|
---|
Category:Letter
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML22312A5502022-11-0707 November 2022 Proposed License Amendment Request to Revise Emergency Plan Staff Augmentation Times ML22307A3172022-11-0303 November 2022 Proposed License Amendment Request Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump ML22223A1452022-08-11011 August 2022 (Naps), Units 1 and 2 - Subsequent License Renewal Application (SLRA) Second 10 CFR 54.21(b) Annual Amendment ML22146A0272022-05-25025 May 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant. ML21294A3382021-10-21021 October 2021 Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . ML21252A5142021-09-0909 September 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Rev 1, Using the Consolidated Line Item Improvement Process ML21238A2972021-08-26026 August 2021 Subsequent License Renewal Application Supplement 4 ML21126A3142021-05-0606 May 2021 Proposed License Amendment Request - Revise Primary Grade Water Isolation Time from 15 Minutes to 1 Hour Following Reactor Shutdown ML21076B0252021-03-17017 March 2021 Update to Subsequent License Renewal Application, Supplement 2 ML21035A3032021-02-0404 February 2021 (Naps), Units 1 and 2 - Update to Subsequent License Renewal Application (SLRA) Supplement 1 ML21007A2642021-01-0707 January 2021 Proposed License Amendment Request Revise Reactor Core Safety Limit to Reflect WCAP-17642-P-A, Revision 1 ML20352A3942020-12-17017 December 2020 Proposed License Amendment Request to Change Battery Surveillance Requirements ML20090B3972020-03-26026 March 2020 Revised License Renewal Commitment Pressurizer Surge Line Weld Inspection Frequency ML19309D1972019-10-30030 October 2019 Proposed License Amendment Request Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident ML19086A1132019-03-18018 March 2019 Proposed License Amendment Request to Reduce Maximum EDG Steady State Voltage from 4580V to 4400V ML18334A1062018-11-19019 November 2018 Amendment for Flood Protection Dike Modification ML18092A0812018-03-26026 March 2018 Supplement to Proposed License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML18029A1182018-01-22022 January 2018 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML18025B4932018-01-16016 January 2018 Attachments 7 & 8: Surry - Proposed Changed SPS Emergency Plan Pages and Offsite Response Agency Letters of Concurrence ML18025B4912018-01-16016 January 2018 Attachments 5 and 6: North Anna - Proposed Changed to Emergency Plan Pages and Marked-Up SPS Emergency Plan Page Changes ML18025B4882018-01-16016 January 2018 Attachments 1 to 4: Proposed Consolidated Emergency Operations Facility ML18025B4852018-01-16016 January 2018 Isfsis, Surry, Units 1 and 2, and ISFSIs - Submittal of Proposed Consolidated Emergency Operations Facility ML17207A1702017-07-19019 July 2017 Proposed License Amendment Request for Spent Fuel Storage and New Fuel Storage ML17129A4512017-05-0202 May 2017 Submittal of Proposed License Amendment Request for Spent Fuel Storage and New Fuel Storage ML17129A4522016-11-30030 November 2016 Criticality Safety Evaluation Report ML15352A1082015-12-10010 December 2015 License Amendment Request to Address the Issues Identified in Westinghouse Documents NSAL-09-5, Rev. 1 and NSAL-15-1 ML15147A0292015-05-22022 May 2015 Proposed License Amendment Request (Lar), TS 3.8.1 - AC Sources - Operating, Revised Surveillance Requirement ML15041A6672015-02-0404 February 2015 Proposed License Amendment Request Re Alternate Control Rod Position Monitoring ML14246A1902014-08-27027 August 2014 Proposed License Amendment Request, Clarification of Reactor Coolant System Heatup and Cooldown Technical Specification Figures ML13179A0142013-06-26026 June 2013 Proposed License Amendment Request Addition of an Analytical Methodology to Core Operating Limits Reports and an Increase to Minimum Temperature for Criticality ML13179A0152013-05-31031 May 2013 Units I and 2, Qualification of the ABB-NV and Wlop CHF Correlations in the Dominion VIPRE-D Computer Code ML13064A3522013-02-22022 February 2013 Proposed License Amendment Request (LAR) Control Bank Sequence and Overlap Limit Action ML12356A2982012-12-13013 December 2012 Supplemental Information for Proposed Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process. ML12283A0692012-09-27027 September 2012 ISFSIs and Surry, Units 1 and 2 and ISFSIs Proposed Emergency Action Level Revisions ML12219A0722012-07-30030 July 2012 Proposed Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process ML12136A4512012-05-11011 May 2012 Proposed License Amendment Request - Temporary Change to Allow Two Inoperable Demand Position Indicators Per Control Bank ML1111900932011-04-27027 April 2011 License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation. ML1029804472010-10-21021 October 2010 Proposed License Amendment Request (LAR) Addition of Analytical Methodology to COLR Best-Estimate Large Break Loss of Coolant Accident (BE-LBLOCA) ML1012605172010-05-0606 May 2010 Proposed License Amendments and Exemption Request for Use of Optimized Zirlo Fuel Rod Cladding ML1009001672010-03-30030 March 2010 Marked-Up Technical Specification Bases Page Changes ML1009001632010-03-30030 March 2010 Proposed License Amendment Request Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) ML0933602472009-11-20020 November 2009 Request for Approval of Cyber Security Plan ML0927304682009-09-28028 September 2009 Proposed License Amendment Request, TS 3.7.12 - ECCS Pump Room Exhaust Air Cleanup System (Preacs) Addition of Conditions/Action Statements ML0920503812009-07-23023 July 2009 License Amendment Request, One Time Extension of the Completion Time for 1 J - 480 Volt AC Distribution Subsystem ML0909102652009-03-26026 March 2009 License Amendment Request on Measurement Uncertainty Recapture Power Uprate ML0909000552009-03-26026 March 2009 License Amendment Request, Measurement Uncertainty Recapture Power Uprate ML0904004652009-02-0606 February 2009 License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Work Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0902102792009-01-15015 January 2009 Proposed License Amendment Request TS 3.7.12 - ECCS Pump Room Exhaust Air Cleanup System (Preacs) Addition of Conditions/Action Statements ML0835309822008-12-17017 December 2008 Proposed License Amendment Request Adoption of TSTF-490, Revision 0, Regarding Deletion of E Bar Definition and Revision to RCS Specific Activity Using the Consolidated Line Item Improvement Process ML0823211982008-08-18018 August 2008 Application to Use Weighting Factors for External Exposure 2022-08-11
