 2 from full power operation in an orderly manner and without challenging unit systems.SURVEILLANCE REQU IREMENTS SR 3.2.1.1 and SR 3.2.1.2 are modified by a Note. It states that during power escalation, THERMAL POWER may be increased until a power level for extended operation has been achieved at which a power distribution map can be obtained.
B 3.2.1 BASES ACTIONS           B.2 (continued)
This allowance is modified, however, by one of the Frequency conditions that requires verification that FQ(Z) is within its specified limit after a power rise of more than 10% RTP over the THERMAL POWER at which it was last verified to be within specified limits. In the absence of this Frequency condition, it is possible to increase power to RTP and operate for 31 days without verification of FQ(Z). The Frequency condition is not intended to require verification of these parameters after every 10% increase in power level above the last verification.
(conti nued) restricts the absolute power density such that even if a transient occurred, core peaking factors are not exceeded.
It only requires verification after a power level is achieved for extended operation that is 10% higher than that power at which FQ was last measured.(continued)
The percent that FQT (Z) exceeds the limits can be determined from:
I I North Anna Units 1 and 2B321-Reionx B 3.2.1-8 Revision xx FQ(Z)B 3.2.1 BASES SURVEILLANCE REQU IREMENTS (continued)
F 1maximum over Z 1 rFQIZ)
SR 3.2.1.1 Verification that FQE (Z) is within its specified limits involves increasing FQ(Z) to allow for manufacturing tolerance and uncertainties in order to obtain FQ (Z). Specifically, FQ (Z) is the measured value of FQ(Z)obtained from incore flux map results multiplied by manufacturing and measurement uncertainties (1.05 x 1.03 = 1.0815). FQ (Z) is then compared to its specified limits.The limit with which FQE (Z) is compared varies inversely with power above 50%0 RTP and directly with a function called K(Z) provided in the COLR.Performing this in MODE 1 prior to exceeding 75% RTP ensures that the FQ (Z) limit is met when RTP is achieved, because peaking factors generally decrease as power level is increased.
FQK(Z)J-1} xlO0   for P > 0.5 maximum over Z   F-*    -1xli00   for P
If THERMAL POWER has beep increased by > 10% RTP since the last determination of FQ (Z) , another evaluation of this factor is required 12 hours after achieving equilibrium conditions at this higher power level (to ensure that FeE (Z)values are being reduced sufficiently with power increase to stay within the LCO limits).SR 3.2.1.2 The nuclear design process includes calculations performed to determine that the core can be operated within the FQ(Z) limits. Because flux maps are taken in steady state conditions, the variations in power distribution resulting from normal operational maneuvers are not present in the flux map data. These variations are, however, conservatively calculated by considering a wide range of unit maneuvers in normal operation.
* 0.5 0.5 B.3 A reduction of the Power Range Neutron Flux-High trip setpoints by >1% for each 1% by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.
The maximum peaking factor increase over steady state values, calculated as a function of core elevation, Z, is called N(Z).The limit with which with power above 50%function called K(Z)FQT (Z) is compared varies inversely RTP and N(Z) and directly with a provided in the COLR.SR 3.2.1.2 requires a Surveillance of FQT (Z) during the initial startup following each refueling within 12 hours after achieving equilibrium conditions after exceeding 75%(continued)
B.4 Reduction in the Overpower AT trip setpoints (value of K4 ) by
North Anna Units 1 and 2B321-Reionx B 3.2.1-9 Revision xx FQ(Z)B 3.2.1 BASES SURVEILLANCE REQUIREMENTS (conti nued)SR 3.2.1.2 (continued)
                  >1% for each 1% by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours is sufficient considering the small likelihood of a severe transient in this time period, and preceding prompt reduction.in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.
RTP. THERMAL POWER levels below 75% are typically non-limiting with respect to the limit for FQT (Z) .Also, initial startups following a refueling are slow and well controlled due to startup ramp rate limitations and fuel conditioning requirements.
(conti nued)
Furthermore, startup physics testing and flux symmetry measurements, also performed at low power, provide confirmation that the core is operating as expected.
North Anna Units 1 and 2B321-ReionxB 3.2.1-7
Consequently, the initial startup following a refueling will not result in non-equilibrium power shapes that could challenge the FQT (Z)T limit. This Frequency ensures that verification of FQT (Z) is performed prior to extended operation at high power levels where the maximum permitted peak LHR could be challenged by non-equilibrium operation.
 
If a previous Surveillance of FqT (Z) was performed at part power conditions (below RTP), SR 3.2.1.2 also requires that FQT (Z) be yenifi ed at power level s_> 10% RTP above the THERMAL POWER of its last verification within 12 hours after achieving equilibrium conditions.
FQ(Z)
This ensures that FQT (7)is within its limit using radial peaking factors measured at the higher power level.If THERMAL POWER has been increased by 10% RTP since the last determination of FQT (Z), another evaluation of this factor is required 12 hours after achieving equilibrium conditions at this higher power level (to ensure that FQT (Z)values are being reduced sufficiently with power increase to stay within the LCO limits).The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.Flux map data are taken for multiple core elevations.
B 3.2.1 BASES ACTIONS           B.5 (conti nued)
FQT (Z)evaluations are not applicable for the following axial core regions, measured in percent of core height: a. Lower core region, from 0 to 15% inclusive; and b. Upper core region, from 85 to 100% inclusive.(conti nued)North Anna Units 1 and 2 B3211 eiinx B 3.2.1-10 Revision xx FQ(z)B 3.2.1 BASES SURVEILLANCE REQUIREMENTS (conti nued)SR 3.2.1.2 (continued)
Verification that FQT (Z) has been restored to within its limit, by performing SR 3.2.1.1 and SR 3.2.1.2 prior to increasing THERMAL POWER and AFD limits above the maximum allowable power and AFD limits imposed by Required Actions B.1 and B.2 ensures that core conditions during operation at higher power levels and future operation are consistent with safety analyses assumptions.
The top and bottom 15% of the core are excluded from the evaluation because of the low probability that these regions would be more limiting in the safety analyses and because of the difficulty of making a precise measurement in these regions.This Surveillance has been modified by a Note that may require that more frequent surveillances be performed.
C.'
An evaluation of the expressions below are required to account for any increase to FqT (Z) that may occur and cause the FQT (Z) limit to be exceeded before the next required FQT (Z)eval uati on.If the two most recent FQ(Z) evaluations show that either the maximum over z OR L 1 FQ(Z)K(Z)-maximum over z has increased or is expected to increase prior to the next evaluation then it is required to increase the Fe T (Z) by the appropriate factor, as specified in the COLR, and verify(Z) is still within limits or evaluate FQ(Z) every 7 EFPD until SR 3.2.1.2 is satisfied.
If Required Actions A.I through A.4 and B.I through B.5 are not met within their associated Completion Times, the unit must be placed in a MODE or condition in which the LCO requirements are not applicable. This is done by placing the unit in at least MODE 2 within 6 hours.
These alternate requirements prevent FQ(Z) from exceeding its limit without detection.
This allowed Completion Time is reasonable based on operating experience regarding the amount of time it takes to reach MODE 2 from full power operation in an orderly manner and without challenging unit systems.
REFERENCES
SURVEILLANCE     SR 3.2.1.1 and SR 3.2.1.2 are modified by a Note. It states REQU IREMENTS    that during power escalation, THERMAL POWER may be increased until a power level for extended operation has been achieved at which a power distribution map can be obtained. This allowance is modified, however, by one of the Frequency conditions that requires verification that FQ(Z) is within its specified limit after a power rise of more than 10% RTP   I over the THERMAL POWER at which it was last verified to be within specified limits. In the absence of this Frequency condition, it is possible to increase power to RTP and operate for 31 days without verification of FQ(Z). The         I Frequency condition is not intended to require verification of these parameters after every 10% increase in power level above the last verification. It only requires verification after a power level is achieved for extended operation that is 10% higher than that power at which FQ was last measured.
: 1. 10 CFR 50.46.2. VEP-NFE-2-A, "VEPCO Evaluation of the Control Rod Ejection Transient." 3. UFSAR, Section 3.1.22.4. VEP-NE-1-A, "VEPCO Relaxed Power Distribution Control Methodology and Associated FQ Surveillance Technical Specifications." North Anna Units 1 and 2 B3211 eiinx FQ(Z)B3.2.1 1.2 1.1 1.0 0.9 0.8 0.7._. 0.6 0.5 0.4 0.3 0.2 0.1 0.0 DO NO IPRT IN TIS AREA DONO OPRT NHSAE (6, 1.0)(12, .925)THIS FIGURE FOR-ILLUSTRATION ONLY. DO NOT USE FOR OPERATION FT. 0 1 2 3 4 5 6 7 8 9 10 11 12 16.6 33.3 50.0 66.7 83.3 100 CORE HEIGHT* FOR CORE HEIGHT OF 12 FEET Figure B 3.2.1-1 (page 1 of 1)K(Z)-Normalized FQ(Z) as a Function of Core Height North Anna Units 1 and 2 B3211 eiinx B 3,2.1-12 Revision xx}}
(continued)
North Anna Units 1 and 2B321-ReionxB 3.2.1-8                       Revision xx
 
FQ(Z)
B 3.2.1 BASES SURVEILLANCE     SR 3.2.1.1 REQU IREMENTS (continued)    Verification that FQE (Z) is within its specified limits involves increasing FQ(Z) to allow for manufacturing tolerance and measuremleni* uncertainties in order to obtain FQ (Z). Specifically, FQ (Z) is the measured value of FQ(Z) obtained from incore flux map results multiplied by manufacturing and measurement uncertainties (1.05 x 1.03 = 1.0815). FQ (Z) is then compared to its specified limits.
The limit with which FQE (Z) is compared varies inversely with power above 50%0 RTP and directly with a function called K(Z) provided in the COLR.
Performing this Surveillanc* in MODE 1 prior to exceeding 75% RTP ensures that the FQ (Z) limit is met when RTP is achieved, because peaking factors generally decrease as power level is increased.
If THERMAL POWER has beep increased by > 10% RTP since the last determination of FQ (Z) , another evaluation of this factor is required 12 hours after achieving equilibrium conditions at this higher power level (to ensure that FeE (Z) values are being reduced sufficiently with power increase to stay within the LCO limits).
SR 3.2.1.2 The nuclear design process includes calculations performed to determine that the core can be operated within the FQ(Z) limits. Because flux maps are taken in steady state conditions, the variations in power distribution resulting from normal operational maneuvers are not present in the flux map data. These variations are, however, conservatively calculated by considering a wide range of unit maneuvers in normal operation. The maximum peaking factor increase over steady state values, calculated as a function of core elevation, Z, is called N(Z).
The limit with which FQT (Z) is compared varies inversely with power above 50% RTP and N(Z) and directly with a function called K(Z) provided in the COLR.
SR 3.2.1.2 requires a Surveillance of FQT (Z) during the initial startup following each refueling within 12 hours after achieving equilibrium conditions after exceeding 75%
(continued)
North Anna Units 1 and 2B321-ReionxB 3.2.1-9                         Revision xx
 
FQ(Z)
B 3.2.1 BASES SURVEILLANCE     SR 3.2.1.2 (continued)
REQUIREMENTS (conti nued)    RTP. THERMAL POWER levels below 75% are typically non-limiting with respect to the limit for FQT (Z) . Also, initial startups following a refueling are slow and well controlled due to startup ramp rate limitations and fuel conditioning requirements. Furthermore, startup physics testing and flux symmetry measurements, also performed at low power, provide confirmation that the core is operating as expected. Consequently, the initial startup following a refueling will not result in non-equilibrium power shapes that could challenge the FQT (Z)T limit. This Frequency ensures that verification of FQT (Z) is performed prior to extended operation at high power levels where the maximum permitted peak LHR could be challenged by non-equilibrium operation.
If a previous Surveillance of FqT (Z) was performed at part power conditions (below RTP), SR 3.2.1.2 also requires that FQT (Z) be yenifi ed at power level s_> 10% RTP above the THERMAL POWER of its last verification within 12 hours after achieving equilibrium conditions. This ensures that FQT (7) is within its limit using radial peaking factors measured at the higher power level.
If THERMAL POWER has been increased by &#x17d; 10% RTP since the last determination of FQT (Z), another evaluation of this factor is required 12 hours after achieving equilibrium conditions at this higher power level (to ensure that FQT (Z) values are being reduced sufficiently with power increase to stay within the LCO limits).
The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.
Flux map data are taken for multiple core elevations. FQT (Z) evaluations are not applicable for the following axial core regions, measured in percent of core height:
: a. Lower core region, from 0 to 15% inclusive; and
: b. Upper core region, from 85 to 100% inclusive.
(conti nued)
North Anna Units 1 and 2           B 3.2.1-10 B3211                              Revision eiinxxx
 
FQ(z)
B 3.2.1 BASES SURVEILLANCE     SR 3.2.1.2 (continued)
REQUIREMENTS (conti nued)    The top and bottom 15% of the core are excluded from the evaluation because of the low probability that these regions would be more limiting in the safety analyses and because of the difficulty of making a precise measurement in these regions.
This Surveillance has been modified by a Note that may require that more frequent surveillances be performed. An evaluation of the expressions below are required to account for any increase to FqT (Z) that may occur and cause the FQT (Z) limit to be exceeded before the next required FQT (Z) eval uati on.
If the two most recent FQ(Z) evaluations show that either the maximum over z L1 FQ*Z)
OR FQ(Z) maximum over z                  K(Z)-
has increased evaluation    thenorit is isexpected requiredtotoincrease increase prior toT (Z) the Fe    the by next the appropriate factor, as specified in the COLR, and verify FQ* (Z) is still within limits or evaluate FQ(Z) every 7 EFPD until SR 3.2.1.2 is satisfied. These alternate requirements prevent FQ(Z) from exceeding its limit without detection.
REFERENCES       1. 10 CFR 50.46.
: 2. VEP-NFE-2-A, "VEPCO Evaluation of the Control Rod Ejection Transient."
: 3. UFSAR,   Section 3.1.22.
: 4. VEP-NE-1-A, "VEPCO Relaxed Power Distribution Control Methodology and Associated FQ Surveillance Technical Specifications."
North Anna Units 1 and 2             B3211                                       eiinx
 
FQ(Z)
B3.2.1 1.2 DONO    IPRT INTIS AREA 1.1 DONOOPRT      NHSAE (6, 1.0) 1.0 0.9 (12, .925) 0.8 0.7
          ._. 0.6 0.5 0.4 0.3 0.2             THIS FIGURE FOR-ILLUSTRATION ONLY. DO NOT USE FOR OPERATION 0.1 0.0 FT.     0   1   2     3     4     5     6     7   8 9   10     11     12 16.6       33.3       50.0       66.7  83.3          100 CORE HEIGHT
* FOR CORE HEIGHT OF 12 FEET Figure B 3.2.1-1 (page 1 of 1)
K(Z)-Normalized FQ(Z) as a Function of Core Height North Anna Units 1 and 2                 B3211 B 3,2.1-12                               Revision eiinxxx}}

Revision as of 04:02, 31 October 2019

License Amendment Request to Address the Issues Identified in Westinghouse Documents NSAL-09-5, Rev. 1 and NSAL-15-1
ML15352A108
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/10/2015
From: Mark D. Sartain
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
15-494
Download: ML15352A108 (57)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 December 10, 2015 10 CFR 50.90 U.S. Nuclear Regulatory Commission Serial No.15-494 Attention: Document Control Desk NLOS/DEA R0 Washington, DC 20555 Docket Nos.: 50-338/339 License Nos.: NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

NORTH ANNA POWER STATION UNITS 1 AND 2 LICENSE AMENDMENT REQUEST TO ADDRESS THE ISSUES IDENTIFIED IN WESTINGHOUSE DOCUMENTS NSAL-09-5. REV. 1 AND NSAL-1 5-I In accordance with the provisions of 10 CFR 50.90, Virginia Electric and Power Company (Dominion) is submitting a license amendment request to revise the North Anna Power Station Units 1 and 2 Technical Specifications (TS). The proposed changes would revise the TS to address the issues identified in two Westinghouse communication documents.

Specifically, the proposed changes will address the issues identified in:

  • Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Rev. 1 (Reference
1) by relocating required operating space reductions (power and AFD) to the Core Operating Limits Report, accompanied by verification for each reload cycle
  • Westinghouse Nuclear Safety Advisory Letter NSAL-1 5-1, Rev. 0 (Reference
2) by defining TS surveillance requirements for steady-state and transient FQ(Z) and corresponding actions with which to apply an appropriate penalty factor to measured results provides a discussion of the proposed change. The marked-up and proposed TS pages are included in Attachments 2 and 3, respectively. The marked-up and proposed TS Bases changes are provided for NRC information only in .

We have evaluated the proposed amendment and have determined that it does not involve a significant hazards consideration as defined in 10 CFR 50.92. The basis for this determination is included in Attachment 1. We have also determined that operation with the proposed change will not result in any significant increase in the amount of effluents that may be released offsite or any significant increase in individual or cumulative occupational radiation exposure. Therefore, the proposed amendment is eligible for categorical exclusion from an environmental assessment as set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment is needed in connection with the approval of the proposed

_A4u6)

Serial No: 15-494 Docket Nos.: 50-338/339 Page 2 of 3 change. The proposed TS change has been reviewed and approved by the Facility Safety Review Committee.

Dominion requests approval of the proposed amendment by May 31, 2017 to enable implementation of the changes by the Unit 2 refueling outage in the fall of 2017.

Should you have any questions in regard to this submittal, please contact Ms. Diane E. Aitken at (804) 273-2694.

Sincerely, Mark D. Sartain Vice President - Nuclear Engineering COMMONWEALTH OF VIRGINIA ))

COUNTY OF HENRICO )

The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mark D. Sartain, who is Vice President - Nuclear Engineering of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this ..L day of -).c.* Lers' 2015.

M y.('.nm m ik*inn F vnir p.*' i *l .<4I 3)1 , "Zo LA *

  • 1 r

&

ivl3 v*,,,,,,,v*o Notary Public Z) ~bl~

Commonwealth of Virginia Reg. # 7629412 My Commission Expires August 31, 20L2

References:

1. Westinghouse Nuclear Safety Advisory Letter, NSAL-09-5, Rev. 1, "Relaxed Axial Offset Control EQ Technical Specification Actions," September 23, 2009.
2. Westinghouse Nuclear Safety Advisory Letter, NSAL-1 5-1, Rev. 0, "Heat Flux Hot Channel Factor Technical Specification Surveillance," February 6, 2015.

Attachments:

1. Discussion of Change
2. Marked-up Technical Specifications Pages
3. Proposed Technical Specifications Pages
4. Marked-up Technical Specifications Bases Pages (for information only)

Commitments made in this letter: None

Serial No: 15-494 Docket Nos.: 50-338/339 Page 3 of 3 cc: U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1 257 State Health Commissioner Virginia Department of Health James Madison Building - 7 th floor 109 Governor Street Suite 730 Richmond, VA 23219 Dr. V. Sreenivas NRC Project Manager - North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Karen Cotton-Gross NRC Project Manager U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power Station

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 1 of 16 ATTACHMENT I DISCUSSION OF CHANGE Virginia Electric and Power Company (Dominion)

North Anna Power Station Units I and 2

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-i15-I, Rev. 0 Attachment 1, Page 2 of 16 Table of Contents

1.0 DESCRIPTION

............................................................................................ 3 2.0 PROPOSED TECHNICAL SPECIFICATIONS CHANGES ............................................ 4 3.0 TECHNICALANALYSIS ..................................................  :................................

4.0 REGULATORY EVALUATION

......................................................................... 13

5.0 ENVIRONMENTAL CONSIDERATION

S .............................................................. 16

6.0 REFERENCES

........................................................................................... 16

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. I and NSAL-15-1, Rev. 0 Attachment 1, Page 3 of 16

1.0 DESCRIPTION

In accordance with the provisions of 10 CFR 50.90, Virginia Electric and Power Company (Dominion) is submitting a request to amend the Technical Specifications (TS) for North Anna Power Station Units 1 and 2 (NAPS). The changes are intended to address the issues identified in Westinghouse communications NSAL-09-5, Rev. 1 (Reference 1) and NSAL-15-1 (Reference 2).

Reference 1 notified Westinghouse customers of an issue associated with the Required Actions for Condition B of TS 3.2.1B, "Heat Flux Hot Channel Factor (FQ(Z) (RAOC-W(Z)

Methodology)," in Reference 3 for plants that have implemented the relaxed axial offset control (RAOC) methodology. In certain situations where transient FQ, FQw(Z), is not within its limit, the existing Required Actions may be insufficient to restore FQw(Z) to within the limit. Revision 1 of Reference 1 provided clarification regarding the applicability of the recommended interim actions to address this issue and how they should be implemented, including potential inclusion in plant specific Technical Specification changes. Dominion's evaluation of Reference I determined that it was applicable to NAPS, based on the similarities between the RAOC and Dominion's Relaxed Power Distribution Control (RPDC) methodologies.

Reference 2 notified Westinghouse customers of an issue associated with Surveillance Requirement (SR) 3.2.1.2 in TS 3.2.1B of Reference 3. For certain trends in measured FQ(Z) and non-equilibrium factor W(Z), the existing SR may not ensure that the transient FQ, FQw(Z), limit will be met between the performance of the monthly flux map measurements, for those plants that use the W(Z) FQ surveillance methodology. Dominion's evaluation of Reference 2 determined that it was also applicable to NAPS, based on the similarities between the RAOC and Dominion's Relaxed Power Distribution Control (RPDC) methodologies.

Dominion is proposing to change TS 3.2.1, "Heat Flux Hot Channel Factor (FQ(Z))," to enhance the required actions to be taken in the event that transient Fo(Z) surveillance limits are not met. Changes are also proposed that define separate terms, action steps and surveillance requirements for steady-state and transient FQ(Z), denoted as FQE(Z) and FQT(Z), respectively. The use of separate surveillance requirements (SR) in this manner is consistent with Westinghouse Standard Technical Specifications, NUREG-1431, Rev. 4 (Reference 3). The revised surveillance requirements provide guidance for application of, and determining the magnitude of a penalty factor for the measured FQ(Z). The factor will be applied if the trend in measured values indicates decreasing margin to the applicable limit since performing the previous surveillance or if the trend in predicted values indicates decreasing margin to the applicable limit prior to the next required surveillance. The

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 4 of 16 changes specify that this factor will be defined in the Core Operating Limits Report (COLR),

which allows specific numerical values of the factor to be evaluated for each reload core.

The Bases for TS 3.2.1 are being modified to address the proposed changes to TS 3.2.1.

The TS Bases changes are provided for information only. Changes to the TS Bases will be incorporated in accordance with the TS Bases Control Program (TS 5.5.13) upon approval of this amendment request.

2.0 PROPOSED TECHNICAL SPECIFICATIONS CHANGES The proposed TS and SR changes are detailed below. To aid review, deleted text is struck through and added text is italicized and bolded. For more extensive changes, reference is made to the TS markups in Attachment 2 and TS Bases markups in Attachment 4.

2.1 TS 3.2.1 - Heat Flux Hot Channel Factor (FQ(Z))

TS 3.2.1 currently reflects use of the Dominion Relaxed Power Distribution Control (RPDC) power distribution control methodology (Reference 4). The proposed changes detailed below revise certain specification terminology, including relocation of some equations to the TS Bases, and revision of appropriate TS Required Actions to address the issues in References 1 and 2.

The proposed changes follow:

LCO 3.2.1

  • LCO 3.2.1 will be revised as follows:

FQ(Z), as approximated by ,E{-- FQE(z) and FQT(Z), shall be within the limits specified in the COLR.

TS 3.2.1 - CONDITION A. REQUIRED ACTIONS AND COMPLETION TIME

  • TS 3.2.1 CONDITION A will be revised as follows:

-.......

NOTE-------....

Required Action A.4 shall be completed whenever this Condition is entered. SR 3.2.1.2 is not required to be performed if this Condition is entered prior to THERMAL POWER exceeding 75% RTP after a refueling.

A. F-QM-Z-) FQE(Z) not within limit.

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 5 of 16

  • Delete TS 3.2.1 REQUIRED ACTION A.1 and renumber remaining REQUIRED ACTIONS as REQUIRED ACTION A.1, A.2, A.3, and A.4
  • New TS 3.2.1 REQUIRED ACTION A.1 reads as follows:

Reduce THERMAL POWER > 1% RTP for each 1% $*M(Z) FQE(Z) exceeds limit.

A.1 COMPLETION TIME 15 minutes after each FQM(-Z-) FQE(Z) determination

  • New TS 3.2.1 REQUIRED ACTION A.2 reads as follows:

Reduce Power Range Neutron Flux-High trip setpoints > 1% for each 1% .FQM(-Z--

eee-litthat THERMAL POWER is limited below RTP by Required Action A. 1.

A.2 COMPLETION TIME 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each .FQM(-Z-) FQE(Z) determination

  • New TS 3.2.1 REQUIRED ACTION A.3 reads as follows:

Reduce Overpower AT trip setpoints > 1% for each 1% = Z)-e ....ee-li,;ii that THERMAL POWER is limited below RTP by Required Action A. 1.

A.3 COMPLETION TIME 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each .FQM(-Z-) FQE(Z) determination

  • New TS 3.2.1 ACTION A.4 reads as follows:

Perform SR 3.2.1.1 and SR 3.2.1.2 A.4 COMPLETION TIME Prior to increasing THERMAL POWER above the limit of Required Action A.21

Serial No: 15-494 Docket Nos.: 50-338/339 LAR- NSAL-09-5, Rev. 1 and NSAL-15-1, Rev. 0 Attachment 1, Page 6 of 16 TS 3.2.1 - CONDITION B. REQUIRED ACTIONS and COMPLETION TIME

  • New TS 3.2.1 CONDITION B will be added, to read as follows:

ACTIONS CONDITION ] REQUIRED ACTIONj COMPLETION TIME B.----NOTE-..... 8.1 Reduce AFD limits 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after each Required Action B.5 as specified in the FQT(Z) determination shall be completed COLR.

whenever this AND Condition is entered. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after each B.2 Reduce THERMAL FQT(Z) determination FQT(z) not within POWER as specified in limit. the COLR.

AND 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each B.3 Reduce Power FQT(z) determination Range Neutron Flux-High trip setpoints > 1%

for each 1% that THERMAL POWER is limited below RTP by Required Action 8.2.

AND 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each FQT(Z) determination B.4 Reduce Overpower AT trip setpoints > 1%

for each 1% that THERMAL POWER is limited below RTP by Required Action 8.2. Priorto increasing AND THERMAL POWER and AFD limits above 8.5 Perform SR 3.2.1.1 the limits of Required and SR 3.2.1.2. Actions 8.1 and 8.2

  • Renumber existing TS 3.2.1 CONDITION B, REQUIRED ACTION, as follows:

BC. Required Action and associated Completion Time not met.

BC.1 Be in MODE 2.

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 7 of 16 2.2 SR 3.2.1.1, SR 3.2.1.2 [new] - Heat Flux Hot Channel Factor (FQ(Z))

The changes to SR 3.2.1.1 and the addition of SR 3.2.1.2 conform with the introduction of steady-state, FQE(Z), and transient, FQT(Z), in TS 3.2.1. These changes define separate surveillance requirements for the two representations of FQ(Z).

The proposed changes follow:

SR 3.2.1.1

Verify .F-*(-Z- FQE(Z) is within limit.

SR 3.2.1.1 [FREQUENCY] (the 2 nd clause):

Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions after exceeding, by -- 10%

RTP, the THERMAL POWER at which FQM(-Z-) FQE(Z) was last verified

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Attachment 1, Page 8 of 16

S UR VEILLA NCE FREQUENCY SR 3.2.1.2----..............NOTE.........

If measurements indicate that either the maximum over z

[K(Z) I OR K(z) ]

maximum over z has increasedsince the previous evaluation of FQ(Z)or is expected to increaseprior to the next evaluation:

A. Increase FQT(Z) by the appropriatefactor, as specified in the COLR, and verify FQT(Z) is still within limits or B. Repeat SR 3.2.1.2 once perT7 EFPD until Once after each

a. Above (A) is met or refueling within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
b. Two successive flux maps indicate that the after achieving equilibrium conditions after

[~¶21 THERMAL POWER exceeds 75% RTP maximum over z LKzJ AND AND Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> K(Z)]. after achieving maximum over z equilibrium conditions has not increased. after exceeding, by

> 10% RTP, the Verify FQT(Z) is within limit.

THERMAL POWER at which FQT(Z) was last verified AND In accordancewith the Surveillance Frequency Control Program

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 9 of 16 2.3 TS Bases 3.2.1 - Heat Flux Hot Channel Factor (FQ(Z))

Several changes to the Bases will be required which reflect the terminology changes and relocation of items from the specific TS sections noted in the description above.

Summary list of key changes (see markup in Attachment 4):

  • Revise terminology throughout to reflect use of FQ(Z), FQE(Z) and FQT(Z) as appropriate
  • Changes to conform with deletion and renumbered Condition A REQUIRED ACTIONS in TS 3.2.1
  • Insert 4 describes the relation for FQT(Z), including the N(Z) factor
  • Insert 5 describes actions to reduce core power and AFD limits if FQE(Z) and FQT(Z) cannot be maintained within LCO limits
  • Insert 6 describes the Condition B REQUIRED ACTIONS added in TS 3.2.1 for FaT(Z)
  • Insert 7 describes the steady-state peaking factor, FQE(Z) for SR 3.2.1.1
  • Insert 8 describes the frequency conditions for the transient peaking factor, FQT(Z) for SR 3.2.1.2
  • Insert 9 describes expressions for both FQE (Z) and FQT(z) that are evaluated to determine whether to apply the appropriate penalty factor or increase the frequency of surveillance Based on Dominion's analytical assessment of internal and external operating experiences (e.g. Westinghouse Communication 06-IC-03, Reference 5), the magnitudes of the lower and upper core regions excluded from FQ surveillances had been proactively and conservatively reduced (in approximately 2006) from what was and is currently described in the North Anna Technical Specification Bases. An update to the Technical Specification Bases to expand the FQ axial surveillance regions is being tracked by Dominion's corrective action system.

3.0 TECHNICAL ANALYSIS

The proposed TS changes identified in Section 2.0 are evaluated for technical adequacy in the following sections.

3.1 TS 3.2.1 - Heat Flux Hot Channel Factor (FQ(Z))

The proposed changes involve additions, deletions and revisions to existing TS content that are associated with LCO 3.2.1. These changes provide resolution of issues documented in Westinghouse notification documents NSAL-09-5, Rev. 1 (Reference 1) and NSAL-15-1 (Reference 2). NAPS is currently operating with compensatory actions which address the issues identified in References 1 and 2. Evaluation of the specific proposed changes is provided below.

Serial No: 15-494 Docket Nos.: 50-338/339 LAR,- NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Attachment 1, Page 10 of 16 LCO 3.2.1 The existing LCO 3.2.1 specifies that FQ(Z) is approximated by F0 M(Z), which is described in the Bases as the steady-state measured value for FQ(Z). The COLR limit to which FQM(z) is compared is adjusted by the factor, N(Z), which accounts for the calculated worst case transient core conditions. The N(Z) factor is calculated in accordance with the approved Dominion RPDC methodology (Reference 4). The proposed changes specify that Fo(Z) is approximated by F0 E(z) and FQT(Z), denoted as the steady-state and transient quantities, respectively. Separate surveillance requirements are specified for FQE(Z) and FQT(Z), which is consistent with the comparable terms F0 c(Z) and F0 w(Z) in Standard Technical Specifications for Westinghouse plants (Reference 3).

A Note is inserted before LCO 3.2.1 Condition A to explain that Action A.4 is always required to be performed unless SR 3.2.1.2 is performed prior to exceeding 75% RTP after a refueling outage. This note is consistent with language proposed for this LCO condition in response to an NRC Request for Additional Information during review of WCAP-1 7661-P (Reference 6).

Required Action A.1 in existing LCO 3.2.1 is deleted, since the revised Condition A now applies to steady-state FQE(Z), for which this action does not apply, per the comparable Reference 3 actions for TS 3.2.IB. The remaining actions for LCO 3.2.1 Condition A are retained, with changes to each action that reflect use of FQE(Z) versus FQM(Z).

A new Condition B with corresponding Required Actions is added to address the situation in which FQT(Z) is not within its limit. Proposed Required Actions B.1 through B.5 are a modified version of the interim actions identified in NSAL-09-5, Rev. 1 (Reference 1), for this situation. These changes are proposed as the resolution for the issues identified in Reference 1.

Westinghouse's proposal for the long term resolution of NSAL-09-5, Rev. 1 is to seek NRC approval for the methods described in WCAP-17661-P (Reference 6). WCAP-17661-P is intended to revise the existing RAOC and Constant Axial Offset Control (CAOC) F0 Surveillance Technical Specifications to address several outstanding issues, one of which was NSAL-09-5. Dominion has strategically chosen not to adopt WCAP-17661-P and its subsequent Technical Specification Task Force (TSTF) traveler for North Anna.

This alternate approach was determined by Dominion evaluation to most appropriately address the issues in NSAL-09-5, Rev. 1 for NAPS. The Dominion approach has these desirable aspects: 1) it addresses directly the issues of NSAL-09-5, Rev. 1; 2) it retains the existing TS surveillance scheme and structure; and 3) it retains the existing axial control calculational methodology (RPDC). By relocating the numerical values to the COLR,

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 11 of 16 Dominion's proposed resolution of NSAL-09-5 allows the required RPDC operating space (THERMAL POWER and AFD) reductions to be evaluated and modified on a cycle-specific basis. This proposed resolution is supported by current Dominion RPDC methods.

Specifically, the allowable operating space that applies to Required Action B.1 and 8.2 is relocated to the COLR. A new table, entitled "Required Operating Space Reductions for FQT(Z) Exceeding Its Limits," will be added to the COLR to quantify the required THERMAL POWER and AFD limits associated with different amounts of FQT(Z) margin improvement (1%, 2%, etc.). If LCO 3.2.1, Condition B is entered, the operating space as defined in the new COLR table will ensure that sufficient margin exists. COLR Table 3.2-3 below presents a sample of the proposed table to be included in the COLR.

The values provided in the sample table below are only intended to provide a representative example of typical reload values. The determination and verification of the required FQT(Z) margin improvements and the corresponding required reductions in the THERMAL POWER Limit and AFD Bands will be performed on a reload specific basis in accordance with the approved methodology of VEP-NE-1-A listed in Technical Specification 5.6.5.b.

COLR Table 3.2-3 Required Operating Space Reductions for FQT(Z) Exceeding Its Limits Required FQT(z) Margin THERMAL POWER Negative AFD Positive AFD Improvement Reduction Band Reduction Band Reduction

(%RTP) (%AFD) (%AFD)

< %>3% >Ž2.0% > 2.0%

> 1% and*<2% >Ž5% > 3.0% > 3.0%

> 2% and <3% ___8% __.3.5% >Ž3.5%

> 3% _Ž50% N/A N/A 3.2 SR 3.2.1.1, SR 3.2.1.2 [new] - Heat Flux Hot Channel Factor (FQ(Z))

The proposed changes to SR 3.2.1.1 address surveillance for FQE(Z), and the addition of new SR 3.2.1.2 addresses surveillance for FQT(Z). Specifying separate requirements for FQE(Z) and FQT(Z), iS consistent with treatment of the comparable terms F0 c(Z) and FQw(Z) in Standard Technical Specifications for Westinghouse plants (Reference 3).

The Note preceding SR 3.2.1.1 is deleted since it is not applicable to surveillance for the steady-state parameter FQE(z). It relates to considerations that apply only to conducting surveillance for the transient FQ(Z) limits.

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 12 of 16 Insert 3 describes proposed new SR 3.2.1.2 for FQT(Z), including a Note preceding SR 3.2.1.2 that describes the actions for the situation in which either FQE(Z) or FQT(Z) have increased since the last evaluation of FQ(Z) or are expected to increase prior to the next evaluation. Required Action A of the Note involves increasing FQT(Z) by the appropriate factor, as specified in the COLR, if the conditions concerning either FQE(Z) or FQT(Z) are met. This approach, although different in the details of application from that recommended in Reference 2, has been deemed to be more suitable for use with Dominion methods. The proposed SR 3.2.1 .2 has been confirmed by analysis with Dominion methods for representative NAPS reload cores to ensure that FQE(Z) and FQT(Z) will satisfy their respective limits and to resolve the issue -of undetected loss of margin identified in Reference 2.

As applied by Dominion, SR 3.2.1.2 involves looking for increases in steady-state and transient, measured and predicted FQ(Z) to determine if the penalty factor should be applied. The application of the appropriate penalty factor will be required if any of the following conditions are met:

1. Increase in measured maximum FoE(Z,) I K(Z) from the previous surveillance,
2. Increase in measured maximum FQT(Z) I K(Z) from the previous surveillance,
3. Increase in predicted maximum FQE(Z) I K(Z) over the next surveillance period, or
4. Increase in predicted maximum FQT(Z) I K(Z) over the next surveillance period.

Cycle-specific analyses will be performed to determine the appropriate penalty factor required to accommodate potential increases in FQ(Z) over the surveillance period. SR 3.2.1.2 notes that the 'appropriate factor' will be specified in the COLR. This allows for the details of the appropriate penalty factors to be evaluated and modified on a cycle-specific basis. This revised surveillance requirement will ensure an appropriate analytical penalty factor is applied during performance of SR 3.2.1.2, which addresses the issues identified in NSAL-15-1 (Reference 2).

A new table, entitled "Penalty Factors for Flux Map Analysis," will be added to the COLR.

Table 3.2-2 below presents a sample of the proposed table to be included in the COLR. The values provided in the sample table below are only intended to provide a representative example of typical reload values. The determination and verification of the appropriate penalty factor will be performed on a reload specific basis in accordance with the approved methodology of VEP-NE-1-A listed in Technical Specification 5.6.5.b.

Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Attachment 1, Page 13 of 16 COLR Table 3.2-2 Penalty Factors for Flux Map Analysis Burnup Surveillance (MWD/MTU) Factor 0 -999 4.00%

1000 -1999 3.50%

2000 -2999 2.00%

3000 -3999 2.00%

4000 -4999 2.00%

5000 -6999 2.00%

7000 -8999 2.00%

9000 -10999 2.00%

11000 -12999 2.00%

13000 -14999 2.00%

15000 -16999 2.00%

17000 -18999 2.00%

19000 - EOR 2.00%

Subsequent to approval of this LAR, Dominion intends to process appropriate conforming changes, in the form of a modification (denoted VEP-NE-1, Rev. 0.2-A) to the RPDC topical report. These changes will reflect the adjustments discussed herein to address the issues in References 1 and 2. This modification will be prepared in accordance with Dominion's topical modification process, as provided for in our reload methods topical report VEP-FRD-42-A (Reference 7).

4.0 REGULATORY EVALUATION

4.1 Applicable Regulatory Requirements and Criteria 10 CFR 50, Appendix B, General Design Criterion 10, which states:

The reactor core and associated coolant, control, and protection systems shall be designed with appropriate margin to assure that specified acceptable fuel design limits are not exceeded during any condition of normal operation, including the effects of anticipated operational occurrences.

10 CFR 50.36, Technical Specifications, paragraph (c)(2) states that technical specifications will include limiting conditions for operation. Paragraph (c)(3) states that technical specifications will include surveillance requirements. Both of these paragraphs are applicable to the proposed change.

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-15-1, Rev. 0 Attachment 1, Page 14 of 16 Section (c)(2)(ii)(B) provides that LCOs must be established for each item meeting one or more criteria. For the power distribution items affected by the proposed change, the following criterion applies:

(B) Criterion 2. A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. The association with the relevant design basis accident analysis is described below.

10 CFR 50.46, Acceptance Criteria For Emergency Core Cooling Systems For Light-Water Nuclear Power Reactors, establishes acceptable limits for the performance of emergency core cooling systems (ECCS), and requirements for the analytical models used to validate the performance. The analyses of ECOS performance use various inputs and assumptions that reflect the conditions and features of a given plant. In accordance with North Anna TS 5.6.5.b, Core Operating Limits Report, the ECCS analysis establishes limits for FQ(Z), Heat Flux Hot Channel Factor, which is the subject of the proposed TS changes.

The proposed change maintains compliance with these requirements.

4.2 No Significant Hazards Consideration Dominion has evaluated whether a significant hazards consideration is involved with the proposed amendment by addressing the three standards set forth in 10 CFR 50.92, "Issuance of Amendment," as discussed below:

1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No.

The proposed change for resolution of Westinghouse notification documents NSAL 5, Rev. 1 and NSAL-1 5-1, Rev. 0 is intended to address deficiencies identified within the existing NAPS Technical Specifications and to return them to their as-designed function.

Operation in accordance with the revised TS ensures that the assumptions for initial conditions of key parameter values in the safety analyses remain valid and does not result in actions that would increase the probability or consequences of any accident previously evaluated.

Therefore, the proposed amendment does not involve a significant increase in the probability or the consequences of any accident previously evaluated.

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 15 of 16

2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No.