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 PROPRIETARY INFORMATION-WITHHOLD UNDER 10 CFR 2.390 10 CFR 50.90 July 19, 2017 U.S. Nuclear Regulatory Commission Serial No.: 16-383A Attention: Document Control Desk NRA/DEA RO Washington, DC 20555 Docket Nos.: 50-338/339 License Nos.: NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNITS 1 AND 2 PROPOSED LICENSE AMENDMENT REQUEST FOR SPENT FUEL STORAGE AND NEW FUEL STORAGE ANNOTATED PROPRIETARY ATTACHMENT WITH JUSTIFICATION FOR CLAIMING INFORMATION AS PROPRIETARY By letter dated May 2, 2017, Dominion submitted a license amendment request to revise Technical Specifications (TS) 3.7.18, "Spent Fuel Pool Storage" and TS 4.3.1 "Criticality."
Conforming changes were proposed to Technical Specifications Bases (TSB) B3. 7 .18. A supporting criticality safety evaluation for fuel assembly storage in the North Anna Power Station (NAPS) Spent Fuel Pool (SFP) storage racks and the New Fuel Storage Racks (NFSR) was performed for the proposed TS change. A proprietary version of the Criticality Safety Evaluation Report was provided as Attachment 6 to the proposed license amendment request. However, although each page of Attachment 6 was identified as proprietary, the information which was proprietary was not contained within brackets and the reason for claiming the information as proprietary was not indicated. Enclosure 1 provides an annotated version of Attachment 6 which identifies proprietary information in brackets along with the reason for claiming the information as proprietary. Change bars are also included in the right margin to help identify where the annotations were added.
Information provided in the Enclosures to this letter is summarized below:
Enclosure 1 provides an annotated version of Attachment 6, Criticality Safety Evaluation Report - (Proprietary).
Enclosure 2 contains the Affidavit of AREVA NP, Inc. (AREVA) for withholding proprietary information from public disclosure.
Enclosure 3 contains the Westinghouse Electric Company, LLC (Westinghouse) application for withholding proprietary information from public disclosure CAW 4510 and accompanying affidavit. (Westinghouse information only)
Enclosure 4 contains the Affidavit of Electric Power Research Institute, Inc. (EPRI) and AREVA for withholding proprietary information from public disclosure.
Enclosure 5 contains the Westinghouse Electric Company, LLC (Westinghouse) application for withholding proprietary information from public disclosure CAW l 4513 and accompanying affidavit. (~egarding information co-owned with EPRI) A VD rJfl~
Enclosure 1 contains information that is being withheld from public disclosure under 10 CFR 2.390. Upon separation from Enclosure 1, this letter is decontrolled.
Serial No. 16-383A Docket Nos.: 50-338/339 Page 2 of 4 The associated Affidavits for withholding proprietary information from public disclosure were included in the original license amendment submittal as Attachments 8 thru 11 and are included as Enclosures 2 through 5, respectively, as indicated above.
Since Enclosure 1 (the annotated version of Attachment 6) contains information proprietary to AREVA NP, Inc. (AREVA), Westinghouse, and EPRI, it is supported by affidavits signed by the owners of the information. The affidavits set forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR 2.390.
Accordingly, it is respectfully requested that the proprietary information be withheld from public disclosure in accordance with 10 CFR 2.390.
Should you have any questions in regard to this submittal, please contact Diane E. Aitken at (804) 273-2694.
Sincerely, Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mark D. Sartain, who is Vice President - Nuclear Engineering and Fleet Support of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this J 1+1, day of ~ \'-\ , 2017.
j My Commission Expires: a'-'Jvs-t" ~l J2 0 l 1.
Commitments made in this letter: None
Serial No. 16-383A Docket Nos.: 50-338/339 Page 3 of 4
Enclosures:
- 1. Annotated version of Attachment 6, Criticality Safety Evaluation Report -
(Proprietary).
- 2. Affidavit of AREVA NP, Inc.
- 3. Affidavit of Westinghouse Electric Company, LLC (Westinghouse information only)
- 4. Affidavit of Electric Power Research Institute, Inc. and AREVA
- 5. Affidavit of Westinghouse Electric Company, LLC (regarding information co-owned with EPRI)
Serial No. 16-383A Docket Nos.: 50-338/339 Page 4 of 4 cc: U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1257 State Health Commissioner Virginia Department of Health James Madison Building - 7th floor 109 Governor Street Suite 730 Richmond, VA 23219 Mr. James R. Hall NRC Senior Project Manager - North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Karen Cotton-Gross NRC Project Manager U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power Station Mr. J. E. Reasor, Jr.
Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.
Suite 300 Glen Allen, VA 23060