Operation in accordance with the revised TS and its limits precludes new challenges to SSCs that might introduce a new type of accident. All design and performance criteria will continue to be met and no new single failure mechanisms will be created. The proposed change for resolution of Westinghouse notification documents NSAL-09-5, Rev. 1 and NSAL-15-1, Rev. 0 does not involve the alteration of plant equipment or introduce unique operational modes or accident precursors. It thus does not create the potential for a different kind of accident.

Therefore, the proposed amendment does not create a new or different kind of accident from any accident previously evaluated.

3. Does the proposed change involve a significant reduction in a margin of safety?

Response: No.

Operation in accordance with the revised TS and its limits preserves the margins assumed in the initial conditions for key parameters assumed in the safety analysis. This ensures that all design and performance criteria associated with the safety analysis will continue to be met and that the margin of safety is not affected.

Therefore, the proposed amendment does not involve a significant reduction in a margin of safety.

Based on the above information, Dominion concludes that the proposed license amendment involves no significant hazards consideration under the criteria set forth in 10 CFR 50.92(c) and, accordingly, a finding of no significant hazards consideration is justified.

4.3 Precedents The proposed changes to the North Anna Units 1 and 2 TS are fundamentally the same as those in the following submittal associated with previous application of Dominion methods:

1. Letter from Mark D. Sartain (Dominion) to USNRC, "Millstone Power Station Unit 3 License Amendment Request to Adopt Dominion Core Design and Safety Analysis Methods and to Address the Issues Identified in Westinghouse Documents NSAL-09-5, Rev. 1, NSAL-1 5-1 and 06-1C-03," May 8, 2015 (ADAMS Accession No. ML15134A244).

Precedent 1 included proposed TS changes that address each of the issues identified in References 1 and 2 in a comparable manner to those enclosed in this LAR. For both

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 16 of 16 Precedent 1 and this LAR, the proposed TS changes are compatible with Dominion reload core design methods.

5.0 ENVIRONMENTAL CONSIDERATION

S Dominion has reviewed the proposed license amendment for environmental considerations.

The proposed license amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion from an environmental assessment as set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51 .22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.

6.0 REFERENCES

1. Westinghouse Nuclear Safety Advisory Letter, NSAL-09-5, Rev. 1, "Relaxed Axial Offset Control EQ Technical Specification Actions," September 23, 2009.
2. Westinghouse Nuclear Safety Advisory Letter, NSAL-15-1, Rev. 0, "Heat Flux Hot Channel Factor Technical Specification Surveillance," February 3, 2015.
3. NUREG-1431, Revision 4, Vol. 1 and 2, "Standard Technical Specifications -

Westinghouse Plants."

4. Topical Report, VEP-NE-1, Rev. 0.1-A, "VEPCO Relaxed Power Distribution Control Methodology and Associated FQ Surveillance Technical Specifications," August 2003.
5. Westinghouse Notice 06-1C-03, "FQ and Fxy, Surveillance Zone Issue," February 21, 2006.
6. WCAP-17661-P, Revision 1, "Improved RAOC and CAOC FQ Surveillance Technical Specifications," November 2013.
7. Topical Report, VEP-FRD-42, Rev. 2.1-A, "Reload Nuclear Design Methodology,"

August 2003.

Serial No.15-494 LAR - NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Docket Nos. 50-338/339 ATTACHMENT 2 MARKED-UP TECHNICAL SPECIFICATIONS PAGES Virginia Electric and Power Company (Dominion)

North Anna Power Station Units 1 and 2

FQ(Z) 3.2.1 3.2 POWER DISTRIBUTION LIMITS 3.2.1 Heat Flux Hot Channel Factor (FQ(Z)) ,,- FQE(Z)and FQ'(Z) 1k LCO 3.2.1 FQ(Z), as approximated by specified in the COLR.

-f*-~ , shall be within the limits APPLICABILITY: MODE 1.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME

/*I NSRT"1']

A. -F-.Z* not within A1eADlimits _>1% 15 mi er" limit. foreac-M(Z)FQ(Z) exeesliidetermi nation A.-Z*. Reduce THERMAL POWER 15 minutes after

Ž1% RTP for each 1% each -F~-+Z 4- IFQE(Z) determi nation AND A.-2-.2 Reduce Power Range 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after Neutron Flux-High trip each -F -- ~----

setpoints Ž 1% for determi nation each 1% M AND A.f-..3 Reduce Overpower AT 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after trip setpoints Ž 1% each f*() 4-for each 1%-F/-,,,- determination cxcd limit. that THERMAL POWER AND is limited below RTP by Required Action A.1 A.-2-.4 Perform SR 3.2.1.1 Prior to increasing land SR 3.2.1.2 THERMAL POWER above the limit of Required Action A.f-..I North Anna Units 1 and 2 3.2.1-I 3211Aedet 3/1

FQ(Z) 3.2.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME

--- Required Action and -B-.I Be in MODE 2. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> I* associated Completions SURVEILLANCE REQUIREMENTS


NOTE- - - - - - - - --

During power escalation, THERMAL POWER may be increased until a power level for extended operation has been achieved, at which a power distribution map is obtai ned.

North Anna Units 1 and 2 3212Aedet 3.2.1-2 3/1

FQ(Z) 3.2.1 SURVEILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY SR 3.2.1.1 I F(Z) measurements indicate

-...

NOTE---- --

maximu over z LK-(Z) has increas ,d since the p iu eval uation o Z

a. Increase F*( by he appropriate factor and-verf F(Z) is still within limits;
b. Repeat SR .21. ce per 7 EFPD until two cesv lux maps indicate maxium verz [

__as not increased'.*

K~(Z)j]

IFoE(Z) Veri fy>-- (ji s within limit. Once after each refueling prior to THERMAL POWER exceeding 75% RTP AND Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions after exceeding, by

Ž10% RTP, the THERMAL POWER at whicl+W(+*

waslat erifed~

AND In accordance with the Surveil11ance Frequency Control Program North Anna Units 1 and 2 3.2.1-3 Aedet 6/4

INSERT "1"

-~NOTE---

Required Action A.4 shall be completed whenever this Condition is entered. SR 3.2.1.2 is not required to be performed if this Condition is entered prior to THERMAL POWER exceeding 75%

RTP after a refueling.

INSERT "2" ACTIONS CONDITION [REQUIRED ACTION ]COMPLETION TIME B.----NOTE----... B.1 Reduce AFD limits as specified in 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after each Required Action B.5 the COLR. FaT(Z) determination shall be completed AND whenever this B.2 Reduce THERMAL POWER as 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after each Condition is entered. specified in the COLR. FaT(Z) determination AND FQT(Z) not within B.3 Reduce Power Range Neutron 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each limit. Flux-High trip setpoints > 1 % for FaT(Z) determination each 1 % that THERMAL POWER is limited below RTP by Required Action B.2.

AND B.4 Reduce Overpower AT trip 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each setpoints > 1% for each 1% that FQT(z) determination THERMAL POWER is limited below RTP by Required Action B.2.

AND B.5 Perform SR 3.2.1.1 and SR Prior to increasing 3.2.1.2. THERMAL POWER and AFD limits above the limits of Required Actions B.1 and B.2

INSERT "3" SURVEILLANCE FREQUENCY SR 3.2.1.2 -~~~NOTE-----------

If measurements indicate that either the maximum over z [n()]1 OR maximum over z [ K(z)].

has increased since the previous evaluation of FQ(Z) or is expected to increase prior to the next evaluation:

A. Increase FQT(Z) by the appropriate factor, as specified in the COLR, and verify FQT(z) is still within limits or B. Repeat SR 3.2.1.2 once per 7 EFPD until

a. Above (A) is met or
b. Two successive flux maps indicate that the Once after each refueling within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> maximum over z [FK(Z)]J after achieving equilibrium conditions after

[nK~)

AND THERMAL POWER exceeds 75% RTP maximum over z has not increased. AND Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving Verify FQT(Z) is within limit. equilibrium conditions after exceeding, by

> 10% RTP, the THERMAL POWER at which FoT(z) was last verified AND In accordance with the Surveillance Frequency Control Program

Serial No.15-494 LAR - NSAL-09-5, Rev. 1 and NSAL-15-1 Docket Nos. 50-338/339 ATTACHMENT 3 PROPOSED TECHNICAL SPECIFICATIONS PAGES Virginia Electric and Power Company (Dominion)

North Anna Power Station Units 1 and 2

FQ(Z) 3.2.1 3.2 POWER DISTRIBUTION LIMITS 3.2.1 Heat Flux Hot Channel Factor (FQ(Z))

LCO 3.2.1 FQ(Z) , as approximated the limits specified in bytheFQECOLR.

(Z) and FQT (Z), shall be within APPLICABILITY: MODE 1.

ACTIONS CONDITION ] REQUIRED ACTION TCOMPLE TIME A.------NOTE--- -- A.I Reduce THERMAL POWER 15 minutes after Required Action A.4 Ž1% RTP for each 1% each FeE (7) shall be completed FQE (Z) exceeds limit. determi nati on whenever this Condition is entered. SR 3.2.1.2 is not required to be AND performed if this A.2 Reduce Power Range 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> afteYr each Condition is entered Neutron Flux-High FQE (Z) prior to THERMAL POWER exceeding 75% RTP after trip setpoints Ž 1% determi nati on a refueling. for each 1% that THERMAL POWER is limited below RTP by FQE (7) not within Required Action A.I.

limit.

AND A.3 Reduce Overpower AT 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each trip setpoints Ž 1% FQE (Z) for each 1% that determi nati on THERMAL POWER is limited below RTP by Required Action A.1.

AND A.4 Perform SR 3.2.1.1 Prior to increasing and SR 3.2.1.2. THERMAL POWER above the limit of Required Action A.I I

North Anna Units 1 and 2 3.2.1-1 3211Aedet Amendments

FQ(Z) 3.2.1 ACTIONS CONDITION ]R EQUIRED ACTION COMPLETION TIME B.------NOTE- --- B.I Reduce AFD limits as 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after each Required Action B.5 specified in the FQT (7) shall be completed COLR, determi nati on whenever this Condition is entered.

AND B,2 Reduce THERMAL POWER 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after each FQT (Z) not within as specified in the FQT (Z) limit.

COLR. determi nati on AND B.3 Reduce Power Range 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each Neutron Flux-High FQT (Z) trip setpoints > 1% determi nati on for each 1% that THERMAL POWER is limited below RTP by Required Action B.2 AND B,4 Reduce Overpower AT 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each trip setpoints > 1% FQT (Z) for each 1% that determi nati on THERMAL POWER is limited below RTP by Required Action B.2.

AND B.5 Perform SR 3.2.1.1 Prior to increasing and SR 3.2.1.2. THERMAL POWER and AFD limits above the limits of Required Actions B.I and B.2.

C. Required Action and associated Completion

}C.1 Be in MODE 2. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Time not met.,______________ _________

North Anna Units 1 and 2 3,2.1-2 3212Aedet Amendments

FQ(Z) 3.2.1 SURVEILLANCE REQUIREMENTS

-- - - - - - - - - - - - - - - - -- NOTE - - - - - - - - - -

During power escalation, THERMAL POWER may be increased until a power level for extended operation has been achieved, at which a power distribution map is obtained.

SURVEILLANCE REQUIREMENTS _____________

SURVEILLANCE FREQUENCY SR 3.2.1.1 Verify FQ (Z) is within limit. Once after each refueling prior to THERMAL POWER exceeding 75% RTP AND Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions after exceeding, by

Ž10% RTP, the THERMAL POWER at which FQE (Z) was last verified AND In accordance with the Surveillance Frequency Control Program North Anna Units 1 and 2 3213Aedet 3.2.1-3 Amendments

FQ(Z) 3.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY

+

SR 3.2.1.2 -NOTE-If measurements indicate that either the maximum over z LK(Z)

SFQ*Z) 1 j

OR FQ*Z) 1 maximum over z has increased of since FQ (7) the previous evaluation or is expected to increase prior to the next evaluation:

A. Increase FQT (7) by the appropriate factor, as specified in the COLR, and verify FQT (7) is still within limits or B. Repeat SR 3.2.1.2 once per 7 EFPD until1

a. Above (A) is met or
b. Two successive flux maps indicate that the maximum over z SFQ(Z)]

AND maximum over z K(Z) j has not increased.

(conti nued)

North Anna Units 1 and 2 3.2.1-4 3214Aedet Amendments

FQ(Z) 3.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.1.2 (conti nued)

Verify FQT (Z) is within limit.

Once after each refueling within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions after THERMAL POWER exceeds 75% RTP AND Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions after exceeding, by

Ž10% RTP, the THERMAL POWER at which FQT (Z) was last verified AND In accordance with the Surveillance Frequency Control Program North Anna Units 1 and 2 3.2.1-5 3215Aedet Amendments

Intentionally Blank Serial No.15-494 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Docket Nos. 50-338/339 ATTACHMENT 4 MARKED-UP AND PROPOSED TECHNICAL SPECIFICATIONS BASES PAGES (for information only)

Virginia Electric and Power Company (Dominion)

North Anna Power Station Units 1 and 2

FQ(Z)

B 3.2.1 B 3.2 POWER DISTRIBUTION LIMITS B 3.2.1 Heat Flux Hot Channel Factor (FQ(Z))

BASES BACKGROUND The the purpose of thepellet) limits on the values of FQ(Z) is to limit local (i.e., peak power density. The value of FQ(Z) is approximated by FQ(Z) varies along the axial height (Z) of the core.

FQE(Z) and FaT(Z). FQE(Z) is defined as the FQ(Z) is defined as the maximum local fuel rod linear power measured value of FQ(Z), density divided by the average fuel rod linear power density, assuming nominal fuel pellet and fuel rod incorporating dimensions. Therefore, FQ(Z) is a measure of the peak fuel manufacturing tolerances pellet power within the reactor core.

and measurement uncertainties. FaT(Z) is During power operation, the global power distribution is limited by LCO 3.2.3, "AXIAL FLUX DIFFERENCE (AFD)," and defined as the FQE(Z) LCO 3.2.4, "QUADRANT POWER TILT RATIO (QPTR)," which are incorporating a non- directly and continuously measured process variables. These equilibrium factor that LCOs, along with LCO 3.1.6, "Control Bank Insertion Limits,"

maintain the core limits on power distributions on a accounts for possible continuous basis.

power distribution transients during normal FQ(Z) varies with fuel loading patterns, control bank operation. insertion, fuel burnup, and changes in axial power distribution.

FQ(Z) system.is These measured periodically using the incore detector measurements are generally taken with the core at or near steady state conditions.

Isteady-state F0 (Z),I Using is the measured possible three to derive dimensional a measure val1 power distributions, it foFQ)rt\

IFQE(Z)I However, because this value represents a steady state condition, it does not encompass the variations in the value of FQ(Z) that are present during nonequilibrium situations, such as load changes.

To account for these possible variations, the steady state

......... e\ is"adjusted by an elevation dependent factor

  • -.
  • that accounts for the calculated worst case transient conditions itO derive FaT(Z) Ii Core monitoring and control under nonsteady state conditions are accomplished by operating the core within the limits of the appropriate LC~s, including the limits on AFD, QPTR, and control rod insertion.

North Anna Units 1 and 2 B 3.2.1-1 B3211Rvso Revision 0

FQ(Z)

B 3.2.1 BASES APPLICABLE This LCO precludes core power distributions that violate the SAFETY ANALYSES following fuel design criteria:

a. During a loss of coolant accident (LOCA), the peak cladding temperature during a small break LOCA must not exceed 2200°F, and there must be a high level of probability that the peak cladding temperature does not exceed 2200 0 F for the large breaks (Ref. 1);
b. During a loss of forced reactor coolant flow accident, there must be at least 95% probability at the 95%

confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a departure from nucleate boiling (DNB) condition;

c. During an ejected rod accident, the energy deposition to unirradiated fuel is limited to 225 cal/gm and irradiated fuel is limited to 200 cal/gm (Ref. 2); and
d. The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest worth control rod stuck fully withdrawn (Ref. 3).

Limits on Fo(7) ensure that the value of the initial total peaking factor assumed in the accident analyses remains valid. Other criteria must also be met (e.g., maximum cladding oxidation, maximum hydrogen generation, coolable geometry, and long term cooling). However, the peak cladding temperature is typically most limiting.

Fo (Z) limits assumed in the LOCA analysis are typically limiting relative to (i.e., lower than) the FQ(Z) limit assumed in safety analyses for other postulated accidents.

Therefore, this LCO provides conservative limits for other postulated accidents.

FQ(Z) satisfies Criterion 2 of 10 CFR 50.36(c) (2) (ii).

North Anna Units 1 and 2B321-Reion B 3.2.1-2 Revision 13 3

FQ(Z)

B 3.2.1 BASES NE

[CO The*-*M-~ued- Heat Flux Hot Channel Factor, f-Ft), shall be limited by the following relationships, asu=, .... bad dec Ifor where: CFQ is the FQ(Z) limit at RTP provided in the COLR, K(Z) is the normalized F (Z) as a function of core height provided in the CObLR, s cedependentra function

" tha nontered I o" included in the P is the fraction of RATED THERMAL POWER defined as

=THERMAL POWER FQ(Z) is approximated by FQE(Z) and FQT(Z). Thus, both -- *The actual values of CF, K(Z), an ()aegven in the FQE(Z) and FQT(Z) must meet \COLR; however, CFQ is normally approximately 2. (Z) s ar-the preceding limits on FQ(Z). \ function that looks like the one provided in I FQ(Z)

An_* evluaionrequires MEI.From the incore flux obtaining map resultsan we incore obtainflux themap in au measured value of FQ(Z). Then, the measured *-}r-Z-Y.-..s increased by 1.03 which is a factor that accounts for fuel manufacturing tolerances and 1.05 which accounts for flux I NER 4"

  • measurement unetit o banFEZ The FQ(Z) limits define limiting values for core power peaking that precludes peak cladding temperatures above 2200°F during a small break LOCA and assures with a high level of probability that the peak cladding temperature does not exceed 2200°F for large breaks (Ref. 1).

This LCO requires operation within the bounds assumed in the safety analyses. Calculations are performed in the core design process to confirm that the core can be controlled in (conti nued)

North Anna Units 1 and 2B321-Reion3 B 3.2.1-3 Revision 13

FQ(Z)

B 3.2.1 BASES LCO such LOCA a"Ft'cQ/(

manner during operation that it can stay within the (conti nued) limits.. .=If FQ(Z ...... ~i^ ma-inta-.^d ,.,ih-n th..

r::::r:r7 :III~2r' i~ rcguir~u.

Violating consequences the ifLCOa limits design for basisFQ(Z) eventproduces occurs unacceptable while FQ(Z) is outside its specified limits.

APPLICABILITY The FQ(Z) limits must be maintained in MODE 1 to prevent core power distributions from exceeding the limits assumed in the safety analyses. Applicability in other MODES is not required because there is either insufficient stored energy in the fuel or insufficient energy being transferred to the reactor coolant to require a limit on the distribution of core power.

ACTIONS occurred, oepain r r texceeded. The maximum AFD limits initilaL.-*etermined by Req d Action A.1 may be affce euntdtriains o MZ)and would require rdcin ih1 iue fteF

-~i. AP--1 R~ducing THERMAL 4r,-fZ-)-exceeds its POWER limit,by maintains

Ž 1% RTP for each 1% by which an acceptable absolute power density. The percent that.*-~f~-exceeds the limit can 100 for P > 0.5

-l1.O}x 100 for P

  • 0.5 (conti nued)

North Anna Units 1 and 2B3.1-Reion B 3.2.1-4 Revision 13 3

FQ(Z)

B3.2.1 BASES ACTIONS A.-1. (continued)

QE(ZI- -......- >-F~-*)is the measured FQ(Z) multiplied by factors accounting for manufacturing tolerances and measurement uncertainties.

FM(Z) ,.* t,,e ,,=ou= ,ahe u, ,(Z). The Completion Time of 15 minutes provides an acceptable time to reduce power in an orderly manner and without allowing the unit to remain in an unacceptable condition for an extended period of time. The maximum allowable power level initially determined by Required Action A.-t.I may be affected by subsequent determinations okf*-F~)-and would require power reductions within 15 minutegof the.*FfZ-determination, if necessary to comply with the decr~ased maximum allowable power level.

Decreases iricF-(*)would allow increasing the maximum allowable po~ler level and increasing power up to this revised limit.

Ithat THERMAL POWER is limited A.--f.2 Ibelow RTP by Required Action A.1 A reduction of the Power Range Neutron Flux-High trip setpoints by > 1% for each 1% by ,which F*(Z) ..... d liz _.

--im-it, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.-*-.I. The maximum allowable Power Range Neutron Flux-High trip setpoints initially determined by Required Action A.-2-,2 may be affected by subsequent determinations of-.zF-~-and would require Power Range Neutron Flux-High trip setpoint reductions within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of thecF,*)-determination, if necessary to comply with the decr'6ased maximum allowable Power Range Neutron Flux-High trip setpoints. Decreases in

>_-FZ-(-_4 would allow increasing the maximum allowable Power Range Neutron Flux-High trip setpoints.

A.-4-. 3 Reduction in the Overpower AT trip setpoints (value of K4) by

Ž1% (in AT span) for each 1% by which F*(Z) exceeds itz<-

++w+t, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is sufficient considering the small likelihood of a severe transient in this time period, and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.-2..1. The (conti nued)

North Anna Units 1 and 2B3.1-Reion B 3.2.1-5 3

FQ(Z)

B 3.2.1 BASES ACTIONS A.-2-.3 (continued) maximum allowable Overpower AT trip setpoints initially determined by Required Action A.*Z-.3 may be affected by

[FoE(Z)I subsequent determinations o~f~ftand would require Overpower AT trip setpoint r~ductions within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of the

-*** determination, if necessary to comply with the decreased maximum allowable Overpower AT trip setpoints.

Decreases i -. {)would allow increasing the maximum Overpower AT trip setpoints.

A f.Ai-tA

"*-*"* /-and Verification thatl.F-,)-has bee rerestored,SRto3.2121 within, its limit, by perforrifng SR 3.2.1.1 prior to increasing THERMAL POWER above the limit imposed by Required Action A."Z1.,

ensures that core conditions during operation at higher power levels are consistent with safety analyses assumptions.

-_--1 I--A.1 through A.4 and B.1 through B.5I If Required Actions A.I, A.2.1, A.2.2, A.2.3, or A.2.1 are not met within their associated Completion Times, the unit must be placed in a MODE or condition in which the LCO requirements are not applicable. This is done by placing the unit in at least MODE 2 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

This allowed Completion Time is reasonable based on SURVEILLANCE SR 3.2.1.1 4-modified by a Note. It states that THERMAL REQUIREMENTS POWER may be increased until a power level for extended operation has been achieved at which a power distribution map can be obtained. This allowance is modified, however, by one of the Frequency conditions that requires verification FQZ tha -*f+-is within its specified limit after a power rise IFQ~z I I of ore than 10% RTP over the THERMAL POWER at which it was I last verified to be within specified limits. In the absence I of this Frequency condition, it is possible to increase I power to RTP and operate for 31 days without verification of 44..*. The Frequency condition is not intended to require "verification of these parameters after every 10% increase in power level above the last verification. It only requires (continued)

North Anna Units 1 and 2B321-Reion3 B 3.2.1-6 Revision 13

FQ(Z)

B 3.2.1 BASES SURVEILLANCE verification after a power level is achieved for extended REQUIREMENTS operation that is 10% higher than that power at which FQ was (continued) last measured.

SR 3.2.1.1 I INSR~i111I The nuclear design process includes calculations performed to determine that the core can be operated within the FQ(Z) limits. Because flux maps are taken in steady state conditions, the variations in power distribution resulting from normal operational maneuvers are not present in the flux map data. These variations are, however, conservatively calculated by considering a wide range of unit maneuvers in normal operation. The maximum peaking factor increase over steady state values, calculated as a function of core elevation, Z, is called N(Z).

The limit with which-~-~ is compared varies inversely with power above 50% RTP~and N(Z) and directly with a function called K(Z) provided in the COLR. IINSERT,"8",

If THERMAL POWER has been increased by Ž 10% RTP since the last determination o0 *4~ , another evaluation of this factor is required 12hours after achieving equilibrium conditions at this higher power level (to ensure thakc-F~()-

values are being reduced sufficiently with power increase to stay within the LCO limits).

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

Flux map data are taken for multiple core elevations ..A+

evaluations are not applicable for the following axi*1 core regions, measured in percent of core height:

a. Lower core region, from 0 to 15% inclusive; and
b. Upper core region, from 85 to 100% inclusive.

North Anna Units 1 and 2B321-Reion4B 3.2.1-7 Revision 46

FQ(Z)

B 3.2.1 BASES SURVE ILLANCE SR -3.2.1. (continued)

REQUIREMENTS The top and because evaluation bottom of of the core are excluded from the 15%the low probability that these regions would be more limiting in the safety analyses and because of the difficulty of making a precise measurement in these This Surveillce has been modified by a Note that may require that mor requent surveillances be performed. An FQ()evaluation of the *x,~o eG 3required to account IFTZ or any increase t F*(* )that may occur and__cause th ~r~

limit to be exceeded before the next require(e evaluation.

a two most recent F*(Z) evaluations show an incri it is required increased by to apepropriate m e F*(Z) l im or to factor, ith the uate last F*(Z)

F*(Z) more fr~pm lly, each 7 EFPD. These alternative r rements pr* FQ(Z) from exceeding its limit without detectli REFERENCES 1. 10 CFR 50.46.

2. VEP-NFE-2-A, "VEPCO Evaluation of the Control Rod Ejection Transient."
3. UFSAR, Section 3.1.22.
4. VEP-NE-I-A, "VEPCO Relaxed Power Distribution Control Methodology and Associated FQ Surveillance Technical Specifications."

North Anna Units 1 and 2B321-Reion3 B 3.2.1-8 Revision 13

INSERT "4" FQE(Z) is an excellent approximation for FQ(Z) when the reactor is at the steady-state power at which the incore flux map was taken.

The expression for FQT(Z) is:

FQT(Z) "- FQE(Z) N(Z)

Where: N(Z) is a cycle dependent function that accounts for power distribution transients encountered during normal operation. N(Z) is included in the COLR. The FQT(Z) is calculated as described in Reference 4.

INSERT "5" If FQE(Z) cannot be maintained within the LCO limits, reduction of core power is required and if FQT(Z) cannot be maintained within the LCO limits, reduction of the AFD limits is also required.

INSERT "6" B.1 If it is found that the maximum calculated value of FQ(Z) that can occur during normal maneuvers, FQT(Z) , exceeds its specified limits, there exists a potential for FQE(Z) to become excessively high if a normal operational transient occurs. Reducing the AFD Limit by the amount specified in the COLR within the allowed Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, restricts the axial flux distribution such that even if a transient occurred, core peaking factors are not exceeded.

INSERT "6" (Continued)

B.2 If it is found that the maximum calculated value of FQ(Z) that can occur during normal maneuvers, FQT(Z) , exceeds its specified limits, there exists a potential for FQE(Z) to become excessively high if a normal operational transient occurs. Reducing THERMAL POWER by the amount specified in the COLR within the allowed Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, restricts the absolute power density such that even if a transient occurred, core peaking factors are not exceeded. The percent that FQT(Z) exceeds the limit can be determined from:

{maximum over Z ('C;-Q(-Z))! 1 xl00forP>0.5 tmaximum overZ CFQKZ~)' 1} x100 for P*<O.5 B.3 A reduction of the Power Range Neutron Flux-High trip setpoints by > 1% for each 1%

by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.

B.4 Reduction in the Overpower AT trip setpoints (value of K4 ) by > 1 % for each 1% by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is sufficient considering the small likelihood of a severe transient in this time period, and the preceding prompt reduction in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.

INSERT "6" (Continued)

B.5 Verification that FQT(z) has been restored to within its limit, by performing SR 3.2.1.1 and SR 3.2.1.2 prior to increasing THERMAL POWER and AFD limits above the maximum allowable power and AFD limits imposed by Required Actions B.1 and B.2 ensures that core conditions during operation at higher power levels and future operation are consistent with safety analyses assumptions.

C.1 INSERT "7" Verification that FQE(Z) is within its specified limits involves increasing FQ(Z) to allow for manufacturing tolerance and measurement uncertainties in order to obtain FQE(z).

Specifically, FQE(Z) is the measured value of FQ(Z) obtained from incore flux map results multiplied by manufacturing and measurement uncertainties (1.05 x 1.03 = 1.0815).

FQE(Z) is then compared to its specified limits.

The limit with which FQE(z) is compared varies inversely with power above 50% RTP and directly with a function called K(Z) provided in the COLR.

Performing this Surveillance in MODE 1 prior to exceeding 75% RTP ensures that the FQE(Z) limit is met when RTP is achieved, because peaking factors generally decrease as power level is increased.

If THERMAL POWER has been increased by > 10% RTP since the last determination of FQE(Z), another evaluation of this factor is required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions at this higher power level (to ensure that FQE(Z) values are being reduced sufficiently with power increase to stay within the LCO limits).

SR 3.2.1.2

INSERT "8" SR 3.2.1.2 requires a Surveillance of FQT(Z) during the initial startup following each refueling within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions after exceeding 75%

RTP. THERMAL POWER levels below 75% are typically non-limiting with respect to the limit for FQT(Z). Also, initial startups following a refueling are slow and well controlled due to startup ramp rate limitations and fuel conditioning requirements. Furthermore, startup physics testing and flux symmetry measurements, also performed at low power, provide confirmation that the core is operating as expected. Consequently, the initial startup following a refueling will not result in non-equilibrium power shapes that could challenge the FQT(Z) limit. This Frequency ensures that verification of FaT(Z) is performed prior to extended operation at high power levels where the maximum permitted peak LHR could be challenged by non-equilibrium operation.

If a previous Surveillance of FQT(Z) was performed at part power conditions (below RTP), SR 3.2.1.2 also requires that FoT(Z) be verified at power levels ->10% RTP above the THERMAL POWER of its last verification within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions. This ensures that FQT(Z) is within its limit using radial peaking factors measured at the higher power level.

INSERT "9" If the two most recent FQ(Z) evaluations show that either the maximum over Z [ K()]

OR maximum over Z/ ()J has increased or is expected to increase prior to the next evaluation then it is required to increase the FQT(Z) by the appropriate factor, as specified in the COLR, and verify FQT(z) is still within limits or evaluate FQ(Z) every 7 EFPD until SR 3.2.1 .2 is satisfied.

These alternate requirements prevent FQ(Z) from exceeding its limit without detection.

FQ(Z)

B 3.2.1 B 3.2 POWER DISTRIBUTION LIMITS B 3.2.1 Heat Flux Hot Channel Factor (FQ(Z))

BASES BACKGROUND The purpose of the limits on the values of FQ(Z) is to limit the local (i.e., pellet) peak power density. The value of FQ(Z) varies along the axial height (Z) of the core.

FQ(Z) is defined as the maximum local fuel rod linear power density divided by the average fuel rod linear power density, assuming nominal fuel pellet and fuel rod dimensions. Therefore, FQ(Z) is a measure of the peak fuel pellet power within the reactor core.

FQ(Z) is approximated by FQE (Z) and FQT (Z). FeE (7) is defined as the measured value of FQ(Z), incorporating manufacturing tolerances and measurement uncertainties.

FQT (Z) i s defined as the FQE (Z) incorporating a non-equilibrium factor that accounts for possible power distribution transients during normal operation.

During power operation, the global power distribution is limited by LCO 3.2.3, "AXIAL FLUX DIFFERENCE (AFD)," and LCO 3.2.4, "QUADRANT POWER TILT RATIO (QPTR)," which are directly and continuously measured process variables. These LCOs, along with LCO 3.1.6, "Control Bank Insertion Limits,"

maintain the core limits on power distributions on a continuous basis.

FQ(Z) varies with fuel loading patterns, control bank insertion, fuel burnup, and changes in axial power distribution.

FQ(Z) is measured periodically using the incore detector system. These measurements are generally taken with the core at or near steady state conditions.

Using the measured three dimensional power distributions, it is possible to derive a measured value for steady state FQ(Z), FQE (Z). However, because this val ue represents a steady state condition, it does not encompass the variations in the value of FQ(Z) that are present during nonequilibrium situations, such as load changes.

(conti nued)

North Anna Units 1 and 2B32.-Reionx B 3.2.1-i Revision xx

FQ(Z)

B 3.2.1 BASES BACKGROUND To account for these possible variations, the steady state (continued) FeE (Z) is adjusted by an elevation dependent factor that accounts for the calculated worst case transient conditions l to derive FQT (Z). I Core monitoring and control under nonsteady state conditions are accomplished by operating the core within the limits of the appropriate LCOs, including the limits on AFD, QPTR, and control rod insertion.

APPLICABLE This LCO precludes core power distributions that violate the SAFETY ANALYSES following fuel design criteria:

a. During a loss of coolant accident (LOCA), the peak cladding temperature during a small break LOCA must not exceed 22000 F, and there must be a high level of probability that the peak cladding temperature does not exceed 2200°F for the large breaks (Ref. 1);
b. During a loss of forced reactor coolant flow accident, there must be at least 95% probability at the 95%

confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a departure from nucleate boiling (DNB) condition;

c. During an ejected rod accident, the energy deposition to unirradiated fuel is limited to 225 cal/gm and irradiated fuel is limited to 200 cal/gm (Ref. 2); and
d. The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest worth control rod stuck fully withdrawn (Ref. 3).

Limits on F (Z) ensure that the value of the initial total peaking factor assumed in the accident analyses remains valid. Other criteria must also be met (e.g., maximum cladding oxidation, maximum hydrogen generation, coolable geometry, and long term cooling). However, the peak cladding temperature is typically most limiting.

FQ(Z) limits assumed in the LOCA analysis are typically limiting relative to (i.e., lower than) the FQ(Z) limit assumed in safety analyses for other postulated accidents.

Therefore, this LCO provides conservative limits for other postulated accidents.

FQ(Z) satisfies Criterion 2 of 10 CFR 50.36(c) (2) (ii).

North Anna Units 1 and 2B3212ReionxB 3.2.1-2

FQ(Z)

B 3.2.1 BASES LCO The Heat Flux Hot Channel Factor, FQ(Z), shall be limited by the following relationships:

FQ(Z) < CFQ K(Z) for P > 0.5 FQ(Z) < CFQ K(Z) for P

  • 0.5 where: CFQ is the FQ(Z) limit at RTP provided in the COLR, K(Z) is the normalized F (Z) as a function of core height provided in the COLR and P is the fraction of RATED THERMAL POWER defined as THERMAL POWER RTP The actual values of CFQ and K(Z) are given in the COLR; however, CFQ is normally approximately 2 and K(Z) is aI function that looks like the one provided in Figure B 3.2.1-1.

FQ*Z) is approximated by FeE (Z) and FQT (Z). Thus, both FQ (z) and FQT (Z) must meet the preceding limits on FQ(Z).

An FQE (Z) evaluation requires obtaining an incore flux map in MODE 1. From the incore flux map results we obtain the measured value of FQ(Z). Then, the measured value is increased by 1.03 which is a factor that accounts for fuel manufacturing tolerances and 1.05 which accounts for flux map measurement uncertainty to obtain FQE (Z) (Ref. 4).

FeE (Z) is an excellent approximation for FQ(Z) when the reactor is at the steady state power at which the i ncore flux map was taken.

The expression for FQT (Z) is:

FQT (Z)= =FQE (Z) N(Z)

Where: N(Z) is a cycle dependent function that accounts for power distribution transients encountered during normal operation. N(Z) is included in the COLR. The FQT (Z) is calculated as described in Reference 4.

(conti nued)

North Anna Units 1 and 2B32.-ReionxB3.2.1-3 Revision xx

FQ(Z)

B 3.2.1 BASES LCO(conti nued) The FQ(Z) limits define limiting values for core power peaking that precludes peak cladding temperatures above 2200°F during a small break LOCA and assures with a high level of probability that the peak cladding temperature does not exceed 2200°F for large breaks (Ref. 1).

This LCO requires operation within the bounds assumed in the safety analyses. Calculations are performed in the core design process to confirm that the core can be controlled in such a manner during operation that it can stay within the LOCA FQ(Z) limits. If FQE (Z) cannot be maintained within the LCO limits, reduction of core power is required and if FQT (Z) cannot be maintained within the LCO limits, reduction of the AFD limits is also required.

Violating the LCO limits for FQ(Z) produces unacceptable consequences if a design basis event occurs while FQ(Z) is outside its specified limits.

APPLICABILITY The FQ(Z) limits must be maintained in MODE 1 to prevent core power distributions from exceeding the limits assumed in the safety analyses. Applicability in other MODES is not required because there is either insufficient stored energy in the fuel or insufficient energy being transferred to the reactor coolant to require a limit on the distribution of core power.

ACTIONS A.I RedJucing THERMAL POWER by _>1%0 RTP for each 1%o by FQ (Z) exceeds its limit, maintaips an acceptable which absol ute power density. The percent that FQ (Z) exceeds the limit can be determined from:

{maximum over z C.Q_ Z)J-i.0 xlO0 for P > 0.5

{maximum over z CF-O-*Z)J-1.0 x1i00 for P *<0.5 0.

(conti nued)

North Anna Units 1 and 2B321-ReionxB 3.2.1-4 Revision xx

FQ(Z)

B 3.2.1 BASES ACTIONS A.1 (continued)

(conti nued) FQE (Z) is the measured FQ(Z) multiplied by factors accounting for manufacturing tolerances and measurement uncertainties. The Completion Time of 15 minutes provides an acceptable time to reduce power in an orderly manner and without allowing the unit to remain in an unacceptable condition for an extended period of time. The maximum allowable power level initially determined by Required Action A.1 may be affected by subsequent determinations of FQE (Z) and would require power reductions within .15 minutes of the FQE (Z) determination, if necessary to comply with the decreased maximum allowable power level. Decreases in FeE (Z) would allow increasing the maximum allowable power level and increasing power up to this revised limit.

A.2 A reduction of the Power Range Neutron Flux-High trip setpoints by >_ 1% for each 1%o that THERMAL POWER is limited below RTP by Required Action A.I, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.1. The maximum allowable Power Range Neutron Flux-High trip setpoints initially determined by Required Action A.2 may be affected by subsequent determinations of FQE (Z) and would require Power Range Neutron Flux-High trip setpoint reductions within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of the FeE (Z) determination, if necessary to comply with the decreased maximum allowable Power Range Neutron Flux-High trip setpoints. Decreases in FeE (Z) would allow increasing the maximum allowable Power Range Neutron Flux-High trip setpoi nts.

A.3 Reduction i n the Overpower AT trip setpoints (value of K4 ) by

>_ 1% (in AT span) for each 1% that THERMAL POWER is limited below RTP by Required Action A.1, is a conservative action (conti nued)

North Anna Units 1 and 2B321-Reionx B 3.2.1-5 Revision xx

FQ(Z)

B 3.2.1 BASES ACTIONS A.3 (continued)

(contnued) for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is sufficient considering the small likelihood of a severe transient in this time period, and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.I. The maximum allowable Overpower AT trip setpoints initially determined by Required Action A.3 may be affected by subsequent determinations of FQE (Z) and would require Overpower AT trip setpoint reductions within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of the FQE (Z) determination, if necessary to comply with the decreased maximum allowable Overpower AT trip setpoints. Decreases in FQE (Z) would allow increasing the maximum Overpower AT trip setpoints.

A.4 Verification that FQE(Z) has been restored to within its limit, by performing SR 3.2.1.1 and SR 3.2.1.2 prior to increasing THERMAL POWER above the limit imposed by Required Action A.1, ensures.that core conditions during operation at higher power levels are consistent with safety analyses assumptions.

B.1 If it is found that the maximum calculated value of FQ(Z) that can occur during normal maneuvers, FQT (Z), exceeds its specified limits, there exists a potential for FQE (Z) to become excessively high if a normal operational transient occurs. Reducing the AFD Limit by the amount specified in the COLR within the allowed Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, restricts the axial flux distribution such that even if a transient occurred, core peaking factors are not exceeded.

B.2 If it is found that the maximum calculated value of FQ(Z) that can occur during normal maneuvers, FQT (Z), exceeds its specified limits, there exists a potential for FQE (Z) to become excessively high if a normal operational transient occurs. Reducing THERMAL POWER by the amount specified in the COLR within the allowed Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, (conti nued)

North Anna Units 1 and 2B321-ReionxB 3.2.1-6

FQ(Z)

B 3.2.1 BASES ACTIONS B.2 (continued)

(conti nued) restricts the absolute power density such that even if a transient occurred, core peaking factors are not exceeded.

The percent that FQT (Z) exceeds the limits can be determined from:

F 1maximum over Z 1 rFQIZ)

FQK(Z)J-1} xlO0 for P > 0.5 maximum over Z F-* -1xli00 for P

  • 0.5 0.5 B.3 A reduction of the Power Range Neutron Flux-High trip setpoints by >1% for each 1% by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.

B.4 Reduction in the Overpower AT trip setpoints (value of K4 ) by

>1% for each 1% by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is sufficient considering the small likelihood of a severe transient in this time period, and preceding prompt reduction.in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.

(conti nued)

North Anna Units 1 and 2B321-ReionxB 3.2.1-7

FQ(Z)

B 3.2.1 BASES ACTIONS B.5 (conti nued)

Verification that FQT (Z) has been restored to within its limit, by performing SR 3.2.1.1 and SR 3.2.1.2 prior to increasing THERMAL POWER and AFD limits above the maximum allowable power and AFD limits imposed by Required Actions B.1 and B.2 ensures that core conditions during operation at higher power levels and future operation are consistent with safety analyses assumptions.

C.'

If Required Actions A.I through A.4 and B.I through B.5 are not met within their associated Completion Times, the unit must be placed in a MODE or condition in which the LCO requirements are not applicable. This is done by placing the unit in at least MODE 2 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

This allowed Completion Time is reasonable based on operating experience regarding the amount of time it takes to reach MODE 2 from full power operation in an orderly manner and without challenging unit systems.

SURVEILLANCE SR 3.2.1.1 and SR 3.2.1.2 are modified by a Note. It states REQU IREMENTS that during power escalation, THERMAL POWER may be increased until a power level for extended operation has been achieved at which a power distribution map can be obtained. This allowance is modified, however, by one of the Frequency conditions that requires verification that FQ(Z) is within its specified limit after a power rise of more than 10% RTP I over the THERMAL POWER at which it was last verified to be within specified limits. In the absence of this Frequency condition, it is possible to increase power to RTP and operate for 31 days without verification of FQ(Z). The I Frequency condition is not intended to require verification of these parameters after every 10% increase in power level above the last verification. It only requires verification after a power level is achieved for extended operation that is 10% higher than that power at which FQ was last measured.

(continued)

North Anna Units 1 and 2B321-ReionxB 3.2.1-8 Revision xx

FQ(Z)

B 3.2.1 BASES SURVEILLANCE SR 3.2.1.1 REQU IREMENTS (continued) Verification that FQE (Z) is within its specified limits involves increasing FQ(Z) to allow for manufacturing tolerance and measuremleni* uncertainties in order to obtain FQ (Z). Specifically, FQ (Z) is the measured value of FQ(Z) obtained from incore flux map results multiplied by manufacturing and measurement uncertainties (1.05 x 1.03 = 1.0815). FQ (Z) is then compared to its specified limits.

The limit with which FQE (Z) is compared varies inversely with power above 50%0 RTP and directly with a function called K(Z) provided in the COLR.

Performing this Surveillanc* in MODE 1 prior to exceeding 75% RTP ensures that the FQ (Z) limit is met when RTP is achieved, because peaking factors generally decrease as power level is increased.

If THERMAL POWER has beep increased by > 10% RTP since the last determination of FQ (Z) , another evaluation of this factor is required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions at this higher power level (to ensure that FeE (Z) values are being reduced sufficiently with power increase to stay within the LCO limits).

SR 3.2.1.2 The nuclear design process includes calculations performed to determine that the core can be operated within the FQ(Z) limits. Because flux maps are taken in steady state conditions, the variations in power distribution resulting from normal operational maneuvers are not present in the flux map data. These variations are, however, conservatively calculated by considering a wide range of unit maneuvers in normal operation. The maximum peaking factor increase over steady state values, calculated as a function of core elevation, Z, is called N(Z).

The limit with which FQT (Z) is compared varies inversely with power above 50% RTP and N(Z) and directly with a function called K(Z) provided in the COLR.

SR 3.2.1.2 requires a Surveillance of FQT (Z) during the initial startup following each refueling within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions after exceeding 75%

(continued)

North Anna Units 1 and 2B321-ReionxB 3.2.1-9 Revision xx

FQ(Z)

B 3.2.1 BASES SURVEILLANCE SR 3.2.1.2 (continued)

REQUIREMENTS (conti nued) RTP. THERMAL POWER levels below 75% are typically non-limiting with respect to the limit for FQT (Z) . Also, initial startups following a refueling are slow and well controlled due to startup ramp rate limitations and fuel conditioning requirements. Furthermore, startup physics testing and flux symmetry measurements, also performed at low power, provide confirmation that the core is operating as expected. Consequently, the initial startup following a refueling will not result in non-equilibrium power shapes that could challenge the FQT (Z)T limit. This Frequency ensures that verification of FQT (Z) is performed prior to extended operation at high power levels where the maximum permitted peak LHR could be challenged by non-equilibrium operation.

If a previous Surveillance of FqT (Z) was performed at part power conditions (below RTP), SR 3.2.1.2 also requires that FQT (Z) be yenifi ed at power level s_> 10% RTP above the THERMAL POWER of its last verification within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions. This ensures that FQT (7) is within its limit using radial peaking factors measured at the higher power level.

If THERMAL POWER has been increased by Ž 10% RTP since the last determination of FQT (Z), another evaluation of this factor is required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions at this higher power level (to ensure that FQT (Z) values are being reduced sufficiently with power increase to stay within the LCO limits).

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

Flux map data are taken for multiple core elevations. FQT (Z) evaluations are not applicable for the following axial core regions, measured in percent of core height:

a. Lower core region, from 0 to 15% inclusive; and
b. Upper core region, from 85 to 100% inclusive.

(conti nued)

North Anna Units 1 and 2 B 3.2.1-10 B3211 Revision eiinxxx

FQ(z)

B 3.2.1 BASES SURVEILLANCE SR 3.2.1.2 (continued)

REQUIREMENTS (conti nued) The top and bottom 15% of the core are excluded from the evaluation because of the low probability that these regions would be more limiting in the safety analyses and because of the difficulty of making a precise measurement in these regions.

This Surveillance has been modified by a Note that may require that more frequent surveillances be performed. An evaluation of the expressions below are required to account for any increase to FqT (Z) that may occur and cause the FQT (Z) limit to be exceeded before the next required FQT (Z) eval uati on.

If the two most recent FQ(Z) evaluations show that either the maximum over z L1 FQ*Z)

OR FQ(Z) maximum over z K(Z)-

has increased evaluation thenorit is isexpected requiredtotoincrease increase prior toT (Z) the Fe the by next the appropriate factor, as specified in the COLR, and verify FQ* (Z) is still within limits or evaluate FQ(Z) every 7 EFPD until SR 3.2.1.2 is satisfied. These alternate requirements prevent FQ(Z) from exceeding its limit without detection.

REFERENCES 1. 10 CFR 50.46.

2. VEP-NFE-2-A, "VEPCO Evaluation of the Control Rod Ejection Transient."
3. UFSAR, Section 3.1.22.
4. VEP-NE-1-A, "VEPCO Relaxed Power Distribution Control Methodology and Associated FQ Surveillance Technical Specifications."

North Anna Units 1 and 2 B3211 eiinx

FQ(Z)

B3.2.1 1.2 DONO IPRT INTIS AREA 1.1 DONOOPRT NHSAE (6, 1.0) 1.0 0.9 (12, .925) 0.8 0.7

._. 0.6 0.5 0.4 0.3 0.2 THIS FIGURE FOR-ILLUSTRATION ONLY. DO NOT USE FOR OPERATION 0.1 0.0 FT. 0 1 2 3 4 5 6 7 8 9 10 11 12 16.6 33.3 50.0 66.7 83.3 100 CORE HEIGHT

  • FOR CORE HEIGHT OF 12 FEET Figure B 3.2.1-1 (page 1 of 1)

K(Z)-Normalized FQ(Z) as a Function of Core Height North Anna Units 1 and 2 B3211 B 3,2.1-12 Revision eiinxxx

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 December 10, 2015 10 CFR 50.90 U.S. Nuclear Regulatory Commission Serial No.15-494 Attention: Document Control Desk NLOS/DEA R0 Washington, DC 20555 Docket Nos.: 50-338/339 License Nos.: NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

NORTH ANNA POWER STATION UNITS 1 AND 2 LICENSE AMENDMENT REQUEST TO ADDRESS THE ISSUES IDENTIFIED IN WESTINGHOUSE DOCUMENTS NSAL-09-5. REV. 1 AND NSAL-1 5-I In accordance with the provisions of 10 CFR 50.90, Virginia Electric and Power Company (Dominion) is submitting a license amendment request to revise the North Anna Power Station Units 1 and 2 Technical Specifications (TS). The proposed changes would revise the TS to address the issues identified in two Westinghouse communication documents.

Specifically, the proposed changes will address the issues identified in:

  • Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Rev. 1 (Reference
1) by relocating required operating space reductions (power and AFD) to the Core Operating Limits Report, accompanied by verification for each reload cycle
  • Westinghouse Nuclear Safety Advisory Letter NSAL-1 5-1, Rev. 0 (Reference
2) by defining TS surveillance requirements for steady-state and transient FQ(Z) and corresponding actions with which to apply an appropriate penalty factor to measured results provides a discussion of the proposed change. The marked-up and proposed TS pages are included in Attachments 2 and 3, respectively. The marked-up and proposed TS Bases changes are provided for NRC information only in .

We have evaluated the proposed amendment and have determined that it does not involve a significant hazards consideration as defined in 10 CFR 50.92. The basis for this determination is included in Attachment 1. We have also determined that operation with the proposed change will not result in any significant increase in the amount of effluents that may be released offsite or any significant increase in individual or cumulative occupational radiation exposure. Therefore, the proposed amendment is eligible for categorical exclusion from an environmental assessment as set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment is needed in connection with the approval of the proposed

_A4u6)

Serial No: 15-494 Docket Nos.: 50-338/339 Page 2 of 3 change. The proposed TS change has been reviewed and approved by the Facility Safety Review Committee.

Dominion requests approval of the proposed amendment by May 31, 2017 to enable implementation of the changes by the Unit 2 refueling outage in the fall of 2017.

Should you have any questions in regard to this submittal, please contact Ms. Diane E. Aitken at (804) 273-2694.

Sincerely, Mark D. Sartain Vice President - Nuclear Engineering COMMONWEALTH OF VIRGINIA ))

COUNTY OF HENRICO )

The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mark D. Sartain, who is Vice President - Nuclear Engineering of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this ..L day of -).c.* Lers' 2015.

M y.('.nm m ik*inn F vnir p.*' i *l .<4I 3)1 , "Zo LA *

  • 1 r

&

ivl3 v*,,,,,,,v*o Notary Public Z) ~bl~

Commonwealth of Virginia Reg. # 7629412 My Commission Expires August 31, 20L2

References:

1. Westinghouse Nuclear Safety Advisory Letter, NSAL-09-5, Rev. 1, "Relaxed Axial Offset Control EQ Technical Specification Actions," September 23, 2009.
2. Westinghouse Nuclear Safety Advisory Letter, NSAL-1 5-1, Rev. 0, "Heat Flux Hot Channel Factor Technical Specification Surveillance," February 6, 2015.

Attachments:

1. Discussion of Change
2. Marked-up Technical Specifications Pages
3. Proposed Technical Specifications Pages
4. Marked-up Technical Specifications Bases Pages (for information only)

Commitments made in this letter: None

Serial No: 15-494 Docket Nos.: 50-338/339 Page 3 of 3 cc: U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1 257 State Health Commissioner Virginia Department of Health James Madison Building - 7 th floor 109 Governor Street Suite 730 Richmond, VA 23219 Dr. V. Sreenivas NRC Project Manager - North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Karen Cotton-Gross NRC Project Manager U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power Station

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 1 of 16 ATTACHMENT I DISCUSSION OF CHANGE Virginia Electric and Power Company (Dominion)

North Anna Power Station Units I and 2

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-i15-I, Rev. 0 Attachment 1, Page 2 of 16 Table of Contents

1.0 DESCRIPTION

............................................................................................ 3 2.0 PROPOSED TECHNICAL SPECIFICATIONS CHANGES ............................................ 4 3.0 TECHNICALANALYSIS ..................................................  :................................

4.0 REGULATORY EVALUATION

......................................................................... 13

5.0 ENVIRONMENTAL CONSIDERATION

S .............................................................. 16

6.0 REFERENCES

........................................................................................... 16

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. I and NSAL-15-1, Rev. 0 Attachment 1, Page 3 of 16

1.0 DESCRIPTION

In accordance with the provisions of 10 CFR 50.90, Virginia Electric and Power Company (Dominion) is submitting a request to amend the Technical Specifications (TS) for North Anna Power Station Units 1 and 2 (NAPS). The changes are intended to address the issues identified in Westinghouse communications NSAL-09-5, Rev. 1 (Reference 1) and NSAL-15-1 (Reference 2).

Reference 1 notified Westinghouse customers of an issue associated with the Required Actions for Condition B of TS 3.2.1B, "Heat Flux Hot Channel Factor (FQ(Z) (RAOC-W(Z)

Methodology)," in Reference 3 for plants that have implemented the relaxed axial offset control (RAOC) methodology. In certain situations where transient FQ, FQw(Z), is not within its limit, the existing Required Actions may be insufficient to restore FQw(Z) to within the limit. Revision 1 of Reference 1 provided clarification regarding the applicability of the recommended interim actions to address this issue and how they should be implemented, including potential inclusion in plant specific Technical Specification changes. Dominion's evaluation of Reference I determined that it was applicable to NAPS, based on the similarities between the RAOC and Dominion's Relaxed Power Distribution Control (RPDC) methodologies.

Reference 2 notified Westinghouse customers of an issue associated with Surveillance Requirement (SR) 3.2.1.2 in TS 3.2.1B of Reference 3. For certain trends in measured FQ(Z) and non-equilibrium factor W(Z), the existing SR may not ensure that the transient FQ, FQw(Z), limit will be met between the performance of the monthly flux map measurements, for those plants that use the W(Z) FQ surveillance methodology. Dominion's evaluation of Reference 2 determined that it was also applicable to NAPS, based on the similarities between the RAOC and Dominion's Relaxed Power Distribution Control (RPDC) methodologies.

Dominion is proposing to change TS 3.2.1, "Heat Flux Hot Channel Factor (FQ(Z))," to enhance the required actions to be taken in the event that transient Fo(Z) surveillance limits are not met. Changes are also proposed that define separate terms, action steps and surveillance requirements for steady-state and transient FQ(Z), denoted as FQE(Z) and FQT(Z), respectively. The use of separate surveillance requirements (SR) in this manner is consistent with Westinghouse Standard Technical Specifications, NUREG-1431, Rev. 4 (Reference 3). The revised surveillance requirements provide guidance for application of, and determining the magnitude of a penalty factor for the measured FQ(Z). The factor will be applied if the trend in measured values indicates decreasing margin to the applicable limit since performing the previous surveillance or if the trend in predicted values indicates decreasing margin to the applicable limit prior to the next required surveillance. The

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 4 of 16 changes specify that this factor will be defined in the Core Operating Limits Report (COLR),

which allows specific numerical values of the factor to be evaluated for each reload core.

The Bases for TS 3.2.1 are being modified to address the proposed changes to TS 3.2.1.

The TS Bases changes are provided for information only. Changes to the TS Bases will be incorporated in accordance with the TS Bases Control Program (TS 5.5.13) upon approval of this amendment request.

2.0 PROPOSED TECHNICAL SPECIFICATIONS CHANGES The proposed TS and SR changes are detailed below. To aid review, deleted text is struck through and added text is italicized and bolded. For more extensive changes, reference is made to the TS markups in Attachment 2 and TS Bases markups in Attachment 4.

2.1 TS 3.2.1 - Heat Flux Hot Channel Factor (FQ(Z))

TS 3.2.1 currently reflects use of the Dominion Relaxed Power Distribution Control (RPDC) power distribution control methodology (Reference 4). The proposed changes detailed below revise certain specification terminology, including relocation of some equations to the TS Bases, and revision of appropriate TS Required Actions to address the issues in References 1 and 2.

The proposed changes follow:

LCO 3.2.1

  • LCO 3.2.1 will be revised as follows:

FQ(Z), as approximated by ,E{-- FQE(z) and FQT(Z), shall be within the limits specified in the COLR.

TS 3.2.1 - CONDITION A. REQUIRED ACTIONS AND COMPLETION TIME

  • TS 3.2.1 CONDITION A will be revised as follows:

-.......

NOTE-------....

Required Action A.4 shall be completed whenever this Condition is entered. SR 3.2.1.2 is not required to be performed if this Condition is entered prior to THERMAL POWER exceeding 75% RTP after a refueling.

A. F-QM-Z-) FQE(Z) not within limit.

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 5 of 16

  • Delete TS 3.2.1 REQUIRED ACTION A.1 and renumber remaining REQUIRED ACTIONS as REQUIRED ACTION A.1, A.2, A.3, and A.4
  • New TS 3.2.1 REQUIRED ACTION A.1 reads as follows:

Reduce THERMAL POWER > 1% RTP for each 1% $*M(Z) FQE(Z) exceeds limit.

A.1 COMPLETION TIME 15 minutes after each FQM(-Z-) FQE(Z) determination

  • New TS 3.2.1 REQUIRED ACTION A.2 reads as follows:

Reduce Power Range Neutron Flux-High trip setpoints > 1% for each 1% .FQM(-Z--

eee-litthat THERMAL POWER is limited below RTP by Required Action A. 1.

A.2 COMPLETION TIME 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each .FQM(-Z-) FQE(Z) determination

  • New TS 3.2.1 REQUIRED ACTION A.3 reads as follows:

Reduce Overpower AT trip setpoints > 1% for each 1% = Z)-e ....ee-li,;ii that THERMAL POWER is limited below RTP by Required Action A. 1.

A.3 COMPLETION TIME 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each .FQM(-Z-) FQE(Z) determination

  • New TS 3.2.1 ACTION A.4 reads as follows:

Perform SR 3.2.1.1 and SR 3.2.1.2 A.4 COMPLETION TIME Prior to increasing THERMAL POWER above the limit of Required Action A.21

Serial No: 15-494 Docket Nos.: 50-338/339 LAR- NSAL-09-5, Rev. 1 and NSAL-15-1, Rev. 0 Attachment 1, Page 6 of 16 TS 3.2.1 - CONDITION B. REQUIRED ACTIONS and COMPLETION TIME

  • New TS 3.2.1 CONDITION B will be added, to read as follows:

ACTIONS CONDITION ] REQUIRED ACTIONj COMPLETION TIME B.----NOTE-..... 8.1 Reduce AFD limits 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after each Required Action B.5 as specified in the FQT(Z) determination shall be completed COLR.

whenever this AND Condition is entered. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after each B.2 Reduce THERMAL FQT(Z) determination FQT(z) not within POWER as specified in limit. the COLR.

AND 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each B.3 Reduce Power FQT(z) determination Range Neutron Flux-High trip setpoints > 1%

for each 1% that THERMAL POWER is limited below RTP by Required Action 8.2.

AND 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each FQT(Z) determination B.4 Reduce Overpower AT trip setpoints > 1%

for each 1% that THERMAL POWER is limited below RTP by Required Action 8.2. Priorto increasing AND THERMAL POWER and AFD limits above 8.5 Perform SR 3.2.1.1 the limits of Required and SR 3.2.1.2. Actions 8.1 and 8.2

  • Renumber existing TS 3.2.1 CONDITION B, REQUIRED ACTION, as follows:

BC. Required Action and associated Completion Time not met.

BC.1 Be in MODE 2.

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 7 of 16 2.2 SR 3.2.1.1, SR 3.2.1.2 [new] - Heat Flux Hot Channel Factor (FQ(Z))

The changes to SR 3.2.1.1 and the addition of SR 3.2.1.2 conform with the introduction of steady-state, FQE(Z), and transient, FQT(Z), in TS 3.2.1. These changes define separate surveillance requirements for the two representations of FQ(Z).

The proposed changes follow:

SR 3.2.1.1

Verify .F-*(-Z- FQE(Z) is within limit.

SR 3.2.1.1 [FREQUENCY] (the 2 nd clause):

Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions after exceeding, by -- 10%

RTP, the THERMAL POWER at which FQM(-Z-) FQE(Z) was last verified

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Attachment 1, Page 8 of 16

S UR VEILLA NCE FREQUENCY SR 3.2.1.2----..............NOTE.........

If measurements indicate that either the maximum over z

[K(Z) I OR K(z) ]

maximum over z has increasedsince the previous evaluation of FQ(Z)or is expected to increaseprior to the next evaluation:

A. Increase FQT(Z) by the appropriatefactor, as specified in the COLR, and verify FQT(Z) is still within limits or B. Repeat SR 3.2.1.2 once perT7 EFPD until Once after each

a. Above (A) is met or refueling within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
b. Two successive flux maps indicate that the after achieving equilibrium conditions after

[~¶21 THERMAL POWER exceeds 75% RTP maximum over z LKzJ AND AND Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> K(Z)]. after achieving maximum over z equilibrium conditions has not increased. after exceeding, by

> 10% RTP, the Verify FQT(Z) is within limit.

THERMAL POWER at which FQT(Z) was last verified AND In accordancewith the Surveillance Frequency Control Program

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 9 of 16 2.3 TS Bases 3.2.1 - Heat Flux Hot Channel Factor (FQ(Z))

Several changes to the Bases will be required which reflect the terminology changes and relocation of items from the specific TS sections noted in the description above.

Summary list of key changes (see markup in Attachment 4):

  • Revise terminology throughout to reflect use of FQ(Z), FQE(Z) and FQT(Z) as appropriate
  • Changes to conform with deletion and renumbered Condition A REQUIRED ACTIONS in TS 3.2.1
  • Insert 4 describes the relation for FQT(Z), including the N(Z) factor
  • Insert 5 describes actions to reduce core power and AFD limits if FQE(Z) and FQT(Z) cannot be maintained within LCO limits
  • Insert 6 describes the Condition B REQUIRED ACTIONS added in TS 3.2.1 for FaT(Z)
  • Insert 7 describes the steady-state peaking factor, FQE(Z) for SR 3.2.1.1
  • Insert 8 describes the frequency conditions for the transient peaking factor, FQT(Z) for SR 3.2.1.2
  • Insert 9 describes expressions for both FQE (Z) and FQT(z) that are evaluated to determine whether to apply the appropriate penalty factor or increase the frequency of surveillance Based on Dominion's analytical assessment of internal and external operating experiences (e.g. Westinghouse Communication 06-IC-03, Reference 5), the magnitudes of the lower and upper core regions excluded from FQ surveillances had been proactively and conservatively reduced (in approximately 2006) from what was and is currently described in the North Anna Technical Specification Bases. An update to the Technical Specification Bases to expand the FQ axial surveillance regions is being tracked by Dominion's corrective action system.

3.0 TECHNICAL ANALYSIS

The proposed TS changes identified in Section 2.0 are evaluated for technical adequacy in the following sections.

3.1 TS 3.2.1 - Heat Flux Hot Channel Factor (FQ(Z))

The proposed changes involve additions, deletions and revisions to existing TS content that are associated with LCO 3.2.1. These changes provide resolution of issues documented in Westinghouse notification documents NSAL-09-5, Rev. 1 (Reference 1) and NSAL-15-1 (Reference 2). NAPS is currently operating with compensatory actions which address the issues identified in References 1 and 2. Evaluation of the specific proposed changes is provided below.

Serial No: 15-494 Docket Nos.: 50-338/339 LAR,- NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Attachment 1, Page 10 of 16 LCO 3.2.1 The existing LCO 3.2.1 specifies that FQ(Z) is approximated by F0 M(Z), which is described in the Bases as the steady-state measured value for FQ(Z). The COLR limit to which FQM(z) is compared is adjusted by the factor, N(Z), which accounts for the calculated worst case transient core conditions. The N(Z) factor is calculated in accordance with the approved Dominion RPDC methodology (Reference 4). The proposed changes specify that Fo(Z) is approximated by F0 E(z) and FQT(Z), denoted as the steady-state and transient quantities, respectively. Separate surveillance requirements are specified for FQE(Z) and FQT(Z), which is consistent with the comparable terms F0 c(Z) and F0 w(Z) in Standard Technical Specifications for Westinghouse plants (Reference 3).

A Note is inserted before LCO 3.2.1 Condition A to explain that Action A.4 is always required to be performed unless SR 3.2.1.2 is performed prior to exceeding 75% RTP after a refueling outage. This note is consistent with language proposed for this LCO condition in response to an NRC Request for Additional Information during review of WCAP-1 7661-P (Reference 6).

Required Action A.1 in existing LCO 3.2.1 is deleted, since the revised Condition A now applies to steady-state FQE(Z), for which this action does not apply, per the comparable Reference 3 actions for TS 3.2.IB. The remaining actions for LCO 3.2.1 Condition A are retained, with changes to each action that reflect use of FQE(Z) versus FQM(Z).

A new Condition B with corresponding Required Actions is added to address the situation in which FQT(Z) is not within its limit. Proposed Required Actions B.1 through B.5 are a modified version of the interim actions identified in NSAL-09-5, Rev. 1 (Reference 1), for this situation. These changes are proposed as the resolution for the issues identified in Reference 1.

Westinghouse's proposal for the long term resolution of NSAL-09-5, Rev. 1 is to seek NRC approval for the methods described in WCAP-17661-P (Reference 6). WCAP-17661-P is intended to revise the existing RAOC and Constant Axial Offset Control (CAOC) F0 Surveillance Technical Specifications to address several outstanding issues, one of which was NSAL-09-5. Dominion has strategically chosen not to adopt WCAP-17661-P and its subsequent Technical Specification Task Force (TSTF) traveler for North Anna.

This alternate approach was determined by Dominion evaluation to most appropriately address the issues in NSAL-09-5, Rev. 1 for NAPS. The Dominion approach has these desirable aspects: 1) it addresses directly the issues of NSAL-09-5, Rev. 1; 2) it retains the existing TS surveillance scheme and structure; and 3) it retains the existing axial control calculational methodology (RPDC). By relocating the numerical values to the COLR,

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 11 of 16 Dominion's proposed resolution of NSAL-09-5 allows the required RPDC operating space (THERMAL POWER and AFD) reductions to be evaluated and modified on a cycle-specific basis. This proposed resolution is supported by current Dominion RPDC methods.

Specifically, the allowable operating space that applies to Required Action B.1 and 8.2 is relocated to the COLR. A new table, entitled "Required Operating Space Reductions for FQT(Z) Exceeding Its Limits," will be added to the COLR to quantify the required THERMAL POWER and AFD limits associated with different amounts of FQT(Z) margin improvement (1%, 2%, etc.). If LCO 3.2.1, Condition B is entered, the operating space as defined in the new COLR table will ensure that sufficient margin exists. COLR Table 3.2-3 below presents a sample of the proposed table to be included in the COLR.

The values provided in the sample table below are only intended to provide a representative example of typical reload values. The determination and verification of the required FQT(Z) margin improvements and the corresponding required reductions in the THERMAL POWER Limit and AFD Bands will be performed on a reload specific basis in accordance with the approved methodology of VEP-NE-1-A listed in Technical Specification 5.6.5.b.

COLR Table 3.2-3 Required Operating Space Reductions for FQT(Z) Exceeding Its Limits Required FQT(z) Margin THERMAL POWER Negative AFD Positive AFD Improvement Reduction Band Reduction Band Reduction

(%RTP) (%AFD) (%AFD)

< %>3% >Ž2.0% > 2.0%

> 1% and*<2% >Ž5% > 3.0% > 3.0%

> 2% and <3% ___8% __.3.5% >Ž3.5%

> 3% _Ž50% N/A N/A 3.2 SR 3.2.1.1, SR 3.2.1.2 [new] - Heat Flux Hot Channel Factor (FQ(Z))

The proposed changes to SR 3.2.1.1 address surveillance for FQE(Z), and the addition of new SR 3.2.1.2 addresses surveillance for FQT(Z). Specifying separate requirements for FQE(Z) and FQT(Z), iS consistent with treatment of the comparable terms F0 c(Z) and FQw(Z) in Standard Technical Specifications for Westinghouse plants (Reference 3).

The Note preceding SR 3.2.1.1 is deleted since it is not applicable to surveillance for the steady-state parameter FQE(z). It relates to considerations that apply only to conducting surveillance for the transient FQ(Z) limits.

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 12 of 16 Insert 3 describes proposed new SR 3.2.1.2 for FQT(Z), including a Note preceding SR 3.2.1.2 that describes the actions for the situation in which either FQE(Z) or FQT(Z) have increased since the last evaluation of FQ(Z) or are expected to increase prior to the next evaluation. Required Action A of the Note involves increasing FQT(Z) by the appropriate factor, as specified in the COLR, if the conditions concerning either FQE(Z) or FQT(Z) are met. This approach, although different in the details of application from that recommended in Reference 2, has been deemed to be more suitable for use with Dominion methods. The proposed SR 3.2.1 .2 has been confirmed by analysis with Dominion methods for representative NAPS reload cores to ensure that FQE(Z) and FQT(Z) will satisfy their respective limits and to resolve the issue -of undetected loss of margin identified in Reference 2.

As applied by Dominion, SR 3.2.1.2 involves looking for increases in steady-state and transient, measured and predicted FQ(Z) to determine if the penalty factor should be applied. The application of the appropriate penalty factor will be required if any of the following conditions are met:

1. Increase in measured maximum FoE(Z,) I K(Z) from the previous surveillance,
2. Increase in measured maximum FQT(Z) I K(Z) from the previous surveillance,
3. Increase in predicted maximum FQE(Z) I K(Z) over the next surveillance period, or
4. Increase in predicted maximum FQT(Z) I K(Z) over the next surveillance period.

Cycle-specific analyses will be performed to determine the appropriate penalty factor required to accommodate potential increases in FQ(Z) over the surveillance period. SR 3.2.1.2 notes that the 'appropriate factor' will be specified in the COLR. This allows for the details of the appropriate penalty factors to be evaluated and modified on a cycle-specific basis. This revised surveillance requirement will ensure an appropriate analytical penalty factor is applied during performance of SR 3.2.1.2, which addresses the issues identified in NSAL-15-1 (Reference 2).

A new table, entitled "Penalty Factors for Flux Map Analysis," will be added to the COLR.

Table 3.2-2 below presents a sample of the proposed table to be included in the COLR. The values provided in the sample table below are only intended to provide a representative example of typical reload values. The determination and verification of the appropriate penalty factor will be performed on a reload specific basis in accordance with the approved methodology of VEP-NE-1-A listed in Technical Specification 5.6.5.b.

Serial No: 15-494 Docket Nos.: 50-338/339 LAR -NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Attachment 1, Page 13 of 16 COLR Table 3.2-2 Penalty Factors for Flux Map Analysis Burnup Surveillance (MWD/MTU) Factor 0 -999 4.00%

1000 -1999 3.50%

2000 -2999 2.00%

3000 -3999 2.00%

4000 -4999 2.00%

5000 -6999 2.00%

7000 -8999 2.00%

9000 -10999 2.00%

11000 -12999 2.00%

13000 -14999 2.00%

15000 -16999 2.00%

17000 -18999 2.00%

19000 - EOR 2.00%

Subsequent to approval of this LAR, Dominion intends to process appropriate conforming changes, in the form of a modification (denoted VEP-NE-1, Rev. 0.2-A) to the RPDC topical report. These changes will reflect the adjustments discussed herein to address the issues in References 1 and 2. This modification will be prepared in accordance with Dominion's topical modification process, as provided for in our reload methods topical report VEP-FRD-42-A (Reference 7).

4.0 REGULATORY EVALUATION

4.1 Applicable Regulatory Requirements and Criteria 10 CFR 50, Appendix B, General Design Criterion 10, which states:

The reactor core and associated coolant, control, and protection systems shall be designed with appropriate margin to assure that specified acceptable fuel design limits are not exceeded during any condition of normal operation, including the effects of anticipated operational occurrences.

10 CFR 50.36, Technical Specifications, paragraph (c)(2) states that technical specifications will include limiting conditions for operation. Paragraph (c)(3) states that technical specifications will include surveillance requirements. Both of these paragraphs are applicable to the proposed change.

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-15-1, Rev. 0 Attachment 1, Page 14 of 16 Section (c)(2)(ii)(B) provides that LCOs must be established for each item meeting one or more criteria. For the power distribution items affected by the proposed change, the following criterion applies:

(B) Criterion 2. A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. The association with the relevant design basis accident analysis is described below.

10 CFR 50.46, Acceptance Criteria For Emergency Core Cooling Systems For Light-Water Nuclear Power Reactors, establishes acceptable limits for the performance of emergency core cooling systems (ECCS), and requirements for the analytical models used to validate the performance. The analyses of ECOS performance use various inputs and assumptions that reflect the conditions and features of a given plant. In accordance with North Anna TS 5.6.5.b, Core Operating Limits Report, the ECCS analysis establishes limits for FQ(Z), Heat Flux Hot Channel Factor, which is the subject of the proposed TS changes.

The proposed change maintains compliance with these requirements.

4.2 No Significant Hazards Consideration Dominion has evaluated whether a significant hazards consideration is involved with the proposed amendment by addressing the three standards set forth in 10 CFR 50.92, "Issuance of Amendment," as discussed below:

1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No.

The proposed change for resolution of Westinghouse notification documents NSAL 5, Rev. 1 and NSAL-1 5-1, Rev. 0 is intended to address deficiencies identified within the existing NAPS Technical Specifications and to return them to their as-designed function.

Operation in accordance with the revised TS ensures that the assumptions for initial conditions of key parameter values in the safety analyses remain valid and does not result in actions that would increase the probability or consequences of any accident previously evaluated.

Therefore, the proposed amendment does not involve a significant increase in the probability or the consequences of any accident previously evaluated.

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 15 of 16

2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No.

Operation in accordance with the revised TS and its limits precludes new challenges to SSCs that might introduce a new type of accident. All design and performance criteria will continue to be met and no new single failure mechanisms will be created. The proposed change for resolution of Westinghouse notification documents NSAL-09-5, Rev. 1 and NSAL-15-1, Rev. 0 does not involve the alteration of plant equipment or introduce unique operational modes or accident precursors. It thus does not create the potential for a different kind of accident.

Therefore, the proposed amendment does not create a new or different kind of accident from any accident previously evaluated.

3. Does the proposed change involve a significant reduction in a margin of safety?

Response: No.

Operation in accordance with the revised TS and its limits preserves the margins assumed in the initial conditions for key parameters assumed in the safety analysis. This ensures that all design and performance criteria associated with the safety analysis will continue to be met and that the margin of safety is not affected.

Therefore, the proposed amendment does not involve a significant reduction in a margin of safety.

Based on the above information, Dominion concludes that the proposed license amendment involves no significant hazards consideration under the criteria set forth in 10 CFR 50.92(c) and, accordingly, a finding of no significant hazards consideration is justified.

4.3 Precedents The proposed changes to the North Anna Units 1 and 2 TS are fundamentally the same as those in the following submittal associated with previous application of Dominion methods:

1. Letter from Mark D. Sartain (Dominion) to USNRC, "Millstone Power Station Unit 3 License Amendment Request to Adopt Dominion Core Design and Safety Analysis Methods and to Address the Issues Identified in Westinghouse Documents NSAL-09-5, Rev. 1, NSAL-1 5-1 and 06-1C-03," May 8, 2015 (ADAMS Accession No. ML15134A244).

Precedent 1 included proposed TS changes that address each of the issues identified in References 1 and 2 in a comparable manner to those enclosed in this LAR. For both

Serial No: 15-494 Docket Nos.: 50-338/339 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Attachment 1, Page 16 of 16 Precedent 1 and this LAR, the proposed TS changes are compatible with Dominion reload core design methods.

5.0 ENVIRONMENTAL CONSIDERATION

S Dominion has reviewed the proposed license amendment for environmental considerations.

The proposed license amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion from an environmental assessment as set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51 .22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.

6.0 REFERENCES

1. Westinghouse Nuclear Safety Advisory Letter, NSAL-09-5, Rev. 1, "Relaxed Axial Offset Control EQ Technical Specification Actions," September 23, 2009.
2. Westinghouse Nuclear Safety Advisory Letter, NSAL-15-1, Rev. 0, "Heat Flux Hot Channel Factor Technical Specification Surveillance," February 3, 2015.
3. NUREG-1431, Revision 4, Vol. 1 and 2, "Standard Technical Specifications -

Westinghouse Plants."

4. Topical Report, VEP-NE-1, Rev. 0.1-A, "VEPCO Relaxed Power Distribution Control Methodology and Associated FQ Surveillance Technical Specifications," August 2003.
5. Westinghouse Notice 06-1C-03, "FQ and Fxy, Surveillance Zone Issue," February 21, 2006.
6. WCAP-17661-P, Revision 1, "Improved RAOC and CAOC FQ Surveillance Technical Specifications," November 2013.
7. Topical Report, VEP-FRD-42, Rev. 2.1-A, "Reload Nuclear Design Methodology,"

August 2003.

Serial No.15-494 LAR - NSAL-09-5, Rev. I and NSAL-1 5-1, Rev. 0 Docket Nos. 50-338/339 ATTACHMENT 2 MARKED-UP TECHNICAL SPECIFICATIONS PAGES Virginia Electric and Power Company (Dominion)

North Anna Power Station Units 1 and 2

FQ(Z) 3.2.1 3.2 POWER DISTRIBUTION LIMITS 3.2.1 Heat Flux Hot Channel Factor (FQ(Z)) ,,- FQE(Z)and FQ'(Z) 1k LCO 3.2.1 FQ(Z), as approximated by specified in the COLR.

-f*-~ , shall be within the limits APPLICABILITY: MODE 1.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME

/*I NSRT"1']

A. -F-.Z* not within A1eADlimits _>1% 15 mi er" limit. foreac-M(Z)FQ(Z) exeesliidetermi nation A.-Z*. Reduce THERMAL POWER 15 minutes after

Ž1% RTP for each 1% each -F~-+Z 4- IFQE(Z) determi nation AND A.-2-.2 Reduce Power Range 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after Neutron Flux-High trip each -F -- ~----

setpoints Ž 1% for determi nation each 1% M AND A.f-..3 Reduce Overpower AT 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after trip setpoints Ž 1% each f*() 4-for each 1%-F/-,,,- determination cxcd limit. that THERMAL POWER AND is limited below RTP by Required Action A.1 A.-2-.4 Perform SR 3.2.1.1 Prior to increasing land SR 3.2.1.2 THERMAL POWER above the limit of Required Action A.f-..I North Anna Units 1 and 2 3.2.1-I 3211Aedet 3/1

FQ(Z) 3.2.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME

--- Required Action and -B-.I Be in MODE 2. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> I* associated Completions SURVEILLANCE REQUIREMENTS


NOTE- - - - - - - - --

During power escalation, THERMAL POWER may be increased until a power level for extended operation has been achieved, at which a power distribution map is obtai ned.

North Anna Units 1 and 2 3212Aedet 3.2.1-2 3/1

FQ(Z) 3.2.1 SURVEILLANCE REQUIREMENTS SURVE ILLANCE FREQUENCY SR 3.2.1.1 I F(Z) measurements indicate

-...

NOTE---- --

maximu over z LK-(Z) has increas ,d since the p iu eval uation o Z

a. Increase F*( by he appropriate factor and-verf F(Z) is still within limits;
b. Repeat SR .21. ce per 7 EFPD until two cesv lux maps indicate maxium verz [

__as not increased'.*

K~(Z)j]

IFoE(Z) Veri fy>-- (ji s within limit. Once after each refueling prior to THERMAL POWER exceeding 75% RTP AND Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions after exceeding, by

Ž10% RTP, the THERMAL POWER at whicl+W(+*

waslat erifed~

AND In accordance with the Surveil11ance Frequency Control Program North Anna Units 1 and 2 3.2.1-3 Aedet 6/4

INSERT "1"

-~NOTE---

Required Action A.4 shall be completed whenever this Condition is entered. SR 3.2.1.2 is not required to be performed if this Condition is entered prior to THERMAL POWER exceeding 75%

RTP after a refueling.

INSERT "2" ACTIONS CONDITION [REQUIRED ACTION ]COMPLETION TIME B.----NOTE----... B.1 Reduce AFD limits as specified in 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after each Required Action B.5 the COLR. FaT(Z) determination shall be completed AND whenever this B.2 Reduce THERMAL POWER as 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after each Condition is entered. specified in the COLR. FaT(Z) determination AND FQT(Z) not within B.3 Reduce Power Range Neutron 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each limit. Flux-High trip setpoints > 1 % for FaT(Z) determination each 1 % that THERMAL POWER is limited below RTP by Required Action B.2.

AND B.4 Reduce Overpower AT trip 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each setpoints > 1% for each 1% that FQT(z) determination THERMAL POWER is limited below RTP by Required Action B.2.

AND B.5 Perform SR 3.2.1.1 and SR Prior to increasing 3.2.1.2. THERMAL POWER and AFD limits above the limits of Required Actions B.1 and B.2

INSERT "3" SURVEILLANCE FREQUENCY SR 3.2.1.2 -~~~NOTE-----------

If measurements indicate that either the maximum over z [n()]1 OR maximum over z [ K(z)].

has increased since the previous evaluation of FQ(Z) or is expected to increase prior to the next evaluation:

A. Increase FQT(Z) by the appropriate factor, as specified in the COLR, and verify FQT(z) is still within limits or B. Repeat SR 3.2.1.2 once per 7 EFPD until

a. Above (A) is met or
b. Two successive flux maps indicate that the Once after each refueling within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> maximum over z [FK(Z)]J after achieving equilibrium conditions after

[nK~)

AND THERMAL POWER exceeds 75% RTP maximum over z has not increased. AND Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving Verify FQT(Z) is within limit. equilibrium conditions after exceeding, by

> 10% RTP, the THERMAL POWER at which FoT(z) was last verified AND In accordance with the Surveillance Frequency Control Program

Serial No.15-494 LAR - NSAL-09-5, Rev. 1 and NSAL-15-1 Docket Nos. 50-338/339 ATTACHMENT 3 PROPOSED TECHNICAL SPECIFICATIONS PAGES Virginia Electric and Power Company (Dominion)

North Anna Power Station Units 1 and 2

FQ(Z) 3.2.1 3.2 POWER DISTRIBUTION LIMITS 3.2.1 Heat Flux Hot Channel Factor (FQ(Z))

LCO 3.2.1 FQ(Z) , as approximated the limits specified in bytheFQECOLR.

(Z) and FQT (Z), shall be within APPLICABILITY: MODE 1.

ACTIONS CONDITION ] REQUIRED ACTION TCOMPLE TIME A.------NOTE--- -- A.I Reduce THERMAL POWER 15 minutes after Required Action A.4 Ž1% RTP for each 1% each FeE (7) shall be completed FQE (Z) exceeds limit. determi nati on whenever this Condition is entered. SR 3.2.1.2 is not required to be AND performed if this A.2 Reduce Power Range 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> afteYr each Condition is entered Neutron Flux-High FQE (Z) prior to THERMAL POWER exceeding 75% RTP after trip setpoints Ž 1% determi nati on a refueling. for each 1% that THERMAL POWER is limited below RTP by FQE (7) not within Required Action A.I.

limit.

AND A.3 Reduce Overpower AT 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each trip setpoints Ž 1% FQE (Z) for each 1% that determi nati on THERMAL POWER is limited below RTP by Required Action A.1.

AND A.4 Perform SR 3.2.1.1 Prior to increasing and SR 3.2.1.2. THERMAL POWER above the limit of Required Action A.I I

North Anna Units 1 and 2 3.2.1-1 3211Aedet Amendments

FQ(Z) 3.2.1 ACTIONS CONDITION ]R EQUIRED ACTION COMPLETION TIME B.------NOTE- --- B.I Reduce AFD limits as 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after each Required Action B.5 specified in the FQT (7) shall be completed COLR, determi nati on whenever this Condition is entered.

AND B,2 Reduce THERMAL POWER 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after each FQT (Z) not within as specified in the FQT (Z) limit.

COLR. determi nati on AND B.3 Reduce Power Range 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each Neutron Flux-High FQT (Z) trip setpoints > 1% determi nati on for each 1% that THERMAL POWER is limited below RTP by Required Action B.2 AND B,4 Reduce Overpower AT 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each trip setpoints > 1% FQT (Z) for each 1% that determi nati on THERMAL POWER is limited below RTP by Required Action B.2.

AND B.5 Perform SR 3.2.1.1 Prior to increasing and SR 3.2.1.2. THERMAL POWER and AFD limits above the limits of Required Actions B.I and B.2.

C. Required Action and associated Completion

}C.1 Be in MODE 2. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Time not met.,______________ _________

North Anna Units 1 and 2 3,2.1-2 3212Aedet Amendments

FQ(Z) 3.2.1 SURVEILLANCE REQUIREMENTS

-- - - - - - - - - - - - - - - - -- NOTE - - - - - - - - - -

During power escalation, THERMAL POWER may be increased until a power level for extended operation has been achieved, at which a power distribution map is obtained.

SURVEILLANCE REQUIREMENTS _____________

SURVEILLANCE FREQUENCY SR 3.2.1.1 Verify FQ (Z) is within limit. Once after each refueling prior to THERMAL POWER exceeding 75% RTP AND Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions after exceeding, by

Ž10% RTP, the THERMAL POWER at which FQE (Z) was last verified AND In accordance with the Surveillance Frequency Control Program North Anna Units 1 and 2 3213Aedet 3.2.1-3 Amendments

FQ(Z) 3.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY

+

SR 3.2.1.2 -NOTE-If measurements indicate that either the maximum over z LK(Z)

SFQ*Z) 1 j

OR FQ*Z) 1 maximum over z has increased of since FQ (7) the previous evaluation or is expected to increase prior to the next evaluation:

A. Increase FQT (7) by the appropriate factor, as specified in the COLR, and verify FQT (7) is still within limits or B. Repeat SR 3.2.1.2 once per 7 EFPD until1

a. Above (A) is met or
b. Two successive flux maps indicate that the maximum over z SFQ(Z)]

AND maximum over z K(Z) j has not increased.

(conti nued)

North Anna Units 1 and 2 3.2.1-4 3214Aedet Amendments

FQ(Z) 3.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.1.2 (conti nued)

Verify FQT (Z) is within limit.

Once after each refueling within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions after THERMAL POWER exceeds 75% RTP AND Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions after exceeding, by

Ž10% RTP, the THERMAL POWER at which FQT (Z) was last verified AND In accordance with the Surveillance Frequency Control Program North Anna Units 1 and 2 3.2.1-5 3215Aedet Amendments

Intentionally Blank Serial No.15-494 LAR - NSAL-09-5, Rev. 1 and NSAL-1 5-1, Rev. 0 Docket Nos. 50-338/339 ATTACHMENT 4 MARKED-UP AND PROPOSED TECHNICAL SPECIFICATIONS BASES PAGES (for information only)

Virginia Electric and Power Company (Dominion)

North Anna Power Station Units 1 and 2

FQ(Z)

B 3.2.1 B 3.2 POWER DISTRIBUTION LIMITS B 3.2.1 Heat Flux Hot Channel Factor (FQ(Z))

BASES BACKGROUND The the purpose of thepellet) limits on the values of FQ(Z) is to limit local (i.e., peak power density. The value of FQ(Z) is approximated by FQ(Z) varies along the axial height (Z) of the core.

FQE(Z) and FaT(Z). FQE(Z) is defined as the FQ(Z) is defined as the maximum local fuel rod linear power measured value of FQ(Z), density divided by the average fuel rod linear power density, assuming nominal fuel pellet and fuel rod incorporating dimensions. Therefore, FQ(Z) is a measure of the peak fuel manufacturing tolerances pellet power within the reactor core.

and measurement uncertainties. FaT(Z) is During power operation, the global power distribution is limited by LCO 3.2.3, "AXIAL FLUX DIFFERENCE (AFD)," and defined as the FQE(Z) LCO 3.2.4, "QUADRANT POWER TILT RATIO (QPTR)," which are incorporating a non- directly and continuously measured process variables. These equilibrium factor that LCOs, along with LCO 3.1.6, "Control Bank Insertion Limits,"

maintain the core limits on power distributions on a accounts for possible continuous basis.

power distribution transients during normal FQ(Z) varies with fuel loading patterns, control bank operation. insertion, fuel burnup, and changes in axial power distribution.

FQ(Z) system.is These measured periodically using the incore detector measurements are generally taken with the core at or near steady state conditions.

Isteady-state F0 (Z),I Using is the measured possible three to derive dimensional a measure val1 power distributions, it foFQ)rt\

IFQE(Z)I However, because this value represents a steady state condition, it does not encompass the variations in the value of FQ(Z) that are present during nonequilibrium situations, such as load changes.

To account for these possible variations, the steady state

......... e\ is"adjusted by an elevation dependent factor

  • -.
  • that accounts for the calculated worst case transient conditions itO derive FaT(Z) Ii Core monitoring and control under nonsteady state conditions are accomplished by operating the core within the limits of the appropriate LC~s, including the limits on AFD, QPTR, and control rod insertion.

North Anna Units 1 and 2 B 3.2.1-1 B3211Rvso Revision 0

FQ(Z)

B 3.2.1 BASES APPLICABLE This LCO precludes core power distributions that violate the SAFETY ANALYSES following fuel design criteria:

a. During a loss of coolant accident (LOCA), the peak cladding temperature during a small break LOCA must not exceed 2200°F, and there must be a high level of probability that the peak cladding temperature does not exceed 2200 0 F for the large breaks (Ref. 1);
b. During a loss of forced reactor coolant flow accident, there must be at least 95% probability at the 95%

confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a departure from nucleate boiling (DNB) condition;

c. During an ejected rod accident, the energy deposition to unirradiated fuel is limited to 225 cal/gm and irradiated fuel is limited to 200 cal/gm (Ref. 2); and
d. The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest worth control rod stuck fully withdrawn (Ref. 3).

Limits on Fo(7) ensure that the value of the initial total peaking factor assumed in the accident analyses remains valid. Other criteria must also be met (e.g., maximum cladding oxidation, maximum hydrogen generation, coolable geometry, and long term cooling). However, the peak cladding temperature is typically most limiting.

Fo (Z) limits assumed in the LOCA analysis are typically limiting relative to (i.e., lower than) the FQ(Z) limit assumed in safety analyses for other postulated accidents.

Therefore, this LCO provides conservative limits for other postulated accidents.

FQ(Z) satisfies Criterion 2 of 10 CFR 50.36(c) (2) (ii).

North Anna Units 1 and 2B321-Reion B 3.2.1-2 Revision 13 3

FQ(Z)

B 3.2.1 BASES NE

[CO The*-*M-~ued- Heat Flux Hot Channel Factor, f-Ft), shall be limited by the following relationships, asu=, .... bad dec Ifor where: CFQ is the FQ(Z) limit at RTP provided in the COLR, K(Z) is the normalized F (Z) as a function of core height provided in the CObLR, s cedependentra function

" tha nontered I o" included in the P is the fraction of RATED THERMAL POWER defined as

=THERMAL POWER FQ(Z) is approximated by FQE(Z) and FQT(Z). Thus, both -- *The actual values of CF, K(Z), an ()aegven in the FQE(Z) and FQT(Z) must meet \COLR; however, CFQ is normally approximately 2. (Z) s ar-the preceding limits on FQ(Z). \ function that looks like the one provided in I FQ(Z)

An_* evluaionrequires MEI.From the incore flux obtaining map resultsan we incore obtainflux themap in au measured value of FQ(Z). Then, the measured *-}r-Z-Y.-..s increased by 1.03 which is a factor that accounts for fuel manufacturing tolerances and 1.05 which accounts for flux I NER 4"

  • measurement unetit o banFEZ The FQ(Z) limits define limiting values for core power peaking that precludes peak cladding temperatures above 2200°F during a small break LOCA and assures with a high level of probability that the peak cladding temperature does not exceed 2200°F for large breaks (Ref. 1).

This LCO requires operation within the bounds assumed in the safety analyses. Calculations are performed in the core design process to confirm that the core can be controlled in (conti nued)

North Anna Units 1 and 2B321-Reion3 B 3.2.1-3 Revision 13

FQ(Z)

B 3.2.1 BASES LCO such LOCA a"Ft'cQ/(

manner during operation that it can stay within the (conti nued) limits.. .=If FQ(Z ...... ~i^ ma-inta-.^d ,.,ih-n th..

r::::r:r7 :III~2r' i~ rcguir~u.

Violating consequences the ifLCOa limits design for basisFQ(Z) eventproduces occurs unacceptable while FQ(Z) is outside its specified limits.

APPLICABILITY The FQ(Z) limits must be maintained in MODE 1 to prevent core power distributions from exceeding the limits assumed in the safety analyses. Applicability in other MODES is not required because there is either insufficient stored energy in the fuel or insufficient energy being transferred to the reactor coolant to require a limit on the distribution of core power.

ACTIONS occurred, oepain r r texceeded. The maximum AFD limits initilaL.-*etermined by Req d Action A.1 may be affce euntdtriains o MZ)and would require rdcin ih1 iue fteF

-~i. AP--1 R~ducing THERMAL 4r,-fZ-)-exceeds its POWER limit,by maintains

Ž 1% RTP for each 1% by which an acceptable absolute power density. The percent that.*-~f~-exceeds the limit can 100 for P > 0.5

-l1.O}x 100 for P

  • 0.5 (conti nued)

North Anna Units 1 and 2B3.1-Reion B 3.2.1-4 Revision 13 3

FQ(Z)

B3.2.1 BASES ACTIONS A.-1. (continued)

QE(ZI- -......- >-F~-*)is the measured FQ(Z) multiplied by factors accounting for manufacturing tolerances and measurement uncertainties.

FM(Z) ,.* t,,e ,,=ou= ,ahe u, ,(Z). The Completion Time of 15 minutes provides an acceptable time to reduce power in an orderly manner and without allowing the unit to remain in an unacceptable condition for an extended period of time. The maximum allowable power level initially determined by Required Action A.-t.I may be affected by subsequent determinations okf*-F~)-and would require power reductions within 15 minutegof the.*FfZ-determination, if necessary to comply with the decr~ased maximum allowable power level.

Decreases iricF-(*)would allow increasing the maximum allowable po~ler level and increasing power up to this revised limit.

Ithat THERMAL POWER is limited A.--f.2 Ibelow RTP by Required Action A.1 A reduction of the Power Range Neutron Flux-High trip setpoints by > 1% for each 1% by ,which F*(Z) ..... d liz _.

--im-it, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.-*-.I. The maximum allowable Power Range Neutron Flux-High trip setpoints initially determined by Required Action A.-2-,2 may be affected by subsequent determinations of-.zF-~-and would require Power Range Neutron Flux-High trip setpoint reductions within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of thecF,*)-determination, if necessary to comply with the decr'6ased maximum allowable Power Range Neutron Flux-High trip setpoints. Decreases in

>_-FZ-(-_4 would allow increasing the maximum allowable Power Range Neutron Flux-High trip setpoints.

A.-4-. 3 Reduction in the Overpower AT trip setpoints (value of K4) by

Ž1% (in AT span) for each 1% by which F*(Z) exceeds itz<-

++w+t, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is sufficient considering the small likelihood of a severe transient in this time period, and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.-2..1. The (conti nued)

North Anna Units 1 and 2B3.1-Reion B 3.2.1-5 3

FQ(Z)

B 3.2.1 BASES ACTIONS A.-2-.3 (continued) maximum allowable Overpower AT trip setpoints initially determined by Required Action A.*Z-.3 may be affected by

[FoE(Z)I subsequent determinations o~f~ftand would require Overpower AT trip setpoint r~ductions within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of the

-*** determination, if necessary to comply with the decreased maximum allowable Overpower AT trip setpoints.

Decreases i -. {)would allow increasing the maximum Overpower AT trip setpoints.

A f.Ai-tA

"*-*"* /-and Verification thatl.F-,)-has bee rerestored,SRto3.2121 within, its limit, by perforrifng SR 3.2.1.1 prior to increasing THERMAL POWER above the limit imposed by Required Action A."Z1.,

ensures that core conditions during operation at higher power levels are consistent with safety analyses assumptions.

-_--1 I--A.1 through A.4 and B.1 through B.5I If Required Actions A.I, A.2.1, A.2.2, A.2.3, or A.2.1 are not met within their associated Completion Times, the unit must be placed in a MODE or condition in which the LCO requirements are not applicable. This is done by placing the unit in at least MODE 2 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

This allowed Completion Time is reasonable based on SURVEILLANCE SR 3.2.1.1 4-modified by a Note. It states that THERMAL REQUIREMENTS POWER may be increased until a power level for extended operation has been achieved at which a power distribution map can be obtained. This allowance is modified, however, by one of the Frequency conditions that requires verification FQZ tha -*f+-is within its specified limit after a power rise IFQ~z I I of ore than 10% RTP over the THERMAL POWER at which it was I last verified to be within specified limits. In the absence I of this Frequency condition, it is possible to increase I power to RTP and operate for 31 days without verification of 44..*. The Frequency condition is not intended to require "verification of these parameters after every 10% increase in power level above the last verification. It only requires (continued)

North Anna Units 1 and 2B321-Reion3 B 3.2.1-6 Revision 13

FQ(Z)

B 3.2.1 BASES SURVEILLANCE verification after a power level is achieved for extended REQUIREMENTS operation that is 10% higher than that power at which FQ was (continued) last measured.

SR 3.2.1.1 I INSR~i111I The nuclear design process includes calculations performed to determine that the core can be operated within the FQ(Z) limits. Because flux maps are taken in steady state conditions, the variations in power distribution resulting from normal operational maneuvers are not present in the flux map data. These variations are, however, conservatively calculated by considering a wide range of unit maneuvers in normal operation. The maximum peaking factor increase over steady state values, calculated as a function of core elevation, Z, is called N(Z).

The limit with which-~-~ is compared varies inversely with power above 50% RTP~and N(Z) and directly with a function called K(Z) provided in the COLR. IINSERT,"8",

If THERMAL POWER has been increased by Ž 10% RTP since the last determination o0 *4~ , another evaluation of this factor is required 12hours after achieving equilibrium conditions at this higher power level (to ensure thakc-F~()-

values are being reduced sufficiently with power increase to stay within the LCO limits).

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

Flux map data are taken for multiple core elevations ..A+

evaluations are not applicable for the following axi*1 core regions, measured in percent of core height:

a. Lower core region, from 0 to 15% inclusive; and
b. Upper core region, from 85 to 100% inclusive.

North Anna Units 1 and 2B321-Reion4B 3.2.1-7 Revision 46

FQ(Z)

B 3.2.1 BASES SURVE ILLANCE SR -3.2.1. (continued)

REQUIREMENTS The top and because evaluation bottom of of the core are excluded from the 15%the low probability that these regions would be more limiting in the safety analyses and because of the difficulty of making a precise measurement in these This Surveillce has been modified by a Note that may require that mor requent surveillances be performed. An FQ()evaluation of the *x,~o eG 3required to account IFTZ or any increase t F*(* )that may occur and__cause th ~r~

limit to be exceeded before the next require(e evaluation.

a two most recent F*(Z) evaluations show an incri it is required increased by to apepropriate m e F*(Z) l im or to factor, ith the uate last F*(Z)

F*(Z) more fr~pm lly, each 7 EFPD. These alternative r rements pr* FQ(Z) from exceeding its limit without detectli REFERENCES 1. 10 CFR 50.46.

2. VEP-NFE-2-A, "VEPCO Evaluation of the Control Rod Ejection Transient."
3. UFSAR, Section 3.1.22.
4. VEP-NE-I-A, "VEPCO Relaxed Power Distribution Control Methodology and Associated FQ Surveillance Technical Specifications."

North Anna Units 1 and 2B321-Reion3 B 3.2.1-8 Revision 13

INSERT "4" FQE(Z) is an excellent approximation for FQ(Z) when the reactor is at the steady-state power at which the incore flux map was taken.

The expression for FQT(Z) is:

FQT(Z) "- FQE(Z) N(Z)

Where: N(Z) is a cycle dependent function that accounts for power distribution transients encountered during normal operation. N(Z) is included in the COLR. The FQT(Z) is calculated as described in Reference 4.

INSERT "5" If FQE(Z) cannot be maintained within the LCO limits, reduction of core power is required and if FQT(Z) cannot be maintained within the LCO limits, reduction of the AFD limits is also required.

INSERT "6" B.1 If it is found that the maximum calculated value of FQ(Z) that can occur during normal maneuvers, FQT(Z) , exceeds its specified limits, there exists a potential for FQE(Z) to become excessively high if a normal operational transient occurs. Reducing the AFD Limit by the amount specified in the COLR within the allowed Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, restricts the axial flux distribution such that even if a transient occurred, core peaking factors are not exceeded.

INSERT "6" (Continued)

B.2 If it is found that the maximum calculated value of FQ(Z) that can occur during normal maneuvers, FQT(Z) , exceeds its specified limits, there exists a potential for FQE(Z) to become excessively high if a normal operational transient occurs. Reducing THERMAL POWER by the amount specified in the COLR within the allowed Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, restricts the absolute power density such that even if a transient occurred, core peaking factors are not exceeded. The percent that FQT(Z) exceeds the limit can be determined from:

{maximum over Z ('C;-Q(-Z))! 1 xl00forP>0.5 tmaximum overZ CFQKZ~)' 1} x100 for P*<O.5 B.3 A reduction of the Power Range Neutron Flux-High trip setpoints by > 1% for each 1%

by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.

B.4 Reduction in the Overpower AT trip setpoints (value of K4 ) by > 1 % for each 1% by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is sufficient considering the small likelihood of a severe transient in this time period, and the preceding prompt reduction in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.

INSERT "6" (Continued)

B.5 Verification that FQT(z) has been restored to within its limit, by performing SR 3.2.1.1 and SR 3.2.1.2 prior to increasing THERMAL POWER and AFD limits above the maximum allowable power and AFD limits imposed by Required Actions B.1 and B.2 ensures that core conditions during operation at higher power levels and future operation are consistent with safety analyses assumptions.

C.1 INSERT "7" Verification that FQE(Z) is within its specified limits involves increasing FQ(Z) to allow for manufacturing tolerance and measurement uncertainties in order to obtain FQE(z).

Specifically, FQE(Z) is the measured value of FQ(Z) obtained from incore flux map results multiplied by manufacturing and measurement uncertainties (1.05 x 1.03 = 1.0815).

FQE(Z) is then compared to its specified limits.

The limit with which FQE(z) is compared varies inversely with power above 50% RTP and directly with a function called K(Z) provided in the COLR.

Performing this Surveillance in MODE 1 prior to exceeding 75% RTP ensures that the FQE(Z) limit is met when RTP is achieved, because peaking factors generally decrease as power level is increased.

If THERMAL POWER has been increased by > 10% RTP since the last determination of FQE(Z), another evaluation of this factor is required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions at this higher power level (to ensure that FQE(Z) values are being reduced sufficiently with power increase to stay within the LCO limits).

SR 3.2.1.2

INSERT "8" SR 3.2.1.2 requires a Surveillance of FQT(Z) during the initial startup following each refueling within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions after exceeding 75%

RTP. THERMAL POWER levels below 75% are typically non-limiting with respect to the limit for FQT(Z). Also, initial startups following a refueling are slow and well controlled due to startup ramp rate limitations and fuel conditioning requirements. Furthermore, startup physics testing and flux symmetry measurements, also performed at low power, provide confirmation that the core is operating as expected. Consequently, the initial startup following a refueling will not result in non-equilibrium power shapes that could challenge the FQT(Z) limit. This Frequency ensures that verification of FaT(Z) is performed prior to extended operation at high power levels where the maximum permitted peak LHR could be challenged by non-equilibrium operation.

If a previous Surveillance of FQT(Z) was performed at part power conditions (below RTP), SR 3.2.1.2 also requires that FoT(Z) be verified at power levels ->10% RTP above the THERMAL POWER of its last verification within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions. This ensures that FQT(Z) is within its limit using radial peaking factors measured at the higher power level.

INSERT "9" If the two most recent FQ(Z) evaluations show that either the maximum over Z [ K()]

OR maximum over Z/ ()J has increased or is expected to increase prior to the next evaluation then it is required to increase the FQT(Z) by the appropriate factor, as specified in the COLR, and verify FQT(z) is still within limits or evaluate FQ(Z) every 7 EFPD until SR 3.2.1 .2 is satisfied.

These alternate requirements prevent FQ(Z) from exceeding its limit without detection.

FQ(Z)

B 3.2.1 B 3.2 POWER DISTRIBUTION LIMITS B 3.2.1 Heat Flux Hot Channel Factor (FQ(Z))

BASES BACKGROUND The purpose of the limits on the values of FQ(Z) is to limit the local (i.e., pellet) peak power density. The value of FQ(Z) varies along the axial height (Z) of the core.

FQ(Z) is defined as the maximum local fuel rod linear power density divided by the average fuel rod linear power density, assuming nominal fuel pellet and fuel rod dimensions. Therefore, FQ(Z) is a measure of the peak fuel pellet power within the reactor core.

FQ(Z) is approximated by FQE (Z) and FQT (Z). FeE (7) is defined as the measured value of FQ(Z), incorporating manufacturing tolerances and measurement uncertainties.

FQT (Z) i s defined as the FQE (Z) incorporating a non-equilibrium factor that accounts for possible power distribution transients during normal operation.

During power operation, the global power distribution is limited by LCO 3.2.3, "AXIAL FLUX DIFFERENCE (AFD)," and LCO 3.2.4, "QUADRANT POWER TILT RATIO (QPTR)," which are directly and continuously measured process variables. These LCOs, along with LCO 3.1.6, "Control Bank Insertion Limits,"

maintain the core limits on power distributions on a continuous basis.

FQ(Z) varies with fuel loading patterns, control bank insertion, fuel burnup, and changes in axial power distribution.

FQ(Z) is measured periodically using the incore detector system. These measurements are generally taken with the core at or near steady state conditions.

Using the measured three dimensional power distributions, it is possible to derive a measured value for steady state FQ(Z), FQE (Z). However, because this val ue represents a steady state condition, it does not encompass the variations in the value of FQ(Z) that are present during nonequilibrium situations, such as load changes.

(conti nued)

North Anna Units 1 and 2B32.-Reionx B 3.2.1-i Revision xx

FQ(Z)

B 3.2.1 BASES BACKGROUND To account for these possible variations, the steady state (continued) FeE (Z) is adjusted by an elevation dependent factor that accounts for the calculated worst case transient conditions l to derive FQT (Z). I Core monitoring and control under nonsteady state conditions are accomplished by operating the core within the limits of the appropriate LCOs, including the limits on AFD, QPTR, and control rod insertion.

APPLICABLE This LCO precludes core power distributions that violate the SAFETY ANALYSES following fuel design criteria:

a. During a loss of coolant accident (LOCA), the peak cladding temperature during a small break LOCA must not exceed 22000 F, and there must be a high level of probability that the peak cladding temperature does not exceed 2200°F for the large breaks (Ref. 1);
b. During a loss of forced reactor coolant flow accident, there must be at least 95% probability at the 95%

confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience a departure from nucleate boiling (DNB) condition;

c. During an ejected rod accident, the energy deposition to unirradiated fuel is limited to 225 cal/gm and irradiated fuel is limited to 200 cal/gm (Ref. 2); and
d. The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest worth control rod stuck fully withdrawn (Ref. 3).

Limits on F (Z) ensure that the value of the initial total peaking factor assumed in the accident analyses remains valid. Other criteria must also be met (e.g., maximum cladding oxidation, maximum hydrogen generation, coolable geometry, and long term cooling). However, the peak cladding temperature is typically most limiting.

FQ(Z) limits assumed in the LOCA analysis are typically limiting relative to (i.e., lower than) the FQ(Z) limit assumed in safety analyses for other postulated accidents.

Therefore, this LCO provides conservative limits for other postulated accidents.

FQ(Z) satisfies Criterion 2 of 10 CFR 50.36(c) (2) (ii).

North Anna Units 1 and 2B3212ReionxB 3.2.1-2

FQ(Z)

B 3.2.1 BASES LCO The Heat Flux Hot Channel Factor, FQ(Z), shall be limited by the following relationships:

FQ(Z) < CFQ K(Z) for P > 0.5 FQ(Z) < CFQ K(Z) for P

  • 0.5 where: CFQ is the FQ(Z) limit at RTP provided in the COLR, K(Z) is the normalized F (Z) as a function of core height provided in the COLR and P is the fraction of RATED THERMAL POWER defined as THERMAL POWER RTP The actual values of CFQ and K(Z) are given in the COLR; however, CFQ is normally approximately 2 and K(Z) is aI function that looks like the one provided in Figure B 3.2.1-1.

FQ*Z) is approximated by FeE (Z) and FQT (Z). Thus, both FQ (z) and FQT (Z) must meet the preceding limits on FQ(Z).

An FQE (Z) evaluation requires obtaining an incore flux map in MODE 1. From the incore flux map results we obtain the measured value of FQ(Z). Then, the measured value is increased by 1.03 which is a factor that accounts for fuel manufacturing tolerances and 1.05 which accounts for flux map measurement uncertainty to obtain FQE (Z) (Ref. 4).

FeE (Z) is an excellent approximation for FQ(Z) when the reactor is at the steady state power at which the i ncore flux map was taken.

The expression for FQT (Z) is:

FQT (Z)= =FQE (Z) N(Z)

Where: N(Z) is a cycle dependent function that accounts for power distribution transients encountered during normal operation. N(Z) is included in the COLR. The FQT (Z) is calculated as described in Reference 4.

(conti nued)

North Anna Units 1 and 2B32.-ReionxB3.2.1-3 Revision xx

FQ(Z)

B 3.2.1 BASES LCO(conti nued) The FQ(Z) limits define limiting values for core power peaking that precludes peak cladding temperatures above 2200°F during a small break LOCA and assures with a high level of probability that the peak cladding temperature does not exceed 2200°F for large breaks (Ref. 1).

This LCO requires operation within the bounds assumed in the safety analyses. Calculations are performed in the core design process to confirm that the core can be controlled in such a manner during operation that it can stay within the LOCA FQ(Z) limits. If FQE (Z) cannot be maintained within the LCO limits, reduction of core power is required and if FQT (Z) cannot be maintained within the LCO limits, reduction of the AFD limits is also required.

Violating the LCO limits for FQ(Z) produces unacceptable consequences if a design basis event occurs while FQ(Z) is outside its specified limits.

APPLICABILITY The FQ(Z) limits must be maintained in MODE 1 to prevent core power distributions from exceeding the limits assumed in the safety analyses. Applicability in other MODES is not required because there is either insufficient stored energy in the fuel or insufficient energy being transferred to the reactor coolant to require a limit on the distribution of core power.

ACTIONS A.I RedJucing THERMAL POWER by _>1%0 RTP for each 1%o by FQ (Z) exceeds its limit, maintaips an acceptable which absol ute power density. The percent that FQ (Z) exceeds the limit can be determined from:

{maximum over z C.Q_ Z)J-i.0 xlO0 for P > 0.5

{maximum over z CF-O-*Z)J-1.0 x1i00 for P *<0.5 0.

(conti nued)

North Anna Units 1 and 2B321-ReionxB 3.2.1-4 Revision xx

FQ(Z)

B 3.2.1 BASES ACTIONS A.1 (continued)

(conti nued) FQE (Z) is the measured FQ(Z) multiplied by factors accounting for manufacturing tolerances and measurement uncertainties. The Completion Time of 15 minutes provides an acceptable time to reduce power in an orderly manner and without allowing the unit to remain in an unacceptable condition for an extended period of time. The maximum allowable power level initially determined by Required Action A.1 may be affected by subsequent determinations of FQE (Z) and would require power reductions within .15 minutes of the FQE (Z) determination, if necessary to comply with the decreased maximum allowable power level. Decreases in FeE (Z) would allow increasing the maximum allowable power level and increasing power up to this revised limit.

A.2 A reduction of the Power Range Neutron Flux-High trip setpoints by >_ 1% for each 1%o that THERMAL POWER is limited below RTP by Required Action A.I, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.1. The maximum allowable Power Range Neutron Flux-High trip setpoints initially determined by Required Action A.2 may be affected by subsequent determinations of FQE (Z) and would require Power Range Neutron Flux-High trip setpoint reductions within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of the FeE (Z) determination, if necessary to comply with the decreased maximum allowable Power Range Neutron Flux-High trip setpoints. Decreases in FeE (Z) would allow increasing the maximum allowable Power Range Neutron Flux-High trip setpoi nts.

A.3 Reduction i n the Overpower AT trip setpoints (value of K4 ) by

>_ 1% (in AT span) for each 1% that THERMAL POWER is limited below RTP by Required Action A.1, is a conservative action (conti nued)

North Anna Units 1 and 2B321-Reionx B 3.2.1-5 Revision xx

FQ(Z)

B 3.2.1 BASES ACTIONS A.3 (continued)

(contnued) for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is sufficient considering the small likelihood of a severe transient in this time period, and the preceding prompt reduction in THERMAL POWER in accordance with Required Action A.I. The maximum allowable Overpower AT trip setpoints initially determined by Required Action A.3 may be affected by subsequent determinations of FQE (Z) and would require Overpower AT trip setpoint reductions within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of the FQE (Z) determination, if necessary to comply with the decreased maximum allowable Overpower AT trip setpoints. Decreases in FQE (Z) would allow increasing the maximum Overpower AT trip setpoints.

A.4 Verification that FQE(Z) has been restored to within its limit, by performing SR 3.2.1.1 and SR 3.2.1.2 prior to increasing THERMAL POWER above the limit imposed by Required Action A.1, ensures.that core conditions during operation at higher power levels are consistent with safety analyses assumptions.

B.1 If it is found that the maximum calculated value of FQ(Z) that can occur during normal maneuvers, FQT (Z), exceeds its specified limits, there exists a potential for FQE (Z) to become excessively high if a normal operational transient occurs. Reducing the AFD Limit by the amount specified in the COLR within the allowed Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, restricts the axial flux distribution such that even if a transient occurred, core peaking factors are not exceeded.

B.2 If it is found that the maximum calculated value of FQ(Z) that can occur during normal maneuvers, FQT (Z), exceeds its specified limits, there exists a potential for FQE (Z) to become excessively high if a normal operational transient occurs. Reducing THERMAL POWER by the amount specified in the COLR within the allowed Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, (conti nued)

North Anna Units 1 and 2B321-ReionxB 3.2.1-6

FQ(Z)

B 3.2.1 BASES ACTIONS B.2 (continued)

(conti nued) restricts the absolute power density such that even if a transient occurred, core peaking factors are not exceeded.

The percent that FQT (Z) exceeds the limits can be determined from:

F 1maximum over Z 1 rFQIZ)

FQK(Z)J-1} xlO0 for P > 0.5 maximum over Z F-* -1xli00 for P

  • 0.5 0.5 B.3 A reduction of the Power Range Neutron Flux-High trip setpoints by >1% for each 1% by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is sufficient considering the small likelihood of a severe transient in this time period and the preceding prompt reduction in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.

B.4 Reduction in the Overpower AT trip setpoints (value of K4 ) by

>1% for each 1% by which the maximum allowable power is reduced, is a conservative action for protection against the consequences of severe transients with unanalyzed power distributions. The Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is sufficient considering the small likelihood of a severe transient in this time period, and preceding prompt reduction.in THERMAL POWER and AFD limits in accordance with Required Actions B.1 and B.2.

(conti nued)

North Anna Units 1 and 2B321-ReionxB 3.2.1-7

FQ(Z)

B 3.2.1 BASES ACTIONS B.5 (conti nued)

Verification that FQT (Z) has been restored to within its limit, by performing SR 3.2.1.1 and SR 3.2.1.2 prior to increasing THERMAL POWER and AFD limits above the maximum allowable power and AFD limits imposed by Required Actions B.1 and B.2 ensures that core conditions during operation at higher power levels and future operation are consistent with safety analyses assumptions.

C.'

If Required Actions A.I through A.4 and B.I through B.5 are not met within their associated Completion Times, the unit must be placed in a MODE or condition in which the LCO requirements are not applicable. This is done by placing the unit in at least MODE 2 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

This allowed Completion Time is reasonable based on operating experience regarding the amount of time it takes to reach MODE 2 from full power operation in an orderly manner and without challenging unit systems.

SURVEILLANCE SR 3.2.1.1 and SR 3.2.1.2 are modified by a Note. It states REQU IREMENTS that during power escalation, THERMAL POWER may be increased until a power level for extended operation has been achieved at which a power distribution map can be obtained. This allowance is modified, however, by one of the Frequency conditions that requires verification that FQ(Z) is within its specified limit after a power rise of more than 10% RTP I over the THERMAL POWER at which it was last verified to be within specified limits. In the absence of this Frequency condition, it is possible to increase power to RTP and operate for 31 days without verification of FQ(Z). The I Frequency condition is not intended to require verification of these parameters after every 10% increase in power level above the last verification. It only requires verification after a power level is achieved for extended operation that is 10% higher than that power at which FQ was last measured.

(continued)

North Anna Units 1 and 2B321-ReionxB 3.2.1-8 Revision xx

FQ(Z)

B 3.2.1 BASES SURVEILLANCE SR 3.2.1.1 REQU IREMENTS (continued) Verification that FQE (Z) is within its specified limits involves increasing FQ(Z) to allow for manufacturing tolerance and measuremleni* uncertainties in order to obtain FQ (Z). Specifically, FQ (Z) is the measured value of FQ(Z) obtained from incore flux map results multiplied by manufacturing and measurement uncertainties (1.05 x 1.03 = 1.0815). FQ (Z) is then compared to its specified limits.

The limit with which FQE (Z) is compared varies inversely with power above 50%0 RTP and directly with a function called K(Z) provided in the COLR.

Performing this Surveillanc* in MODE 1 prior to exceeding 75% RTP ensures that the FQ (Z) limit is met when RTP is achieved, because peaking factors generally decrease as power level is increased.

If THERMAL POWER has beep increased by > 10% RTP since the last determination of FQ (Z) , another evaluation of this factor is required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions at this higher power level (to ensure that FeE (Z) values are being reduced sufficiently with power increase to stay within the LCO limits).

SR 3.2.1.2 The nuclear design process includes calculations performed to determine that the core can be operated within the FQ(Z) limits. Because flux maps are taken in steady state conditions, the variations in power distribution resulting from normal operational maneuvers are not present in the flux map data. These variations are, however, conservatively calculated by considering a wide range of unit maneuvers in normal operation. The maximum peaking factor increase over steady state values, calculated as a function of core elevation, Z, is called N(Z).

The limit with which FQT (Z) is compared varies inversely with power above 50% RTP and N(Z) and directly with a function called K(Z) provided in the COLR.

SR 3.2.1.2 requires a Surveillance of FQT (Z) during the initial startup following each refueling within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions after exceeding 75%

(continued)

North Anna Units 1 and 2B321-ReionxB 3.2.1-9 Revision xx

FQ(Z)

B 3.2.1 BASES SURVEILLANCE SR 3.2.1.2 (continued)

REQUIREMENTS (conti nued) RTP. THERMAL POWER levels below 75% are typically non-limiting with respect to the limit for FQT (Z) . Also, initial startups following a refueling are slow and well controlled due to startup ramp rate limitations and fuel conditioning requirements. Furthermore, startup physics testing and flux symmetry measurements, also performed at low power, provide confirmation that the core is operating as expected. Consequently, the initial startup following a refueling will not result in non-equilibrium power shapes that could challenge the FQT (Z)T limit. This Frequency ensures that verification of FQT (Z) is performed prior to extended operation at high power levels where the maximum permitted peak LHR could be challenged by non-equilibrium operation.

If a previous Surveillance of FqT (Z) was performed at part power conditions (below RTP), SR 3.2.1.2 also requires that FQT (Z) be yenifi ed at power level s_> 10% RTP above the THERMAL POWER of its last verification within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions. This ensures that FQT (7) is within its limit using radial peaking factors measured at the higher power level.

If THERMAL POWER has been increased by Ž 10% RTP since the last determination of FQT (Z), another evaluation of this factor is required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving equilibrium conditions at this higher power level (to ensure that FQT (Z) values are being reduced sufficiently with power increase to stay within the LCO limits).

The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

Flux map data are taken for multiple core elevations. FQT (Z) evaluations are not applicable for the following axial core regions, measured in percent of core height:

a. Lower core region, from 0 to 15% inclusive; and
b. Upper core region, from 85 to 100% inclusive.

(conti nued)

North Anna Units 1 and 2 B 3.2.1-10 B3211 Revision eiinxxx

FQ(z)

B 3.2.1 BASES SURVEILLANCE SR 3.2.1.2 (continued)

REQUIREMENTS (conti nued) The top and bottom 15% of the core are excluded from the evaluation because of the low probability that these regions would be more limiting in the safety analyses and because of the difficulty of making a precise measurement in these regions.

This Surveillance has been modified by a Note that may require that more frequent surveillances be performed. An evaluation of the expressions below are required to account for any increase to FqT (Z) that may occur and cause the FQT (Z) limit to be exceeded before the next required FQT (Z) eval uati on.

If the two most recent FQ(Z) evaluations show that either the maximum over z L1 FQ*Z)

OR FQ(Z) maximum over z K(Z)-

has increased evaluation thenorit is isexpected requiredtotoincrease increase prior toT (Z) the Fe the by next the appropriate factor, as specified in the COLR, and verify FQ* (Z) is still within limits or evaluate FQ(Z) every 7 EFPD until SR 3.2.1.2 is satisfied. These alternate requirements prevent FQ(Z) from exceeding its limit without detection.

REFERENCES 1. 10 CFR 50.46.

2. VEP-NFE-2-A, "VEPCO Evaluation of the Control Rod Ejection Transient."
3. UFSAR, Section 3.1.22.
4. VEP-NE-1-A, "VEPCO Relaxed Power Distribution Control Methodology and Associated FQ Surveillance Technical Specifications."

North Anna Units 1 and 2 B3211 eiinx

FQ(Z)

B3.2.1 1.2 DONO IPRT INTIS AREA 1.1 DONOOPRT NHSAE (6, 1.0) 1.0 0.9 (12, .925) 0.8 0.7

._. 0.6 0.5 0.4 0.3 0.2 THIS FIGURE FOR-ILLUSTRATION ONLY. DO NOT USE FOR OPERATION 0.1 0.0 FT. 0 1 2 3 4 5 6 7 8 9 10 11 12 16.6 33.3 50.0 66.7 83.3 100 CORE HEIGHT

  • FOR CORE HEIGHT OF 12 FEET Figure B 3.2.1-1 (page 1 of 1)